Showing comments and forms 1 to 30 of 41

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24693

Received: 23/05/2024

Respondent: Miss Julia Dance

Representation Summary:

I admire and endorse the Council's vision

Full text:

I admire and endorse the Council's vision

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24727

Received: 31/05/2024

Respondent: Sedlescombe Parish Council

Representation Summary:

The ambitious vision is supported along with the aim to future proof the work. In the context of challenging times, meaning constraints on budgets and funding, the statutory and VCSE sectors required to deliver these ambitions are under pressure. There should be a recognition of this in the aims.

Will the infrastructure be in place to support?

Full text:

Please see attached comments on draft Local Plan, including Brede Valley Landscape Assessment and East Sussex Landscape Assessment.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24728

Received: 31/05/2024

Respondent: Sedlescombe Parish Council

Representation Summary:

“village clusters” -Fairly aspirational- no mention of supporting shops/ services/ additional school places + “public transport” doesn’t show increased development

Full text:

Please see attached comments on draft Local Plan, including Brede Valley Landscape Assessment and East Sussex Landscape Assessment.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24729

Received: 31/05/2024

Respondent: Sedlescombe Parish Council

Representation Summary:

Asking for all developments to be net zero is laudable but may be an issue as part L building regulations do not require this. Is it possible to have policies which are in conflict or go beyond building regulations?

Full text:

Please see attached comments on draft Local Plan, including Brede Valley Landscape Assessment and East Sussex Landscape Assessment.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24730

Received: 31/05/2024

Respondent: Sedlescombe Parish Council

Representation Summary:

Missing is access to rail travel with better integration between road/bus and rail services. The assumption seems to be (3rd paragraph on page 19) that we are talking about travel within the district, and train travel is explicitly excluded. Travel within the district should be enhanced but coordinated better, especially train travel, to areas further afield. Links to Eastbourne, Brighton, London and Ashford (potentially then also for re-instated Eurostar service to the Continent) are all relevant here.

Full text:

Please see attached comments on draft Local Plan, including Brede Valley Landscape Assessment and East Sussex Landscape Assessment.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24823

Received: 06/06/2024

Respondent: Mr Simon Moody

Representation Summary:

RDC seem to be focusing on the extremities of the Borough. If neighbouring boroughs do the same then it is likely there will be concentrations of highly developed areas across boundaries.
This impacts on the entire infrastructure..... Policing, fire service, ambulance service, traffic volumes across trunk roads, and local roads. This side from the obvious like health, schooling, crime prevention etc.
The published shed policy does not extend to all areas of the borough. Furthermore the policy fails to incorporate the impact of neighbouring boroughs adopting the same policy e.g
Keep it out of our primary centres and let the extremities handle it. So if Wealden and Rother sanction building 50 new homes on the border...... We will end up with a new sink estate.
Roads and road closures are an obvious issue that your colleagues were unable to adequately address.....roads around the A21 corridor cannot cope as it is.

Full text:

RDC seem to be focusing on the extremities of the Borough. If neighbouring boroughs do the same then it is likely there will be concentrations of highly developed areas across boundaries.
This impacts on the entire infrastructure..... Policing, fire service, ambulance service, traffic volumes across trunk roads, and local roads. This side from the obvious like health, schooling, crime prevention etc.
The published shed policy does not extend to all areas of the borough. Furthermore the policy fails to incorporate the impact of neighbouring boroughs adopting the same policy e.g
Keep it out of our primary centres and let the extremities handle it. So if Wealden and Rother sanction building 50 new homes on the border...... We will end up with a new sink estate.
Roads and road closures are an obvious issue that your colleagues were unable to adequately address.....roads around the A21 corridor cannot cope as it is.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24878

Received: 20/06/2024

Respondent: Mrs Anna Wilson-Patterson

Representation Summary:

The vision feels unachievable. Officers avoid dialogue residents, who consequently have little trust in RDC’s integrity and competence. How will an infrastructure baseline be established? For example “Sensitive, sustainable and well-designed development that meets local housing and employment needs will be complemented by the timely delivery of supporting infrastructure.” RDC should revisit past developments that fall short of this criteria. In Fairlight Cove we’ve lost amenity for 2 years caused by a poor quality, cramped, steep development of 16 houses. Residents dispute it’s built to the planning consent. Storm overflows cover the lane with sewage, before the 16 new houses are even connected.

Full text:

Q1.

Sadly the vision feels unachievable. Rother Officers avoid dialogue or face to face contact with some residents, who as a result have little trust in RDC’s integrity and competence. Disillusion with poor quality planning includes perceptions of cronyism and corruption. How will an infrastructure baseline be established? For example “Sensitive, sustainable and well-designed development that meets local housing and employment needs will be complemented by the timely delivery of supporting infrastructure.” RDC should revisit past developments that fall short of this criteria, where community complaints have been high. In Fairlight Cove we’ve lost amenity for 2 years caused by a poor quality, cramped, steep development of 16 houses. Residents dispute it’s built to the planning consent approved on appeal by the Planning Inspectorate. Storm overflows cover the lane with sewage, before the 16 new houses are even connected. A resident survey describes the gridlock of parked vehicles on our bus route, obstructing junctions and folk struggling to get on/off their driveways. Over decades there appears to have been no imaginative attempts to meet village overflow parking needs. For example removing wide grass verges to create parking spaces. We can’t see strategic joint working by RDC with our Parish Council. Our precept has increased by 40% in the past few years without extensive consultation and Parish Councillors spend our tax on their high running costs, meetings and social projects for retired people that duplicate existing locally funded voluntary sector provision by professional staff. Accountability and evaluation systems are lacking for Parish Councils to maintain infrastructure. Parts of Fairlight are lanes with high numbers of walkers, no pavements or footpaths, very few seats and signage clutter. A baseline study would show village assets in poor repair, with an increase in vehicle movements. Parking and speeding are increasing problems. Results from the 2023 Parish Council Residents Survey are not in the public domain. In relation to ‘Quality of Life’ residents regularly state a priority is public toilets. The decision by RDC to not cover the cost of public toilets at our local beach and in Rye indicates how removed you are from meeting basic expectations and needs of your residents, visitors to our area and local businesses.

Q2.

‘Conserving and enhancing the significant landscape and environmental quality across the district’ It would help if RDC insisted on professional quality Construction Management Plans or contractors signed up to the ‘Considerate Contractor’ Scheme. Also if RDC Enforcement Officers were resourced and supported to penalise construction sites in the same way they penalise residents or local builders, especially for radios, drug use and aggressive behaviours on site. Planting Management Plans and TPO’s are ignored, trees and hedgerows are cut, with no apparent penalties. Residents are encouraged to provide free labour to report alleged breaches of planning consent, but then Developers break the rules with impunity. The perception is that Rother Officers are too close to Developers, whilst being unwilling to meet with residents. There appears to be no monitoring of what the CIL funds are spent on in parishes in relation to the exisiting Local Plan and no minimum standard of “community consultation”.

Q3.

