Proposed Submission Core Strategy

Ended on the 11 November 2011

(2) APPENDIX 3 - COMPONENTS OF HOUSING SUPPLY

Housing Requirements for Plan Period 2011 to 2028


Addendum - Attention is drawn to a revised Appendix 3 which corrects errors in some figures below relating to Rye and Rye Harbour and ‘total allocations required’.  However, these do not affect the ‘Total Housing Requirement 2011 – 2028’ for Rye and Rye Harbour or for the District as a whole.

Housing Requirements Number of dwellings
Bexhill* Hastings
Fringes
Battle Rye &
Rye
Harbour
Villages Total
Total Housing
Requirement
2011-2028
2,050-
2,2501
45-80 400-440 250-350 950-
1,000
3,700-
4,100

Total outstanding permissions

311

44

289

169

364

1,177

Current allocations (including reserve sites)

1,411

0

14

170

160

1,755

Total commitments (permissions and allocations)

1,722

44

303

3392

524

2,932

Estimated small site windfalls in years 10-153

75

1

15

16

118

225

Total permissions, allocations and windfalls

1,797

45

318

16

642

3,157

Total allocations required (existing and new)

1,664-1,864

0-35

96-136

170

468-518

2413-2798

Further allocations required - actual

253-453

0-35

82-122

02

308-358

543-943

Further allocations required - rounded

250-450

0-35

100

0

310-360

550-950

Total 2006-2026 implied by mid-point

2578

56

452

355

1317

4,758

Total 2011-2028 - required by mid-point

2,150

63

420

300

975

3,908

1 Delivery at Bexhill is heavily dependent upon confirmation of funding of the Link Road.
2 There is a degree of uncertainty regarding delivery of existing commitments at Rye, which accounts in part for lack of additional allocations.
3 Based on rate of small site windfalls at 50% of rate over period 2000-2010.
For instructions on how to use the system and make comments, please see our help guide.
back to top back to top