Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 22526

Received: 18/02/2017

Respondent: Bexhill Wheelers

Representation Summary:

Agree: Vital that Walking and Cycle Links are integrated with other Rights of Way, Shared Space paths, Quite Roads with 20mph limits and are of common high quality standards, clearly signed that connect with other adjoining developments and projects. That Bus infrastructure is provided with routes negotiated and agreed prior to construction to ensure access to work and homes by public transport is available. Provision made to ensure vehicles park or lay-by in designated places by physical barriers or engineering at turning radius.

Full text:

Agree: Vital that Walking and Cycle Links are integrated with other Rights of Way, Shared Space paths, Quite Roads with 20mph limits and are of common high quality standards, clearly signed that connect with other adjoining developments and projects. That Bus infrastructure is provided with routes negotiated and agreed prior to construction to ensure access to work and homes by public transport is available. Provision made to ensure vehicles park or lay-by in designated places by physical barriers or engineering at turning radius.