‘By supporting strong, safe and sustainable communities’ In Fairlight Cove there is a minimal bus service, which unfortunately can be disrupted at very short notice by road closures. Leaving school children or people without mobile phones disorientated and abandoned. Plus there is poor access to travel around our village for people with disabilities. There appears to be no baseline of how many village roads are difficult to use for disabled people, due to issues such as rough surfaces/moonscapes, pavement parking, cracked pavements or speeding traffic. New charges for car parks across RDC and HBC means people now drive into Fairlight Cove to park for free and some camp overnight outside residents homes. HBC is commonly perceived online as having corrupt working practices in relation to planning and development sites.

Q5.

SO 9 feels very important, but unless there are new initiatives in villages, there appears to be no resources to make this happen. It is difficult to get a face to face appointment at Hill Surgery, Hastings, few people can get through to reception. For people on low incomes, without a computer or mobile phone it is especially hard.

Q.27

There seems to be an opt out clause on Density. There seems little point in having policies, if you then create ways for property developers not to meet them.

Q.33

LWL3 Facilities at bus stops and iii Coastal Access This would be very important if it could be implemented.

LWL5

We welcome these policies in terms of height and steep sites, for example if a village is predominantly small low dwellings, very tall buildings stand out. For example at the entrance to Fairlight Cove and in the “transition” of the new Market Garden Site to the south.

LWL6

We welcome these policies in terms of height and steep sites, for example if a village is predominantly small low dwellings, very tall buildings stand out. For example at the entrance to Fairlight Cove and in the “transition” of the new Market Garden Site to the south.

Q45.

Streets For All. We welcome the shared streets policy especially “street furniture, good signage and way finding that is accessible to all to encourage walking and prioritise vulnerable users.” It would be beneficial to identify who currently lives in a ‘street’ or a ‘road’ and whether 4.62 SUDS and 4.64 could be implemented across the District. If RDC had clear design standards and guidelines, this would help Parish Councils who may not have access to professional expertise in planning. Community pride and cohesion is undermined by dirty and deteriorating infrastructure, Pett Level Road, Pett Level Toilets, Highways Pavement repairs, Southern Water sewage etc

Q.48

RDC needs to work with Parish Councils to create Parking Strategies for villages where parked vehicles now dominate the public realm, block footways, crossing points and sight lines.

Paragraph 5.16

Quiet Lanes and Slow Ways should be introduced on the 1066 walk and popular coastal footpaths as a priority.
This is a key issue for Fairlight enabling all generations to stay in rural communities for their lifetime and a source of frustration that new homes have not addressed the housing needs of local residents.

Q.54

The notion of “Hastings Fringes” feels unclear and ‘sensitive growth’ lacks a number, clarification would help.

Q.59

We object to the notion that a minimum of 35 dwellings in Fairlight is “sensitive” growth, we assume the site is East Field. This has been contested so many times over the years and the Field continues to flood, the sewage continues to overflow on Lower Waites Lane and Stream Lane. The increased traffic puts enormous pressure on village lanes which are in a poor state of repair. Pett Level Road is unpassable during the evening time due to the size of the pot holes. Access to a Post Office, Doctors Surgery and Dentists is limited.

Q.72

“Including the undeveloped coast, also has high intrinsic amenity value and is an important resource for nature conservation, leisure and tourism.” This would be more convincing if Pett Level Road were usable as a road, the moonscapes by the road side could be used for parking and the public toilets were open throughout the year.

Q.82

DEV3 The development boundary concept sounds confusing. If Fairlight Cove has a development boundary in the Local Plan surely the boundary of Waites lane is facing the ‘countryside’. Therefore an allocation of East Field for 35 houses would not meet the policy?

Q.90

DEV6 The Strategic Green Gap between Fairlight and Hastings is warmly welcomed, as are all the Gaps in the Plan. There are regular incidents where large vehicles e.g two buses/lorries etc get wedged along the narrow lanes travelling east along Fairlight Road which is claustrophobic and parked vehicles dominate. The areas open character feels essential to demarcate the start of the countryside.

Q.101

HWB5 Green and Blue Infrastructure
There is no minimum length for new development to be built away from a water course. In the case of the Market Garden Site in Fairlight, three new builds are on the banks of the stream and the earth has subsided as a result.

Q.102

A minimum precise measurement length should be insisted upon for all new developments near a water course. There is also no clear mention in Construction Management Plans for Site workers not to litter or pollute a water course. Also to store construction materials such as water proof insulation, glass etc a few metres from the edge so as they don’t fall into the water course.

Q.123

HOU5 Rural Exception Sites
This feels like another ‘get out’ clause. There is no clarity as to what RDC mean by “meaningful community engagement” If RDC has any examples of how this had worked in practice that would be helpful. Otherwise it could be removed.

Q.129

HOU8 Access to Standards Paragraph 8.72 This feels like another ‘get out’ clause

Paragraph 8.137

ESCC parking guidance is an under estimate, for the number of people who actually use a garage. The number of cars owned per household in rural areas and the fact that most dwellings have visitors and delivery vehicles. The car parking spaces are mean on new build developments, causing parked vehicles to over flow onto rural lanes and bus routes.

Q.144

”… private rear garden spaces of at least 10 metres in length will normally be required, other than in exceptional circumstances where this cannot be achieved in an otherwise acceptable development” We strongly object to the wording and opt outs within this Policy. At the Market Garden Site in Fairlight residents allege the 10 metre gardens have not been created. Allowing flexibility on the 10 metre rule makes a mockery of it being a Policy. This allows for Developers to erect cramped buildings on irregular and sloped sites. This is very disappointing. Similarly the policy can be avoided if “future occupiers of the dwellings will have a lesser requirement for amenity space” How can this be proven if properties are sold on the open market, another loophole for allowing dwellings with low amenity. It leaves little room for outdoor washing lines which have an environmental impact if clothes is dried indoors. Also the capacity for play equipment, to plant veg/fruit trees, store bicycles/canoes etc. We object to 8.136.

Q.146

The Policy is inappropriately flexible. Getting away with squashing the tiniest housing units onto a plot seems to be the game for a few Developers and RDC are encouraging it with this type of policy.

Q.166

Like most of our responses our comments relate to balancing new developments with maintaining infrastructure or improving strategic working with ESCC or Parish Councils. If the majority of visits are day trips then the issue of parking, overflow parking and public toilets remain very high on the list of problems to be addressed, which currently fail to meet customer expectations. The poor state of ESCC roads is a major factor in putting off visitors.

Q.180

LAN1 This is very important, especially to the undeveloped coast.

Page 356 (ix) The failure of RDC to stop Developers clearing trees and hedges is depressing.

Q.191

ENV 4 Fairlight Cove Coastal Change Management Area is important to support the work of the Fairlight Preservation Trust.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24879

Received: 20/06/2024

Respondent: Mrs Anna Wilson-Patterson

Representation Summary:

In Fairlight Cove we’ve lost amenity for 2 years caused by a poor quality, cramped, steep development of 16 houses. A resident survey describes the gridlock of parked vehicles on our bus route, obstructing junctions and folk struggling to get on/off their driveways. Over decades there appears to have been no imaginative attempts to meet village overflow parking needs. For example removing wide grass verges to create parking spaces. We can’t see strategic joint working by RDC with our Parish Council.

