Respondent: Natural England
Designated sites - Combe Haven SSSI; within 'Impact Risk Zone' (IRZ) for the
SSSI.
If the allocation is likely to have a significant effect on the SSSI, appropriate mitigation measures need to be specified.
One example would be hydrological impact; such as increased water levels entering the SSSI and from SuDS/ground water/surface water run-off and pollutants entering the ditch network feeding the SSSI, with potential to harm the botanical,
invertebrate and bird interest of the SSSI.
Designated sites - Combe Haven SSSI; within 'Impact Risk Zone' (IRZ) for the
SSSI.
If the allocation is likely to have a significant effect on the SSSI, appropriate mitigation measures need to be specified.
One example would be hydrological impact; such as increased water levels entering the SSSI and from SuDS/ground water/surface water run-off and pollutants entering the ditch network feeding the SSSI, with potential to harm the botanical,
invertebrate and bird interest of the SSSI.