Showing comments and forms 1 to 16 of 16

Support

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 28976

Received: 02/03/2026

Respondent: Southern Water

Representation Summary:

CR1 to CR3

Please see: Full representation on Draft Rother District Local Plan 2025-2042 Consultation

Full text:

Please see attached for full representation:

- Full representation on Draft Rother District Local Plan 2025-2042 Consultation (including underlined text and hyperlinks that do not appear in text copied out below)
- Supporting document: Southern Water input to Rother District Council’s 2026 IDP review
- Supporting document: IDP feedback provided for the Regulation 18 consultation deadline 23rd July 2024

Q5 We attach our separate IDP response to Rother as part of our feedback to this Regulation 18 consultation on the Local Plan, requesting update of the IDP in accord with the information and explanations provided. This also includes our feedback from the previous 2024 Regulation 18 consultation, in addition to a full explanation of how Southern Water plans investment for adopted local plans. Included within this explanation are our key AMP8 (2025-2030) investment plans for the Rother district. Some plans extend into AMP9, but for the reasons we explain in our IDP response, most AMP9 schemes are not known at this time.

There is considerable investment planned for the district in this 2025-2030 AMP8 period, supported by a range of technical disciplines. This represents the latest investment information and therefore supersedes the DWMP content referred to (as this DWMP work was concluded in 2023).

Q8 For development to be sustainable, Southern Water believes that it must always deliver sustainable drainage.

Communities need planning policy to go further as climate change now demands we re-think and re-design communities. More resilient and efficient homes are essential – conserving both energy and water. However, we also need to ensure that housing design/delivery will not mean that rainwater continues to run off surfaces so fast that it causes flooding and storm discharges into rivers and seas. By controlling the rate and volume of surface water entering the combined sewer network, sustainable urban drainage systems (SuDS) can improve existing flood risk and water quality.

We need planning policy to encourage proactive, cross-sector collaboration, as well as requiring development to adhere to the principles of integrated water management in line with the National Standards for Sustainable Drainage (June 2025).

The complexities and challenges of drainage need a collaborative approach between the responsible organisations, such as Local Authorities, Southern Water, the Environment Agency and community groups to adapt the urban environment to be more resilient to our changing weather patterns. Together, we need to separate rainwater from wastewater.

Q9 For development to be sustainable, Southern Water believes that it must always deliver sustainable drainage. This will be particularly important in areas where higher housing densities are proposed.

Communities need planning policy to go further as climate change now demands we re-think and re-design communities. More resilient and efficient homes are essential – conserving both energy and water. However, we also need to ensure that housing design/delivery will not mean that rainwater continues to run off surfaces so fast that it causes flooding and storm discharges into rivers and seas. By controlling the rate and volume of surface water entering the combined sewer network, sustainable urban drainage systems (SuDS) can improve existing flood risk and water quality.

We need planning policy to encourage proactive, cross-sector collaboration, as well as requiring all development to adhere to the principles of integrated water management in line with the National Standards for Sustainable Drainage (June 2025).

The complexities and challenges of drainage need a collaborative approach between the responsible organisations, such as Local Authorities, Southern Water, the Environment Agency and community groups to adapt the urban environment to be more resilient to our changing weather patterns. Together, we need to separate rainwater from wastewater.

Q10 For development to be sustainable, Southern Water believes that it must always deliver sustainable drainage. This will be particularly important in areas where higher housing densities are proposed.

Communities need planning policy to go further as climate change now demands we re-think and re-design communities. More resilient and efficient homes are essential – conserving both energy and water. However, we also need to ensure that housing design/delivery will not mean that rainwater continues to run off surfaces so fast that it causes flooding and storm discharges into rivers and seas. By controlling the rate and volume of surface water entering the combined sewer network, sustainable urban drainage systems (SuDS) can improve existing flood risk and water quality.

We need planning policy to encourage proactive, cross-sector collaboration, as well as requiring all development to adhere to the principles of integrated water management in line with the National Standards for Sustainable Drainage (June 2025).

The complexities and challenges of drainage need a collaborative approach between the responsible organisations, such as Local Authorities, Southern Water, the Environment Agency and community groups to adapt the urban environment to be more resilient to our changing weather patterns. Together, we need to separate rainwater from wastewater.

Q17 Q17 - all BX sites.

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

In addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more detailed checks made closer to the timeline of expected development, Southern Water request the addition of the following wording to all sites –
“We also encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.
Early engagement will be particularly important for the larger site proposals, or where constraints are indicated due to critical assets running beneath sites.”

Southern Water’s initial checks indicate that a number of the new/changed sites (BX6, BX7, BX22, 23, 24, 27, 28, BX31, 34, 36, 37, 38, 39 and BX41) may have limited local network capacity, and phasing of development may therefore be needed alongside network reinforcement prior to occupation of the total number of dwellings indicated in each policy. For these sites, and all those we’ve previously requested phasing wording (unless the detailed planning consultation responses we’ve provided indicate otherwise) please include the following wording:

Occupation of development will be phased to align with the delivery of sewerage infrastructure, in consultation with the service provider.

Also, Southern Water infrastructure crosses site BX9 and may require easements or diversion. For this site, and any we’ve previously requested layout wording please include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

Q19 For development to be sustainable, Southern Water believes that it must always deliver sustainable drainage. This will be particularly important in areas where higher housing densities are proposed.

Communities need planning policy to go further as climate change now demands we re-think and re-design communities. More resilient and efficient homes are essential – conserving both energy and water. However, we also need to ensure that housing design/delivery will not mean that rainwater continues to run off surfaces so fast that it causes flooding and storm discharges into rivers and seas. By controlling the rate and volume of surface water entering the combined sewer network, sustainable urban drainage systems (SuDS) can improve existing flood risk and water quality.

We need planning policy to encourage proactive, cross-sector collaboration, as well as requiring all development to adhere to the principles of integrated water management in line with the National Standards for Sustainable Drainage (June 2025).

The complexities and challenges of drainage need a collaborative approach between the responsible organisations, such as Local Authorities, Southern Water, the Environment Agency and community groups to adapt the urban environment to be more resilient to our changing weather patterns. Together, we need to separate rainwater from wastewater.