Full text:

Q1.

Sadly the vision feels unachievable. Rother Officers avoid dialogue or face to face contact with some residents, who as a result have little trust in RDC’s integrity and competence. Disillusion with poor quality planning includes perceptions of cronyism and corruption. How will an infrastructure baseline be established? For example “Sensitive, sustainable and well-designed development that meets local housing and employment needs will be complemented by the timely delivery of supporting infrastructure.” RDC should revisit past developments that fall short of this criteria, where community complaints have been high. In Fairlight Cove we’ve lost amenity for 2 years caused by a poor quality, cramped, steep development of 16 houses. Residents dispute it’s built to the planning consent approved on appeal by the Planning Inspectorate. Storm overflows cover the lane with sewage, before the 16 new houses are even connected. A resident survey describes the gridlock of parked vehicles on our bus route, obstructing junctions and folk struggling to get on/off their driveways. Over decades there appears to have been no imaginative attempts to meet village overflow parking needs. For example removing wide grass verges to create parking spaces. We can’t see strategic joint working by RDC with our Parish Council. Our precept has increased by 40% in the past few years without extensive consultation and Parish Councillors spend our tax on their high running costs, meetings and social projects for retired people that duplicate existing locally funded voluntary sector provision by professional staff. Accountability and evaluation systems are lacking for Parish Councils to maintain infrastructure. Parts of Fairlight are lanes with high numbers of walkers, no pavements or footpaths, very few seats and signage clutter. A baseline study would show village assets in poor repair, with an increase in vehicle movements. Parking and speeding are increasing problems. Results from the 2023 Parish Council Residents Survey are not in the public domain. In relation to ‘Quality of Life’ residents regularly state a priority is public toilets. The decision by RDC to not cover the cost of public toilets at our local beach and in Rye indicates how removed you are from meeting basic expectations and needs of your residents, visitors to our area and local businesses.

Q2.

‘Conserving and enhancing the significant landscape and environmental quality across the district’ It would help if RDC insisted on professional quality Construction Management Plans or contractors signed up to the ‘Considerate Contractor’ Scheme. Also if RDC Enforcement Officers were resourced and supported to penalise construction sites in the same way they penalise residents or local builders, especially for radios, drug use and aggressive behaviours on site. Planting Management Plans and TPO’s are ignored, trees and hedgerows are cut, with no apparent penalties. Residents are encouraged to provide free labour to report alleged breaches of planning consent, but then Developers break the rules with impunity. The perception is that Rother Officers are too close to Developers, whilst being unwilling to meet with residents. There appears to be no monitoring of what the CIL funds are spent on in parishes in relation to the exisiting Local Plan and no minimum standard of “community consultation”.

Q3.

‘By supporting strong, safe and sustainable communities’ In Fairlight Cove there is a minimal bus service, which unfortunately can be disrupted at very short notice by road closures. Leaving school children or people without mobile phones disorientated and abandoned. Plus there is poor access to travel around our village for people with disabilities. There appears to be no baseline of how many village roads are difficult to use for disabled people, due to issues such as rough surfaces/moonscapes, pavement parking, cracked pavements or speeding traffic. New charges for car parks across RDC and HBC means people now drive into Fairlight Cove to park for free and some camp overnight outside residents homes. HBC is commonly perceived online as having corrupt working practices in relation to planning and development sites.

Q5.

SO 9 feels very important, but unless there are new initiatives in villages, there appears to be no resources to make this happen. It is difficult to get a face to face appointment at Hill Surgery, Hastings, few people can get through to reception. For people on low incomes, without a computer or mobile phone it is especially hard.

Q.27

There seems to be an opt out clause on Density. There seems little point in having policies, if you then create ways for property developers not to meet them.

Q.33

LWL3 Facilities at bus stops and iii Coastal Access This would be very important if it could be implemented.

LWL5

We welcome these policies in terms of height and steep sites, for example if a village is predominantly small low dwellings, very tall buildings stand out. For example at the entrance to Fairlight Cove and in the “transition” of the new Market Garden Site to the south.

LWL6

We welcome these policies in terms of height and steep sites, for example if a village is predominantly small low dwellings, very tall buildings stand out. For example at the entrance to Fairlight Cove and in the “transition” of the new Market Garden Site to the south.

Q45.

Streets For All. We welcome the shared streets policy especially “street furniture, good signage and way finding that is accessible to all to encourage walking and prioritise vulnerable users.” It would be beneficial to identify who currently lives in a ‘street’ or a ‘road’ and whether 4.62 SUDS and 4.64 could be implemented across the District. If RDC had clear design standards and guidelines, this would help Parish Councils who may not have access to professional expertise in planning. Community pride and cohesion is undermined by dirty and deteriorating infrastructure, Pett Level Road, Pett Level Toilets, Highways Pavement repairs, Southern Water sewage etc

Q.48

RDC needs to work with Parish Councils to create Parking Strategies for villages where parked vehicles now dominate the public realm, block footways, crossing points and sight lines.

Paragraph 5.16

Quiet Lanes and Slow Ways should be introduced on the 1066 walk and popular coastal footpaths as a priority.
This is a key issue for Fairlight enabling all generations to stay in rural communities for their lifetime and a source of frustration that new homes have not addressed the housing needs of local residents.

Q.54

The notion of “Hastings Fringes” feels unclear and ‘sensitive growth’ lacks a number, clarification would help.

Q.59

We object to the notion that a minimum of 35 dwellings in Fairlight is “sensitive” growth, we assume the site is East Field. This has been contested so many times over the years and the Field continues to flood, the sewage continues to overflow on Lower Waites Lane and Stream Lane. The increased traffic puts enormous pressure on village lanes which are in a poor state of repair. Pett Level Road is unpassable during the evening time due to the size of the pot holes. Access to a Post Office, Doctors Surgery and Dentists is limited.

Q.72

“Including the undeveloped coast, also has high intrinsic amenity value and is an important resource for nature conservation, leisure and tourism.” This would be more convincing if Pett Level Road were usable as a road, the moonscapes by the road side could be used for parking and the public toilets were open throughout the year.

Q.82

DEV3 The development boundary concept sounds confusing. If Fairlight Cove has a development boundary in the Local Plan surely the boundary of Waites lane is facing the ‘countryside’. Therefore an allocation of East Field for 35 houses would not meet the policy?

Q.90

DEV6 The Strategic Green Gap between Fairlight and Hastings is warmly welcomed, as are all the Gaps in the Plan. There are regular incidents where large vehicles e.g two buses/lorries etc get wedged along the narrow lanes travelling east along Fairlight Road which is claustrophobic and parked vehicles dominate. The areas open character feels essential to demarcate the start of the countryside.

Q.101

HWB5 Green and Blue Infrastructure
There is no minimum length for new development to be built away from a water course. In the case of the Market Garden Site in Fairlight, three new builds are on the banks of the stream and the earth has subsided as a result.

