Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30795
Received: 21/03/2026
Respondent: Jane Chater
Objection to BT7
I strongly object to the proposed plan to build eighty houses on this proposed site, for the following reasons:
The impact it would have on the historic setting of Battle Abbey and the 1066 Battlefield.
The loss of greenfield land within the High Weald National landscape would be terrible The impact it would have on the ancient woodland and protected species. Battle slowly but surely is being ruined. We do not have the infrastructure. The Doctors surgeries are being stretched to the limit as it is - they have neither new surgeries or medical staff. The schools also are stretched to their limit.
The safety of all pedestrians including the Claverham pupils could not be guaranteed. The exit via Tollgates on to North Trade Road would be gridlocked.
There would also be a risk of flooding due to surface water and nowhere for it to go
I strongly object to the proposed plan to build eighty houses on this proposed site, for the following reasons:
The impact it would have on the historic setting of Battle Abbey and the 1066 Battlefield.
The loss of greenfield land within the High Weald National landscape would be terrible The impact it would have on the ancient woodland and protected species. Also the effect it would have on all wild life including birds. It would be devastating. Battle slowly but surely is being ruined. We do not have the infrastructure for all these people. The Doctors surgeries are being stretched to the limit as it is - they have neither new surgeries or medical staff. The schools also are stretched to their limit.
The safety of all pedestrians including the Claverham pupils could not be guaranteed. The exit via Tollgates on to North Trade Road would be gridlocked- it is bad enough already.
There would also be a risk of flooding due to surface water and nowhere for it to go I am very sad that Battle is going to lose its identity. We should be preserving it for future generations.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30798
Received: 22/03/2026
Respondent: Angela Smith
Object to the proposed allocation of ‘Land at Almonry Farm (Policy BT7)’ for residential development of approximately 80 houses.
Objection for reasons including:
- Impact on High Weald National Landscape
- Heritage significance and setting
- Ancient woodland and biodiversity
- Surface water and flood risk
- Highway safety and infrastructure capacity
The cumulative impact of multiple allocations around Battle must be properly assessed to avoid gradual suburbanisation of a town of exceptional historic importance.
For the reasons outlined above, Policy BT7 is not justified by robust evidence, fails to give appropriate weight to nationally protected landscape and heritage assets, and does not adequately address infrastructure and environmental constraints.
I am writing to formally object to the proposed allocation of ‘Land at Almonry Farm (Policy BT7)’ for residential development of approximately 80 houses.
I am of the opinion this allocation fails the tests of soundness set out in the National Planning Policy Framework (NPPF). It is not justified, not effective, and is not consistent with national policy relating to protected landscapes, heritage assets, biodiversity and infrastructure.
1. Impact on the High Weald National Landscape – the site lies wholly within the High Weald National Landscape. Under Section 85 of the Countryside and Rights of Way Act 2000, the Council has a statutory duty to conserve and enhance the natural beauty of this nationally protected landscape.
The site comprises undeveloped greenfield land forming part of an intact historic field system defined by mature hedgerows and trees — characteristic features of the High Weald. The proposed suburban development of approximately 35 dwellings per hectare would introduce urban form into a sensitive rural landscape, resulting in permanent harm.
The allocation does not demonstrate exceptional circumstances or overriding public interest sufficient to justify development within this protected landscape.
2. Heritage Significance and Setting – the site lies near nationally significant heritage assets, including:
• The Registered Battlefield (1066 Battle of Hastings.
• Battle Abbey Gatehouse Scheduled Monument.
• Battle Conservation Area.
• Grade II listed Lower Almonry Farmhouse.
The site forms part of the historic agricultural setting associated with Battle Abbey and contributes to the wider battlefield landscape. Even where development does not directly affect designated assets, the NPPF requires great weight to be given to the conservation of their setting.
There is also recognised archaeological potential in this area, with local historical evidence suggesting nearby Manser’s Shaw may correspond to the “Malfosse” episode of the 1066 battle. Allocation at this stage, prior to comprehensive archaeological assessment, is premature.
Development would suburbanise part of the Abbey’s wider landscape context and erode the rural character that contributes to the significance of these nationally important assets.
3. Ancient Woodland and Biodiversity – ancient woodland and priority habitat lies immediately adjacent to the eastern boundary of the site. While a 15-metre buffer is proposed, national guidance often recommends greater separation to prevent long-term degradation caused by light spill, recreational pressure, domestic pets, and hydrological change.
The site supports wildlife including deer, bats, and other protected species. The cumulative ecological impact of development in this sensitive location has not been adequately demonstrated at plan-making stage.
The allocation of this site therefore risks conflict with national policy requiring protection of irreplaceable habitats and delivery of genuine biodiversity net gain.
4. Surface Water and Flood Risk – the supporting text acknowledges that parts of the site are at risk of surface water flooding. Development of greenfield land increases hard surfacing and run-off, potentially exacerbating flood risk to neighbouring properties and downstream systems. The Local Plan should not allocate sites where flood risk mitigation remains uncertain.
5. Highway Safety and Infrastructure Capacity – access is proposed via Tollgates, with impacts on North Trade Road and the A2100. The Plan itself acknowledges that further junction capacity assessments are required.
Given existing congestion and the proximity to Claverham Community College, there are legitimate concerns regarding pedestrian safety and traffic conflict. Allocation of this site prior to confirmed modelling and mitigation measures renders the proposal unjustified and potentially ineffective.
In addition, Battle’s healthcare provision, school capacity, and local services are already under pressure. The allocation does not secure clear, deliverable infrastructure improvements aligned with the scale of growth proposed.
6. Cumulative and Precedent Effects – Almonry Farm currently contributes to the rural character of the southern edge of Battle. Allocation of this land risks incremental erosion of the wider landscape and may create pressure for further development across remaining farmland.
The cumulative impact of multiple allocations around Battle must be properly assessed to avoid gradual suburbanisation of a town of exceptional historic importance.
For the reasons outlined above, Policy BT7 is not justified by robust evidence, fails to give appropriate weight to nationally protected landscape and heritage assets, and does not adequately address infrastructure and environmental constraints.
I therefore would like to request that Policy BT7 – Land at Almonry Farm – be removed from the next iteration of the Draft Local Plan.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30815
Received: 22/03/2026
Respondent: Mr TONY BETTS
Number of people: 2
Summary of Key Objection Points
· The allocation fails NPPF soundness tests: unjustified, ineffective, and inconsistent with national policy.
· Development would harm the High Weald National Landscape with no exceptional justification.
· Significant adverse impact on heritage assets including the 1066 Battlefield and Battle Abbey.
· Archaeological potential not assessed—allocation premature.
· Risks to Ancient Woodland, Priority Habitat, and protected species; biodiversity net gain not demonstrated.
· Surface water flood risk likely to increase due to loss of greenfield land.
· Highway capacity, congestion and pedestrian safety concerns remain unresolved.
· Local healthcare, school capacity and services already overstretched.
· Cumulative effects risk long term suburbanisation of historic Battle.
Re: Draft Rother Local Plan (2025–2042) – Regulation 18 Consultation
Policy BT7 – Land at Almonry Farm, Battle
I am writing to register a strong and formal objection to the proposed allocation of Land at Almonry Farm (Policy BT7) for approximately 80 dwellings. On review of the available evidence and the requirements of the National Planning Policy Framework (NPPF), it is clear that this allocation fails the key tests of soundness. It is not justified, not effective, and conflicts directly with national policy regarding protected landscapes, heritage assets, biodiversity and infrastructure readiness.
1. Impact on the High Weald National Landscape
The site lies wholly within the High Weald National Landscape, where the Council has a statutory duty—under Section 85 of the Countryside and Rights of Way Act 2000—to conserve and enhance natural beauty. The land forms part of an intact historic field system, defined by established hedgerows and mature trees typical of the High Weald. Developing at a density of 35 dwellings per hectare would introduce intrusive suburban form into a sensitive rural environment, causing irreversible harm. There is no evidence of exceptional circumstances nor overriding public interest that would justify such harm.
2. Heritage Significance and Setting
The site lies in close proximity to nationally significant heritage assets, including the Registered 1066 Battlefield, the Battle Abbey Gatehouse Scheduled Monument, Battle Conservation Area and the Grade II listed Lower Almonry Farmhouse. The landscape forms part of the historic agricultural setting of Battle Abbey and contributes to the broader battlefield context. The NPPF requires great weight to be given to the conservation of heritage assets and their settings. Furthermore, local historical interpretation suggests nearby Manser’s Shaw may relate to the “Malfosse” incident of the 1066 battle, reinforcing the area’s archaeological sensitivity. Allocation in advance of proper archaeological assessment is premature and contrary to national guidance.
3. Ancient Woodland and Biodiversity
Ancient Woodland and Priority Habitat immediately adjoin the eastern boundary. While a 15 metre buffer has been suggested, national guidance commonly recommends considerably larger buffers to avoid degradation caused by recreation, light pollution, domestic pets and altered drainage patterns. The site supports wildlife including deer, bats and other protected species. The cumulative ecological impact of development has not been demonstrated, and there is no adequate evidence that the scheme could deliver biodiversity net gain, as required by national policy.
4. Surface Water and Flood Risk
Parts of the site are known to be at risk of surface water flooding. Substituting permeable greenfield land with hard surfaces will inevitably increase runoff and may heighten flood risk to neighbouring properties and downstream areas. Until the flood mitigation strategy is fully understood, tested and proven deliverable, allocating this site is not appropriate.
5. Highway Safety and Infrastructure Capacity
The proposed access via Tollgates would affect North Trade Road and the A2100—areas already experiencing congestion. The Plan itself states that further junction capacity modelling is needed. Without such modelling, the allocation cannot be considered justified. The proximity to Claverham Community College also raises significant concerns regarding pupil safety and increased conflict between vehicles and pedestrians. Additionally, Battle’s healthcare, education and community services are already under pressure, with no clearly secured, deliverable infrastructure improvements to support the proposed growth.
6. Cumulative and Precedent Effects
Almonry Farm currently contributes to the rural character of Battle’s southern edge. Allocating this site risks creating a precedent for further encroachment into surrounding farmland, leading to incremental suburbanisation. The cumulative impact of multiple developments around Battle has not been properly assessed and risks diminishing the character and historic significance of the town.
