Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Search representations

Results for Hastings Borough Council search

New search New search

Support

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Q1

Representation ID: 31162

Received: 23/03/2026

Respondent: Hastings Borough Council

Representation Summary:

See attached representation for full response.

The Council welcomes Objective 5, which seeks to ‘Deliver sustainable growth and regeneration in Bexhill and its edges, along with Hastings Fringes, with supporting infrastructure, contributing to the needs of the wider housing and economic market area’. The council will continue to engage with RDC on matters required to support this objective, such as the joint Housing and Economic Development Needs Assessment (HEDNA).

The council also welcomes the addition of Objective 11, which seeks to prioritise the use of brownfield land and build to appropriate densities, whilst recognising local context and character.

Full text:

See attached response from Hastings Borough Council in response to questions 1, 2, 3, 4, 5, 6, 10, 11, 28, 29, 33 and 69.

Support

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Q2

Representation ID: 31163

Received: 23/03/2026

Respondent: Hastings Borough Council

Representation Summary:

See attached representation for full response.

The council recognises the difficulties faced by RDC in meeting the challenging housing targets set by Government. We note the increase in RDC’s requirement from 733 dwellings per annum (dpa) to 912 dpa, equating to 15,504 over the plan period. This is in contrast to the adopted Core Strategy which contains a target of 335 dpa, and a current delivery rate of 215 dpa.

The council notes that the draft Plan sets a housing target of 8,427 dwellings over the plan period, equating to 495 dpa, a shortfall of 7,077 over the plan period (417 dpa) when compared to the local housing need figure arising from standard method. This is roughly 54% of the standard method. The council notes the extensive constraints within the district and believes the housing target in the draft Plan is reasonable.

Full text:

See attached response from Hastings Borough Council in response to questions 1, 2, 3, 4, 5, 6, 10, 11, 28, 29, 33 and 69.

Support

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Q6

Representation ID: 31164

Received: 23/03/2026

Respondent: Hastings Borough Council

Representation Summary:

See attached representation for full response.

The council notes RDC’s assessment of an additional option to develop land within the strategic gap between RDC and Hastings (SDO14). It is noted that, following assessment of this option through the Sustainability Appraisal (SA), RDC has concluded any such option would undermine the principal intent of strategic gaps, i.e. to maintain the separate identity and distinctiveness between settlements and prevent coalescence. It may also be relevant to refer to the role of the strategic gap in terms of its multifunctional contribution to flood storage capacity, environmental and landscape protections.

It is noted that paragraph 5.13 refers to the protection of strategic gaps as a function of Policy DEV6 in the draft Rother Local Plan (2024).

Full text:

See attached response from Hastings Borough Council in response to questions 1, 2, 3, 4, 5, 6, 10, 11, 28, 29, 33 and 69.

Support

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Q11

Representation ID: 31165

Received: 23/03/2026

Respondent: Hastings Borough Council

Representation Summary:

See attached representation for full response.

The council welcomes the Vision for Southern Rother and the Hastings Fringes on page 71, and that development in this area will be sensitive and well connected to the urban fabric of Hastings. The council also notes that development of some 382 dwellings is proposed within Southern Rother and the Hastings Fringes over the plan period, comprising 135 from existing allocations and sites with planning permission, and 247 from new allocations, along with some 5,300m2 of employment floorspace (3,500m2 from new allocations). The council welcomes continued joint working with RDC to address infrastructure needs and other cross-boundary matters relevant to site proposals in this area, including land stability and flood risk management.

Full text:

See attached response from Hastings Borough Council in response to questions 1, 2, 3, 4, 5, 6, 10, 11, 28, 29, 33 and 69.

Support

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Q28

Representation ID: 31166

Received: 23/03/2026

Respondent: Hastings Borough Council

Representation Summary:

See attached representation for full response.

GU1 Land north of A265, Ivyhouse Lane, Hastings
This is an existing allocation, and is proposed to be allocated for employment uses, comprising 3,300m2 of business floorspace. The site borders the northeast of Hastings borough and adjoins ES7:Ivyhouse Lane, Northern Extension in the Hastings Draft Local Plan.

The council welcomes criterion i which requires a comprehensive scheme to be developed in conjunction with ES7. The development criteria should be reviewed such that they align with ES7, such as adding an additional criterion to require a lighting plan to minimise light spill into the National Landscape.

GU2 Brackendale, Rock Lane, Hastings
The council welcomes the policy wording, in particular criterion iii which requires a comprehensive scheme to be developed in conjunction with the adjoining land in Hastings, namely site HS21 Land East of Rock Lane and HS13 Land North-West of Winchelsea Lane adjoining that.