Q.102

A minimum precise measurement length should be insisted upon for all new developments near a water course. There is also no clear mention in Construction Management Plans for Site workers not to litter or pollute a water course. Also to store construction materials such as water proof insulation, glass etc a few metres from the edge so as they don’t fall into the water course.

Q.123

HOU5 Rural Exception Sites
This feels like another ‘get out’ clause. There is no clarity as to what RDC mean by “meaningful community engagement” If RDC has any examples of how this had worked in practice that would be helpful. Otherwise it could be removed.

Q.129

HOU8 Access to Standards Paragraph 8.72 This feels like another ‘get out’ clause

Paragraph 8.137

ESCC parking guidance is an under estimate, for the number of people who actually use a garage. The number of cars owned per household in rural areas and the fact that most dwellings have visitors and delivery vehicles. The car parking spaces are mean on new build developments, causing parked vehicles to over flow onto rural lanes and bus routes.

Q.144

”… private rear garden spaces of at least 10 metres in length will normally be required, other than in exceptional circumstances where this cannot be achieved in an otherwise acceptable development” We strongly object to the wording and opt outs within this Policy. At the Market Garden Site in Fairlight residents allege the 10 metre gardens have not been created. Allowing flexibility on the 10 metre rule makes a mockery of it being a Policy. This allows for Developers to erect cramped buildings on irregular and sloped sites. This is very disappointing. Similarly the policy can be avoided if “future occupiers of the dwellings will have a lesser requirement for amenity space” How can this be proven if properties are sold on the open market, another loophole for allowing dwellings with low amenity. It leaves little room for outdoor washing lines which have an environmental impact if clothes is dried indoors. Also the capacity for play equipment, to plant veg/fruit trees, store bicycles/canoes etc. We object to 8.136.

Q.146

The Policy is inappropriately flexible. Getting away with squashing the tiniest housing units onto a plot seems to be the game for a few Developers and RDC are encouraging it with this type of policy.

Q.166

Like most of our responses our comments relate to balancing new developments with maintaining infrastructure or improving strategic working with ESCC or Parish Councils. If the majority of visits are day trips then the issue of parking, overflow parking and public toilets remain very high on the list of problems to be addressed, which currently fail to meet customer expectations. The poor state of ESCC roads is a major factor in putting off visitors.

Q.180

LAN1 This is very important, especially to the undeveloped coast.

Page 356 (ix) The failure of RDC to stop Developers clearing trees and hedges is depressing.

Q.191

ENV 4 Fairlight Cove Coastal Change Management Area is important to support the work of the Fairlight Preservation Trust.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24880

Received: 20/06/2024

Respondent: Mrs Anna Wilson-Patterson

Representation Summary:

Our precept has increased by 40% in the past few years without extensive consultation and Parish Councillors spend our tax on their high running costs, meetings and social projects for retired people that duplicate existing locally funded voluntary sector provision by professional staff. Accountability and evaluation systems are lacking for Parish Councils to maintain infrastructure. Parts of Fairlight are lanes with high numbers of walkers, no pavements or footpaths, very few seats and signage clutter.

Full text:

Q1.

Sadly the vision feels unachievable. Rother Officers avoid dialogue or face to face contact with some residents, who as a result have little trust in RDC’s integrity and competence. Disillusion with poor quality planning includes perceptions of cronyism and corruption. How will an infrastructure baseline be established? For example “Sensitive, sustainable and well-designed development that meets local housing and employment needs will be complemented by the timely delivery of supporting infrastructure.” RDC should revisit past developments that fall short of this criteria, where community complaints have been high. In Fairlight Cove we’ve lost amenity for 2 years caused by a poor quality, cramped, steep development of 16 houses. Residents dispute it’s built to the planning consent approved on appeal by the Planning Inspectorate. Storm overflows cover the lane with sewage, before the 16 new houses are even connected. A resident survey describes the gridlock of parked vehicles on our bus route, obstructing junctions and folk struggling to get on/off their driveways. Over decades there appears to have been no imaginative attempts to meet village overflow parking needs. For example removing wide grass verges to create parking spaces. We can’t see strategic joint working by RDC with our Parish Council. Our precept has increased by 40% in the past few years without extensive consultation and Parish Councillors spend our tax on their high running costs, meetings and social projects for retired people that duplicate existing locally funded voluntary sector provision by professional staff. Accountability and evaluation systems are lacking for Parish Councils to maintain infrastructure. Parts of Fairlight are lanes with high numbers of walkers, no pavements or footpaths, very few seats and signage clutter. A baseline study would show village assets in poor repair, with an increase in vehicle movements. Parking and speeding are increasing problems. Results from the 2023 Parish Council Residents Survey are not in the public domain. In relation to ‘Quality of Life’ residents regularly state a priority is public toilets. The decision by RDC to not cover the cost of public toilets at our local beach and in Rye indicates how removed you are from meeting basic expectations and needs of your residents, visitors to our area and local businesses.

Q2.

‘Conserving and enhancing the significant landscape and environmental quality across the district’ It would help if RDC insisted on professional quality Construction Management Plans or contractors signed up to the ‘Considerate Contractor’ Scheme. Also if RDC Enforcement Officers were resourced and supported to penalise construction sites in the same way they penalise residents or local builders, especially for radios, drug use and aggressive behaviours on site. Planting Management Plans and TPO’s are ignored, trees and hedgerows are cut, with no apparent penalties. Residents are encouraged to provide free labour to report alleged breaches of planning consent, but then Developers break the rules with impunity. The perception is that Rother Officers are too close to Developers, whilst being unwilling to meet with residents. There appears to be no monitoring of what the CIL funds are spent on in parishes in relation to the exisiting Local Plan and no minimum standard of “community consultation”.

Q3.

‘By supporting strong, safe and sustainable communities’ In Fairlight Cove there is a minimal bus service, which unfortunately can be disrupted at very short notice by road closures. Leaving school children or people without mobile phones disorientated and abandoned. Plus there is poor access to travel around our village for people with disabilities. There appears to be no baseline of how many village roads are difficult to use for disabled people, due to issues such as rough surfaces/moonscapes, pavement parking, cracked pavements or speeding traffic. New charges for car parks across RDC and HBC means people now drive into Fairlight Cove to park for free and some camp overnight outside residents homes. HBC is commonly perceived online as having corrupt working practices in relation to planning and development sites.

Q5.

SO 9 feels very important, but unless there are new initiatives in villages, there appears to be no resources to make this happen. It is difficult to get a face to face appointment at Hill Surgery, Hastings, few people can get through to reception. For people on low incomes, without a computer or mobile phone it is especially hard.

Q.27

There seems to be an opt out clause on Density. There seems little point in having policies, if you then create ways for property developers not to meet them.

Q.33

LWL3 Facilities at bus stops and iii Coastal Access This would be very important if it could be implemented.

LWL5

We welcome these policies in terms of height and steep sites, for example if a village is predominantly small low dwellings, very tall buildings stand out. For example at the entrance to Fairlight Cove and in the “transition” of the new Market Garden Site to the south.

