Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Part 5 – Appendices
Appendix 1: Council Motion on draft Policy LWL7 – Streets for All
At its meeting on 15th December 2025, Rother District Council carried the following motion in relation to 20mph speed limits:
1. This Council accepts that new developments are new communities. Evidence shows that a 20mph speed limit reduces the severity of accidents and encourages people to walk and cycle because they feel safe thus improving community and individual wellbeing.
2. Therefore, this Council will include an update on proposed Policy LWL7, which was consulted upon in 2024, within the Regulation 18 Consultation going out in January 2026. This will ensure that when giving consent to new developments, new roads will be designed in such a way that 20mph is the maximum speed at which it is possible to drive.
Proposed Policy LWL7 (Streets for All) was included in the Rother District Local Plan 2020-2040 Draft (Regulation 18) Version (April 2024). Policy LWL7 is a strategic policy within the Live Well Locally chapter of the draft Local Plan. It includes criteria relating to streets, which development proposals are expected to meet. The first of these criteria is relevant to the motion:
(A) All development proposals must meet the following criteria:
i) Design Speed of New Streets. New or improved streets designed (no centre line, horizontal deflection, narrow width) and signed for vehicles to travel at a max speed of 20mph.
During the Regulation 18 consultation in 2024, a number of comments on proposed Policy LWL7 were received from individuals and organisations, some of which raised points or queries which could influence the final text of the policy. For example, East Sussex County Council commented that signage may not always be required if design speeds are 20mph, as there should be sufficient speed-reducing visual character features to create a low-speed environment, such as trees, crossing points, prominent footways/cycleways and play areas.
To reflect these comments, we propose to amend the policy text as follows:
(A) All development proposals must meet the following criteria:
i) Design Speed of New Streets. New or improved streets shall be designed for vehicles to travel at a maximum speed of 20mph. Design features could include, but are not limited to, no centre line, horizontal deflection, narrow width, speed-reducing design features in the local environment. Signage should be used where appropriate.
Additionally, we propose to add the following supporting text to the policy, to reflect the representations, the Council motion and the National Design Guide:
In a well-designed place, all modes of transport are positively designed into the built form. They are integrated into public spaces with character that people enjoy using. People move around in attractive streets and other public spaces - parks, natural open spaces and green corridors. New developments are new communities. Evidence shows that a 20mph speed limit reduces the severity of accidents and encourages people to walk and cycle because they feel safe thus improving community and individual wellbeing. Speed-reducing visual character features such as trees, crossing points, prominent footways/cycleways and play areas can be effective in creating a low-speed environment, meaning that signage (which itself can create visual clutter) will not always be necessary, although this will be considered on a case-by-case basis.
The final version of proposed Policy LWL7 will be published at the next stage of the Local Plan process, “Regulation 19”.
66. Do you have any comments on the proposed changes to Policy LWL7 (A) (i) (Streets for All)? Comment
Appendix 2: Glossary
1066 Country Walk – the route commemorates 1066, the year of the Battle of Hastings, and seeks to link the places and the people of that important year. It runs through East Sussex from Pevensey to Rye, passing through Battle.
Accessibility – the ability of people to move around an area and reach places and facilities, including elderly and disabled people, those with young children and those encumbered with luggage or shopping.
Active Travel – the collective name for ‘walking, wheeling and cycling’ (see definition).
Affordable housing – housing for sale or rent, for those whose needs are not met by the market (including housing that provides a subsidised route to home ownership and/or is for essential local workers); and which complies with one or more of the following definitions:
a) Social Rent: meets all of the following conditions: (a) the rent is set in accordance with the Government’s rent policy for Social Rent; (b) the landlord is a registered provider; and (c) it includes provisions to remain at an affordable price for future eligible households, or for the subsidy to be recycled for alternative affordable housing provision.
b) Other affordable housing for rent: meets all of the following conditions: (a) the rent is set in accordance with the Government’s rent policy for Affordable Rent, or is at least 20% below local market rents (including service charges where applicable); (b) the landlord is a registered provider, except where it is included as part of a Build to Rent scheme (in which case the landlord need not be a registered provider); and (c) it includes provisions to remain at an affordable price for future eligible households, or for the subsidy to be recycled for alternative affordable housing provision. For Build to Rent schemes affordable housing for rent is expected to be the normal form of affordable housing provision (and, in this context, is known as Affordable Private Rent).
c) Discounted market sales housing: is that sold at a discount of at least 20% below local market value. Eligibility is determined with regard to local incomes and local house prices. Provisions should be in place to ensure housing remains at a discount for future eligible households.
d) Other affordable routes to home ownership: is housing provided for sale that provides a route to ownership for those who could not achieve home ownership through the market. It includes shared ownership, relevant equity loans, other low cost homes for sale (at a price equivalent to at least 20% below local market value) and rent to buy (which includes a period of intermediate rent). Where public grant funding is provided, there should be provisions for the homes to remain at an affordable price for future eligible households, or for any receipts to be recycled for alternative affordable housing provision, or refunded to Government or the relevant authority specified in the funding agreement.
See also Intermediate Affordable Housing.
Agricultural Diversification – A farm or forestry business broadening its business model to include economic activities other than agriculture, to provide a long-term sustainable income stream that supplements agricultural income and allows farming of the land to remain viable.
Ancient Woodland – an area that has been wooded continuously since at least 1600 AD. It includes ancient semi-natural woodland and plantations on ancient woodland sites (PAWS). Note “wooded continuously” doesn’t mean there’s been a continuous tree cover across the whole site. Not all trees in the woodland have to be old. Open space, both temporary and permanent, is an important component of ancient woodlands.
Ancient or Veteran Tree – a tree which, because of its age, size and condition, is of exceptional biodiversity, cultural or heritage value. All ancient trees are veteran trees. Not all veteran trees are old enough to be ancient but are old relative to other trees of the same species. Very few trees of any species reach the ancient life-stage.
Appropriate Assessment – Appropriate Assessment (AA) refers to stage 2 of the Habitat Regulations Assessment (HRA) process. It considers the impacts of a plan or project assessed against the conservation objectives of a European Site, in order to identify whether there are likely to be any adverse effects on site integrity and site features. The purpose of appropriate assessment of local plans is to ensure that protection of the integrity of European sites is a part of the planning process at a regional and local level.
Article 4 Direction – A direction made under Article 4 of the Town and Country Planning (General Permitted Development) (England) Order 2015 which withdraws permitted development rights granted by that Order.
Authority Monitoring Report (AMR) – produced by the local authority this will assess the impact of policies and whether targets are being met, and where necessary identify adjustments or revision to policies/proposals.
Biodiversity – the whole variety of life encompassing all genetic, species and ecosystem variations, including plants and animals.
Biodiversity Action Plan (BAP) – a strategy aimed at conserving and enhancing biological diversity, operational until 2012. UK BAP priority species and habitats have now been succeeded by Priority Habitats and Species as identified under Section 41 of the Natural Environment and Rural Communities (NERC) Act 2006.