Summary of Key Objection Points
· The allocation fails NPPF soundness tests: unjustified, ineffective, and inconsistent with national policy.
· Development would harm the High Weald National Landscape with no exceptional justification.
· Significant adverse impact on heritage assets including the 1066 Battlefield and Battle Abbey.
· Archaeological potential not assessed—allocation premature.
· Risks to Ancient Woodland, Priority Habitat, and protected species; biodiversity net gain not demonstrated.
· Surface water flood risk likely to increase due to loss of greenfield land.
· Highway capacity, congestion and pedestrian safety concerns remain unresolved.
· Local healthcare, school capacity and services already overstretched.
· Cumulative effects risk long term suburbanisation of historic Battle.
Conclusion
For all the reasons outlined above, Policy BT7 should be considered unsound. It is unsupported by robust evidence, fails to protect nationally designated landscape and heritage assets, and does not adequately address infrastructure or environmental constraints. I respectfully request that Policy BT7 – Land at Almonry Farm – be removed from the next iteration of the Draft Local Plan.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30817
Received: 22/03/2026
Respondent: Laura and Stuart Farlow
Number of people: 2
Objection to Proposed Allocation Policy BT1, BT8, BT10 (Land south of Hastings Road, Battle):
1. Traffic Congestion and Safety on Hastings Road
2. Environmental Impact and Air Quality
3. Infrastructure Deficits and Delivery Failures
Re: Objection to Proposed Allocation Policy BT1, BT8, BT10 (Land south of Hastings Road, Battle) Draft Rother Local Plan (2025-2042)
We are writing to formally submit our objection to the proposed allocations of site BT1 and adjacent sites. As residents of Glengorse, we have direct, daily experience of the site conditions. This development is unsupportable based on material planning considerations, the democratically adopted Battle Neighbourhood Plan (BNP), and the National Planning Policy Framework (NPPF) 2024/25 (and the subsequent 2025/26 updates regarding National Decision-Making Policies).
1. Traffic Congestion and Safety on Hastings Road
Hastings Road (A2100) is already at breaking point. Traffic is backed up every morning and evening, creating a bottleneck that cannot accommodate the additional vehicle movements generated by a minimum of 250 new dwellings (sites mentioned above). The Battle Neighbourhood Plan (Battle NP) explicitly identifies traffic congestion as a critical weakness of the parish. Adding a major junction to this existing chaos without significant infrastructure upgrades is negligent.
Junction Interference and "Staggered" Conflict At a distance of less than 200 metres, these two major junctions will interfere with one another. Turning movements into BT1 (250 dwellings) will frequently be blocked by "tailback" traffic exiting or entering Blackfriars (210+ dwellings). This creates a high risk of "rear-end" collisions and "side-swipe" accidents as drivers attempt to navigate emerging traffic from two major hubs in such a short span.
The 30mph to 40mph Transition Danger The sites sit at a critical transition point where the speed limit increases from 30mph to 40mph.
Acceleration Risk: Vehicles traveling outbound (towards Hastings) are legally accelerating exactly where the BT1 entrance is proposed.
Braking Distance: Vehicles entering the 30mph zone from the south (inbound) often carry higher speeds before decelerating.
Placing two high-volume junctions in a high-speed transition zone is fundamentally unsafe. The NPPF Paragraph 115 requires that "safe and suitable access to the site can be achieved for all users." Given the topography and speed transition here, this requirement cannot be met.
2. Environmental Impact and Air Quality
Unjustified Harm to the National Landscape (AONB) and Greenfield Land
Greenfield Loss: BT1 proposes building on 11.09 hectares of Greenfield land. This directly contradicts the Battle NP's vision to prioritise brownfield sites and protect the countryside.
National Landscape (AONB) Impact: The site is within the High Weald National Landscape (formerly AONB). Under NPPF Paragraph 190, National Landscapes are afforded the highest level of protection. A density of 40 dwellings per hectare is urban, not rural, and is entirely out of keeping with the character of the High Weald. Major development should only occur in exceptional circumstances (NPPF Paragraph 189).
Wildlife and Trees: The proposal threatens "fields, paddocks" and "High Weald Wildflower Meadow Priority Habitat". The construction of a minimum of 250 homes will inevitably sever wildlife corridors and destroy hedgerows, regardless of "buffer zone" promises.
Flooding Risk and Surface Water (NPPF Paragraph 170) The policy text for BT1 explicitly acknowledges a "surface water flooding risk to the southern boundaries of the site". Replacing natural drainage (fields) with impermeable surfaces (housing/roads) on 11 hectares of land already identified as a flood risk is reckless planning that endangers existing properties downhill, contradicting NPPF Paragraph 170 and failing the current Climate Resilience tests.
3. Infrastructure Deficits and Delivery Failures
Critical Lack of Infrastructure (GP, Dentistry, Schools) The town lacks the capacity to support this population increase. The NPPF (Para 35 and 20) requires Local Plans to set out other infrastructure required (Education, health, transport, flood and water management)
Medical: East Sussex is currently facing a documented "dentistry crisis" with reports indicating 8 in 10 NHS dentists are not accepting new patients. GP practices are similarly reporting "increasing demand" and workforce challenges that make appointments difficult to secure.
Schools: The Council’s own supporting text for BT1 admits the site is "some distance from primary schools" and implies a reliance on "active travel" which is unrealistic given the topography and traffic conditions.
Precedent: We have seen this failure before. The Blackfriars development was approved with promises of infrastructure that have been slow to materialise or insufficient.
The Blackfriars Precedent: "Watered Down" Commitments We have no confidence in the "policy compliant" assurances for BT1 because we have seen the Council fail to deliver on similar promises at Blackfriars. That development was sold as a "gold standard" of green, high-tech housing. However, documents show it faced an £8 million funding gap and underwent "redesign" to "better align with market demand" and "improve efficiencies" due to rising costs. If the flagship Blackfriars project had to be value-engineered due to market pressures, the high-quality, landscape-led masterplan promised for BT1 is likely to be similarly watered down once permission is granted.
Conclusion
This proposal expands development to 250 units on a Greenfield National Landscape site amidst an infrastructure crisis. The plan is unsound as it ignores statutory environmental duties and local experience. I urge the Council to remove development pressure from this area before progressing the plan further.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30828
Received: 21/03/2026
Respondent: Mr and Ms Andrew and Helen Phillips
Number of people: 2
Object to BT1, BT8 and BT10 due to severe existing congestion on Hastings Road. Peak‑time queues, bottlenecks and two major junctions within 200m of Blackfriars would cause unsafe tailbacks, with additional risks created by the 30–40mph speed‑transition zone. BT1 would cause substantial harm to the High Weald National Landscape by building high‑density housing on 11 hectares of greenfield land, severing wildlife corridors and removing countryside character. BT1 also has acknowledged surface‑water flooding risk, which development would worsen. Local GP, dental and school capacity is already inadequate, and similar infrastructure commitments at Blackfriars were not delivered. Economic conditions and unsold recent builds further undermine deliverability. The allocation is unsound.
We are writing to formally submit our objection to the proposed allocations of site BT1 and adjacent sites. As residents of Hastings Road, we have direct, daily experience of the site conditions. This development is unsupportable based on material planning considerations, the democratically adopted Battle Neighbourhood Plan (BNP), and the National Planning Policy Framework (NPPF) 2024/25 (and the subsequent 2025/26 updates regarding National Decision-Making Policies).
1. Traffic Congestion and Safety on Hastings Road
Hastings Road (A2100) is already at breaking point. Traffic is backed up every morning and evening, creating a bottleneck that cannot accommodate the additional vehicle movements generated by a minimum of 250 new dwellings (sites mentioned above). The Battle Neighbourhood Plan (Battle NP) explicitly identifies traffic congestion as a critical weakness of the parish. Adding a major junction to this existing chaos without significant infrastructure upgrades is negligent.
Junction Interference and "Staggered" Conflict At a distance of less than 200 metres, these two major junctions will interfere with one another. Turning movements into BT1 (250 dwellings) will frequently be blocked by "tailback" traffic exiting or entering Blackfriars (210+ dwellings). This creates a high risk of "rear-end" collisions and "side-swipe" accidents as drivers attempt to navigate emerging traffic from two major hubs in such a short span.
The 30mph to 40mph Transition Danger The sites sit at a critical transition point where the speed limit increases from 30mph to 40mph.
• Acceleration Risk: Vehicles traveling outbound (towards Hastings) are legally accelerating exactly where the BT1 entrance is proposed.
• Braking Distance: Vehicles entering the 30mph zone from the south (inbound) often carry higher speeds before decelerating.
Placing two high-volume junctions in a high-speed transition zone is fundamentally unsafe. The NPPF Paragraph 115 requires that "safe and suitable access to the site can be achieved for all users." Given the topography and speed transition here, this requirement cannot be met.
2. Environmental Impact and Air Quality
Unjustified Harm to the National Landscape (AONB) and Greenfield Land
• Greenfield Loss: BT1 proposes building on 11.09 hectares of Greenfield land. This directly contradicts the Battle NP's vision to prioritise brownfield sites and protect the countryside.
• National Landscape (AONB) Impact: The site is within the High Weald National Landscape (formerly AONB). Under NPPF Paragraph 190, National Landscapes are afforded the highest level of protection. A density of 40 dwellings per hectare is urban, not rural, and is entirely out of keeping with the character of the High Weald. Major development should only occur in exceptional circumstances (NPPF Paragraph 189).
• Wildlife and Trees: The proposal threatens "fields, paddocks" and "High Weald Wildflower Meadow Priority Habitat". The construction of a minimum of 250 homes will inevitably sever wildlife corridors and destroy hedgerows, regardless of "buffer zone" promises.
Flooding Risk and Surface Water (NPPF Paragraph 170) The policy text for BT1 explicitly acknowledges a "surface water flooding risk to the southern boundaries of the site". Replacing natural drainage (fields) with impermeable surfaces (housing/roads) on 11 hectares of land already identified as a flood risk is reckless planning that endangers existing properties downhill, contradicting NPPF Paragraph 170 and failing the current Climate Resilience tests.