LWL6

We welcome these policies in terms of height and steep sites, for example if a village is predominantly small low dwellings, very tall buildings stand out. For example at the entrance to Fairlight Cove and in the “transition” of the new Market Garden Site to the south.

Q45.

Streets For All. We welcome the shared streets policy especially “street furniture, good signage and way finding that is accessible to all to encourage walking and prioritise vulnerable users.” It would be beneficial to identify who currently lives in a ‘street’ or a ‘road’ and whether 4.62 SUDS and 4.64 could be implemented across the District. If RDC had clear design standards and guidelines, this would help Parish Councils who may not have access to professional expertise in planning. Community pride and cohesion is undermined by dirty and deteriorating infrastructure, Pett Level Road, Pett Level Toilets, Highways Pavement repairs, Southern Water sewage etc

Q.48

RDC needs to work with Parish Councils to create Parking Strategies for villages where parked vehicles now dominate the public realm, block footways, crossing points and sight lines.

Paragraph 5.16

Quiet Lanes and Slow Ways should be introduced on the 1066 walk and popular coastal footpaths as a priority.
This is a key issue for Fairlight enabling all generations to stay in rural communities for their lifetime and a source of frustration that new homes have not addressed the housing needs of local residents.

Q.54

The notion of “Hastings Fringes” feels unclear and ‘sensitive growth’ lacks a number, clarification would help.

Q.59

We object to the notion that a minimum of 35 dwellings in Fairlight is “sensitive” growth, we assume the site is East Field. This has been contested so many times over the years and the Field continues to flood, the sewage continues to overflow on Lower Waites Lane and Stream Lane. The increased traffic puts enormous pressure on village lanes which are in a poor state of repair. Pett Level Road is unpassable during the evening time due to the size of the pot holes. Access to a Post Office, Doctors Surgery and Dentists is limited.

Q.72

“Including the undeveloped coast, also has high intrinsic amenity value and is an important resource for nature conservation, leisure and tourism.” This would be more convincing if Pett Level Road were usable as a road, the moonscapes by the road side could be used for parking and the public toilets were open throughout the year.

Q.82

DEV3 The development boundary concept sounds confusing. If Fairlight Cove has a development boundary in the Local Plan surely the boundary of Waites lane is facing the ‘countryside’. Therefore an allocation of East Field for 35 houses would not meet the policy?

Q.90

DEV6 The Strategic Green Gap between Fairlight and Hastings is warmly welcomed, as are all the Gaps in the Plan. There are regular incidents where large vehicles e.g two buses/lorries etc get wedged along the narrow lanes travelling east along Fairlight Road which is claustrophobic and parked vehicles dominate. The areas open character feels essential to demarcate the start of the countryside.

Q.101

HWB5 Green and Blue Infrastructure
There is no minimum length for new development to be built away from a water course. In the case of the Market Garden Site in Fairlight, three new builds are on the banks of the stream and the earth has subsided as a result.

Q.102

A minimum precise measurement length should be insisted upon for all new developments near a water course. There is also no clear mention in Construction Management Plans for Site workers not to litter or pollute a water course. Also to store construction materials such as water proof insulation, glass etc a few metres from the edge so as they don’t fall into the water course.

Q.123

HOU5 Rural Exception Sites
This feels like another ‘get out’ clause. There is no clarity as to what RDC mean by “meaningful community engagement” If RDC has any examples of how this had worked in practice that would be helpful. Otherwise it could be removed.

Q.129

HOU8 Access to Standards Paragraph 8.72 This feels like another ‘get out’ clause

Paragraph 8.137

ESCC parking guidance is an under estimate, for the number of people who actually use a garage. The number of cars owned per household in rural areas and the fact that most dwellings have visitors and delivery vehicles. The car parking spaces are mean on new build developments, causing parked vehicles to over flow onto rural lanes and bus routes.

Q.144

”… private rear garden spaces of at least 10 metres in length will normally be required, other than in exceptional circumstances where this cannot be achieved in an otherwise acceptable development” We strongly object to the wording and opt outs within this Policy. At the Market Garden Site in Fairlight residents allege the 10 metre gardens have not been created. Allowing flexibility on the 10 metre rule makes a mockery of it being a Policy. This allows for Developers to erect cramped buildings on irregular and sloped sites. This is very disappointing. Similarly the policy can be avoided if “future occupiers of the dwellings will have a lesser requirement for amenity space” How can this be proven if properties are sold on the open market, another loophole for allowing dwellings with low amenity. It leaves little room for outdoor washing lines which have an environmental impact if clothes is dried indoors. Also the capacity for play equipment, to plant veg/fruit trees, store bicycles/canoes etc. We object to 8.136.

Q.146

The Policy is inappropriately flexible. Getting away with squashing the tiniest housing units onto a plot seems to be the game for a few Developers and RDC are encouraging it with this type of policy.

Q.166

Like most of our responses our comments relate to balancing new developments with maintaining infrastructure or improving strategic working with ESCC or Parish Councils. If the majority of visits are day trips then the issue of parking, overflow parking and public toilets remain very high on the list of problems to be addressed, which currently fail to meet customer expectations. The poor state of ESCC roads is a major factor in putting off visitors.

Q.180

LAN1 This is very important, especially to the undeveloped coast.

Page 356 (ix) The failure of RDC to stop Developers clearing trees and hedges is depressing.

Q.191

ENV 4 Fairlight Cove Coastal Change Management Area is important to support the work of the Fairlight Preservation Trust.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24881

Received: 20/06/2024

Respondent: Mrs Anna Wilson-Patterson

Representation Summary:

How will an infrastructure baseline be established? A baseline study would show village assets in poor repair, with an increase in vehicle movements. Parking and speeding are increasing problems. Results from the 2023 Parish Council Residents Survey are not in the public domain. In relation to ‘Quality of Life’ residents regularly state a priority is public toilets. The decision by RDC to not cover the cost of public toilets at our local beach and in Rye indicates how removed you are from meeting basic expectations and needs of your residents, visitors to our area and local businesses.

Full text:

Q1.

Sadly the vision feels unachievable. Rother Officers avoid dialogue or face to face contact with some residents, who as a result have little trust in RDC’s integrity and competence. Disillusion with poor quality planning includes perceptions of cronyism and corruption. How will an infrastructure baseline be established? For example “Sensitive, sustainable and well-designed development that meets local housing and employment needs will be complemented by the timely delivery of supporting infrastructure.” RDC should revisit past developments that fall short of this criteria, where community complaints have been high. In Fairlight Cove we’ve lost amenity for 2 years caused by a poor quality, cramped, steep development of 16 houses. Residents dispute it’s built to the planning consent approved on appeal by the Planning Inspectorate. Storm overflows cover the lane with sewage, before the 16 new houses are even connected. A resident survey describes the gridlock of parked vehicles on our bus route, obstructing junctions and folk struggling to get on/off their driveways. Over decades there appears to have been no imaginative attempts to meet village overflow parking needs. For example removing wide grass verges to create parking spaces. We can’t see strategic joint working by RDC with our Parish Council. Our precept has increased by 40% in the past few years without extensive consultation and Parish Councillors spend our tax on their high running costs, meetings and social projects for retired people that duplicate existing locally funded voluntary sector provision by professional staff. Accountability and evaluation systems are lacking for Parish Councils to maintain infrastructure. Parts of Fairlight are lanes with high numbers of walkers, no pavements or footpaths, very few seats and signage clutter. A baseline study would show village assets in poor repair, with an increase in vehicle movements. Parking and speeding are increasing problems. Results from the 2023 Parish Council Residents Survey are not in the public domain. In relation to ‘Quality of Life’ residents regularly state a priority is public toilets. The decision by RDC to not cover the cost of public toilets at our local beach and in Rye indicates how removed you are from meeting basic expectations and needs of your residents, visitors to our area and local businesses.