Biodiversity Opportunity Area (BOA) – landscape-scale areas identified as having the greatest opportunities for habitat creation and restoration. Mapped through work carried out by the Sussex Biodiversity Record Centre.
Brownfield Land/Site – land which has previously been developed (see Previously Developed Land).
Brownfield Land Register – Registers of previously developed land that local planning authorities consider to be appropriate for residential development, having regard to criteria in the Town and Country Planning (Brownfield Land Registers) Regulations 2017. Local planning authorities will be able to trigger a grant of permission in principle for residential development on suitable sites in their registers where they follow the required procedures.
Building Regulations – regulations which are separate from the planning act, but which have to be adhered to in the construction of development.
Build to Rent – Purpose built housing that is typically 100% rented out. It can form part of a wider multi-tenure development comprising either flats or houses, but should be on the same site and/or contiguous with the main development. Schemes will usually offer longer tenancy agreements of three years or more, and will typically be professionally managed stock in single ownership and management control.
Campaign for Real Ale (CAMRA) – an independent voluntary consumer organisation which promotes real ale, real cider and the traditional British pub.
Campaign to Protect Rural England (CPRE) – a registered charity with over 60,000 members and supporters, formed in 1926 to limit urban sprawl and ribbon development.
Catchment Flood Management Plan (CFMP) – a Catchment Flood Management Plan is a strategic planning tool through which the Environment Agency will seek to work with other key decision-makers within a river catchment to identify and agree policies for sustainable flood risk management.
Combined Heat and Power – CHP plants incorporate both power and heat from a single heat source.
Commitments – the use of the term in this plan relates to all proposals for development which are the subject of a current full or outline planning permission.
Community Infrastructure Levy (CIL) – a levy allowing local authorities to raise funds from owners or developers of land undertaking new building projects in their area, as set out in regulations.
Community-led development – A development taken forward by, or with, a not-for-profit organisation, that is primarily for the purpose of meeting the needs of its members or the wider local community, rather than being a primarily commercial enterprise. The organisation should be created, managed and democratically controlled by its members, and membership of the organisation should be open to all beneficiaries and prospective beneficiaries of that organisation. It may take any one of various legal forms including a co-operative society, community benefit society and company limited by guarantee. The organisation should own, manage or steward the development in a manner consistent with its purpose, potentially through a mutually supported arrangement with a Registered Provider of Social Housing. The benefits of the development to the community should be clearly defined and consideration given to how those benefits can be protected over time, including in the event of the organisation being wound up.
Comparison Goods/Floorspace – comparison goods are items not obtained on a frequent basis. These include clothing, footwear, household and recreational goods.
Conservation Area – an area designated under the Town and Country Planning (Listed Building and Conservation Areas) Act 1990 on account of its special architectural or historic interest, the character and appearance of which it is intended to preserve and enhance.
Contaminated Land – land that has been polluted or harmed in some way making it unfit for safe development and usage unless cleaned.
Convenience Goods/Floorspace – convenience goods are everyday essential items, including food, drinks, newspapers/magazines and confectionery.
Core Strategy – sets out the long–term vision for the future of the area, the spatial objectives and strategic policies to deliver that vision. It forms Part 1 of the Council’s Local Plan for the District. It was adopted (approved) in September 2014.
Cumulative Impact – where there are a number of developments in a locality or a continuous activity over time that together may have an increased impact on the environment, local community or the local economy.
Department for the Environment Food and Rural Affairs (DEFRA) – the UK Government department tasked with issues such as the environment, rural development, the countryside, wildlife, animal welfare and sustainable development.
Development Boundary – A drawn boundary which represents the extent (or built-up area) of a town or village. They are used in policy to identify land within, adjacent or outside a settlement.
Development Plan – the statutory development plan is the starting point in the consideration of planning applications for the development or use of land. The development plan consists of local plans prepared by the District Council, with Minerals and Waste Local Plans prepared by the County Council, and Neighbourhood Plans prepared locally by Town or Parish Councils.
Edge of Centre – for retail purposes, a location that is well connected to, and up to 300 metres from, the primary shopping area. For all other main town centre uses, a location within 300 metres of a town centre boundary. For office development, this includes locations outside the town centre but within 500 metres of a public transport interchange. In determining whether a site falls within the definition of edge of centre, account should be taken of local circumstances.
Employment Land / floorspace – that which is in use for the following purposes – office, industrial and warehousing - falling within Use Class E(g), B2 or B8.
Environment Agency (EA) – an Executive Agency of DEFRA, this body is responsible for wide-ranging matters, including the management of water resources, surface water drainage, flooding and water quality.
Evidence Base – the information and data gathered by local authorities to justify the “soundness” of the policy approach set out in local planning documents, including physical, economic, and social characteristics of an area.
Floodplain – an area of land over which water flows in time of flood or would flow but for the presence of flood defences where they exist.
Flood Zone 1 (Low Probability) – this zone comprises land assessed as having a less than 1 in 1000 annual probability of river or sea flooding in any year (<0.1%).
Flood Zone 2 (Medium Probability) – this zone comprises land assessed as having between a 1 in 100 and 1 in 1000 annual probability of river flooding (1% – 0.1%) or between a 1 in 200 and 1 in 1000 annual probability of sea flooding (0.5% – 0.1%) in any year.
Flood Zone 3a (High Probability) – this zone comprises land assessed as having a 1 in 100 or greater annual probability of river flooding (>1%) or a 1 in 200 or greater annual probability of flooding from the sea (>0.5%) in any year.
Flood Zone 3b (Functional Floodplain) – this zone comprises land where water has to flow or be stored in times of flood (land which would flood with an annual probability of 1 in 30 (3.3%) or greater in any year or is designed to flood in an extreme (0.1%) flood).
Greenfield Land or Site – land (or a defined site) usually farmland, that has not previously been developed, also including allotments and residential gardens.
Gypsies and Travellers – Persons of nomadic habit of life whatever their race or origin, including such persons who on grounds only of their own or their family’s or dependants’ educational or health needs or old age have ceased to travel temporarily or permanently, and all other persons with a cultural tradition of nomadism or of living in a caravan, but excluding members of an organised group of travelling showpeople or circus people travelling together as such. (Defined in Annex 1 of the Planning Policy for Traveller Sites, December 2024).
Habitat – the natural living space of a plant or animal.
Habitat Regulations Assessment (HRA) – this describes the entire assessment process set out in the Habitats Directive and associated regulations. It includes an ‘appropriate assessment’. The Habitats Directive protects habitats and non-avian species of European importance and applies to Special Areas of Conservation (SACs) while the European Directive (79/409/EEC) on the Conservation of Wild Birds (Birds Directive), protects bird species of European importance and applies to Special Protection Areas (SPAs).
Habitats Site – Any site which would be included within the definition at regulation 8 of the Conservation of Habitats and Species Regulations 2017 for the purpose of those regulations, including candidate Special Areas of Conservation, Sites of Community Importance, Special Areas of Conservation, Special Protection Areas and any relevant Marine Sites.