26 CR1 to CR3

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

However, we note that for site CR2 in particular, there is no wording in the site allocation policy to address the site’s proximity to an operational wastewater treatment works. In addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more detailed checks made closer to the timeline of expected development, Southern Water request the addition of the following wording for all sites –
“We also encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.
Early engagement will be particularly important for the larger site proposals, or where constraints are indicated due to the close proximity to operational wastewater treatment works or where there are critical assets running beneath sites.”

The proposed boundary to site CR2 is within 500m of Battle wastewater treatment works and we therefore request the additional wording –
“The layout of development for any site allocation with 500m of an operational wastewater treatment works should be informed by an odour assessment to be undertaken in consultation with statutory wastewater operator for the works.”

28 GU1 & GU2

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

Southern Water has identified no potential capacity constraints for site GU2 at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –

“We encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.
Southern Water infrastructure crosses GU2 and may require easements or diversion.”

30 GU4 & 5

Southern Water has identified no potential capacity constraints for these sites at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –

“We encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.

Southern Water infrastructure crosses site GU5 and may require easements or diversion. For GU5, and any sites we’ve previously requested layout wording please also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

31 GU6

Southern Water has identified no constraints for this site at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –
“We encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.

32 IK1&2

Southern Water has identified no potential capacity constraints for these sites at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –
“We encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.

Southern Water infrastructure crosses site IK1 and may require easements or diversion. For IK1, and any sites we’ve previously requested layout wording please also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

34 WS1 WS2, WS3 WS4 WS5

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

In addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more detailed checks made closer to the timeline of expected development, Southern Water request the addition of the following wording for all sites –
“We also encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.”

Southern Water’s initial checks indicate that sites WS2 and WS3 may have limited local network capacity, and phasing of development may therefore be needed alongside network reinforcement prior to occupation of the total number of dwellings indicated in each policy. For these sites, and any we’ve previously requested phasing wording (unless the detailed planning consultation responses we’ve provided indicate otherwise) please include the following wording:

Occupation of development will be phased to align with the delivery of sewerage infrastructure, in consultation with the service provider.

Also, Southern Water infrastructure crosses site WS3 and may require easements or diversion. For WS3, and any sites we’ve previously requested layout wording please also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

36 BT1 to BT11 (BT3, BT4, BT5, BT6)

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

In addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more detailed checks made closer to the timeline of expected development, Southern Water request the addition of the following wording for all sites –
“We also encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.
Early engagement will be particularly important for the larger site proposals, or where constraints are indicated due to the close proximity to operational wastewater treatment works or where there are critical assets running beneath sites.”

The proposed boundary to this site is within 500m of Battle wastewater treatment works and we therefore request the additional wording – The layout of development for any site allocation with 500m of an operational wastewater treatment works should be informed by an odour assessment to be undertaken in consultation with statutory wastewater operator for the works.

Southern Water’s initial checks indicate that sites BT1, BT2, BT7, BT9, BT10 and BT11 may have limited local network capacity, and phasing of development may therefore be needed alongside network reinforcement prior to occupation of the total number of dwellings indicated in each policy. For these sites, and any we’ve previously requested phasing wording (unless the detailed planning consultation responses we’ve provided indicate otherwise) please include the following wording:
Occupation of development will be phased to align with the delivery of sewerage infrastructure, in consultation with the service provider.

Also, Southern Water infrastructure crosses site BT11 and may require easements or diversion. For BT11, and any sites we’ve previously requested layout wording please also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

38 CT1 CT2 CT3

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

Southern Water has identified no potential capacity constraints for these sites at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –
“We encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.

Southern Water infrastructure may cross sites CT2 and CT3 and may require easements or diversion. For these sites, and any we’ve previously requested layout wording please also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

39 NE1 & 2

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

40 SD10 SD11 (SD1 to SD9)

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

Southern Water has identified no potential capacity constraints for these sites at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –
“We also encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.
Early engagement will be particularly important for the larger site proposals, or where constraints are indicated due to the close proximity to operational wastewater treatment works or where there are critical assets running beneath sites.”

The proposed boundary to site SD11 (and as previously advised the for the existing site allocation SD7) is within 500m of Sedlescombe wastewater treatment works and we therefore request the following additional wording in these policies–
The layout of development for any site allocation with 500m of an operational wastewater treatment works should be informed by an odour assessment to be undertaken in consultation with statutory wastewater operator for the works.

42 BC1 (BC2) BC3

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

Southern Water has identified no potential capacity constraints for these sites at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –
“We encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.

Southern Water infrastructure crosses site BC3 and may require easements or diversion. For BC3, and any sites we’ve previously requested layout wording please also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

43 (BR1) BR2 BR3

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

Southern Water has identified no potential capacity constraints for these sites at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –
“We encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.

44 CM1 to CM3

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

45 (ID1) ID2

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

Southern Water has identified no potential capacity constraints for these sites at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –
“We encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.

Southern Water infrastructure crosses site ID2 and may require easements or diversion. For ID2, and any sites we’ve previously requested layout wording please also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

46 NR1 and NR2

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

Southern Water has identified no potential capacity constraints for this site (NR2) at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –
“We encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.
Early engagement will be particularly important for the larger site proposals, or where constraints are indicated due to the close proximity to operational wastewater treatment works or where there are critical assets running beneath sites.”

Additional policy wording is needed for each site to address it’s proximity to operational wastewater treatment works. The proposed boundary of each site is within 500m of an operational wastewater treatment works (Mill Corner Northiam WTW, and Quickbourne Lane Northiam WTW) and we therefore request the additional wording for each site policy –
“The layout of development for any site allocation with 500m of an operational wastewater treatment works should be informed by an odour assessment to be undertaken in consultation with statutory wastewater operator for the works.”

Also, Southern Water infrastructure crosses site NR2 and may require easements or diversion. For NR2, and any sites we’ve previously requested layout wording please also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

47 PE1, 2 & 3 (PE4 & PE5)

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

Southern Water has identified no constraints for these sites at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –
“We also encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.
Early engagement will be particularly important for the larger site proposals, or where constraints are indicated due to the close proximity to operational wastewater treatment works or where there are critical assets running beneath sites.”

49 (RY1 to RY1, RY7&8) RY5, RY6 & RY9

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

In addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more detailed checks made closer to the timeline of expected development, Southern Water request the addition of the following wording for all sites –
“We also encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.

