Object
Proposed Submission Core Strategy
Representation ID: 20616
Received: 21/09/2011
Respondent: Sedlescombe Parish Council
Legally compliant? Yes
Sound? No
Duty to co-operate? Not specified
Representation Summary:
To be effective the location of the proposed cycle network needs to be specified as the existing bridleway network is insufficient and all roads in the District are narrow and unsuitable for installation of cycleways.
Full text:
To be effective the location of the proposed cycle network needs to be specified as the existing bridleway network is insufficient and all roads in the District are narrow and unsuitable for installation of cycleways.