Object

Proposed Submission Development and Site Allocations (DaSA) Local Plan

Representation ID: 24077

Received: 30/11/2018

Respondent: Mrs Bridget Adkins

Legally compliant? No

Sound? No

Duty to co-operate? Yes

Representation Summary:

RR/2017/1705/P DaSA Part II Policy BEX9 (Spindlewood)
As a result of the CJEU April 2018 ruling regarding when 'mitigation measures' should be considered, RDC have left themselves vulnerable to being legally challenged due to their non-compliance with statutory regulations. I strongly object to RDC acceptance and consideration given to untimely mitigation measures submitted by the developer for site BEX9 (Spindlewood) without giving due care and attention to the environmental issues raised by local residents and the harmful effects this development will cause, both in terms of ecology and sustainable housing. My bungalow backs onto the proposed site and garden gets waterlogged in heavy rain.

Full text:

RR/2017/1705/P DaSA Part II Policy BEX9 (Spindlewood)
As a result of the CJEU April 2018 ruling regarding when 'mitigation measures' should be considered, RDC have left themselves vulnerable to being legally challenged due to their non-compliance with statutory regulations. I strongly object to RDC acceptance and consideration given to untimely mitigation measures submitted by the developer for site BEX9 (Spindlewood) without giving due care and attention to the environmental issues raised by local residents and the harmful effects this development will cause, both in terms of ecology and sustainable housing. My bungalow backs onto the proposed site and garden gets waterlogged in heavy rain.