Southern Water’s initial checks indicate that sites RY5 and RY9 may have limited local network capacity, and phasing of development may therefore be needed alongside network reinforcement prior to occupation of the total number of dwellings indicated in each policy. For these sites, and any we’ve previously requested phasing wording (unless the detailed planning consultation responses we’ve provided indicate otherwise) please include the following wording:

Occupation of development will be phased to align with the delivery of sewerage infrastructure, in consultation with the service provider.

Southern Water infrastructure crosses sites RY5, RY6 and RY9 and may require easements or diversion. For these sites, and any we’ve previously requested layout wording please also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

50 RH1

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

53 BW1 to 4

In addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more detailed checks made closer to the timeline of expected development, Southern Water request the addition of the following wording for all sites –
“We also encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.

Southern Water’s initial checks indicate that site BW1 may have limited local network capacity, and phasing of development may therefore be needed alongside network reinforcement prior to occupation of the total number of dwellings indicated in each policy. For this site, and any we’ve previously requested phasing wording (unless the detailed planning consultation responses we’ve provided indicate otherwise) please include the following wording:

Occupation of development will be phased to align with the delivery of sewerage infrastructure, in consultation with the service provider.

Please note that Southern Water wastewater sewers cross all BW sites (BW1 to 4) and may require easements or diversion (so please note that whilst we agree that consultation with Southern Water will be required, it may not be necessary for the developer to deliver a package treatment plant as currently stated in part Xi of the policy. Were the developer to want to deliver such plant they will first need to consult with the Environment Agency). For these sites, and any we’ve previously requested layout wording please also include the following wording:
Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

54 BWC1 and 2

Southern Water has identified no constraints for these sites at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –
“We encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.

55 EC1 to 3

Southern Water has identified no potential capacity constraints for these sites at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –
“We encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.

Southern Water infrastructure crosses site EC1 and may require easements or diversion. For EC1, and any sites we’ve previously requested layout wording please also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

56 (HG1&2) HG3 & 4

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

In addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more detailed checks made closer to the timeline of expected development, Southern Water request the addition of the following wording for all sites –
“We also encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.”

Southern Water’s initial checks indicate that site HG4 may have limited local network capacity, and phasing of development may therefore be needed alongside network reinforcement prior to occupation of the total number of dwellings indicated in each policy. For this site, and any we’ve previously requested phasing wording (unless the detailed planning consultation responses we’ve provided indicate otherwise) please include the following wording:
Occupation of development will be phased to align with the delivery of sewerage infrastructure, in consultation with the service provider.

Southern Water infrastructure crosses site HG3 and may require easements or diversion. For HG3, and any sites we’ve previously requested layout wording please also include the following wording:
Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

57 RB1, RB3, RB4 (RB2, RB5) to RB6a & RB6b

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

Southern Water has identified no potential capacity constraints for these sites at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –
“We also encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.
Early engagement will be particularly important for the larger site proposals, or where constraints are indicated due to the close proximity to operational wastewater treatment works or where there are critical assets running beneath sites.”

The proposed boundary to sites R3 and R4 (and also as will have been previously advised the boundary to existing site allocation RB2) are all within 500m of Robertsbridge wastewater treatment works and we therefore request the following additional wording for these policies–
“The layout of development for any site allocation with 500m of an operational wastewater treatment works should be informed by an odour assessment to be undertaken in consultation with statutory wastewater operator for the works.”

Also, Southern Water infrastructure crosses sites RB3, and RB5 and may require easements or diversion. For these sites, and any we’ve previously requested layout wording please also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

58 SC1 & 2

Southern Water has identified no potential capacity constraints for these sites at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –
“We encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.

Southern Water infrastructure crosses site SC1 and may require easements or diversion. For SC1, and any sites we’ve previously requested layout wording please also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

59 FW1 to FW3

Southern Water’s initial checks indicate that site FW2 may have limited local network capacity, and phasing of development may therefore be needed alongside network reinforcement prior to occupation of the total number of dwellings indicated in each policy.

In addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more detailed checks made closer to the timeline of expected development, Southern Water request the addition of the following wording for all sites –
“We also encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.”

Southern Water infrastructure crosses site FW2 and may require easements or diversion. For FW2, and any sites we’ve previously requested layout wording please also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

60 TC1 (or 2)

Please note that as we have already consulted on all existing allocated sites (in adding to offering LPA free consultations at planning application stage) we comment in this response on new/changed site allocation policies, where the site has not previously been allocated and planning applications have not yet been submitted.

Southern Water’s initial checks indicate that site TC1 may have limited local network capacity, and phasing of development may therefore be needed alongside network reinforcement prior to occupation of the total number of dwellings indicated in each policy.

In addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more detailed checks made closer to the timeline of expected development, Southern Water request the addition of the following wording for all sites –
“We also encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.”

Southern Water infrastructure also crosses site TC1 and may require easements or diversion. For TC1, and any sites we’ve previously requested layout wording please also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

62 SG1 or 2

Southern Water has identified no potential capacity constraints for these sites at this Local Plan stage. For completeness, in addition to Rother consulting us on planning applications (for which we are not statutory consultees) so that we can share the results of more checks made closer to the timeline of expected development, Southern Water request the addition of the following wording –
“We encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.
Early engagement will be particularly important for the larger site proposals, or where constraints are indicated due to the close proximity to operational wastewater treatment works or where there are critical assets running beneath sites.”

The proposed boundaries to each site are within 500m of Stonegate wastewater treatment works and we therefore request the following additional wording for these policies–
“The layout of development for any site allocation with 500m of an operational wastewater treatment works should be informed by an odour assessment to be undertaken in consultation with statutory wastewater operator for the works.”

Southern Water infrastructure crosses these sites and may require easements or diversion. For these sites please therefore also include the following wording: Layout of the development must be planned to ensure future access to existing sewerage infrastructure for maintenance and upsizing purposes.

Q64 GYP1 to GYP6

Southern Water’s initial checks indicate that some of the GYP sites are proposed within 500m of operational wastewater treatment works. For example, the boundary to site GYP6 is within 500m of Robertsbridge WTW.