3. Infrastructure Deficits and Delivery Failures
Critical Lack of Infrastructure (GP, Dentistry, Schools) The town lacks the capacity to support this population increase. The NPPF (Para 35 and 20) requires Local Plans to set out other infrastructure required (Education, health, transport, flood and water management)
• Medical: East Sussex is currently facing a documented "dentistry crisis" with reports indicating 8 in 10 NHS dentists are not accepting new patients. GP practices are similarly reporting "increasing demand" and workforce challenges that make appointments difficult to secure.
• Schools: The Council’s own supporting text for BT1 admits the site is "some distance from primary schools" and implies a reliance on "active travel" which is unrealistic given the topography and traffic conditions.
• Precedent: We have seen this failure before. The Blackfriars development was approved with promises of infrastructure that have been slow to materialise or insufficient.
The Blackfriars Precedent: "Watered Down" Commitments We have no confidence in the "policy compliant" assurances for BT1 because we have seen the Council fail to deliver on similar promises at Blackfriars. That development was sold as a "gold standard" of green, high-tech housing. However, documents show it faced an £8 million funding gap and underwent "redesign" to "better align with market demand" and "improve efficiencies" due to rising costs. If the flagship Blackfriars project had to be value-engineered due to market pressures, the high-quality, landscape-led masterplan promised for BT1 is likely to be similarly watered down once permission is granted.
There are developments that have recently been built, where properties are still not sold, some of there properties do not have access to gas and others in nearby villages did not have a water source.
Rother need to consider the global issues that are causing economic problems at the present and will put the cost of housing and materials up. It is unadvisable for the proposals to go forward.
Conclusion
This proposal expands development to 250 units on a Greenfield National Landscape site amidst an infrastructure crisis. The plan is unsound as it ignores statutory environmental duties and local experience. I urge the Council to remove development pressure from this area before progressing the plan further.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30830
Received: 22/03/2026
Respondent: Dawn Keenan
Proposed Housing at Almonry Farm (BT7)
Objections are summarised as follows.
1. Infrastructure
2. Heritage and Landscape
3. Traffic and Safety
4. Ancient Woodland & Wildlife
5. Flood Risk
Proposed Housing at Almonry Farm (BT7)
I would like to submit the following as objections to the above item in the Draft Local Plan.
I am doing so via email as the option to submit via the Rother District Council document is very difficult to access and is not user friendly.
Objections are as follows.
1. Infrastructure - before any proposals for further housing in the Battle area a credible infrastructure plan must be drawn up and implemented. The town has not yet felt the impact of the Blackfriars development and pressures are already being felt with GP surgeries, schools and local services already being stretched. I work for a local GP and we have outgrown our current premises and have been looking to find new premises with nothing suitable being available.
We have just come out of a prolonged hosepipe ban which has lasted for many months. Water supply is another part of the infrastructure that needs addressing before any further proposed development.
2. Heritage and Landscape - this proposed development forms part of the historic setting of Battle Abbey and the 1066 battlefield. Development here would su urbanise part of one of the most important historic landscapes in Britain. The site lies within nationally protected countryside and once greenfield land is built on it is gone forever.
3. Traffic and Safety - access via Tollgates would add significant traffic to North Trade Road and the A2100. These roads already are gridlocked most days during school start and finish times as the roads service both schools in Battle. There would also be a significant rise in children on pavements during these peak times with the associated risks this would bring. There’s would also be an increased impact on our historic high street this would need to be considered.
4. Ancient Woodland & Wildlife - ancient woodland borders this site. The area supports a wide range of wildlife including, newts, foxes and hedgehogs. This development risks irreversible habitat loss and long-term environmental harm.
5. Flood Risk - parts this proposed site are identified as being at risk from surface water flooding. Building on greenfield land increased run-off and could impact neighbouring areas.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30832
Received: 21/03/2026
Respondent: Sarah Penny
Object to BT6 and BT7. North Trade Road cannot absorb additional traffic from 10 and 80 new homes, with existing congestion worsened by Claverham College drop‑off queues. Proposed junctions would interfere with each other, and BT6 lies within a 30–40mph speed‑transition zone, creating unsafe access. Both sites lie in the High Weald National Landscape and would cause greenfield loss, harm to ancient woodland, heritage assets and wildlife habitats. Parts of both sites have known surface‑water flood risk. Local GP, dental and school capacity is already inadequate, and similar infrastructure promises at Blackfriars were not delivered. The allocations are unsound.
I am writing to formally submit our objection to the proposed allocations of sites BT6 and BT7. As residents of North Trade Road, we have direct, daily experience of the site conditions. These developments are unsupportable based on material planning considerations, the democratically adopted Battle Neighbourhood Plan (BNP), and the National Planning Policy Framework (NPPF) 2024/25 (and the subsequent 2025/26 updates regarding National Decision-Making Policies).
1. Traffic Congestion and Safety on North Trade Road
North Trade Road is already at breaking point. Traffic is backed up every morning and afternoon, creating a bottleneck that cannot accommodate the additional vehicle movements generated by a minimum of new 10 dwellings in BT6 and 80 dwellings in BT7. The Battle Neighbourhood Plan (Battle NP) explicitly identifies traffic congestion as a critical weakness of the parish. Adding major junctions to this existing chaos without significant infrastructure upgrades is negligent.
Junction Interference and "Staggered" Conflict: At a distance of around 600 metres, these two major junctions will interfere with one another and North Trade Road would inevitably be blocked by "tailback" traffic exiting or entering BT7 (80 dwellings), especially considering that in between BT6 and BT7 Claverham College is located with around 1,150 students being dropped off in the morning and picked up in the afternoon – both of which already causing congestion on North Trade Road. All this creates a high risk of "rear-end" collisions and "side-swipe" accidents as drivers attempt to navigate emerging traffic from two major hubs in such a short span.
The 30mph to 40mph Transition Danger: The site (BT6) sits at a critical transition point where the speed limit increases / decreases from 30mph to 40mph.
Acceleration Risk: Vehicles traveling outbound (west bound on North Trade Road) are accelerating where the BT6 entrance is proposed.
Braking Distance: Vehicles entering the 30mph zone from west on North Trade Road (inbound) often carry higher speeds before decelerating.
Placing a high-volume junction in a high-speed transition zone is fundamentally unsafe. The NPPF Paragraph 115 requires that "safe and suitable access to the site can be achieved for all users." Given the topography and speed transition here, this requirement cannot be met.
2. Environmental Impact and Air Quality
Unjustified Harm to the National Landscape (AONB) and Greenfield Land
Greenfield Loss: BT6 and BT7 propose building on 0.58 and 4.80 hectares of Greenfield land. This directly contradicts the Battle NP's vision to prioritise brownfield sites and protect the countryside.
National Landscape (AONB) Impact: The sites are within the High Weald National Landscape (formerly AONB). Under NPPF Paragraph 190, National Landscapes are afforded the highest level of protection. A density of 35 dwellings per hectare is urban, not rural, and is entirely out of keeping with the character of the High Weald. Major developments should only occur in exceptional circumstances (NPPF Paragraph 189).
Ancient Woodland, Deciduous Woodland Priority Habitat and Heritage Constraints: The construction of a minimum of 10 (BT6) and 80 (BT7) homes will inevitably sever wildlife corridors, mature trees and hedging, most importantly ancient woodland. Both the BT6 and the BT7 proposals threaten and affect Ancient Woodland and Deciduous Woodland Priority Habitat located adjacent to the sites. The BT6 plans negatively impact Grade II listed buildings: Beacon Cottage as mentioned in the policy text as well as adjacent Frederick Thatcher Place which is not mentioned in the policy text despite the development being right next to Frederick Thatcher Place. Further to that, BT7 would have an impact on Grade II listed Lower Almonry Farmhouse adjacent to what would be the access to the site, and the site would require an assessment and evaluation of the site’s archaeological potential; the policy text also highlights the site having potential to be of high value for biodiversity including protected species; furthermore it mentions the proximity to heritage assets including the Registered Battlefield where the 1066 Battle of Hastings was fought and Battle Conservation Area.
Flooding Risk and Surface Water (NPPF Paragraph 170): The policy texts for both BT6 and BT7 explicitly acknowledge that parts of the sites are at risk of surface water flooding. Replacing natural drainage with impermeable surfaces (housing/roads) on land already identified as a flood risk is reckless planning that endangers existing properties, contradicting NPPF Paragraph 170 and failing the current Climate Resilience tests.
3. Infrastructure Deficits and Delivery Failures
Critical Lack of Infrastructure (GP, Dentistry, Schools) The town lacks the capacity to support this population increase. The NPPF (Para 35 and 20) requires Local Plans to set out other infrastructure required (Education, health, transport, flood and water management).
Medical: East Sussex is currently facing a documented "dentistry crisis" with reports indicating 8 in 10 NHS dentists are not accepting new patients. GP practices are similarly reporting "increasing demand" and workforce challenges that make appointments difficult to secure.
Schools: The Council’s own supporting text for BT1 admits the site is "some distance from primary schools" and implies a reliance on "active travel" which is unrealistic given the topography and traffic conditions.
Precedent: We have seen this failure before. The Blackfriars development was approved with promises of infrastructure that have been slow to materialise or insufficient.
The Blackfriars Precedent: "Watered Down" Commitments We have no confidence when the policy text for BT7 mentions that “the site is well located in relation to amenities and services in Battle” but no assurances are given how these amenities and services would be sufficient for that many additional dwellings (BT6 doesn't even mention any of that) – we have seen the Council fail to deliver on similar promises at Blackfriars. That development was sold as a "gold standard" of green, high-tech housing. However, documents show it faced an £8 million funding gap and underwent "redesign" to "better align with market demand" and "improve efficiencies" due to rising costs. If the flagship Blackfriars project had to be value-engineered due to market pressures, “an appropriate layout, form and detailed design to ensure the conservation and enhancement of the landscape and character of the High Weald National Landscape and the protection of the setting of heritage assets” for BT7 is likely to be similarly watered down once permission is granted; the same applies to the promise mentioned in the BT7 policy text of “an area of public open space (and no built development) across the western part of the site in line with the ratios indicated above, in order to protect the setting of the adjacent listed building and views from the Battle Abbey Gatehouse Scheduled Monument”.
