Object

Core Strategy Consultation on Strategy Directions 2008

Representation ID: 19430

Received: 30/01/2009

Respondent: Mr. Mrs. Lyons

Agent: Strutt & Parker

Representation Summary:

Support is given to the contingencies proposed in paragraphs 5.92 and 5.93, which are proposed to reduce the risks associated with reliance on the Bexhill/Hastings Link Road to bring forward development. A number of sites within Hastings' fringes should be identified in the Sites Allocation DPD, for both immediate development, and as contingency sites in the event of a Link Road delay.
Box 4 only refers to the contingency approach towards housing development, and does not apply it to economic or other development. The Preferred Strategy should be amended to
include a contingency plan for these, should the Link Road be delayed