We therefore request Rother consult us on planning applications for all sites so that we can share the results of more detailed checks with the authority. Southern Water also request the addition of the following wording for all sites –
“We encourage early engagement by developers who can make use of Southern Water’s pre-planning service here – https://www.southernwater.co.uk/building-and-developing/planning-your-development/pre-planning-enquiries/.
Early engagement will be particularly important for the larger site proposals, or where constraints are indicated due to the close proximity to operational wastewater treatment works or where there are critical assets running beneath sites.”

And for each site proposed within 500m of operational wastewater treatment works (eg GYP6) please include the following additional wording;
“The layout of ‘sensitive residences’ for any site allocation within 500m of an operational wastewater treatment works should be informed by an odour assessment to be undertaken in consultation with statutory wastewater operator for the works.”

Q69 Any other issues or comments?

All site allocations should be proposed in locations where utilities can provide for the forecasted needs of the development without prejudicing existing or future utility provision necessary to support growth. Southern Water therefore requests the following additional policy wording in the Regulation 19 draft of the Local Plan:
The utility network should be protected and development proposals that would compromise existing utilities infrastructure, or encroach on future connections for utilities, will be refused. Opportunities should be sought to safeguard the provision of utilities wherever possible.

Object

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 29113

Received: 08/03/2026

Respondent: Dr Paul Dimmock

Representation Summary:

The proposed increase to 18 dwellings on site CR2 is inappropriate. The area is highly sensitive for wildlife, lies within an AONB, sits close to the Forewood SSSI, and borders the 1066 Way. Woodpeckers, nuthatches, goldfinches and many other species are regularly seen in the surrounding fields and in the gardens of Forewood Rise. Any development must therefore be approached with great care, and increasing the housing density would increase harms.

CR2 is an exposed site, and long‑established views across the Powder Mill valley—from both the 1066 Way and properties at Forewood Rise—would be further disrupted or lost if additional dwellings were permitted. Parking is already insufficient in the neighbouring settlement, where narrow roads cannot safely accommodate more vehicles. Adding six extra dwellings would worsen these pressures.

Given the landscape sensitivity, wildlife impact, and harm to the 1066 Way, increasing the allocation to 18 dwellings is wholly inappropriate.

Full text:

The proposed increase to 18 dwellings for site CR2 is not appropriate.
This is a very sensitive area for wildlife, in an AONB, in close proximity to the Forewood SSSI, and immediately adjacent to the 1066 way.
Woodpeckers, nuthatches, goldfinches and numerous more common birds are a very regular presence in surrounding fields and the gardens of Forewood Rise. Any development needs to be undertaken very sensitively, and a higher housing density further exacerbates harms.
The CR2 site is exposed, and long-standing long distance views across the Powder Mill valley from the 1066 way, and from the properties on the settlement at Forewood Rise, will be further disrupted or eliminated by the proposed additional dwellings.
There is insufficient parking in the existing neighbouring settlement at Forewood Rise and an additional 6 dwellings in the limited space will only exacerbate existing parking issues as surrounding roads are narrow and unsuitable for parking.
It is very questionable whether plot CR2 is suitable for development, given the need to protect our AONBs and obvious impact on landscape, the 1066 way, and wildlife. In any event the increase to 18 dwellings is wholly inappropriate, is likely to bring significant additional harms, and the allocation should not be increased from the existing agreed Neighbourhood Plan.

Object

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 29119

Received: 08/03/2026

Respondent: Mrs Rita Gower

Representation Summary:

CR2: 18 houses is far too many. The infrastructure of Crowhurst roads cannot take more cars. We have no facilities in the village. No shops. Only our lovely village school which is over subscribed.
The light pollution from these house will have a devastating effect on wildlife. I’ve heard night jars, owls and nightingale in the little wood behind proposed site. Also there are bats living in the stables on the entrance to the field.
Also the RSPB wood is only a short walk away.
Forewood Rise is chocked with parking now. 18 houses could mean 36 cars driving through our village.

Full text:

CR2: 18 houses is far too many. The infrastructure of Crowhurst roads cannot take more cars. We have no facilities in the village. No shops. Only our lovely village school which is over subscribed.
The light pollution from these house will have a devastating effect on wildlife. I’ve heard night jars, owls and nightingale in the little wood behind proposed site. Also there are bats living in the stables on the entrance to the field.
Also the RSPB wood is only a short walk away.
Forewood Rise is chocked with parking now. 18 houses could mean 36 cars driving through our village.

Object

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 29120

Received: 08/03/2026

Respondent: Miss Ann Williams

Representation Summary:

1) SITE CR2
My house on Forewood Rise,backs on to an amazing view.The main reason why I bought it was to be in the countryside and enjoy the nature, peace, quiet and lack of noise and light pollution. Now, my view will be rooftops and concrete and have a noisy, muddy building site. Fox dens in the copse of woods, and it’s currently a horse field, which is lovely.

2) 1066 walk is at the bottom of my garden, a nature reserve too. More people coming to disturb the eco system.

3) Parking in Forewood Rise is ridiculous currently and you plan for more cars.

4) More roads, less fields , equals more climate change. Find brown sites .

Full text:

1) SITE CR2
My house on Forewood Rise,backs on to an amazing view.The main reason why I bought it was to be in the countryside and enjoy the nature, peace, quiet and lack of noise and light pollution. Now, my view will be rooftops and concrete and have a noisy, muddy building site. Fox dens in the copse of woods, and it’s currently a horse field, which is lovely.

2) 1066 walk is at the bottom of my garden, a nature reserve too. More people coming to disturb the eco system.

3) Parking in Forewood Rise is ridiculous currently and you plan for more cars.

4) More roads, less fields , equals more climate change. Find brown sites .

Object

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 29121

Received: 08/03/2026

Respondent: Miss Ann Williams

Representation Summary:

Site CR2

Do not ruin the beautiful countryside, the nature, the wildlife. 1066 walk, views of AONB, this is my view from the house. We don’t want noise and light pollution, we moved here for peace and quiet. The village atmosphere will die with more houses built, roads can’t cope with parking as it is. Save our villages, find brown sites.

Full text:

Site CR2

Do not ruin the beautiful countryside, the nature, the wildlife. 1066 walk, views of AONB, this is my view from the house. We don’t want noise and light pollution, we moved here for peace and quiet. The village atmosphere will die with more houses built, roads can’t cope with parking as it is. Save our villages, find brown sites.

