Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 22758

Received: 20/02/2017

Respondent: Mrs Christina Thirkell

Representation Summary:

I do not agree with BX116.

Spindlewood is totally unacceptable because the infrastructure will not be able to cope. Already the bottom of the field that backs onto Maple Walk is very boggy, as happens every year and we've had hardly any rain yet and when we do it floods!
It would be a good idea for someone to inspect it before we have some rain.

Site BX124 is a much preferred option because the infrastructure will be far better. There would be less disruption to surrounding houses and less disruption to surrounding roads.

Full text:

I definitely do not agree with the preferred site BX116.

Spindlewood is totally unacceptable because the infrastructure will not be able to cope. Already the bottom of the field that backs onto Maple Walk is very boggy, as happens every year and we've had hardly any rain yet and when we do it floods!
It would be a good idea for someone to inspect it before we have some rain.

Site ref BX124 - New N BAR link road is a much preferred option because the
infrastructure will be far better due to the new road being built. There would be less
disruption to surrounding houses and less disruption to surrounding roads.