Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 22046

Received: 04/01/2017

Respondent: Mr John Owen

Representation Summary:

The development of the proposed site will almost inevitably lead to further construction of dwellings in the field to the north and west of the site. This would place a huge strain on the cast iron high-pressure sewer that services Iden, one with which the existing sewer will not be able to cope with.

In the past six or seven years the sewer has burst five times where it crosses my land at Mockbeggar Cottage. Southern Water state that renewing the sewer is not part of their policy in the foreseeable future.

Full text:

The development of the proposed site will almost inevitably lead to further construction of dwellings in the field to the north and west of the site. This would place a huge strain on the cast iron high-pressure sewer that services Iden, one with which the existing sewer will not be able to cope with.

In the past six or seven years the sewer has burst five times where it crosses my land at Mockbeggar Cottage. Southern Water state that renewing the sewer is not part of their policy in the foreseeable future.