Object

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 29139

Received: 09/03/2026

Respondent: Ms Claire Marshall

Representation Summary:

The comments object to the proposed housing development due to concerns about its impact on the village’s character, infrastructure, and environment. The village is valued for its rural setting and small community feel, which residents believe could be harmed by large or poorly planned developments. There are also concerns that existing infrastructure, including roads, schools and drainage systems, is already under pressure and may not be able to support additional housing. Furthermore, building on greenfield land could damage local wildlife habitats and reduce the natural landscape that residents value. Overall, the comments argue that any future development should be carefully planned, proportionate, and supported by improvements to local infrastructure to ensure the long-term sustainability and wellbeing of the community.

Full text:

I object to the proposed construction of new housing in our village because of the significant impact it would have on the character, infrastructure, and environment of the area. Our village is valued for its rural setting, open spaces, and small-scale community feel. Large or poorly planned developments risk eroding this character and turning the village into an extension of nearby towns.

Local infrastructure is already under pressure. Roads are often congested, and services such as schools and drainage systems are limited. Additional housing would place further strain on facilities that are not currently equipped to support a larger population.

There are also environmental concerns. Building on greenfield land would reduce wildlife habitats, increase surface runoff, and diminish the natural landscape that residents and visitors enjoy.

Development should be proportionate and sustainable. Until infrastructure improvements and clear environmental protections are in place, approving further housing in the village would be premature and harmful to the long-term wellbeing of the community.

Object

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 29144

Received: 09/03/2026

Respondent: Ms Emily Feist

Representation Summary:

Site CR2: The proposal to build 18 houses on site CR2 in Crowhurst raises significant environmental, landscape, and infrastructure concerns. The site lies within an Area of Outstanding Natural Beauty, where development would permanently alter the character of the valley. The historic 1066 footpath runs through this landscape, and the new housing would obstruct established views across the Powdermill Stream valley, including those enjoyed by residents of Forewood Rise. The location is also extremely close to an RSPB-managed SSSI woodland that supports a wide range of wildlife, including red‑listed bird species and bats. These species regularly use the surrounding fields and gardens, and further development would place additional pressure on an already vulnerable ecosystem. Traffic and parking are already problematic in this part of the village, with narrow roads and limited capacity. Overall, building in such a sensitive and protected area appears inappropriate and unwise.

Full text:

To whom it may concern, regarding site CR2.

Your proposal to support the building of 18 houses on site CR2 in Crowhurst seems problematic for many reasons. Firstly, this is an AONB. In addition, the 1066 footpath runs through this valley, and the views of the valley over powdermill stream will be blocked. In addition, all the houses along that side of Forewood Rise will have their views blocked.

This site is very close to an RSPB SSSI woodland which hosts a large number of bird species, some of which are on the red list of conservation concern. It also houses bats. Many birds from the wood such as woodpeckers, greenfinches, tree sparrows, etc are commonly seen in the nearby fields and gardens. To build here would be putting a lot of additional pressure on an already fragile ecosystem.

The area is also unsuitable from a traffic point of view. There is already extremely limited parking in this part of the village and the majority of families living in rural areas have 2 cars per household. The narrow road by the church makes traffic-flow very difficult at certain times of the day.

In summary, I am surprised that the council would support building in such an AONB in the first place, especially so close to an SSSI and historic footpath. To add even more houses to the proposal seems extremely unwise.

Object

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 29153

Received: 09/03/2026

Respondent: Mrs Natasha Mitchell

Representation Summary:

Regarding CR2
The parking is a big problem I work late shifts so trying to park near my house would become an issue I don’t want too be walking in the dark miles away because lack of spaces if the new building go ahead.The wildlife will be at risk.
Loss of long distance view’s,we moved here for peace and quiet and to enjoy the views from our property , not to be overlooked by houses.The local school would struggle with more children.I think it would be a terrible idea

Full text:

Regarding CR2
The parking is a big problem I work late shifts so trying to park near my house would become an issue I don’t want too be walking in the dark miles away because lack of spaces if the new building go ahead.The wildlife will be at risk.
Loss of long distance view’s,we moved here for peace and quiet and to enjoy the views from our property , not to be overlooked by houses.The local school would struggle with more children.I think it would be a terrible idea

Object

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 29158

Received: 09/03/2026

Respondent: Mrs KAREN GRUN

Representation Summary:

Subject CR3 dwellings. Not to overlook present properties and vehicular access must be via British Rail Station car park as Craig Close is privately owned, and access would be limited for emergency vehicles via Craig Close. Boundary fence presently owned by British Rail to remain.

Full text:

Subject CR3 dwellings. Not to overlook present properties and vehicular access must be via British Rail Station car park as Craig Close is privately owned, and access would be limited for emergency vehicles via Craig Close. Boundary fence presently owned by British Rail to remain.

Object

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 29198

Received: 10/03/2026

Respondent: Mr Peter Linecar

Representation Summary:

Reference CR2 in Crowhurst. This area was identified as suitable for 12 dwellings in the Crowhurst Neighbourhood Plan. This was arrived at after very extensive consultation within the village and we were assured that our Neighbourhood Plan would ensure development would not exceed the limit in the plan. It makes a complete nonsense of the neighbourhood plan process to now 'move the goalposts'. There is no rational reason to propose a hgher number of dwellings and it is absolutely essential to keep to the Neighbourhood Plan in order to maintain confidence in the process we have invested so much effort in.

Full text:

Reference CR2 in Crowhurst. This area was identified as suitable for 12 dwellings in the Crowhurst Neighbourhood Plan. This was arrived at after very extensive consultation within the village and we were assured that our Neighbourhood Plan would ensure development would not exceed the limit in the plan. It makes a complete nonsense of the neighbourhood plan process to now 'move the goalposts'. There is no rational reason to propose a hgher number of dwellings and it is absolutely essential to keep to the Neighbourhood Plan in order to maintain confidence in the process we have invested so much effort in.

Object

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 29552

Received: 18/03/2026

Respondent: Mr Ganan Skandakumar

Representation Summary:

I object to the proposed development on land west of Crowhurst (CH2) due to its likely impact on my property, which lies directly along the northern boundary. There is currently no screening between my garden and the site, meaning any housing in close proximity would result in significant overlooking, loss of privacy, and an overbearing impact.