Conclusion
These proposals expand development to 10 (BT6) and 80 (BT7) dwellings on a Greenfield National Landscape site amidst an infrastructure crisis, with both sites at risk of surface water flooding and threatening ancient woodlands as well as Grade II listed buildings. The plans are unsound as they ignore statutory environmental duties and local experience. I urge the Council to remove development pressure from this area before progressing the plans further.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30834
Received: 23/03/2026
Respondent: Morgan Lloyd-Jones
Objection to Proposed Allocation Policy BT1, BT8, BT10
Objection for reasons including:
- Traffic congestion and safety on Hastings Road
- Environmental impact and air quality
- Infrastructure deficits and delivery failures
- Degradation of an environment of national historic importance
- Blackfriars precedent "watering down" of planning commitments
Conclusion
This proposal expands development to 250 units on a Greenfield National Landscape site amidst an infrastructure crisis. The plan is unsound as it ignores statutory environmental duties and local experience. I urge the Council to remove development pressure from this area before progressing the plan further
Re: Objection to Proposed Allocation Policy BT1, BT8, BT10 (Land south of Hastings Road, Battle) Draft Rother Local Plan (2025-2042)
Date: 26 February 2026
I am writing to formally submit my objection to the proposed allocations of site BT1 and adjacent sites. As a resident of Glengorse, I have direct, daily experience of the site conditions. This development is unsupportable based on material planning considerations, the democratically adopted Battle Neighbourhood Plan (BNP), and the National Planning Policy Framework (NPPF) 2024/25 (and the subsequent 2025/26 updates regarding National Decision-Making Policies).
1. Traffic Congestion and Safety on Hastings Road
Hastings Road (A2100) is already at breaking point. Traffic is backed up every morning and evening, creating a bottleneck that cannot accommodate the additional vehicle movements generated by a minimum of 250 new dwellings (sites mentioned above). The Battle Neighbourhood Plan (Battle NP) explicitly identifies traffic congestion as a critical weakness of the parish. Adding a major junction to this existing chaos without significant infrastructure upgrades is negligent.
The Battle NP explicitly refers to the problematic traffic conditions. It states that Battle’s increasing use as a ‘transport corridor’ has ‘generally increased the problems associated with additional transportation within the confines of our historic town, such as illegal parking and congestion. This has not improved the environment for those living, working or shopping along Battle High Street.’
Junction Interference and "Staggered" Conflict At a distance of less than 200 metres, these two major junctions will interfere with one another. Turning movements into BT1 (250 dwellings) will frequently be blocked by "tailback" traffic exiting or entering Blackfriars (210+ dwellings). This creates a high risk of "rear-end" collisions and "side-swipe" accidents as drivers attempt to navigate emerging traffic from two major hubs in such a short span.
One of the proposed exits for the new site is at Glengorse, a once-quiet residential cul-de-sac. Glengorse is affected by increased volume of traffic on the A2100, making entry and exit increasingly difficult. It is also affected by volume of parking and parking restrictions were recently introduced.
The Glengorse exit is within a short distance of the exit at The Spinney from The Tapestry Development (70 dwellings). The traffic and urban sprawl consequences of these developments would be severe.
The proposed development does not meet the Battle NP’s objective to ‘consider the wider implications and associated costs of traffic movements on the environment and local infrastructure with an overall aim of reduction in the impact of traffic movements’.
The 30mph to 40mph Transition Danger The sites sit at a critical transition point where the speed limit increases from 30mph to 40mph.
• Acceleration Risk: Vehicles traveling outbound (towards Hastings) are legally accelerating exactly where the BT1 entrance is proposed.
• Braking Distance: Vehicles entering the 30mph zone from the south (inbound) often carry higher speeds before decelerating.
Placing two high-volume junctions in a high-speed transition zone is fundamentally unsafe. The NPPF Paragraph 115 requires that "safe and suitable access to the site can be achieved for all users." Given the topography and speed transition here, this requirement cannot be met.
2. Environmental Impact and Air Quality
Unjustified Harm to the National Landscape (AONB) and Greenfield Land
• Greenfield Loss: BT1 proposes building on 11.09 hectares of Greenfield land. This directly contradicts the Battle NP's vision to prioritise brownfield sites and protect the countryside.
• The Battle NP states that the hamlet of Telham – which would be affected by the encroachment of this development - is ‘enclosed by agricultural land it services a small community and acts as a Strategic Green Gap in the fight against urban sprawl.’ The proposed development does not meet the Battle NP’s objective to recognise the separate identities of the areas making up the Parish and to ‘prevent urban sprawl’.
• National Landscape (AONB) Impact: The site is within the High Weald National Landscape (formerly AONB). Under NPPF Paragraph 190, National Landscapes are afforded the highest level of protection. A density of 40 dwellings per hectare is urban, not rural, and is entirely out of keeping with the character of the High Weald. Major development should only occur in exceptional circumstances (NPPF Paragraph 189).
• Wildlife and Trees: The proposal threatens "fields, paddocks" and "High Weald Wildflower Meadow Priority Habitat". The construction of a minimum of 250 homes will inevitably sever wildlife corridors and destroy hedgerows, regardless of "buffer zone" promises.
• The land around the Glengorse Estate was once defined as parkland. Although Telham Court, the property which sits on the Glengorse Estate, is proposed to be protected under the development, the land around it will not be protected. The development will create further light pollution.
• Due consideration cannot have been given to the historic nature of the town and surrounding area. Battle NP states that ‘Battle itself is of national and international importance’. Battle town centre is largely medieval and consists of one street, the road through which is typically in a very poor state of disrepair. It already struggles under the volume of traffic, which would be further increased by this development, and vehicles of the nature required for a major development would cause to the historic buildings.
Flooding Risk and Surface Water (NPPF Paragraph 170) The policy text for BT1 explicitly acknowledges a "surface water flooding risk to the southern boundaries of the site". Replacing natural drainage (fields) with impermeable surfaces (housing/roads) on 11 hectares of land already identified as a flood risk is reckless planning that endangers existing properties downhill, contradicting NPPF Paragraph 170 and failing the current Climate Resilience tests.
The proposed development fails to meet the Battle NP’s objective that ‘To protect and enhance our existing and future open spaces, any new development proposal should conserve and enhance the environment, ecosystem and biodiversity, ensuring that it gives protection to heritage assets, habitats and provides appropriate movement corridors for wildlife.’
3. Infrastructure Deficits and Delivery Failures
Critical Lack of Infrastructure (eg GP, Dentistry, Schools) The town lacks the capacity to support this population increase. The NPPF (Para 35 and 20) requires Local Plans to set out other infrastructure required (Education, health, transport, flood and water management)
• Medical: East Sussex is currently facing a documented "dentistry crisis" with reports indicating 8 in 10 NHS dentists are not accepting new patients. GP practices are similarly reporting "increasing demand" and workforce challenges that make appointments difficult to secure.
• Schools: The Council’s own supporting text for BT1 admits the site is "some distance from primary schools" and implies a reliance on "active travel" which is unrealistic given the topography and traffic conditions.
• Transport: The Battle NP states that there is a ‘distinct lack of public transport within the Parish.’ Increasing housing stock without improving public transport is irresponsible, and would only increase reliance upon vehicular traffic. Among the ‘weaknesses’ identified in the Battle NP are traffic congestion, parking difficulties, lack of public transport and highway maintenance.
• Precedent: We have seen this failure before. The Blackfriars development was approved with promises of infrastructure that have been slow to materialise or insufficient.
The Blackfriars Precedent: "Watered Down" Commitments We have no confidence in the "policy compliant" assurances for BT1 because we have seen the Council fail to deliver on similar promises at Blackfriars. That development was sold as a "gold standard" of green, high-tech housing. However, documents show it faced an £8 million funding gap and underwent "redesign" to "better align with market demand" and "improve efficiencies" due to rising costs. If the flagship Blackfriars project had to be value-engineered due to market pressures, the high-quality, landscape-led masterplan promised for BT1 is likely to be similarly watered down once permission is granted.
Previous proposal
The proposed development is situated on land owned by two absentee landowners, who both live abroad, as far as we know. These landowners, who are property developers, previously proposed a development in which Glengorse would form one entrance and Marylands (34 Hastings Road) the other. The Glengorse Estate, which sits behind the housing cul-de-sac, was purchased with the intention of development. The previous proposed development was subject to objection and was rejected on the grounds that it contravened the then-current policy on the ‘strategic gap’.
In 2019, the Battle NP’s inclusion of a site at Glengorse (original site ref BA31a) was amended in light of the proposed development at Blackfriars. The Battle NP stated that the likely development of Blackfriars rendered the Glengorse development ‘too large a development in a similar location’.
As the previous rejections proposed development does not meet the Battle NP’s objective that developments ‘should meet the needs and wishes of the community’.
Marylands is presently listed on Rightmove with SJD Tunbridge Wells (a development consultancy) as a development opportunity and is presently under offer. The listing states that the ‘land to the west of the site has recently been allocated so it is considered that this land may offer future potential subject to usual consents’.
[https://www.rightmove.co.uk/properties/166422503#/?channel=COM_BUY]
Degradation of an environment of national historical importance
The current housing developments together with the proposed further developments in Battle represent a very real threat to the safeguarding of this site of great historical significance.
Battle’s whole structure as a small town reflects its medieval origins. The very essence of the composition of and distance between settlements, dating back to its foundation, reflects what once was a common pattern across the country; in short, it represents something of national importance which merits particular respect and due attention to conservation. The very act of expanding beyond measure what was once a small town characterised by its historical roots is an act of cultural destruction which must not go unchallenged.
