Support

Draft Charging Schedule and Draft Regulation 123 List

Representation ID: 21751

Received: 26/03/2015

Respondent: SeaChange Sussex

Representation Summary:

Sea Change Sussex welcomes the Draft CIL Charging Schedule and Regulation 123 List and agrees it brings a fairer faster and transparent system for determining developer contributions. The negotiation of S106 Agreements can be time consuming and costly with monies available for the improvement of infrastructure being devoured in legal fees.

Full text:

Sea Change Sussex welcomes the Draft CIL Charging Schedule and Regulation 123 List and agrees it brings a fairer faster and transparent system for determining developer contributions. The negotiation of S106 Agreements can be time consuming and costly with monies available for the improvement of infrastructure being devoured in legal fees.