Policy requires the retention and enhancement of boundary vegetation, yet none exists here. A substantial landscaped buffer with native trees and hedgerows is therefore essential. The policy also requires significant green infrastructure, and the northern edge is a logical and appropriate location for this, rather than development.

Given the site lies within the High Weald National Landscape, a sensitive design is required. Development should avoid a hard built edge and instead provide a softer, landscape-led boundary. I request that housing is kept away from the northern boundary or designed to fully protect neighbouring amenity.

Full text:

Planning Representation – Objection / Concern Regarding Development at Land West of Crowhurst (Site CH2)

I wish to raise a formal objection and set of concerns regarding the proposed development of the above site, specifically in relation to the impact on residential amenity and compliance with adopted planning policy.

My property is located immediately to the northern boundary of the site, directly adjoining the proposed development area. At present, there are no existing trees, hedgerows, or natural screening along this boundary, meaning any development in close proximity would result in a significant and direct impact on my home.

1. Impact on Residential Amenity (Overlooking, Privacy and Overbearing Impact)
Development along the northern edge of the site would result in direct overlooking into my home and garden, causing a clear loss of privacy. Without any natural screening, the relationship between existing and proposed dwellings would be intrusive and overbearing.

I request that any scheme:
- Provides a substantial stand-off distance between existing properties and new dwellings;
- Avoids rear-facing windows directly overlooking neighbouring gardens;
- Considers reduced building heights (e.g. bungalows) along the northern boundary.

2. Failure to Provide Appropriate Boundary Treatment (Policy Requirement)
Policy requires the retention and enhancement of trees and hedgerows on boundaries. As none currently exist along the northern edge, development must incorporate meaningful structural landscaping to comply with this requirement.

I strongly request:
- A landscaped buffer zone along the entire northern boundary;
- New native tree and hedgerow planting of sufficient depth and maturity to provide effective screening;
- Long-term management of this buffer to ensure it remains effective.

3. Opportunity to Locate Green Infrastructure Appropriately
The policy requires a significant area of green infrastructure, particularly across parts of the site. Given the sensitivity of the northern boundary and its direct relationship with existing homes, this edge is an appropriate and logical location for:
- Open space;
- Biodiversity enhancements;
- Landscaping buffers rather than built development.

Positioning housing directly against this boundary would conflict with the intention of creating a well-designed and policy-compliant scheme.

4. Sensitivity of the Site within the High Weald National Landscape
The site lies within the High Weald National Landscape, where development must be of a sensitive form. A dense or abrupt built edge directly adjoining existing residential properties would fail to respect the rural character of the area.

A softer, landscaped edge along the northern boundary would better reflect:
- The landscape-led approach required by policy;
- The transition between built form and open countryside.

5. Increased Disturbance and Loss of Enjoyment of Property
Without adequate buffering, development would result in:
- Increased noise and activity immediately adjacent to my garden;
- General disturbance from new residential use;
- A significant reduction in the enjoyment of my property.

Conclusion
While I recognise that the site is allocated for development, the current policy framework clearly requires a sensitive, well-designed scheme. Development directly along the northern boundary, without adequate separation and landscaping, would conflict with these requirements and result in unacceptable harm to neighbouring amenity.

I therefore request that any proposal:
- Excludes built development from the northern boundary, or
- Incorporates a substantial landscaped buffer with no overlooking, ensuring full compliance with planning policy.

I would ask that these concerns are given full consideration in the determination of any future planning application.

Yours faithfully,

[Personal details redacted]

Object

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 29595

Received: 18/03/2026

Respondent: High Weald AONB Unit

Representation Summary:

Please see attached documents including HWNL response letter and Appendix 1.

Full text:

Draft Rother Local Plan 2025–2042 – Development Strategy and Site Allocations: Public Consultation under Regulation 18 of The Town and Country Planning (Local Planning) (England) Regulations 2012 (as amended)

Thank you for your consultation on the above draft Local Plan.

We have a number of significant concerns with the quantum and scale of site allocations proposed in the draft Local Plan, in terms of impacts on the nationally designated High Weald National Landscape, such that we would consider the plan to conflict with paragraphs 189 and 190 of the NPPF, and thereby unsound in its present form. We would make the following comments:

Development Strategy

Notwithstanding the references in paras 3.9 and 3.21 of the draft plan regarding the protection of National Landscapes, and the ability to reduce housing requirements accordingly, we are extremely concerned by the proposed Development Strategy set out in section 5 of the draft plan, and the quantum of development proposed within the High Weald National Landscape.

Paragraph 189 of the NPPF sets out that ‘great weight’ should be given to conserving and enhancing landscape and scenic beauty in National Landscapes, which (along with National Parks & the Broads) ‘have the highest status of protection in relation to these issues’. It also sets out that ‘the scale and extent of development within these designated areas should be limited’ and that ‘development within their setting should be sensitively located and designed to avoid or minimise adverse impacts on the designated areas.’

The proposed 2,055 number of new dwellings on sites within the High Weald National Landscape (over and above existing allocations in the 2019 DaSA) could in no way be described as ‘limited in extent’, nor could the fact that 23 of the site allocations are proposed for 30+ dwellings, (and 11 of those sites proposed for 60+ dwellings) be descried as ‘limited in scale’. At the broadest level, and notwithstanding the large area of Rother District that lies within the High Weald National Landscape, we therefore consider the allocations strategy at the broadest level would fail to comply with para 189 of the NPPF.

You will see from the Site Allocations comments later in this response, and our site-specific comments appended in table form to this response, that we consider a large number of the proposed site allocations would be harmful to the natural beauty of the High Weald National Landscape, and would fail to comply with para 189 of the NPPF, and, in a number of instances, para 190 too. We therefore consider that a number of the proposed site allocations should be deleted from the draft Local Plan, and the proposed number of dwellings in the housing requirement reduced accordingly.