House of Multiple Occupation (HMO) – as defined under section 254 of the Housing Act 2004 (as amended) as:
- a house which has been converted entirely into bedsits or other non-self-contained accommodation and which is let to three or more tenants who form two or more households and who share kitchen, bathroom or toilet facilities;
- a converted house which contains one or more flats which are not wholly self-contained (i.e. the flat does not contain within it a kitchen, bathroom and toilet) and which is occupied by three or more tenants who form two or more households.
Housing Association – a non-profit making, independent organisation that provides housing; generally they provide accommodation for people in housing need who are unable to afford to buy or rent housing on the open market.
Housing and Economic Development Needs Assessment (HEDNA) – a background evidence study that assesses the future development needs for different types of housing and employment uses through the Local Plan period.
Housing and Economic Land Availability Assessment (HELAA) – a background evidence study that examines the suitability, availability and achievability of potential new sites for housing and employment uses.
Index of Multiple Deprivation – a measure of relative deprivation across the UK based on income, employment, education, health, crime, and other factors.
Infill Development – development of a vacant site in a substantially developed frontage or area.
Infrastructure – the basic requirements for the satisfactory development of an area including such things as roads, footpaths, sewers, schools, open space and other community facilities.
Intermediate Affordable Housing for sale – a general term to describe Affordable Housing for sale, usually shared ownership.
Landscape Character Assessment – an assessment to identify different landscape areas which have a distinct character based on a recognisable pattern of elements, including combinations of geology, landform, soils, vegetation, land use and human settlement.
Landscape Sensitivity Assessment – an assessment of the resilience, or robustness, of a landscape to withstand specified change arising from development types or land management practices, without undue negative effects on the landscape and visual baseline and their value.
Listed Building – a nationally protected building of special architectural or historic interest as designated by Historic England on behalf of the Department for Digital, Culture, Media and Sport.
Local Area for Play (LAP) – a small area of open space for young children to play games such as tag, hopscotch, French cricket or play with outdoor toys. The activity zone should be reasonably flat, have a grass surface, and minimum area of 100sqm. There should be seating for carers and appropriate landscaping/buffer zones.
Local Equipped Area for Play (LEAP) – a play area equipped for children. The activity zone should have a minimum area of 400sqm, with grass playing space and at least five types of play equipment with appropriate safety surfacing. There should also be seating for accompanying adults.
Local Development Scheme (LDS) – a document setting out the programme for the preparation of the local planning policy documents. It sets out a 3-year programme and includes information on consultation dates.
Local Distinctiveness – the positive features of a locality that contributes to its special character and sense of place, distinguishing one local area from another.
Local Plan 2006 – Local Plan adopted by Rother District Council in 2006, some saved policies of which still form part of the development plan for the district.
Local Planning Authority – The public authority whose duty it is to carry out specific planning functions for a particular area. All references to local planning authority include the district council, London borough council, county council, Broads Authority, National Park Authority, the Mayor of London and a development corporation, to the extent appropriate to their responsibilities.
Local Wildlife Sites (LWS) – non-statutory sites that contain features of substantive nature conservation value. They are identified and selected locally. Formerly known as Sites of Nature Conservation Importance (SNCIs).
Low Energy Transformation Initiative (LETI) – established in 2017 to support the transition to net zero, originally in London. It is a voluntary network of over 1000 built environment professionals, working together to put the UK and the planet on the path to a zero-carbon future. They have created best practice model standards for organisations to adhere to.
Main Town Centre Uses – Retail development (including warehouse clubs and factory outlet centres); leisure, entertainment and more intensive sport and recreation uses (including cinemas, restaurants, drive-through restaurants, bars and pubs, nightclubs, casinos, health and fitness centres, indoor bowling centres and bingo halls); offices; and arts, culture and tourism development (including theatres, museums, galleries and concert halls, hotels and conference facilities).
Market Housing – private housing for rent or for sale, where the price is set in the open market.
Material Consideration – a matter that should be taken into account in deciding a planning application or on an appeal against a planning decision.
Mitigation Measures – measures which are put in place to reduce or eliminate any harm caused e.g. if building a house in an area of flood risk, the developer could build the house on stilted foundations to minimise the risk as a mitigation measure.
Mixed Use – development containing some mixture of commercial, retail and/or residential uses.
Multi-Use Games Area (MUGA) – an outdoor fenced area for various types of games, such as football, basketball or tennis.
National Highways – an executive agency of the Department of Transport responsible for operating, maintaining and improving the strategic road network of England.
National Landscapes – areas legally designated as areas of outstanding natural beauty under the National Parks and Access to the Countryside Act 1949 and Countryside and Rights of Way Act 2000. National Landscapes fall within the Protected Landscapes Duty as defined by Section 245 of the Levelling-up and Regeneration Act 2023 where relevant authorities must ‘seek to further’ the statutory purposes of Protected Landscapes.
National Nature Reserve (NNR) – NNRs contain examples of some of the most important natural and semi-natural terrestrial and coastal ecosystems in Great Britain. They are managed to conserve their habitats or to provide special opportunities for scientific study of the habitats, communities and species represented within them. NNRs are declared by the statutory country conservation agencies under the National Parks and Access to the Countryside Act 1949 and the Wildlife and Countryside Act 1981.
National Planning Policy Framework (NPPF) – the National Planning Policy Framework sets out the Government’s planning policies for England and how these are expected to be applied. It provides a framework within which locally-prepared plans for housing and other development can be produced.
Natural England – is a Non-Departmental Public Body of the UK Government. It was formed (vested) on 1 October 2006. It is responsible for ensuring that England’s natural environment, including its land, flora and fauna, freshwater and marine environments, geology and soils are protected and improved. It also has a responsibility to help people enjoy, understand and access the natural environment.
Natural England Green Infrastructure Framework –is a tool resulting from the Government’s 25 Year Environment Plan. It provides an England-wide evidence base to help local authorities and others target Green Infrastructure improvements where they are most needed.
Neighbourhood Plan – a plan prepared by a parish council or neighbourhood forum for a designated neighbourhood area. In law this is described as a neighbourhood development plan in the Planning and Compulsory Purchase Act 2004.
Older People – people over or approaching retirement age, including the active, newly-retired through to the very frail elderly; and whose housing needs can encompass accessible, adaptable general needs housing through to the full range of retirement and specialised housing for those with support or care needs.
Open Space, Sport and Recreation Study – the Study (2007) undertook an audit and assessment of open space across Rother district in accordance with national guidelines. The Study assessed open space, sport and recreational needs of people living, working and visiting Rother, produced local provision standards and identified areas of surplus and deficiency based on quantity quality and accessibility across the district.
Parish Council – a type of local authority found in England which is the lowest, or first, tier of local government. They are elected bodies and are responsible for areas known as civil parishes. They cover only part of England; corresponding to 40% of the population, but cover all of Rother, including Bexhill, Battle and Rye which are known as Town Councils. Parish and Town Councils can prepare Neighbourhood Plans.