Q2.

‘Conserving and enhancing the significant landscape and environmental quality across the district’ It would help if RDC insisted on professional quality Construction Management Plans or contractors signed up to the ‘Considerate Contractor’ Scheme. Also if RDC Enforcement Officers were resourced and supported to penalise construction sites in the same way they penalise residents or local builders, especially for radios, drug use and aggressive behaviours on site. Planting Management Plans and TPO’s are ignored, trees and hedgerows are cut, with no apparent penalties. Residents are encouraged to provide free labour to report alleged breaches of planning consent, but then Developers break the rules with impunity. The perception is that Rother Officers are too close to Developers, whilst being unwilling to meet with residents. There appears to be no monitoring of what the CIL funds are spent on in parishes in relation to the exisiting Local Plan and no minimum standard of “community consultation”.

Q3.

‘By supporting strong, safe and sustainable communities’ In Fairlight Cove there is a minimal bus service, which unfortunately can be disrupted at very short notice by road closures. Leaving school children or people without mobile phones disorientated and abandoned. Plus there is poor access to travel around our village for people with disabilities. There appears to be no baseline of how many village roads are difficult to use for disabled people, due to issues such as rough surfaces/moonscapes, pavement parking, cracked pavements or speeding traffic. New charges for car parks across RDC and HBC means people now drive into Fairlight Cove to park for free and some camp overnight outside residents homes. HBC is commonly perceived online as having corrupt working practices in relation to planning and development sites.

Q5.

SO 9 feels very important, but unless there are new initiatives in villages, there appears to be no resources to make this happen. It is difficult to get a face to face appointment at Hill Surgery, Hastings, few people can get through to reception. For people on low incomes, without a computer or mobile phone it is especially hard.

Q.27

There seems to be an opt out clause on Density. There seems little point in having policies, if you then create ways for property developers not to meet them.

Q.33

LWL3 Facilities at bus stops and iii Coastal Access This would be very important if it could be implemented.

LWL5

We welcome these policies in terms of height and steep sites, for example if a village is predominantly small low dwellings, very tall buildings stand out. For example at the entrance to Fairlight Cove and in the “transition” of the new Market Garden Site to the south.

LWL6

We welcome these policies in terms of height and steep sites, for example if a village is predominantly small low dwellings, very tall buildings stand out. For example at the entrance to Fairlight Cove and in the “transition” of the new Market Garden Site to the south.

Q45.

Streets For All. We welcome the shared streets policy especially “street furniture, good signage and way finding that is accessible to all to encourage walking and prioritise vulnerable users.” It would be beneficial to identify who currently lives in a ‘street’ or a ‘road’ and whether 4.62 SUDS and 4.64 could be implemented across the District. If RDC had clear design standards and guidelines, this would help Parish Councils who may not have access to professional expertise in planning. Community pride and cohesion is undermined by dirty and deteriorating infrastructure, Pett Level Road, Pett Level Toilets, Highways Pavement repairs, Southern Water sewage etc

Q.48

RDC needs to work with Parish Councils to create Parking Strategies for villages where parked vehicles now dominate the public realm, block footways, crossing points and sight lines.

Paragraph 5.16

Quiet Lanes and Slow Ways should be introduced on the 1066 walk and popular coastal footpaths as a priority.
This is a key issue for Fairlight enabling all generations to stay in rural communities for their lifetime and a source of frustration that new homes have not addressed the housing needs of local residents.

Q.54

The notion of “Hastings Fringes” feels unclear and ‘sensitive growth’ lacks a number, clarification would help.

Q.59

We object to the notion that a minimum of 35 dwellings in Fairlight is “sensitive” growth, we assume the site is East Field. This has been contested so many times over the years and the Field continues to flood, the sewage continues to overflow on Lower Waites Lane and Stream Lane. The increased traffic puts enormous pressure on village lanes which are in a poor state of repair. Pett Level Road is unpassable during the evening time due to the size of the pot holes. Access to a Post Office, Doctors Surgery and Dentists is limited.

Q.72

“Including the undeveloped coast, also has high intrinsic amenity value and is an important resource for nature conservation, leisure and tourism.” This would be more convincing if Pett Level Road were usable as a road, the moonscapes by the road side could be used for parking and the public toilets were open throughout the year.

Q.82

DEV3 The development boundary concept sounds confusing. If Fairlight Cove has a development boundary in the Local Plan surely the boundary of Waites lane is facing the ‘countryside’. Therefore an allocation of East Field for 35 houses would not meet the policy?

Q.90

DEV6 The Strategic Green Gap between Fairlight and Hastings is warmly welcomed, as are all the Gaps in the Plan. There are regular incidents where large vehicles e.g two buses/lorries etc get wedged along the narrow lanes travelling east along Fairlight Road which is claustrophobic and parked vehicles dominate. The areas open character feels essential to demarcate the start of the countryside.

Q.101

HWB5 Green and Blue Infrastructure
There is no minimum length for new development to be built away from a water course. In the case of the Market Garden Site in Fairlight, three new builds are on the banks of the stream and the earth has subsided as a result.

Q.102

A minimum precise measurement length should be insisted upon for all new developments near a water course. There is also no clear mention in Construction Management Plans for Site workers not to litter or pollute a water course. Also to store construction materials such as water proof insulation, glass etc a few metres from the edge so as they don’t fall into the water course.

Q.123

HOU5 Rural Exception Sites
This feels like another ‘get out’ clause. There is no clarity as to what RDC mean by “meaningful community engagement” If RDC has any examples of how this had worked in practice that would be helpful. Otherwise it could be removed.

Q.129

HOU8 Access to Standards Paragraph 8.72 This feels like another ‘get out’ clause

Paragraph 8.137

ESCC parking guidance is an under estimate, for the number of people who actually use a garage. The number of cars owned per household in rural areas and the fact that most dwellings have visitors and delivery vehicles. The car parking spaces are mean on new build developments, causing parked vehicles to over flow onto rural lanes and bus routes.