Conclusion
This proposal expands development to 250 units on a Greenfield National Landscape site amidst an infrastructure crisis. The plan is unsound as it ignores statutory environmental duties and local experience. I urge the Council to remove development pressure from this area before progressing the plan further.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30836
Received: 23/03/2026
Respondent: Hannah Geddes
Objection to Proposed Allocation Policy BT1, BT8, BT10
Objections for reasons including:
- Traffic Congestion and Safety on Hastings Road
- Environmental Impact and Air Quality
- Infrastructure Deficits and Delivery Failures
- The Blackfriars Precedent: "Watered Down" Commitments
Conclusion
This proposal expands development to 250 units on a Greenfield National Landscape site amidst an infrastructure crisis. The plan is unsound as it ignores statutory environmental duties and local experience. I urge the Council to remove development pressure from this area before progressing the plan further.
Re: Objection to Proposed Allocation Policy BT1, BT8, BT10 (Land south of Hastings Road, Battle) Draft Rother Local Plan (2025-2042)
Date:
We are writing to formally submit our objection to the proposed allocations of site BT1 and adjacent sites. As residents of Hastings Road, we have direct, daily experience of the site conditions. This development is unsupportable based on material planning considerations, the democratically adopted Battle Neighbourhood Plan (BNP), and the National Planning Policy Framework (NPPF) 2024/25 (and the subsequent 2025/26 updates regarding National Decision-Making Policies).
1. Traffic Congestion and Safety on Hastings Road
Hastings Road (A2100) is already at breaking point. Traffic is backed up every morning and evening, creating a bottleneck that cannot accommodate the additional vehicle movements generated by a minimum of 250 new dwellings (sites mentioned above). The Battle Neighbourhood Plan (Battle NP) explicitly identifies traffic congestion as a critical weakness of the parish. Adding a major junction to this existing chaos without significant infrastructure upgrades is negligent.
Junction Interference and "Staggered" Conflict At a distance of less than 200 metres, these two major junctions will interfere with one another. Turning movements into BT1 (250 dwellings) will frequently be blocked by "tailback" traffic exiting or entering Blackfriars (210+ dwellings). This creates a high risk of "rear-end" collisions and "side-swipe" accidents as drivers attempt to navigate emerging traffic from two major hubs in such a short span.
The 30mph to 40mph Transition Danger The sites sit at a critical transition point where the speed limit increases from 30mph to 40mph.
• Acceleration Risk: Vehicles traveling outbound (towards Hastings) are legally accelerating exactly where the BT1 entrance is proposed.
• Braking Distance: Vehicles entering the 30mph zone from the south (inbound) often carry higher speeds before decelerating.
Placing two high-volume junctions in a high-speed transition zone is fundamentally unsafe. The NPPF Paragraph 115 requires that "safe and suitable access to the site can be achieved for all users." Given the topography and speed transition here, this requirement cannot be met.
2. Environmental Impact and Air Quality
Unjustified Harm to the National Landscape (AONB) and Greenfield Land
• Greenfield Loss: BT1 proposes building on 11.09 hectares of Greenfield land. This directly contradicts the Battle NP's vision to prioritise brownfield sites and protect the countryside.
• National Landscape (AONB) Impact: The site is within the High Weald National Landscape (formerly AONB). Under NPPF Paragraph 190, National Landscapes are afforded the highest level of protection. A density of 40 dwellings per hectare is urban, not rural, and is entirely out of keeping with the character of the High Weald. Major development should only occur in exceptional circumstances (NPPF Paragraph 189).
• Wildlife and Trees: The proposal threatens "fields, paddocks" and "High Weald Wildflower Meadow Priority Habitat". The construction of a minimum of 250 homes will inevitably sever wildlife corridors and destroy hedgerows, regardless of "buffer zone" promises.
Flooding Risk and Surface Water (NPPF Paragraph 170) The policy text for BT1 explicitly acknowledges a "surface water flooding risk to the southern boundaries of the site". Replacing natural drainage (fields) with impermeable surfaces (housing/roads) on 11 hectares of land already identified as a flood risk is reckless planning that endangers existing properties downhill, contradicting NPPF Paragraph 170 and failing the current Climate Resilience tests.
3. Infrastructure Deficits and Delivery Failures
Critical Lack of Infrastructure (GP, Dentistry, Schools) The town lacks the capacity to support this population increase. The NPPF (Para 35 and 20) requires Local Plans to set out other infrastructure required (Education, health, transport, flood and water management)
• Medical: East Sussex is currently facing a documented "dentistry crisis" with reports indicating 8 in 10 NHS dentists are not accepting new patients. GP practices are similarly reporting "increasing demand" and workforce challenges that make appointments difficult to secure.
• Schools: The Council’s own supporting text for BT1 admits the site is "some distance from primary schools" and implies a reliance on "active travel" which is unrealistic given the topography and traffic conditions.
• Precedent: We have seen this failure before. The Blackfriars development was approved with promises of infrastructure that have been slow to materialise or insufficient.
The Blackfriars Precedent: "Watered Down" Commitments We have no confidence in the "policy compliant" assurances for BT1 because we have seen the Council fail to deliver on similar promises at Blackfriars. That development was sold as a "gold standard" of green, high-tech housing. However, documents show it faced an £8 million funding gap and underwent "redesign" to "better align with market demand" and "improve efficiencies" due to rising costs. If the flagship Blackfriars project had to be value-engineered due to market pressures, the high-quality, landscape-led masterplan promised for BT1 is likely to be similarly watered down once permission is granted.
Conclusion
This proposal expands development to 250 units on a Greenfield National Landscape site amidst an infrastructure crisis. The plan is unsound as it ignores statutory environmental duties and local experience. I urge the Council to remove development pressure from this area before progressing the plan further.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30837
Received: 22/03/2026
Respondent: Michelle Mitchell
Object to BT1 and nearby allocations. Hastings Road already suffers severe congestion, with queues each morning and evening. Two major junctions within 200m of Blackfriars would create dangerous tailbacks and collision risks, worsened by the 30–40mph speed‑transition zone. BT1 would cause major harm to the High Weald National Landscape, placing 250 high‑density homes on greenfield land and breaking up wildlife habitat. Surface‑water flood risk is acknowledged in the policy and would worsen with development. Local GP, dental and school capacity is already overstretched, and previous infrastructure commitments at Blackfriars were not delivered. The allocation is unsafe, harmful and unsound.
Re: Objection to Proposed Allocation Policy BT1, BT8, BT10 (Land south of Hastings Road, Battle) Draft Rother Local Plan (2025-2042)
Date:
We are writing to formally submit our objection to the proposed allocations of site BT1 and adjacent sites. As residents of Hastings Road, we have direct, daily experience of the site conditions. This development is unsupportable based on material planning considerations, the democratically adopted Battle Neighbourhood Plan (BNP), and the National Planning Policy Framework (NPPF) 2024/25 (and the subsequent 2025/26 updates regarding National Decision-Making Policies).
1. Traffic Congestion and Safety on Hastings Road
Hastings Road (A2100) is already at breaking point. Traffic is backed up every morning and evening, creating a bottleneck that cannot accommodate the additional vehicle movements generated by a minimum of 250 new dwellings (sites mentioned above). The Battle Neighbourhood Plan (Battle NP) explicitly identifies traffic congestion as a critical weakness of the parish. Adding a major junction to this existing chaos without significant infrastructure upgrades is negligent.
Junction Interference and "Staggered" Conflict At a distance of less than 200 metres, these two major junctions will interfere with one another. Turning movements into BT1 (250 dwellings) will frequently be blocked by "tailback" traffic exiting or entering Blackfriars (210+ dwellings). This creates a high risk of "rear-end" collisions and "side-swipe" accidents as drivers attempt to navigate emerging traffic from two major hubs in such a short span.
The 30mph to 40mph Transition Danger The sites sit at a critical transition point where the speed limit increases from 30mph to 40mph.
• Acceleration Risk: Vehicles traveling outbound (towards Hastings) are legally accelerating exactly where the BT1 entrance is proposed.
• Braking Distance: Vehicles entering the 30mph zone from the south (inbound) often carry higher speeds before decelerating.
Placing two high-volume junctions in a high-speed transition zone is fundamentally unsafe. The NPPF Paragraph 115 requires that "safe and suitable access to the site can be achieved for all users." Given the topography and speed transition here, this requirement cannot be met.
2. Environmental Impact and Air Quality
Unjustified Harm to the National Landscape (AONB) and Greenfield Land
• Greenfield Loss: BT1 proposes building on 11.09 hectares of Greenfield land. This directly contradicts the Battle NP's vision to prioritise brownfield sites and protect the countryside.
• National Landscape (AONB) Impact: The site is within the High Weald National Landscape (formerly AONB). Under NPPF Paragraph 190, National Landscapes are afforded the highest level of protection. A density of 40 dwellings per hectare is urban, not rural, and is entirely out of keeping with the character of the High Weald. Major development should only occur in exceptional circumstances (NPPF Paragraph 189).
• Wildlife and Trees: The proposal threatens "fields, paddocks" and "High Weald Wildflower Meadow Priority Habitat". The construction of a minimum of 250 homes will inevitably sever wildlife corridors and destroy hedgerows, regardless of "buffer zone" promises.
Flooding Risk and Surface Water (NPPF Paragraph 170) The policy text for BT1 explicitly acknowledges a "surface water flooding risk to the southern boundaries of the site". Replacing natural drainage (fields) with impermeable surfaces (housing/roads) on 11 hectares of land already identified as a flood risk is reckless planning that endangers existing properties downhill, contradicting NPPF Paragraph 170 and failing the current Climate Resilience tests.
3. Infrastructure Deficits and Delivery Failures
Critical Lack of Infrastructure (GP, Dentistry, Schools) The town lacks the capacity to support this population increase. The NPPF (Para 35 and 20) requires Local Plans to set out other infrastructure required (Education, health, transport, flood and water management)
• Medical: East Sussex is currently facing a documented "dentistry crisis" with reports indicating 8 in 10 NHS dentists are not accepting new patients. GP practices are similarly reporting "increasing demand" and workforce challenges that make appointments difficult to secure.
• Schools: The Council’s own supporting text for BT1 admits the site is "some distance from primary schools" and implies a reliance on "active travel" which is unrealistic given the topography and traffic conditions.
• Precedent: We have seen this failure before. The Blackfriars development was approved with promises of infrastructure that have been slow to materialise or insufficient.