Pevensey Levels Hydrological Catchment Area – An area that has particular drainage requirements, necessary to avoid surface water and water quality impacts on the designated Pevensey Levels Ramsar site (wetland of international importance). The Pevensey Levels is one of the largest and least-fragmented lowland wet grassland systems in south-east England.
Planning Obligation – a legal obligation under section 106 of the 1990 Town & Country Planning Act to mitigate the impacts of a development proposal, sometimes referred to as ‘developer contributions’ or ‘s106’. They are either in the form of a legal agreement between a planning authority and the persons with an interest in the land, or undertakings offered unilaterally by the landowner. Planning obligations run with the land, are legally binding and enforceable.
Planning Practice Guidance – planning guidance published by the Government to supplement the NPPF.
Previously Developed Land – land which has been lawfully developed and is or was occupied by a permanent structure and any fixed surface infrastructure associated with it, including the curtilage of the developed land (although it should not be assumed that the whole of the curtilage should be developed). It also includes land comprising large areas of fixed surface infrastructure such as large areas of hardstanding which have been lawfully developed. Previously developed land excludes: land that is or was last occupied by agricultural or forestry buildings; land that has been developed for minerals extraction or waste disposal by landfill, where provision for restoration has been made through development management procedures; land in built-up areas such as residential gardens, parks, recreation grounds and allotments; and land that was previously developed but where the remains of the permanent structure or fixed surface structure have blended into the landscape.
Priority Habitats and Species – also known as Habitats and Species of Principle Importance. Those habitats and species included in the England Biodiversity List published by the Secretary of State under Section 41 of the Natural Environment and Rural Communities (NERC) Act 2006. Replaces the previous Biodiversity Action Plan (BAP) designations.
Ramsar Site – wetlands of international importance, designated under the 1971 Ramsar Convention.
Renewable and Low Carbon Energy – includes energy for heating and cooling as well as generating electricity. Renewable energy covers those energy flows that occur naturally and repeatedly in the environment – from the wind, the fall of water, the movement of the oceans, from the sun and also from biomass and deep geothermal heat. Low carbon technologies are those that can help reduce emissions (compared to conventional use of fossil fuels).
Rural Exception Sites – small sites used for affordable housing in perpetuity where sites would not normally be used for housing. Rural exception sites seek to address the needs of the local community by accommodating households who are either current residents or have an existing family or employment connection. A proportion of market homes may be allowed on the site at the local planning authority’s discretion, for example where essential to enable the delivery of affordable units without grant funding.
Rural Diversification Scheme – development of non-agricultural or land-based operations located within an existing and active farm or land-based business to promote the viability of the existing business, while remaining ancillary and subordinate in scale.
Run-off – that part of precipitation, snow melt, or irrigation water that runs off the land into streams or other surface water. It can carry pollutants from the air and land into the receiving waters.
Self-build and custom-build housing – housing built by an individual, a group of individuals, or persons working with or for them, to be occupied by that individual. Such housing can be either market or affordable housing. A legal definition, for the purpose of applying the Self-build and Custom Housebuilding Act 2015 (as amended), is contained in section 1(A1) and (A2) of that Act.
Sequential Approach/Test – a planning principle that seeks to identify, allocate or develop certain types or locations of land before others. For example, brownfield sites before greenfield sites or town centre retail sites before out-of-centre sites, or areas at low risk of flooding before areas of medium and high risk of flooding.
Shoreline Management Plan (SMP) – a Shoreline Management Plan (SMP) provides a large-scale assessment of the risks associated with coastal evolution and presents a policy framework to address these risks to people and the developed, historic and natural environment in a sustainable manner. In doing so, an SMP is a high-level document that forms an important part of the Department for Environment, Food and Rural Affairs (Defra) strategy for flood and coastal defence.
Site of Special Scientific Interest (SSSI) – an area of special interest by reason of its flora, fauna, geological or physiographical features as identified by Natural England and designated under the Wildlife and Countryside Act 1981.
Soundness – a test of a Local Plan. Plans are sound if they are positively prepared; justified; effective; and consistent with national policy. The tests of soundness are set out in full in the NPPF.
Special Area of Conservation (SAC) – areas defined by regulation 3 of the Conservation of Habitats and Species Regulations 2017 which have been given special protection as important conservation sites. (Together with SPAs, SACs form a network of Habitats Sites.)
Special Protection Area (SPA) – areas classified under regulation 15 of the Conservation of Habitats and Species Regulations 2017 which have been identified as being of international importance for the breeding, feeding, wintering or migration of rare and vulnerable species of birds. (Together with SACs, SPAs form a network of Habitats Sites).
Supplementary Planning Documents (SPDs) – these can be produced to provide policy guidance to supplement the policies and proposals in Local Plans. However, they do not form part of the Development Plan although they must undergo a formal process of consultation.
Strategic Flood Risk Assessment (SFRA) – an assessment of the likelihood of flooding in a particular area so that development needs and mitigation measures can be carefully considered.
Strategic Gap – area of largely open land between settlements, which helps to maintain the separate identity and amenity of settlements and prevent them merging together. The boundaries are defined in the Local Plan.
Submission – the final stage in preparation of Plans, whereby they are submitted to the Secretary of State for an Independent Examination.
Sustainability Appraisal (SA)/Strategic Environmental Assessment (SEA) – local Planning Authorities are required to assess the environmental and sustainability impact of policies and proposals in Local Plans and Supplementary Planning Documents. This is a tool for appraising policies to ensure that they reflect sustainable development objectives, i.e. social environmental and economic factors.
Sustainable Access and Recreation Management Strategy (SARMS) – a joint approach between Rother and Folkestone and Hythe District Councils which seeks to ensure that any increases in access and recreational usage of land within or adjacent to the Dungeness Complex of Habitats Sites does not adversely impact on the integrity of the sites.
Sustainable Communities – places where people want to live and work, now and in the future. They meet the diverse needs of existing and future residents, are sensitive to their environment, and contribute to a high quality of life. They are safe and inclusive, well planned, built and run, and offer equality of opportunity and good services for all.
Sustainable Development – development that meets the needs of the present without compromising the ability of future generations to meet their own needs; ensures a better quality of life for everyone now and for generations to come.
Sustainable Drainage Systems (SuDS) – a sustainable drainage system controls surface water run off close to where it falls, combining a mixture of built and nature-based techniques to mimic natural drainage as closely as possible, and accounting for the predicted impacts of climate change. The type of system that would be appropriate will vary from small scale interventions such as permeable paving and soakaways that can be used in very small developments to larger integrated schemes in major developments
Sustainable Transport Modes – any efficient, safe and accessible means of transport with overall low impact on the environment, including walking and cycling, low and ultra low emission vehicles, car sharing and public transport.
Town Council – in England, town councils are civil parish councils, where the civil parish has declared itself to be a town. Civil parishes are the most local level of elected governance, under the district, unitary or county level. There are three in Rother district covering Battle, Bexhill and Rye. Town Councils can prepare Neighbourhood Plans.