Q.144

”… private rear garden spaces of at least 10 metres in length will normally be required, other than in exceptional circumstances where this cannot be achieved in an otherwise acceptable development” We strongly object to the wording and opt outs within this Policy. At the Market Garden Site in Fairlight residents allege the 10 metre gardens have not been created. Allowing flexibility on the 10 metre rule makes a mockery of it being a Policy. This allows for Developers to erect cramped buildings on irregular and sloped sites. This is very disappointing. Similarly the policy can be avoided if “future occupiers of the dwellings will have a lesser requirement for amenity space” How can this be proven if properties are sold on the open market, another loophole for allowing dwellings with low amenity. It leaves little room for outdoor washing lines which have an environmental impact if clothes is dried indoors. Also the capacity for play equipment, to plant veg/fruit trees, store bicycles/canoes etc. We object to 8.136.

Q.146

The Policy is inappropriately flexible. Getting away with squashing the tiniest housing units onto a plot seems to be the game for a few Developers and RDC are encouraging it with this type of policy.

Q.166

Like most of our responses our comments relate to balancing new developments with maintaining infrastructure or improving strategic working with ESCC or Parish Councils. If the majority of visits are day trips then the issue of parking, overflow parking and public toilets remain very high on the list of problems to be addressed, which currently fail to meet customer expectations. The poor state of ESCC roads is a major factor in putting off visitors.

Q.180

LAN1 This is very important, especially to the undeveloped coast.

Page 356 (ix) The failure of RDC to stop Developers clearing trees and hedges is depressing.

Q.191

ENV 4 Fairlight Cove Coastal Change Management Area is important to support the work of the Fairlight Preservation Trust.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24939

Received: 01/07/2024

Respondent: Mrs Rosalyn Day

Representation Summary:

Support the Vision but concerned about funding and delivery. Much of it relies on other bodies to fund e.g. road improvements. Hope that the focus will be more on "appropriate for the protected national landscape.." than the "maximise housing delivery" as in the past biodiversity concerns have often been considered of lower importance than delivering housing.

Full text:

Support the Vision but concerned about funding and delivery. Much of it relies on other bodies to fund e.g. road improvements. Hope that the focus will be more on "appropriate for the protected national landscape.." than the "maximise housing delivery" as in the past biodiversity concerns have often been considered of lower importance than delivering housing.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24983

Received: 03/07/2024

Respondent: Mrs Wendy Morgan

Representation Summary:

This sounds very good to me. It proposes a Bexhill which I would want to live in.

Full text:

This sounds very good to me. It proposes a Bexhill which I would want to live in.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 25114

Received: 10/07/2024

Respondent: Mr Matthew Elms

Representation Summary:

The vision is an admirable one. However, in my view, it is not compatible with the proposals put forward for Catsfield. Catsfield is facing development that would increase the number of homes in the village by almost double. In terms of meeting the needs for the local community development on that scale would have a negative impact on existing services such as sewage (which already struggles) and road networks. There is limited public transport in the village and building work of this nature would impede on the High Weald National Landscape.

Full text:

The vision is an admirable one. However, in my view, it is not compatible with the proposals put forward for Catsfield. Catsfield is facing development that would increase the number of homes in the village by almost double. In terms of meeting the needs for the local community development on that scale would have a negative impact on existing services such as sewage (which already struggles) and road networks. There is limited public transport in the village and building work of this nature would impede on the High Weald National Landscape.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 25253

Received: 12/07/2024

Respondent: Richard Bailey

Agent: DHA Planning

Representation Summary:

Please see attached representation, existing and proposed sites plans.

Full text:

Please see attached representation, existing and proposed sites plans.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 25407

Received: 16/07/2024

Respondent: Denbigh Properties Ltd

Agent: DHA Planning

Representation Summary:

Please see attached:

- Draft Local Plan Representations
- Site Location Plan
- Existing Site Layout Plan
- Call for Sites Illustrative Layout Plan

Full text:

Please see attached:

- Draft Local Plan Representations
- Site Location Plan
- Existing Site Layout Plan
- Call for Sites Illustrative Layout Plan

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 25656

Received: 21/07/2024

Respondent: Miss Suzie Jones

Representation Summary:

The plan speaks of the need for its residents to maintain their ' well being'
Being a sensitive person who has mental health issues because of this ,I am concerned with the amount of new house building proposed across rother.
Many of these new houses...as in Robertsbridge, are being proposed to be built on green field sites around and within the village...green fields with a high diversity of wild plants, animals and insects.
These sites, and their creatures are known and much valued by local people, myself included. My personal well being depends on these rich local resources, although the word resource feels an exploitative word to use for the living world.

Full text:

The plan speaks of the need for its residents to maintain their ' well being'
Being a sensitive person who has mental health issues because of this ,I am concerned with the amount of new house building proposed across rother.
Many of these new houses...as in Robertsbridge, are being proposed to be built on green field sites around and within the village...green fields with a high diversity of wild plants, animals and insects.
These sites, and their creatures are known and much valued by local people, myself included. My personal well being depends on these rich local resources, although the word resource feels an exploitative word to use for the living world.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 25696

Received: 21/07/2024

Respondent: Sussex Wildlife Trust

Representation Summary:

SWT supports the vision and particularly the ambition for bold solutions to address the climate and biodiversity emergencies. We also support the requirement for Biodiversity Net Gain and for the district to contribute to the UK’s carbon and nature recovery goals.

Full text:

SWT supports the vision and particularly the ambition for bold solutions to address the climate and biodiversity emergencies. We also support the requirement for Biodiversity Net Gain and for the district to contribute to the UK’s carbon and nature recovery goals.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 25881

Received: 22/07/2024

Respondent: Mrs Nicola Hill

Representation Summary:

I think the vision is lacking a voice for the huge creative community that resides in the Rye area. Provision for the many arts, music, literary and drama events need to be nurtured as they are a big draw to the area. Both historically and now. If too many community assets are lost in the town to housing. You will lose the Soul of Rye.

Full text:

I think the vision is lacking a voice for the huge creative community that resides in the Rye area. Provision for the many arts, music, literary and drama events need to be nurtured as they are a big draw to the area. Both historically and now. If too many community assets are lost in the town to housing. You will lose the Soul of Rye.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 26011

Received: 23/07/2024

Respondent: Woodland Trust

Representation Summary:

Support the element of the vision stating that "Bold solutions will have successfully addressed the climate and biodiversity emergencies and the housing crisis while protecting the High Weald National Landscape, our designated habitats, our heritage and our flood risk areas."
The climate crisis is paralleled by a nature crisis and we need solutions that will tackle both.

Full text:

Support the element of the vision stating that "Bold solutions will have successfully addressed the climate and biodiversity emergencies and the housing crisis while protecting the High Weald National Landscape, our designated habitats, our heritage and our flood risk areas."
The climate crisis is paralleled by a nature crisis and we need solutions that will tackle both.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 26039

Received: 23/07/2024

Respondent: Miss Nicky Bishop

Representation Summary:

Your vision states that "major development will be focused in places where sustainable development can be achieved". This should apply to ALL development, however small. And ALL is much simpler to apply as there will be no argument over where to draw the line between "major" and minor.
Your vision states that "All development will be net zero carbon ready and provide biodiversity net gain." "net zero carbon READY" is not the same as "net zero carbon". Keep it clear and simple, and require that All development be net zero carbon. TBH, we haven't got the time to muck about with weasel words like "ready".