The Blackfriars Precedent: "Watered Down" Commitments We have no confidence in the "policy compliant" assurances for BT1 because we have seen the Council fail to deliver on similar promises at Blackfriars. That development was sold as a "gold standard" of green, high-tech housing. However, documents show it faced an £8 million funding gap and underwent "redesign" to "better align with market demand" and "improve efficiencies" due to rising costs. If the flagship Blackfriars project had to be value-engineered due to market pressures, the high-quality, landscape-led masterplan promised for BT1 is likely to be similarly watered down once permission is granted.
Conclusion
This proposal expands development to 250 units on a Greenfield National Landscape site amidst an infrastructure crisis. The plan is unsound as it ignores statutory environmental duties and local experience. I urge the Council to remove development pressure from this area before progressing the plan further.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30838
Received: 22/03/2026
Respondent: Lydia Crouch
Object to BT1, BT8 and BT10. The A2100 already experiences severe peak‑time congestion, and placing another major access just 191m from Blackfriars creates a dangerous conflict zone, especially in a 30–40mph speed‑transition area, failing NPPF requirements for safe access. The sites lie in the High Weald National Landscape, and proposals would cause significant visual harm, high‑density urbanisation of greenfield land, loss of rural character, and damage to wildlife corridors and habitats. Parts of the site are at surface‑water flood risk. GP, dental and school services are already overstretched, with no firm infrastructure commitments. The proposals conflict with the Battle Neighbourhood Plan and are unsound.
Dear Sir/Madam,
Re: Draft Rother Local Plan 2025–2042 – Proposed Housing Allocations BT1, BT8 and BT10
I am writing to formally object to the proposed housing allocations BT1, BT8, and BT10 in the Draft Rother Local Plan (2025–2042), which would deliver a minimum of 250 new dwellings on greenfield land south of Hastings Road, adjacent to Loose Farm, Glengorse, and close to the Blackfriars development.
Having reviewed the draft policy and the associated site proposals, I strongly oppose these allocations for the reasons set out below.
________________________________________
1. Severe Traffic, Road Safety, and Highways Impact
The proposed access point to BT1 is only 191.8 metres from the Blackfriars development entrance, creating a hazardous conflict zone along the already congested A2100 (Hastings Road).
This area already experiences:
● High peak-time congestion
● Queueing at junctions on steep gradients
● Limited overtaking opportunities
● Restricted visibility
Adding traffic from over 250 additional dwellings would significantly worsen:
● Collision risk
● Emergency vehicle delays
● Congestion for local and through-traffic
● Air quality impacts
The A2100 simply cannot safely absorb the projected traffic levels associated with these developments. An independent and comprehensive highways assessment is essential.
________________________________________
2. Harm to High Weald National Landscape (AONB)
The proposed sites sit within the High Weald National Landscape (Area of Outstanding Natural Beauty), a nationally protected landscape with the highest level of planning protection under the National Planning Policy Framework (NPPF).
Key concerns include:
● Irreversible loss of tranquillity and rural character
● Urbanisation of valued open countryside
● Visual harm from massed housing on elevated land
● Erosion of the historic landscape pattern
The Battle Neighbourhood Plan originally suggested just 15 homes for this general area, acknowledging its high sensitivity. The current proposal for 250+ homes represents a dramatic and unjustified departure from adopted local evidence.
Under national policy, major development in an AONB should be refused unless exceptional circumstances can be clearly demonstrated—something this proposal does not achieve.
________________________________________
3. Lack of Infrastructure Capacity (GPs, Dentists, Schools, Emergency Services)
Local services are already overstretched:
● GP surgeries report severe appointment shortages.
● Dental practices are at capacity, many not accepting new NHS patients.
● Local schools operate close to or at maximum pupil numbers.
● Hospital and urgent care services already experience delays and long waiting times.
The Draft Plan offers no firm or funded commitments to expand these essential services.
Without guaranteed, timely infrastructure provision, the development would place unsustainable pressure on already overstretched facilities.
________________________________________
4. Environmental and Wildlife Impacts
The site contains ecologically valuable greenfield land that provides:
● Wildlife corridors
● Hedgerow and tree habitats
● Foraging grounds
● Natural drainage
Loss of these habitats would negatively affect local species such as bats, [protected species], birds, and other protected or priority wildlife.
Additionally:
● The area is known to experience surface water run-off from higher ground.
● Hard landscaping and soil compaction would increase downstream flood risk to existing properties.
Proper ecological surveys must be carried out in appropriate seasons, not based solely on developers’ desk-based assessments.
________________________________________
5. Flooding, Drainage and Sewage Concerns
Properties downhill from the proposed sites are already vulnerable to:
● Surface water flooding
● Drainage overload
● Overflow from nearby systems during heavy rainfall
The introduction of roads, rooftops, and impermeable surfaces would worsen surface water flow and increase the risk of flooding.
There is also no clear evidence that the local sewage and wastewater network has capacity for several hundred additional homes.
________________________________________
6. Settlement Pattern and Overdevelopment
The proposals would create a high-density urban extension that sits:
● Outside the existing settlement boundary
● At odds with the character of the surrounding rural environment
● In conflict with the pattern of development set out in the Battle Neighbourhood Plan
The scale and massing proposed are inappropriate for this sensitive landscape and are not supported by local plan evidence.
________________________________________
7. Lack of Sustainable Transport and Increased Car Dependence
The site is poorly served by:
● Frequent public transport
● Safe cycling infrastructure
● Continuous pavements
Residents would be entirely car-dependent, contradicting sustainability requirements within the NPPF.
________________________________________
Conclusion
For the reasons outlined above—traffic and highway safety risks, AONB harm, lack of infrastructure capacity, environmental damage, drainage concerns, and conflict with the Battle Neighbourhood Plan—I strongly object to the proposed allocations BT1, BT8, and BT10 in their current form.
I urge Rother District Council to remove these sites from the Draft Local Plan and to reconsider development locations that are sustainable, safe, landscape-appropriate, and aligned with community-supported planning evidence.
Thank you for considering my representation.
Yours faithfully,
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30839
Received: 22/03/2026
Respondent: Kim Kempster
Object to BT1, BT8 and BT10. Hastings Road already experiences severe congestion, and placing a new access less than 200m from Blackfriars would create tailbacks, unsafe turning movements and increased collision risk, especially in the 30–40mph speed‑transition zone, failing NPPF safety requirements. BT1 would cause major harm to the High Weald National Landscape by urbanising 11 hectares of greenfield land, damaging wildlife corridors, hedgerows and valued landscape. The site carries acknowledged surface‑water flood risks. GP, dental and school capacity is already overstretched, and past infrastructure promises at Blackfriars were not delivered. The allocation is unsafe, environmentally harmful and unsound.
Re: Objection to Proposed Allocation Policy BT1, BT8, BT10 (Land south of Hastings Road, Battle) Draft Rother Local Plan (2025-2042)
Date:
We are writing to formally submit our objection to the proposed allocations of site BT1 and adjacent sites. As residents of Hastings Road, we have direct, daily experience of the site conditions. This development is unsupportable based on material planning considerations, the democratically adopted Battle Neighbourhood Plan (BNP), and the National Planning Policy Framework (NPPF) 2024/25 (and the subsequent 2025/26 updates regarding National Decision-Making Policies).
1. Traffic Congestion and Safety on Hastings Road
Hastings Road (A2100) is already at breaking point. Traffic is backed up every morning and evening, creating a bottleneck that cannot accommodate the additional vehicle movements generated by a minimum of 250 new dwellings (sites mentioned above). The Battle Neighbourhood Plan (Battle NP) explicitly identifies traffic congestion as a critical weakness of the parish. Adding a major junction to this existing chaos without significant infrastructure upgrades is negligent.
Junction Interference and "Staggered" Conflict At a distance of less than 200 metres, these two major junctions will interfere with one another. Turning movements into BT1 (250 dwellings) will frequently be blocked by "tailback" traffic exiting or entering Blackfriars (210+ dwellings). This creates a high risk of "rear-end" collisions and "side-swipe" accidents as drivers attempt to navigate emerging traffic from two major hubs in such a short span.
The 30mph to 40mph Transition Danger The sites sit at a critical transition point where the speed limit increases from 30mph to 40mph.
• Acceleration Risk: Vehicles traveling outbound (towards Hastings) are legally accelerating exactly where the BT1 entrance is proposed.
• Braking Distance: Vehicles entering the 30mph zone from the south (inbound) often carry higher speeds before decelerating.
Placing two high-volume junctions in a high-speed transition zone is fundamentally unsafe. The NPPF Paragraph 115 requires that "safe and suitable access to the site can be achieved for all users." Given the topography and speed transition here, this requirement cannot be met.
2. Environmental Impact and Air Quality
Unjustified Harm to the National Landscape (AONB) and Greenfield Land
• Greenfield Loss: BT1 proposes building on 11.09 hectares of Greenfield land. This directly contradicts the Battle NP's vision to prioritise brownfield sites and protect the countryside.
• National Landscape (AONB) Impact: The site is within the High Weald National Landscape (formerly AONB). Under NPPF Paragraph 190, National Landscapes are afforded the highest level of protection. A density of 40 dwellings per hectare is urban, not rural, and is entirely out of keeping with the character of the High Weald. Major development should only occur in exceptional circumstances (NPPF Paragraph 189).
• Wildlife and Trees: The proposal threatens "fields, paddocks" and "High Weald Wildflower Meadow Priority Habitat". The construction of a minimum of 250 homes will inevitably sever wildlife corridors and destroy hedgerows, regardless of "buffer zone" promises.
Flooding Risk and Surface Water (NPPF Paragraph 170) The policy text for BT1 explicitly acknowledges a "surface water flooding risk to the southern boundaries of the site". Replacing natural drainage (fields) with impermeable surfaces (housing/roads) on 11 hectares of land already identified as a flood risk is reckless planning that endangers existing properties downhill, contradicting NPPF Paragraph 170 and failing the current Climate Resilience tests.
