Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 22634

Received: 20/02/2017

Respondent: Salehurst & Robertsbridge Neighbourhood Plan Steering Group

Representation Summary:

In a village such as Robertsbridge, which in the last 20 years has suffered seriously from both fluvial and surface water flooding, we welcome Policy DEN5 but would wish to see it strengthened in paragraph (i) by requiring any proposal to produce a prior full 12 month monitoring report on run-off from the site. Our Policy IN8 contains equivalent but differently phrased requirements.

Full text:

In a village such as Robertsbridge, which in the last 20 years has suffered seriously from both fluvial and surface water flooding, we welcome Policy DEN5 but would wish to see it strengthened in paragraph (i) by requiring any proposal to produce a prior full 12 month monitoring report on run-off from the site. Our Policy IN8 contains equivalent but differently phrased requirements.