Full text:

Your vision states that "major development will be focused in places where sustainable development can be achieved". This should apply to ALL development, however small. And ALL is much simpler to apply as there will be no argument over where to draw the line between "major" and minor.
Your vision states that "All development will be net zero carbon ready and provide biodiversity net gain." "net zero carbon READY" is not the same as "net zero carbon". Keep it clear and simple, and require that All development be net zero carbon. TBH, we haven't got the time to muck about with weasel words like "ready".

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 26223

Received: 17/07/2024

Respondent: Burwash Parish Council

Representation Summary:

The Vision doesn’t mention the needs and requirements of young people / families or the need for social and affordable housing. Better connectivity is required for homeworking and the way work is more flexible. Rural areas connectivity needs addressing.

Full text:

Please see attached comments from Burwash Parish Council.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 26511

Received: 22/07/2024

Respondent: Tunbridge Wells Borough Council

Representation Summary:

TWBC agrees with the thrust of RDC’s
Vision in striving to achieve sustainable
development, net carbon reduction and
enhancing the quality of life of local
residents in how they live, work and
travel.

Full text:

See attached document

Attachments:

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 26551

Received: 20/07/2024

Respondent: Burwash Common and Weald Residents Association

Representation Summary:

Proposed Local Plan vision. We think the vision might be modified to improve support for young people and families. For example, perhaps there can be more involvement from appropriate housing associations to help deliver genuinely affordable “starter” homes? In addition, there could be more support for hybrid working and working from home (as these are likely to be the cradles for new small businesses) with more flexibility around what constitutes “commercial” and “residential” premises, financial incentives and the introduction more widely of reliable high-speed broadband. Consideration should also be given to strengthening the resilience of local power networks in rural areas which (in our area at least) are subject to frequent and sometimes sustained power cuts often at no notice.

Full text:

Full submission attached

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 26690

Received: 23/07/2024

Respondent: Devine Homes PLC

Agent: Nexus Planning

Representation Summary:

See attached submission (specifically page 3) for comments on the Council's vision.

Full text:

Please see attached full submission from Nexus Planning on behalf of their client Devine Homes regarding the Local Plan and HELAA Site SAL0012: Land at Bishops Lane, Robertsbridge

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 26880

Received: 22/07/2024

Respondent: Brede Parish Council

Representation Summary:

A well drafted and bold plan but a vision with without a means of delivery is a
pipe-dream. Whether it is achievable across the whole district is questionable
as the amount of investment required to achieve it is enormous. Currently basic
infrastructure is failing, eg highways issues, drainage issues, provision of
adequate services such as GP’s and schools and much more.

Full text:

Full submission attached.

Attachments:

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 26971

Received: 22/07/2024

Respondent: Northiam Parish Council

Representation Summary:

NPC is supportive of Councils vision.

Full text:

See attached.

Attachments:

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 27029

Received: 22/07/2024

Respondent: Westfield Parish Council

Representation Summary:

See points 1-10 in the attached submission.

Full text:

Please see attached document for the full submission from Westfield Parish Council.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 27200

Received: 22/07/2024

Respondent: Taylor Wimpey Strategic Land

Agent: Stantec UK Ltd

Representation Summary:

See attached representation regarding:

- Proposed Vision - Chapter 2 of the draft Local Plan

Full text:

See attached representations regarding:

- Proposed Vision - Chapter 2 of the draft Local Plan
- Proposed Development Strategy - Chapter 5 of the draft Local Plan
- Proposed Policy GTC1: Net Zero Building Standards
- Proposed Policy GTC5: Heat Networks
- Proposed Policy GTC8: Biodiversity Net Gain
- Proposed Policy LWL1: Compact Development
- Proposed Policy HOU2: Affordable Housing
- Proposed Policy HOU2: HOU12: Self-Build and Custom Housebuilding

Attachments:

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 27373

Received: 22/07/2024

Respondent: Catsfield Parish Council

Representation Summary:

"Rother District will be an attractive, desirable and affordable place to live, work and visit."
Answer: Agreed, this a desirable Vision. There is however a fundamental problem with the application of this policy and other polices in the draft plan because the polices are relevant to urban areas and not to rural areas. For example, the principles of being able to walk or use public transport to access services cannot apply to rural villages other than at a very small scale. There will always be a very large percent of the Parish who are not in walking distance of services and public transport simply does not meet local needs. Large scale developments in village centres would allow more people to walk to some local services but not to most of the services needed. This will also fundamentally and negatively change the character of a Village. We see this in Hellingly where a once small village is now an urban sprawl. This cannot be accepted as a planning policy. A cap on the percentage increase in developments in Villages is needed to protect village communities from over development.

"The needs of all the local community will be met."
Answer: Yes, if true but this is not true as applied ref the proposals for Catsfield. The needs of the community do not include adding 55 houses into the centre of the Village creating a more than 100% increase in housing in the village centre, on High Weald National Landscape land, with no access to sewers, with no or limited access from roadways (decreasing road safety), with no biodiversity gain, on land that regularly floods.

"With an emphasis on enhanced health and wellbeing for now and into the future."
Answer: Yes, if true but this is not true as applied ref the proposals for Catsfield. There is no evidence in the plan that the health or wellbeing of residents in Catsfield will be enhanced. The plan proposes significantly less green field land, foul water flood risks (no sewer connections on the sites proposed require vast sewage tanks to be fitted), risk of death or injury from roads because of access issues. The access to facilities (Water – we already have low water pressure problems), Drainage – Flooding of the fields, roads and houses in the centre of the village happens every year) & Services (Schools, Doctors) both are in short supply – adding +100% capacity to the housing in the village centre will make these issues worse. The increasing in housing for Catsfield is higher than for other similar villages in Rother, and an overwhelming increase to the housing totals for the Village. This does not support enhanced wellbeing or health.

"Bold solutions will have successfully addressed the climate and biodiversity emergencies and the housing crisis while protecting the High Weald National Landscape, our designated habitats, our heritage and our flood risk areas."
Answer: Yes, if true but this is not true as applied ref the proposals for Catsfield.
• Net zero new housing is fine, but not at this scale, it overpowers the village, our social and community structure cannot cope with development on this scale. Two of the large sites proposed will reduce biodiversity. There is biodiversity net loss by building on green fields at this scale.
• 2 of the 3 sites proposed in the HEELA are within the High Weald National Landscape. (Criteria for refusing similar sites also apply to these sites but have not been applied)
• All 3 of the sites have flood risks.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 27433

Received: 22/07/2024

Respondent: Network Rail

Representation Summary:

It is important that opportunities to promote the use of the railway as a more sustainable
modes of transport are identified and taken forward. The railway network is a vital
element of the country’s economy and a key component in the drive to deliver the
Government’s sustainable agenda.

Network Rail commend the work done by the Council to highlight opportunities to base
new development around proximity to transport hubs as this is also a key focus for
Network Rail. We would agree that the vision for Rother is ambitious but is achievable
and Network Rail will work with the Council to deliver this.

Full text:

Please see attached full representation