Full text:

See attached response from Hastings Borough Council in response to questions 1, 2, 3, 4, 5, 6, 10, 11, 28, 29, 33 and 69.

Support

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Q29

Representation ID: 31167

Received: 23/03/2026

Respondent: Hastings Borough Council

Representation Summary:

See attached representation for full response.

GU3 Rock Lane Urban Fringe Management AreaThe council welcomes the proposed allocation of area GU3 as a buffer policy, protecting the openness of this urban fringe area and green infrastructure at the borough edge. The council also welcomes acknowledgement that the quality of this area could be improved

Full text:

See attached response from Hastings Borough Council in response to questions 1, 2, 3, 4, 5, 6, 10, 11, 28, 29, 33 and 69.

Support

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Q33

Representation ID: 31168

Received: 23/03/2026

Respondent: Hastings Borough Council

Representation Summary:

See attached representation for full response.

WS2 Land east of Beaney’s Lane
This is another cross-boundary site, 7.6ha in total, with around 0.4ha within Hastings borough (proposed allocation HS23: Land East of Beaneys Lane, The Ridge). The requirement to produce land stability and geotechnical reports (criterion xiii) as part of any planning application is welcomed. Whilst the policy does require vehicular access from The Ridge, it falls short of requiring a comprehensive scheme which incorporates the adjoining land (HS23) in Hastings.

WS1 Land at Michael Tyler Furniture
This site adjoins the administrative boundary of Hastings and is proposed to deliver 40 dwellings. Criterion iv requires access from Woodlands Way in Hastings. The council welcomes the retention of the existing tree belts to the west and north of the site. It is not clear if the site would be connected with the adjacent WS2 and HS23 (Hastings) to the south.

Full text:

See attached response from Hastings Borough Council in response to questions 1, 2, 3, 4, 5, 6, 10, 11, 28, 29, 33 and 69.

Support

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Q10

Representation ID: 31169

Received: 23/03/2026

Respondent: Hastings Borough Council

Representation Summary:

See attached representation for full response.

The council welcomes the commitment to retaining the ‘strong green strategic gap’ between Bexhill and Hastings. This is essential to prevent the coalescence of the two settlements and protect the Combe Valley Countryside Park. The council is keen to continue working with RDC on cross-boundary flood risk and storage matters through the SFRA process.

The council acknowledges the continued aspiration for a new western bypass connecting Little Common roundabout with Ninfield road, designed to alleviate traffic through Bexhill on the A259. The council also welcomes the commitment from RDC to further transport modelling following the Regulation 18 consultation, and the council will be keen to work with RDC and the county council on area-wide modelling.

Full text:

See attached response from Hastings Borough Council in response to questions 1, 2, 3, 4, 5, 6, 10, 11, 28, 29, 33 and 69.

Support

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Q3

Representation ID: 31170

Received: 23/03/2026

Respondent: Hastings Borough Council

Representation Summary:

See attached representation for full response.

The council welcomes RDC’s acknowledgement of Hastings and Rother comprising a Functional Economic Market Area (FEMA), evidenced by the joint HEDNA (2024). The council welcomes the employment pipeline identified in the Plan, which aims to meet identified needs in full, despite some large sites becoming unavailable. The council looks forward to working with RDC on updating the HEDNA in 2026 ahead of both Authorities’ Regulation 19 Pre-Submission Plans.

The council notes the conclusions of the Rother Retail and Town Centre Uses Study (2023) and the subsequent decision not to allocate additional land in the district for new retail floorspace, save for minor mixed-use developments.

Full text:

See attached response from Hastings Borough Council in response to questions 1, 2, 3, 4, 5, 6, 10, 11, 28, 29, 33 and 69.

Support

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Q4

Representation ID: 31171

Received: 23/03/2026

Respondent: Hastings Borough Council

Representation Summary:

See attached representation for full response.

The council recognises RDC’s strategy to deliver 18 pitches. This aligns with their requirement as set out in the joint Gypsy, Traveller and Travelling Showpeople Accommodation Needs Assessment (GTAA) (2022). The GTAA established a need in Rother for 28 pitches. The council notes that since the base date of this study, 10 pitches have been delivered, therefore RDC are aiming to meet their requirement in full. The council welcomes continued opportunities to work with RDC on a cross-boundary basis to address any unmet gypsy and traveller needs.

Full text:

See attached response from Hastings Borough Council in response to questions 1, 2, 3, 4, 5, 6, 10, 11, 28, 29, 33 and 69.