We appreciate that the 2024 changes to the standard method for calculating objectively assed need has resulted in a larger OAN for Rother DC (described in paras 3.1-3.4 of the draft plan). However, importantly, the NPPF allows for strategic policies in Local Plans to provide for less than the housing need in certain circumstances, while the NPPG clarifies that Local housing need (calculated using the standard method as amended in December 2024) is not necessarily the same as the housing requirement that goes forward in a Local Plan.
This was confirmed by the Government in their published Government response to the proposed reforms to the NPPF (Government response for Questions 1 and 2) published 20th July 2024, which states:

“The standard method identifies the minimum number of homes needed and local planning authorities are expected to plan to meet their housing needs in full. However it is recognised that there may be local constraints on land and delivery that could justify a lower housing requirement figure.” (N.B. Underlining added for emphasis).

Accordingly, para 69 of the NPPF sets out that strategic policy-making authorities should establish a housing requirement figure for their whole area, which shows the extent to which their identified housing need can be met over the plan period. (N.B. bold added for emphasis)
That Government response also clarified that the NPPG had been updated accordingly. The NPPG (Housing and Economic Needs Assessment) confirms that:

“The standard method set out below identifies a minimum annual housing need figure, … It does not produce a housing requirement figure.” (Paragraph: 002 Reference ID: 2a-002-20241212)

and explains the difference between local housing need and housing requirement, and clarifying that:

“The housing requirement is the minimum number of homes that a plan seeks to provide during the plan period. Once local housing need has been assessed, as set out in this guidance, authorities should then make an assessment of the amount of new homes that can be provided in their area. This should be justified by evidence on land availability, constraints on development and any other relevant matters.” (Paragraph: 040 Reference ID: 2a-040-20241212)

Paragraph 11 (b) (i) of the NPPF sets out that local planning authorities should provide for objectively assessed needs for housing and other uses, as well as any unmet needs from neighbouring areas, unless “the application of policies in this Framework that protect areas or assets of particular importance provides a strong reason for restricting the overall scale, type or distribution of development in the plan area”. The assets referred to are listed in footnote 7 and include National Landscapes, the relevant policies for which in the Framework being 189 and 190.

Accordingly, the NPPG (natural Environment) clarifies that, with regard to National Landscapes:

“The National Planning Policy Framework makes clear that the scale and extent of development in these areas should be limited, in view of the importance of conserving and enhancing their landscapes and scenic beauty. Its policies for protecting these areas may mean that it is not possible to meet objectively assessed needs for development in full through the plan-making process, and they are unlikely to be suitable areas for accommodating unmet needs from adjoining (non-designated) areas…” (Paragraph: 041 Reference ID: 8-041-20190721.) (bold text added for emphasis)

Whilst we acknowledge the intention to seek to meet as far as possible the OAN, this must be carried out in the context of the limited scale and extent of development in National Landscapes required by the NPPF, and within the context of the ‘great weight’ to be given to conserving and enhancing their landscape and scenic beauty.
Further, this must be carried out in a way which is compliant with the High Weald AONB Management Plan 2024-2029 This statutory document is adopted by all the relevant local authorities with land in the High Weald National Landscape, including Rother District Council, as their policy for the management of the area and for the carrying out of their functions in relation to it, and is a material consideration for planning applications affecting the HWNL.

With particular regard to the High Weald National Landscape, Management Plan Settlement Action ‘h’ sets out that partners will “Pursue landscape-led positive planning approaches to settlement planning and housing delivery in the AONB, seeking to prioritise the delivery of new housing primarily through small-scale development consistent with AONB character, recognising the potential for harm through the cumulative effects of separate developments on the designated landscape”

Rother District Council has had considerable success over the last couple of years, including since the publishing of the new standard methodology for OAN, in defending housing development appeals in the HWNL, with Inspectors agreeing with the Council’s assessment of harms of specific proposals on the landscape character and natural beauty of the HWNL, and that such harms meant that policies of the Framework provide a strong reason for refusing the development proposed. The same logic can and should therefore confidently be applied to the consideration of proposed sites under NPPF para 11(d)(i).

Major Development

With regard to the subject of major development in the HWNL in site allocations, we are particularly concerned by para 6.6. of the ‘Draft Development Stategy for Rother’, which, while recognising that the NPPF confirms that major development in National Landscapes should only be permitted in exceptional circumstances and where it can be demonstrated that the development is in the public interest, states ”The need for housing, including affordable housing, in sustainable locations within the district could potentially be an exceptional circumstance that could allow for a major development within the HWNL.”.

To justify major development on the basis of meeting objectively assessed housing needs for the local planning authority area is a circular argument at plan-making stage, because the impact of the scale and distribution of development on the National Landscape should be taken into account in deciding the level of housing provision (NPPF paras 69 and 11(d)(i)). If such housing levels can only be achieved by allocating major development in the NL, which by definition will have “a significant adverse impact on the purposes for which the area has been designated” then this is a good indicator that the impact on the National Landscape provides “a strong reason for restricting the overall scale, type or distribution of development in the plan area” as provided for in NPPF paragraph 11.

Paragraph 190 of the NPPF sets out that within National Landscapes, planning permission should be refused for major development other than in exceptional circumstances, and where it can be demonstrated that the development is in the public interest.

Whilst paragraph 190 specifically refers to planning permissions, it has also been considered relevant by Local Plan Inspectors to allocations within Local Plans.1 Legal advice provided to the South Downs National Park Authority by Landmark Chambers also concluded that “it would arguably amount to an error of law to fail to consider paragraph 116 (now 190) at the site allocations stage of plan making for the National Park. The consequence of doing so would be to risk allocating land for major development that was undeliverable because it was incapable of meeting the major development test in the NPPF”2.

We would consider a large number (some 16) of the site allocations proposed in the draft plan to constitute major development under the NPPF definition in footnote 64 of paragraph 190. As such, there would be a presumption against the allocation of these sites for development, and they are considered in more detail in the individual site comments below and appended table. In summary it is considered that the inclusion of the majority of these major sites would render the current plan unsound, as it would conflict with the NPPF.

Proposed draft Site Allocations

We are extremely concerned that sites with the HWNL have been proposed in this draft local plan prior to the carrying out of any detailed Landscape Capacity Studies, Landscape Sensitivity Studies or Landscape Visual Assessments, as part of the evidence base. We consider any proposed site allocations to be premature in the absence of such work.