Transport Assessment – Transport Assessments are thorough assessments of the transport implications of development. Transport Assessments may propose mitigation measure in relation to any adverse implications of a development, which may also inform the preparation of a Travel Plan.
Travel Plan – a document most commonly produced by/for a large employer which tends to generate a large number of journeys by car. The plans include measures to reduce car dependency and facilitate transport choice, by encouraging more sustainable alternatives to car use.
Travelling Showpeople – Members of a group organised for the purposes of holding fairs, circuses or shows (whether or not travelling together as such). This includes such persons who on the grounds of their own or their family’s or dependants’ more localised pattern of trading, educational or health needs or old age have ceased to travel temporarily or permanently, but excludes Gypsies and Travellers as defined in the national Planning Policy for Traveller Sites, December 2024.
Tree Preservation Order (TPO) – an Order made by a planning authority specifying trees which may not be lopped, topped or felled without consent, except where they become dead, dying or dangerous, when replacements may be required.
Vitality and Viability – in terms of retailing, vitality is the capacity of a centre to grow or to develop its level of commercial activity. Viability is the capacity of a centre to achieve the commercial success necessary to sustain the existence of the centre.
Walking, Wheeling and Cycling – a wide range of mobilities which are defined as “active travel”. “Wheeling” is an equivalent alternative to foot/pedestrian-based mobility and includes wheeled mobilities such as wheelchairs, mobility scooters and rollators. The term is used together with “walking” as both represent the action of moving at a pedestrian’s pace.
Appendix 3: Development Strategy options and preferred approaches
The following table provides a high-level summary of the options considered and assessed for the Development Strategy, including those taken forward for the ‘preferred approach’. This includes options considered during the preparation of the first Regulation 18 consultation on the draft Rother Local Plan (2024), as well as this second Regulation 18 consultation on the Draft Rother Local Plan - Development Strategy and Site Allocations (2026). The associated Sustainability Appraisal Reports should be referred to for further information on the assessment of these options including the ‘preferred approach’ for the Development Strategy.
|
Spatial Development Option (SDO) |
Description |
Focus Areas for Growth in Settlements/Areas of Built Form |
Taken forward ‘preferred approach’ for Regulation 18 Draft Local Plan (April 2024) |
Taken forward ‘preferred approach’ for Regulation 18 Draft Local Plan (January 2026) |
|
SDO1: Village Clusters |
A cluster of villages that are connected with each other to form a sustainable community. Two clusters identified centred around Rye and Battle as key transport and service hubs. |
Rye Cluster – Rye, Camber, Northiam, Playden, Iden, Rye Harbour, Winchelsea, Winchelsea Beach, Peasmarsh, Broad Oak, Beckley, Northiam, Broad Oak/Brede, Udimore Battle Cluster – Battle, Crowhurst, Sedlescombe, Catsfield, Catsfield Stream, Whatlington, Mountfield, John’s Cross, Netherfield. |
Yes |
Yes |
|
SDO2: Radial settlement network connected to Bexhill and Hastings |
A radial network of smaller settlements connected to the facilities and services of Bexhill and Hastings to create sustainable communities. |
Bexhill network: Crowhurst, Catsfield, Lunsford Cross, Normans Bay, Hastings network: Hastings fringes (Rock Lane and Austen Way, Chowns Hill and Ivyhouse Lane, Westfield Lane, Bachelors Bump, Friars Hill, Woodlands Way and Parkwood Road), Sedlescombe, Westfield, Guestling Green, Icklesham, Three Oaks, Pett and Fairlight |
Yes |
Yes |
|
SDO3A: Bexhill Greenfield Growth Option 1 –within the existing road network |
Development on the edges of North and West Bexhill that creates new compact, connected communities, or additions to Sidley or Little Common, accessed by the existing transport network. |
North and West Bexhill. The quantum of development that would be acceptable would be tested through landscape, sustainability and transport assessment. A Bexhill-wide place-making strategy would be required to successfully integrate new development. |
Yes |
Yes |
|
SDO3B: Bexhill Greenfield Growth Option 2 –with new multi modal transport corridor |
A higher level of growth in North and West Bexhill through new sustainable communities that are masterplanned, accessed and served by a new multi-modal transport corridor between the A259 and the A2691 (Haven Brook Avenue). Opportunity to remove through traffic and potentially reallocate road space in Bexhill for shared and active transport. |
North and West Bexhill, with the development of new sustainable communities which links to and provides greater accessibility to community facilities and services in the wider Bexhill area. Mixed use development with a potential range of residential development from 1,500-5,000 dwellings |
No |
No |
|
SDO4: Sustainable Settlement Growth |
Prioritise new development on the edge of sustainable settlements, providing major development and extending settlement boundaries where appropriate |
On the edge of settlements that score highest with regards to sustainability in the Settlement Study: Bexhill, Rye, Battle, Robertsbridge, Ticehurst, Northiam and then smaller growth for other settlements. |
Yes |
Yes |
|
SDO5: Hastings Fringes Urban Growth |
Development on the edge of Hastings in sustainable locations, which may provide opportunity for joint delivery of sites by Hastings BC and Rother DC |
On sites around Hastings Fringes, accessed from The Ridge, Queensway, Hastings Road, Stonestile Lane, Ivyhouse Lane,Rock Lane, and Rye Road. |
Yes |
Yes |
|
SDO6: Brownfield development |
Development within the existing areas of built form, focusing on brownfield development at higher densities |
Larger settlements, but principle applies to all settlements, but with different scales and opportunities |
Yes |
Yes |
|
SDO7: New rural settlement(s) |
Opportunity for (a) standalone settlement(s), with the provision of facilities and services to ensure sustainability |
No specific locations have been identified, but in principle this would include around 1,000-2,000 dwellings in a new settlement. |
No |
No |
|
SDO8: Proportional growth across the District (by population) |
Proportional distribution of development based on the current population of each settlement. |
50% of development in and around Bexhill, with proportionate growth in Rye and Battle and the larger villages of Robertsbridge, Northiam, Ticehurst, Westfield and Burwash for example. |
No |
No |
|
SDO9: Proportional growth by settlement form and function |
Proportional distribution of development based on the order of the settlement in the network of settlements (service centre or hierarchy approach which does not take account of constraints) |
Bexhill, Rye and Battle, and then lower order settlements as identified in the Settlement Study. |
No |
No |
|
SDO10: A21 Corridor growth, with focus on creation of a sustainable transport corridor |
Development along the A21 within an identified corridor of settlements, with opportunities for growth. Opportunities for sustainable travel through enhanced bus services and cycle track along this corridor. |
The following settlement areas south to north: Hastings Fringes/The Ridge, Kent Street, Sedlescombe/Blackbrooks/Marley Lane, Whatlington, Vinehall Street, Johns Cross/Mountfield, Robertsbridge/Salehurst, Silverhill, Hurst Green, Swiftsden, and Flimwell. |
Yes |
No See revised option SDO13. |
|
SDO11: Growth in settlements with train stations |
Development around train stations in settlements served by them[1]. |
Bexhill (Cooden Beach, Collington and Central), Normans Bay, Crowhurst, Battle, Robertsbridge, Etchingham, Stonegate, Three Oaks, Rye |
Yes[2] |
Yes |
|
SDO12: Outside the AONB |
Development only outside the High Weald AONB, which would result in a coastal development strategy including Bexhill and Rye |
Bexhill and its edges, Normans Bay, Catsfield (southern section), some areas of Hastings Fringes/Westfield Lane, Rye, Rye Harbour, Playden, Winchlesea Beach and East Guldeford |
No |
No |
|
SDO13 – A21 corridor growth, focussed within and around existing larger settlements. |
Development along the A21 road corridor, focussed within and around existing settlements, where there is a reasonable level of local services. |
The following settlement areas Robertsbridge/Salehurst, Hurst Green, and Flimwell. |
N/A This is a new, refined option considered following the first Regulation 18 consultation. See option SDO10. |
Yes |
|
SDO14 – Development within the strategic gaps |
Significant new development within identified strategic gaps, with new or improved linkages to the nearest settlements. |
The strategic gaps identified through the adopted Development and Site Allocations Local Plan (2019):
|
N/A This is a new option considered following the first Regulation 18 consultation. |
No |
[1] This does not include places where the station is not in the settlement - i.e. Winchelsea, Stonegate and Doleham
[2] This option was progressed as a preferred approach at the first Regulation 18 stage, but was not accurately signposted in the Local Plan due to an editorial error.