3. Infrastructure Deficits and Delivery Failures
Critical Lack of Infrastructure (GP, Dentistry, Schools) The town lacks the capacity to support this population increase. The NPPF (Para 35 and 20) requires Local Plans to set out other infrastructure required (Education, health, transport, flood and water management)
• Medical: East Sussex is currently facing a documented "dentistry crisis" with reports indicating 8 in 10 NHS dentists are not accepting new patients. GP practices are similarly reporting "increasing demand" and workforce challenges that make appointments difficult to secure.
• Schools: The Council’s own supporting text for BT1 admits the site is "some distance from primary schools" and implies a reliance on "active travel" which is unrealistic given the topography and traffic conditions.
• Precedent: We have seen this failure before. The Blackfriars development was approved with promises of infrastructure that have been slow to materialise or insufficient.
The Blackfriars Precedent: "Watered Down" Commitments We have no confidence in the "policy compliant" assurances for BT1 because we have seen the Council fail to deliver on similar promises at Blackfriars. That development was sold as a "gold standard" of green, high-tech housing. However, documents show it faced an £8 million funding gap and underwent "redesign" to "better align with market demand" and "improve efficiencies" due to rising costs. If the flagship Blackfriars project had to be value-engineered due to market pressures, the high-quality, landscape-led masterplan promised for BT1 is likely to be similarly watered down once permission is granted.
Conclusion
This proposal expands development to 250 units on a Greenfield National Landscape site amidst an infrastructure crisis. The plan is unsound as it ignores statutory environmental duties and local experience. I urge the Council to remove development pressure from this area before progressing the plan further.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30841
Received: 22/03/2026
Respondent: Hayley Loft
Object to BT1, BT8 and BT10. Hastings Road is already severely congested, with queues at peak times and unsafe road conditions. Two major junctions less than 200 metres apart would create tailbacks and collision risks, especially in the 30–40mph speed‑transition zone, failing NPPF requirements for safe access. BT1 would urbanise 11 hectares of greenfield land within the High Weald National Landscape, causing significant landscape harm and loss of wildlife corridors. The site carries known surface‑water flood risk. GP, dental and school capacity is already overstretched, and previous infrastructure promises at Blackfriars were not delivered. The allocation is unsafe, environmentally damaging and unsound.
Re: Objection to Proposed Allocation Policy BT1, BT8, BT10 (Land south of Hastings Road,
Battle) Draft Rother Local Plan (2025-2042)
Date:
We are writing to formally submit our objection to the proposed allocations of site BT1 and
adjacent sites. As residents of Hastings Road, we have direct, daily experience of the site
conditions. This development is unsupportable based on material planning considerations, the
democratically adopted Battle Neighbourhood Plan (BNP), and the National Planning Policy
Framework (NPPF) 2024/25 (and the subsequent 2025/26 updates regarding National Decision
Making Policies).
1. Traffic Congestion and Safety on Hastings Road
Hastings Road (A2100) is already at breaking point. Traffic is backed up every morning and
evening, creating a bottleneck that cannot accommodate the additional vehicle movements
generated by a minimum of 250 new dwellings (sites mentioned above). The Battle
Neighbourhood Plan (Battle NP) explicitly identifies traffic congestion as a critical weakness of
the parish. Adding a major junction to this existing chaos without significant infrastructure
upgrades is negligent.
Junction Interference and "Staggered" Conflict At a distance of less than 200 metres, these
two major junctions will interfere with one another. Turning movements into BT1 (250 dwellings)
will frequently be blocked by "tailback" traffic exiting or entering Blackfriars (210+ dwellings).
This creates a high risk of "rear-end" collisions and "side-swipe" accidents as drivers attempt to
navigate emerging traffic from two major hubs in such a short span.
The 30mph to 40mph Transition Danger The sites sit at a critical transition point where the
speed limit increases from 30mph to 40mph.
• Acceleration Risk: Vehicles traveling outbound (towards Hastings) are legally
accelerating exactly where the BT1 entrance is proposed.
• Braking Distance: Vehicles entering the 30mph zone from the south (inbound) often
carry higher speeds before decelerating.
Placing two high-volume junctions in a high-speed transition zone is fundamentally unsafe. The
NPPF Paragraph 115 requires that "safe and suitable access to the site can be achieved for all
users." Given the topography and speed transition here, this requirement cannot be met.
2. Environmental Impact and Air Quality
Unjustified Harm to the National Landscape (AONB) and Greenfield Land
• Greenfield Loss: BT1 proposes building on 11.09 hectares of Greenfield land. This
directly contradicts the Battle NP's vision to prioritise brownfield sites and protect the
countryside.
• National Landscape (AONB) Impact: The site is within the High Weald National
Landscape (formerly AONB). Under NPPF Paragraph 190, National Landscapes are
afforded the highest level of protection. A density of 40 dwellings per hectare is urban,
not rural, and is entirely out of keeping with the character of the High Weald. Major
development should only occur in exceptional circumstances (NPPF Paragraph 189).
• Wildlife and Trees: The proposal threatens "fields, paddocks" and "High Weald
Wildflower Meadow Priority Habitat". The construction of a minimum of 250 homes will
inevitably sever wildlife corridors and destroy hedgerows, regardless of "buffer zone"
promises.
Flooding Risk and Surface Water (NPPF Paragraph 170) The policy text for BT1 explicitly
acknowledges a "surface water flooding risk to the southern boundaries of the site". Replacing
natural drainage (fields) with impermeable surfaces (housing/roads) on 11 hectares of land
already identified as a flood risk is reckless planning that endangers existing properties
downhill, contradicting NPPF Paragraph 170 and failing the current Climate Resilience tests.
3. Infrastructure Deficits and Delivery Failures
Critical Lack of Infrastructure (GP, Dentistry, Schools) The town lacks the capacity to support
this population increase. The NPPF (Para 35 and 20) requires Local Plans to set out other
infrastructure required (Education, health, transport, flood and water management)
• Medical: East Sussex is currently facing a documented "dentistry crisis" with reports
indicating 8 in 10 NHS dentists are not accepting new patients. GP practices are
similarly reporting "increasing demand" and workforce challenges that make
appointments difficult to secure.
• Schools: The Council’s own supporting text for BT1 admits the site is "some distance
from primary schools" and implies a reliance on "active travel" which is unrealistic given
the topography and traffic conditions.
• Precedent: We have seen this failure before. The Blackfriars development was approved
with promises of infrastructure that have been slow to materialise or insufficient.
The Blackfriars Precedent: "Watered Down" Commitments We have no confidence in the
"policy compliant" assurances for BT1 because we have seen the Council fail to deliver on
similar promises at Blackfriars. That development was sold as a "gold standard" of green, high
tech housing. However, documents show it faced an £8 million funding gap and underwent
"redesign" to "better align with market demand" and "improve efficiencies" due to rising costs. If
the flagship Blackfriars project had to be value-engineered due to market pressures, the high
quality, landscape-led masterplan promised for BT1 is likely to be similarly watered down once
permission is granted.
Conclusion
This proposal expands development to 250 units on a Greenfield National Landscape site
amidst an infrastructure crisis. The plan is unsound as it ignores statutory environmental duties
and local experience. I urge the Council to remove development pressure from this area before
progressing the plan further.
Support
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30851
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
BT2 proposes approximately 145 homes with primary access from the A2100. The site must be understood as part of a wider cross‑boundary growth area, as Hastings Borough Council is simultaneously identifying Land at Breadsell as a “Development Potential Area” in its emerging Local Plan. Both authorities are therefore contemplating a strategic, shared Housing Market Area allocation. Any allocation at BT2 must be planned collaboratively between Rother and Hastings to ensure coordinated infrastructure, delivery, and master‑planning across the boundary.
See attachments.
Support
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30852
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
BT2 is jointly identified by Rother DC and Hastings BC as suitable for residential‑led development, subject to detailed technical assessment. Both authorities recognise the need to understand and protect the hydrology of Marline Valley Woods SSSI. A jointly commissioned hydrological monitoring programme will run over the next year to inform drainage and ensure no adverse effects on the SSSI. A coordinated cross‑boundary scheme is required, with primary access from the A2100 in Rother and most housing within Hastings. Further work is needed on landscape, ancient woodland protection, connectivity and efficient land use. The site is considered deliverable subject to resolving hydrology impacts.
See attachments.
Support
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30853
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
BT2 spans both Rother and Hastings administrative boundaries, with steeper gradients on the Hastings side. Wates considers that a density above the 35 dph referenced in Policy BT2 is likely achievable while still responding to the landscape sensitivity of the nearby High Weald National Landscape. Based on site levels and physical characteristics, their masterplanner advises that an average density of around 40 dph (net) is feasible when the site is considered as a whole across both authorities.
See attachments.
Support
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30854
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
Draft Policy BT2 requires the Rother element of Breadsell to form part of a comprehensive cross‑boundary scheme with the larger adjoining site in Hastings. Wates accepts this principle, noting that the rationale is to ensure development is large enough to deliver infrastructure and improve accessibility. The functional relationship between Rother and Hastings is well established in the HEDNA, confirming a shared Housing Market Area. Wates confirms it intends to submit a coordinated, cross‑boundary application and is willing to work with adjoining land interests. Its Vision Document outlines an emerging joint masterplanning approach consistent with the policy requirement.
See attachments.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30856
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
Draft Policy BT2 - Policy Requirement 2 requires on‑site affordable housing in line with Policy HOU2, but HOU2 has not yet been published, making viability impossible to assess at this stage. Wates agrees affordable housing should be delivered but notes that viability depends on several unresolved issues, including the need for a complex drainage strategy to avoid impacts on the adjacent SSSI, and further investigation of ground levels and stability. Cross‑boundary infrastructure contributions also require coordination between Rother (which uses CIL) and Hastings (which does not). Until affordable housing targets and infrastructure expectations are clarified, it is unclear whether BT2 can meet Requirement 2.
See attachments.
Support
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30857
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
BT2 - Policy Requirement 3: No objection. Wates agrees that development at Breadsell must be informed by a landscape sensitivity assessment to ensure the setting of the High Weald National Landscape is conserved. The site’s topography and landscape features, including adjacent ancient woodland, require careful design. A full Landscape and Visual Impact Assessment (LVIA) will accompany any planning application and will shape a landscape‑led scheme that responds to the site’s landform, protects sensitive areas and incorporates necessary mitigation.
See attachments.
