Object
Core Strategy Consultation on Strategy Directions 2008
Representation ID: 20121
Received: 30/01/2009
Respondent: Highways Agency
Representation Summary:
Paragraph 5.79 to 5.93
The HA is pleased to note a contingency plan has been developed should the Link Road for whatever reason, not be built or be significantly delayed.
The HA would, however, suggest that the contingency plan be further expanded.