Appendix 4: List of Proposed Policies within the Draft (Regulation 18) Local Plan: Development Strategy and Site Allocations (January 2026)
|
Policy Reference |
Site Address |
Parish |
Site Identification |
|
BX1 |
Bexhill Urban Area (area-based policy) |
Bexhill |
New policy |
|
BX2 |
Bexhill Cultural Area (area-based policy) |
Bexhill |
Existing DaSA policy |
|
BX3 |
London Road- Sackville Road Enhancement Area (area-based policy) |
Bexhill |
Existing DaSA policy |
|
BX4 |
Beeching Road Enhancement Area (area-based policy) |
Bexhill |
New policy |
|
BX5 |
Land south-east of Beeching Road |
Bexhill |
Existing site allocation (DaSA) but for alternative use (supermarket) |
|
BX6 |
Land adjacent to Bexhill Town Hall |
Bexhill |
New site identified through HELAA |
|
BX7 |
Sainsburys Site, 1 Buckhurst Place |
Bexhill |
New site identified through HELAA |
|
BX8 |
Former Bexhill High School Site |
Bexhill |
Existing DaSA allocation (amended) |
|
BX9 |
Land south of Terminus Road |
Bexhill |
Existing DaSA allocation (extended) |
|
BX10 |
30 Dorset Road |
Bexhill |
Planning permission |
|
BX11 |
Rear of 11 Endwell Road |
Bexhill |
Planning permission |
|
BX12 |
2a Sackville Road |
Bexhill |
Previous planning permission |
|
BX13 |
Eversley Road Car Park, Eversley Road |
Bexhill |
New site identified through HELAA |
|
BX14 |
Land west of Fryatts Way |
Bexhill |
Planning permission |
|
BX15 |
Land north of Broadoak Lane |
Bexhill |
New site identified through HELAA |
|
BX16 |
Land west of Pages Lane |
Bexhill |
New site identified through HELAA |
|
BX17 |
81 Cooden Drive |
Bexhill |
Planning permission |
|
BX18 |
West Bexhill Growth Area -Infrastructure Policy (area-based policy) |
Bexhill |
Existing DaSA policy |
|
BX19 |
Gorses Car Park and Open Space, The Gorses |
Bexhill |
New site identified through HELAA |
|
BX20 |
Land off Spindlewood Drive |
Bexhill |
Planning permission/ existing DaSA allocation |
|
BX21 |
Land north of Barnhorn Manor Caravan Park |
Bexhill |
New site identified through HELAA |
|
BX22 |
Land south of Barnhorn Road |
Bexhill |
New site identified through HELAA |
|
BX23 |
Land north of Rosewood Park |
Bexhill |
Planning permission |
|
BX24 |
Land east of Sandhurst Lane |
Bexhill |
New site identified through HELAA |
|
BX25 |
Land at Barnhorn Green |
Bexhill |
Planning permission |
|
BX26 |
Land south of Sandhurst Lane |
Bexhill |
New site identified through HELAA |
|
BX27 |
Beeches Farm and land north of Barnhorn Road |
Bexhill |
New site identified through HELAA |
|
BX28 |
Land at Northeye and adjoining land |
Bexhill |
Existing DaSA allocation plus adjoining land |
|
BX29 |
North Bexhill Growth Area -Infrastructure Policy (area-based policy) |
Bexhill |
New policy |
|
BX30 |
Land south of Haven Brook Avenue – Infrastructure (area-based policy) |
Bexhill |
Existing DaSA policy |
|
BX31 |
Land at Kiteye Farm |
Bexhill |
Existing DaSA allocation plus adjoining land |
|
BX32 |
Land west of Watermill Lane (south) |
Bexhill |
Existing DaSA allocation |
|
BX33 |
Land west of Watermill Lane |
Bexhill |
Planning permission |
|
BX34 |
Land east of Watermill Lane |
Bexhill |
Existing DaSA allocation plus adjoining land |
|
BX35 |
Land at Levetts Wood and Oaktree Farm |
Bexhill |
Existing DaSA allocation |
|
BX36 |
Land north of Haven Brook Avenue (east) |
Bexhill |
New site identified through HELAA |
|
BX37 |
Land north of Haven Brook Avenue (west) |
Bexhill |
New site identified through HELAA |
|
BX38 |
Land west of Ninfield Road roundabout |
Bexhill |
New site identified through HELAA |
|
BX39 |
Land west of Ninfield Road |
Bexhill |
New site identified through HELAA |
|
BX40 |
Land at Freezeland Farm, Freezeland Lane |
Bexhill |
Planning permission |
|
BX41 |
Former Sidley Sports Ground |
Bexhill |
Existing site allocation (DaSA) but for alternative use (sports pitches) |
|
BX42 |
Land adjacent to 276 Turkey Road |
Bexhill |
Existing DaSA allocation |
|
BX43 |
Cemetery Lodge, 250 Turkey Road |
Bexhill |
Planning permission |
|
BX44 |
Our Lady of the Rosary Church, Southlands Road |
Bexhill |
Planning permission |
|
BX45 |
Land at Worsham Farm (East) |
Bexhill |
Planning permission |
|
BX46 |
Land at Worsham Farm (West) |
Bexhill |
Previous planning permission |
|
BX47 |
Plot 7, Bexhill Enterprise Park, Mount View Street |
Bexhill |
Previous planning permission and Local Plan (2006) allocation |
|
BX48 |
Bexhill Enterprise Park - Escarpment Site B, south of Glovers End |
Bexhill |
Extant planning permission plus adjoining land |
|
BX49 |
Land west of Bexhill Innovation Park, Glovers End |
Bexhill |
Previous planning permissions |
|
BX50 |
Land at Sidley Car Park, Ninfield Road |
Bexhill |
New site identified through HELAA |
|
CR1 |
Land at Station Road and Forewood Lane, Crowhurst |
Crowhurst |
Extant Neighbourhood Plan allocation plus adjoining land |
|
CR2 |
Land south of Forewood Rise, Crowhurst |
Crowhurst |
Extant Neighbourhood Plan allocation |
|
CR3 |
Land adjacent to Station Car Park, Crowhurst |
Crowhurst |
Extant Neighbourhood Plan allocation |
|
FA1 |
Land east of Waites Lane, Fairlight Cove |
Fairlight |
Existing DaSA allocation |
|
GU1 |
Land north of A265, Ivyhouse Lane, Hastings |
Guestling |
Existing DaSA allocation |
|
GU2 |
Brackendale, Rock Lane, Hastings |
Guestling |
New site identified through HELAA |