Support
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30858
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
BT2 - Policy Requirement 4: Wates agrees that development must comply with recommendations from ecological and hydrological surveys to protect Marline Woods SSSI. A Hydroecological Assessment has been completed, recommending a year‑long water‑monitoring programme and an outline drainage strategy designed to avoid impacts on the SSSI and adjacent ancient woodland. Infiltration testing began in December 2025 and continues throughout the year to gather essential data on groundwater, surface water and soil conditions. Wates supports this requirement and will continue working with Rother, Hastings, East Sussex County Council and Natural England to provide all necessary evidence.
See attachments.
Support
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30859
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
BT2 Policy Requirement 5: Support. Wates agrees a new vehicular access from the A2100 is essential and has commissioned iTransport to design a safe junction. Their Transport Delivery Note shows that a simple priority T‑junction would operate with ample spare capacity for the scale of development proposed. Although not required for capacity, a ghost‑island arrangement has also been assessed and is feasible with minor widening, improving pedestrian and cycle crossing opportunities. There is sufficient A2100 frontage to provide a separate emergency access. Wates is satisfied that a safe and deliverable vehicular access can be secured for BT2.
See attachments.
Support
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30860
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
BT2 Policy Requirement 6: Support in principle. Wates agrees that new pedestrian and cycle links to the A2100 and into adjoining Hastings land are important for a sustainable scheme. The emerging masterplan proposes a continuous north–south pedestrian/cycle route, footway widening along Hastings Road and a safer crossing with a dropped kerb and refuge island. Connections between the Rother and Hastings parcels are expected. However, any additional links through or adjacent to Ancient Woodland need further testing due to ecological sensitivity. A final strategy will depend on detailed assessment.
See attachments.
Support
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30861
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
Policy BT2 Requirement 7 requires development ‘to include any off-site highway improvements
necessary to make the development acceptable'
Wates expects to provide improvements to the footpath on Hastings Road leading into Baldslow as part of a proposed development at the site. The Sustainable Transport Strategy outlined in the TDN also anticipates contributions towards cycle improvements. It is expected that this would benefit routes HS19 and HS23 along The Ridge West and Battle Road, respectively. Wates is willing to contribute to necessary highway improvements, including local bus infrastructure, where these can be demonstrated to meet the tests under the CIL Regulations.
See attachments.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30862
Received: 23/03/2026
Respondent: Chris Spicer
Object to the proposed allocation of Land at Almonry Farm (Policy BT7).
Reasons for objection include:
- Impact on High Weald National Landscape
- Heritage significance and setting
- Ancient woodland and biodiversity
- Surface water and flood risk
- Highway safety and infrastructure capacity
- Cumulative and Precedent Effects
Conclusion
For the reasons outlined above, Policy BT7 is not justified by robust evidence, fails to give appropriate weight to nationally protected landscape and heritage assets, and does not adequately address infrastructure and environmental constraints.
I respectfully request that Policy BT7 – Land at Almonry Farm – be removed from the next iteration of the Draft Local Plan
I write to formally object to the proposed allocation of Land at Almonry Farm (Policy BT7) for residential development of approximately 80 dwellings.
In my view, this allocation fails the tests of soundness set out in the National Planning Policy Framework (NPPF). It is not justified, not effective, and is not consistent with national policy relating to protected landscapes, heritage assets, biodiversity and infrastructure.
1. Impact on the High Weald National Landscape
The site lies wholly within the High Weald National Landscape. Under Section 85 of the Countryside and Rights of Way Act 2000, the Council has a statutory duty to conserve and enhance the natural beauty of this nationally protected landscape.
The site comprises undeveloped greenfield land forming part of an intact historic field system defined by mature hedgerows and trees — characteristic features of the High Weald. The proposed suburban development at approximately 35 dwellings per hectare would introduce urban form into a sensitive rural landscape, resulting in permanent harm.
The allocation does not demonstrate exceptional circumstances or overriding public interest sufficient to justify development within this protected landscape.
2. Heritage Significance and Setting
The site lies in close proximity to nationally significant heritage assets, including:
• The Registered Battlefield (1066 Battle of Hastings)
• Battle Abbey Gatehouse Scheduled Monument
• Battle Conservation Area
• Grade II listed Lower Almonry Farmhouse
The land forms part of the historic agricultural setting associated with Battle Abbey and contributes to the wider battlefield landscape. Even where development does not directly affect designated assets, the NPPF requires great weight to be given to the conservation of their setting.
There is also recognised archaeological potential in this area, with local historical evidence suggesting nearby Manser’s Shaw may correspond to the “Malfosse” episode of the 1066 battle. Allocation at this stage, prior to comprehensive archaeological assessment, is premature.
Development would suburbanise part of the Abbey’s wider landscape context and erode the rural character that contributes to the significance of these nationally important assets.
3. Ancient Woodland and Biodiversity
Ancient Woodland and Priority Habitat lie immediately adjacent to the eastern boundary of the site.
While a 15-metre buffer is proposed, national guidance often recommends greater separation to prevent long-term degradation caused by light spill, recreational pressure, domestic pets and hydrological change.
The site supports wildlife including deer, bats and other protected species. The cumulative ecological impact of development in this sensitive location has not been adequately demonstrated at plan-making stage.
The allocation therefore risks conflict with national policy requiring protection of irreplaceable habitats and delivery of genuine biodiversity net gain.
4. Surface Water and Flood Risk
The supporting text acknowledges that parts of the site are at risk of surface water flooding. Development of greenfield land increases hard surfacing and run-off, potentially exacerbating flood risk to neighbouring properties and downstream systems.
The Local Plan should not allocate sites where flood risk mitigation remains uncertain.
5. Highway Safety and Infrastructure Capacity
Vehicular access is proposed via Tollgates, with impacts on North Trade Road and the A2100. The Plan itself acknowledges that further junction capacity assessments are required.
Given existing congestion and the proximity to Claverham Community College, there are legitimate concerns regarding pedestrian safety and traffic conflict. Allocation prior to confirmed modelling and mitigation measures renders the proposal unjustified and potentially ineffective.
In addition, Battle’s healthcare provision, school capacity and local services are already under pressure. The allocation does not secure clear, deliverable infrastructure improvements aligned with the scale of growth proposed.
6. Cumulative and Precedent Effects
Almonry Farm currently contributes to the rural character of the southern edge of Battle. Allocation of this parcel risks incremental erosion of the wider landscape and may create pressure for further development across remaining farmland.
The cumulative impact of multiple allocations around Battle must be properly assessed to avoid gradual suburbanisation of a town of exceptional historic importance.
Conclusion
For the reasons outlined above, Policy BT7 is not justified by robust evidence, fails to give appropriate weight to nationally protected landscape and heritage assets, and does not adequately address infrastructure and environmental constraints.
I respectfully request that Policy BT7 – Land at Almonry Farm – be removed from the next iteration of the Draft Local Plan.
Support
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30863
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
BT2 Policy Requirement 8: Wates agrees that the BT2 allocation should include significant green infrastructure, public open space and areas for biodiversity net gain. Their vision is for a landscape‑led masterplan where green infrastructure is integral and multifunctional, contributing to climate resilience and ecological enhancement. The emerging design is being developed by a multidisciplinary team, and the final layout will be informed by a site‑specific LVIA and a Green Infrastructure Strategy. Wates supports this requirement and intends to deliver strong environmental and landscape outcomes as part of the scheme.
See attachments.
Support
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30864
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
BT2 - Policy Requirement 9. Support the principle of this criteria. Wates recognises the importance of safeguarding adjacent Ancient Woodland and has incorporated a 15m buffer into the masterplan from the earliest stages. This aligns with Natural England guidance. They note the buffer could appropriately accommodate SuDS, open space or other green infrastructure—subject to root protection and ecological assessment—without harming the woodland. Wates suggests the policy wording be updated to allow “other forms of appropriate Green Infrastructure” to ensure flexibility within a landscape‑led design while maintaining necessary protection.
See attachments.
Support
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30865
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
BT2 Policy Requirement 10: This criterion pertains to retaining and enhancing the existing hedgerow and trees on the south-eastern boundary of the site. Wates appreciates that these landscape features contribute positively to the site's landscape and rural character, and therefore merit protection in any proposed development. An Arboricultural Impact Assessment (AIA) will support a future planning application, and new
planting will be proposed as part of a Landscape Strategy.
See attachments.
Support
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30866
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
BT2 - Policy Requirement 11: Support. Wates agrees that development must follow the recommendations of a full Flood Risk Assessment. Most of BT2 lies in Flood Zone 1, with areas of Zones 2 and 3 near Marline Valley Stream, along with ponds, surface‑water risks and groundwater sensitivity. Wates’ Hydroecological and Drainage Technical Note proposes SuDS features—detention basins, attenuation ponds, swales and filter strips—with runoff discharged to the Marline Valley Stream at restricted greenfield runoff rates. This approach aligns with the hydro‑ecological strategy for protecting the SSSI and would ensure development does not increase flood risk elsewhere.
See attachments.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30867
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
BT - Policy Requirement 12: Unclear why this proposed criterion is needed, and suggests instead that the SuDS strategy for the site is left to the decision-taking stage, following appropriate technical assessment. There also appears to be a conceptual overlap between ‘Requirement 12 and Requirement 11’. More generally, Wates considers that the drainage strategy for the site should be designed to function holistically across RDC’s and HBC’s administrative boundaries, and indeed this will
be necessary to appropriately manage the hydroecological environment. Wates would therefore suggest that this part of the draft policy be revisited and potentially omitted.
See attachments.
Object
Rother Local Plan 2025-2042 – Development Strategy and Site Allocations
Representation ID: 30868
Received: 22/03/2026
Respondent: Wates Developments Ltd
Agent: Boyer Planning Limited
BT2 Policy Requirement 13: Wates does not object to the principle of requiring a connection to the nearest point of adequate sewerage capacity but questions why this requirement is included specifically within BT2, given other emerging Local Plan policies already cover infrastructure provision. Wates agrees that development must safeguard access for maintenance and future upgrades to sewerage and water supply infrastructure, noting this is standard good practice for any well‑designed scheme.
See attachments.