|
GU3 |
Rock Lane Urban Fringe Management Area (area-based policy) |
Guestling |
Existing DaSA policy |
|
GU4 |
Wild Meadows, Chapel Lane, Guestling Green |
Guestling |
New site identified through HELAA |
|
GU5 |
Former Guestling Highways Depot, Guestling Green |
Guestling |
New site identified through HELAA |
|
GU6 |
Field at Halfhouse, Butchers Lane, Three Oaks |
Guestling |
New site identified through HELAA |
|
IK1 |
Land adjacent to Little Sherwood Industry Park, Icklesham |
Icklesham |
New site identified through HELAA |
|
IK2 |
Land adjacent to Orchard Close, Icklesham |
Icklesham |
New site identified through HELAA |
|
WS1 |
Land at Michael Tyler Furniture, Woodlands Way, Hastings |
Westfield |
Existing DaSA allocation |
|
WS2 |
Land east of Beaney’s Lane, Hastings |
Westfield |
New site identified through HELAA |
|
WS3 |
Land at Moor Farm, Westfield |
Westfield |
Existing DaSA allocation and new site identified through HELAA |
|
WS4 |
Land on east side of Cottage Lane, Westfield |
Westfield |
Planning permission |
|
WS5 |
Freshfields Farm, Westfield Lane, Westfield |
Westfield |
New site identified through HELAA |
|
BT1 |
Land south of Hastings Road, Battle |
Battle |
New site identified through the HELAA (including small NP allocation) |
|
BT2 |
Land at Breadsell, Battle |
Battle |
New site identified through HELAA |
|
BT3 |
Beech Farm, Battle |
Battle |
Planning permission |
|
BT4 |
Land at Caldbec House, Battle |
Battle |
Extant Neighbourhood Plan allocation |
|
BT5 |
Rutherfords Business Park, Marley Lane, Battle |
Battle |
Previous Local Plan (2006) allocation |
|
BT6 |
Land at Sunny Rise, North Trade Road, Battle |
Battle |
Previous Local Plan (2006) allocation |
|
BT7 |
Land at Almonry Farm, Battle |
Battle |
New site identified through HELAA |
|
BT8 |
Land adjacent to 1 Loose Farm Cottages, Battle |
Battle |
New site identified through HELAA |
|
BT9 |
Land east of Coronation Gardens, Battle |
Battle |
New site identified through HELAA |
|
BT10 |
Land adjoining Little Brans, Battle |
Battle |
New site identified through HELAA |
|
BT11 |
Battle Market Square, Battle |
Battle |
New site identified through HELAA |
|
BRI1 |
Coldharbour Farm Estate, Coldharbour Lane, Brightling |
Brightling |
Planning permission |
|
CT1 |
Land west of B2204, Catsfield |
Catsfield |
Existing DaSA allocation |
|
CT2 |
Land south of Wilton House Equestrian Centre, Catsfield |
Catsfield |
New site identified through HELAA |
|
CT3 |
Land south of Church Road, Catsfield |
Catsfield |
New site identified through HELAA |
|
NE1 |
Swallow Barn, Netherfield |
Battle |
Extant Neighbourhood Plan allocation |
|
NE2 |
White House Poultry Farm, Netherfield |
Battle |
Planning permission/ NP allocation |
|
SD1 |
Land at Sunningdale, Sedlescombe |
Sedlescombe |
Extant Neighbourhood Plan allocation |
|
SD2 |
Land at Church Hill Farm, North of Village Hall, Sedlescombe |
Sedlescombe |
Extant Neighbourhood Plan allocation |
|
SD3 |
Land at Sedlescombe Sawmills, Sedlescombe |
Sedlescombe |
Extant Neighbourhood Plan allocation |
|
SD4 |
Land adjacent to St John the Baptist Church, Sedlescombe |
Sedlescombe |
Extant Neighbourhood Plan allocation |
|
SD5 |
Land at Gate Cottage, Sedlescombe |
Sedlescombe |
Extant Neighbourhood Plan allocation |
|
SD6 |
Land at Church Hill Farm, Sedlescombe |
Sedlescombe |
Extant Neighbourhood Plan allocation |
|
SD7 |
Street Farm, Sedlescombe |
Sedlescombe |
Planning permission |
|
SD8 |
Marley Lane Business Park, Sedlescombe |
Sedlescombe |
Previous planning permission |
|
SD9 |
Land at Felon's Field, Sedlescombe |
Sedlescombe |
Existing DaSA allocation |
|
SD10 |
Land north of Gorselands, Sedlescombe |
Sedlescombe |
New site identified through HELAA |
|
SD11 |
Land north of Brede Lane, Sedlescombe |
Sedlescombe |
New site identified through HELAA |
|
BC1 |
Land South and West of Buddens Green, Beckley Four Oaks |
Beckley |
Existing DaSA allocation and new site identified through HELAA |
|
BC2 |
Land East of Hobbs Lane, Beckley Four Oaks |
Beckley |
Existing DaSA allocation |
|
BC3 |
Land west of Oaklea Cottages, Beckley Four Oaks |
Beckley |
New site identified through HELAA |
|
BR1 |
Land west of A28, Northiam Rd, Brede |
Brede |
Existing DaSA allocation (reduced site area) |
|
BR2 |
Land west of Tillingham View |
Brede |
New site identified through HELAA |
|
BR3 |
Land at Broad Oak Lodge, Chitcombe Road |
Brede |
New site identified through HELAA |
|
CM1 |
Land at the Former Putting Green Site, Old Lydd Road, Camber |
Camber |
Existing DaSA allocation |
|
CM2 |
Land at the Central Car Park, Old Lydd Road, Camber |
Camber |
Existing DaSA allocation |
|
CM3 |
Lydd Road Garage, Lydd Road, Camber |
Camber |
Former planning permission |
|
RH1 |
Land at Stoneworks Cottages, Rye Harbour |
Icklesham |
Existing DaSA allocation |
|
RH2 |
Employment Land, Harbour Road, Rye Harbour |
Icklesham |
Existing DaSA allocation |
|
ID1 |
Land south of Elmsmead, Iden |
Iden |
Planning permission |
|
ID2 |
Land at Street Field, Main Street, Iden |
Iden |
New site identified through HELAA |
|
NR1 |
Land south of Northiam Church of England Primary School, Northiam |
Northiam |
Existing DaSA allocation (increased density) |
|
NR2 |
Egmont Farm, Northiam |
Northiam |
New site identified through HELAA |
|
PE1 |
Land south of Main Street, Peasmarsh |
Peasmarsh |
New HELAA site/ planning application |
|
PE2 |
Land rear of Pippins, Main Street, Peasmarsh |
Peasmarsh |
Planning permission |
|
PE3 |
Tanyard, Main Street, Peasmarsh |
Peasmarsh |
New site identified through HELAA |
|
PE4 |
Land east of Orchard Way |
Peasmarsh |
Extant Neighbourhood Plan allocation |
|
PE5 |
Malthouse Business Park |
Peasmarsh |
New site identified through HELAA |
|
PL1 |
Land South of Poppyfields and Corner House |
Playden |
New site identified through HELAA |
|
PL2 |
Land between Saltcote and The Steps |
Playden |
New site identified through HELAA |
|
RY1 |
Rye |
Extant Neighbourhood Plan allocation |
|
|
RY2 |
Rye |
Extant Neighbourhood Plan allocation |
|
|
RY3 |
Rye |
Extant Neighbourhood Plan allocation |
|
|
RY4 |
Rye Creative Centre |
Rye |
Extant Neighbourhood Plan allocation |
|
RY5 |
Rye |
Extant Neighbourhood Plan allocation |
|
|
RY6 |
Council Depot, Cyprus Place |
Rye |
New site identified through HELAA |
|
RY7 |
Rye Boatyard |
Rye |
Previous planning permission |
|
RY8 |
Rye |
Planning permission |
|
|
RY9 |
Former Lower School Site, Ferry Road |
Rye |
Previous planning permission/ extant Neighbourhood Plan allocation |
|
BW1 |
Land north of Shrub Lane, Burwash |
Burwash |
Previous planning application |
|
BW2 |
Land at 101 Shrub Lane, Burwash |
Burwash |
New site identified through HELAA |
|
BW3 |
Land east of Shrub Lane (north), Burwash |
Burwash |
New site identified through HELAA |
|
BW4 |
Land east of Shrub Lane (south), Burwash |
Burwash |
New site identified through HELAA |
|
BWC1 |
Land south of Heathfield Road, Burwash Common |
Burwash |
New site identified through HELAA |
|
BWC2 |
Old Orchard Nursery, Heathfield Road, Burwash Common |
Burwash |
New site identified through HELAA |
|
EC1 |
Land at Oxenbridge Lane, Etchingham |
Etchingham |
New site identified through HELAA |
|
EC2 |
Land at Church Lane, Etchingham |
Etchingham |
New site identified through HELAA |
|
EC3 |
Croft Field, Etchingham |
Etchingham |
New site identified through HELAA |
|
HG1 |
Land south of Iridge Place, London Road, Hurst Green |
Hurst Green |
Planning permission |
|
HG2 |
Land South of Lodge Farm, Hurst Green |
Hurst Green |
Planning permission |
|
HG3 |
Land to Rear of The Olde Bakery, London Rd, Hurst Green |
Hurst Green |
New site identified through HELAA |
|
HG4 |
Land at The Lodge, London Road, Hurst Green |
Hurst Green |
New site identified through HELAA |
|
RB1 |
Land south of Heathfield Gardens, Robertsbridge |
Salehurst & Robertsbridge |
Extant Neighbourhood Plan allocation plus adjoining land |
|
RB2 |
Grove Farm, Robertsbridge |
Salehurst & Robertsbridge |
Planning permission |
|
RB3 |
Land at Grove Farm (Phase 2), Robertsbridge |
Salehurst & Robertsbridge |
New site identified through HELAA |
|
RB4 |
Vicarage Land, Land south of the western end of Fair Lane, Robertsbridge |
Salehurst & Robertsbridge |
Extant Neighbourhood Plan allocation |
|
RB5 |
Culverwells, Land north of Station Road, Robertsbridge |
Salehurst & Robertsbridge |
Planning permission |
|
RB6a |
Hodson's Mill, Northbridge Street, Robertsbridge |
Salehurst & Robertsbridge |
Extant Neighbourhood Plan allocation/ previous planning permission |
|
RB6b |
Openfield, north of Northbridge Street, Robertsbridge (extension to Mill site) |
Salehurst & Robertsbridge |
New site identified through HELAA |
|
SC1 |
Land east of Stockwood Meadow, Northiam Road, Staplecross |
Ewhurst |
New site identified through HELAA |
|
SC2 |
Land east of Hop Gardens, Northiam Road, Staplecross |
Ewhurst |
New site identified through HELAA |
|
FW1 |
Land rear of Fruitfields, High Street, Flimwell |
Ticehurst |
New site identified through HELAA |
|
FW2 |
Hawkhurst Road, Flimwell |
Ticehurst |
New site identified through HELAA |
|
FW3 |
Cedar Farm, London Road |
Ticehurst |
New site identified through HELAA |
|
TC1 |
Land at Steellands Farm, Field Rise, Ticehurst |
Ticehurst |
New site identified through HELAA |
|
TC2 |
Orchard Farm, Ticehurst Village |
Ticehurst |
Extant Neighbourhood Plan allocation |
|
TC3 |
Bewl Water (area-based policy) |
Ticehurst |
New policy |
|
SG1 |
Land at Lymden Lane, Stonegate |
Ticehurst |
New site identified through HELAA |
|
SG2 |
Land east of Bardown Road, Stonegate |
Ticehurst |
New site identified through HELAA |
|
GYP1 |
Land adjacent to High Views, Loose Farm Lane, Battle |
Battle |
Existing DaSA allocation |
|
GYP2 |
Land south of Hastings Road, Battle |
Battle |
New site identified through Call for Sites |
|
GYP3 |
Land on the east side of Kingwood Hill, Cackle Street, Brede |
Brede |
Temporary planning permission |
|
GYP4 |
Land adjacent to Fir Tree Cottage, Netherfield Hill, Battle |
Battle |
Temporary planning permission |
|
GYP5 |
Land south of Redlands Lane, Salehurst |
Salehurst & Robertsbridge |
New site identified through Call for Sites |
|
GYP6 |
Land adjacent to Valentine Ridge, A2100, Mountfield |
Mountfield |
New site identified through Call for Sites |
67. Do you have any comments on the Appendices? Comment
68. Do you have any comments on the Interim Sustainability Appraisal in support of the Regulation 18 stage consultation on the Development Strategy and Site Allocations (January 2026)? Comment
69. Are there any other issues, options or other matters you would like to raise? Comment