We note that some sites have been considered in the HELAA Landscape Sensitivity Assessment (September 2022), however, this work is very brief, just one or two paragraphs per site plus a table, and we do not consider this is a sufficiently robust or detailed assessment of the impacts of the sites; the Site Assessment Table doesn’t assess the sensitivity of the sites in the HWNL against the AONB Management Plan key character components of natural beauty, and includes no map or photographic based assessment. Also, along with sensitivity assessments, those sheets also assign a range of ‘value’ to each site, including those within the HWNL (high, high/medium/medium etc) – whereas as designated NLs they have already been assigned the highest level of value by government (see Landscape Institute’s GLVIA3 Notes & Clarifications 5(7). Furthermore, in some instances the cautionary conclusions of the HELAA LSA do not seem to have informed the proposed allocations.

For any sites within, or affecting the setting of the National Landscapes, site assessment work needs to take into account the impact of those potential sites on the purposes of the designation, taking into account the HWNL (AONB) Management Plan. Planning Principle 1 of the High Weald AONB Management Plan 2024-2029 gives advice on the type of assessments that should inform local plans.

Decisions on allocating sites within or affecting the setting of National Landscapes requires a robust understanding of landscape including the history and settlement patterns of the wider landscape. Site-specific landscape sensitivity studies and landscape and visual assessments and are an important part of this, to inform the principle of allocation, the appropriate quantum and location of development, the extent of site coverage, any mitigation strategies, e.g. landscape buffers and their appropriate location and size, and to consider any other site-specific issues.

A key concern is that we note that for a number of the proposed site allocations, the ‘site specific development requirements’ in the draft local plan mention the need for development to be informed by a landscape sensitivity assessment. However, this is too late in the process, the Landscape Sensitivity Study needs to be completed first, to inform the allocation process, not post-allocation. Moreover, the LSS needs to be prepared objectively by the LPA.

No allocation should be being proposed until the above work is completed -it is wholly insufficient to simply include a reference in the policy supporting text (as in the current draft) that ‘”It is within the High Weald National Landscape and therefore a sensitive form of development is required in line with Local Plan policies”– in order to align with the requirements of NPPF para 189, impacts on the setting of the HWNL need to be robustly considered prior to allocating a site; firstly regarding the principle of the allocation; the location and scale of development in relation to the HWNL, and secondly to inform/test the quantum of development that might be appropriate in such a location.

Additionally, any site allocations proposed for grassland sites in the HWNL should also be subject to grassland surveys, and if found to be unimproved grassland these should not continue to be allocated for development in the Reg 19 version, since this is an important habitat type within the HWNL, and an important part of its landscape character and natural beauty.

We consider there therefore needs to be considerable further site-specific work undertaken to inform the next iteration of the draft local plan. We understand that the next iteration is intended to be a Reg 19 version with consultation scheduled for the autumn, for submission in December under the current Local Plans regime. However, in view of the additional work needed in relation to the proposed sites, and our comments on the site allocations below, we consider this would be premature, and the timescale to be unrealistic, and instead we consider a further Reg 18 consultation would be more appropriate.

Densities

We note that para 5.16-5.26 of the draft Local Plan deal with the matter of densities in residential development. Whilst in principle we have no issue with higher densities – High Weald settlements are typically fairly high density in village cores- it is important to recognise that this is through their being populated with tight-knit streetscapes of smaller dwellings. In order to meet Settlement Objectives S1 and S2 of the High Weald AONB Management Plan, we consider that guidance, either in a general density policy and/or the site-specific policies, will need to clarify this, so as to manage developer expectations and avoid scenarios where schemes are submitted consisting of high numbers of detached/semi-detached buildings packed in close proximity to each other, as that would constitute an approach and grain that would be discordant with High Weald settlement pattern and streetscape character.

Site Specific Policies

Further to the site specific assessment work, and to ensure that clear and realistic expectations for each site are set, with regard to the High Weald AONB Management Plan, and the Council’s duty under section 85 of the CRoW Act, we advise that the site-specific policies for all those sites proposed within the HWNL (and those affecting its setting) included in the next iteration of the draft Local Plan should:

• include maps/plans setting guiding principles/parameters for development (including extent of site coverage, building heights, and the retention of any existing wooded boundaries, and enhancement of these where appropriate for mitigation measures), and
• refer to the HWNL in the ‘Site specific development requirements’, and include in those requirements that proposals need to reference the principles in the HW Housing Design Guide, and that lighting proposals (including highways lighting) to be based on the HWNL Dark Skies Planning Advice Note.

Individual proposed sites comments

In the light of the absence of a detailed landscape evidence base, the appended table represents our initial comments on the draft proposed sites; however, with some we are able to recognise significant harms to the HWNL even without the further work, and these are highlighted red in the table as sites that, at this stage, we object to being allocated for development.

Overall, you will see that we consider a number of sites would cause significant harm to the natural beauty of the High Weald National Landscape, would conflict with objectives of the HW AONB Management Plan 2024-2029, and would conflict with policy 189 of the NPPF, resulting in the plan being unsound, and therefore should not be allocated for development in the next iteration of the draft plan. These are: BT1 (in part), BT8, BT10, BC1, BR3, BW3, BW4, BWC1, EC2, EC3, FW2, GU6, HG4, IK1, IK2, NR2, PE1, PL1, SD11, SC2, and TC1. A summary of our reasons for arriving at these conclusions is included in the appended table. This list includes a number of sites that we consider should be considered ‘major development’ in the HWNL under the provisions of NPPF para 190, and for which there do not appear to be exceptional circumstances (see our earlier general comments in this response). However, the absence of red highlight on other sites in the table (or that they are not included in the above list) does not mean that we support the allocation, rather that at this stage we are unable to provide a definitive view on either the principle of development or the quantum proposed, without the further landscape assessment work being carried out (and we set this out for those sites).

Legislative Requirements

Lastly I would also draw to your attention Section 85 of the CRoW Act (as amended by the Levelling-Up and Regeneration Act in December 2023) sets out that ‘relevant authorities’, in exercising or performing any function that affect National Landscapes in England, “must seek to further the purpose of conserving and enhancing the natural beauty of the Area of Outstanding Natural Beauty.”3

Within the planning context, ‘relevant authorities’ are the Local Planning Authorities and the Planning Inspectorate, along with Parish Councils producing Neighbourhood Plans, and the duty applies to all aspects of the planning process, including decisions relating to site allocations in Local Plans etc. More information for LPAs on complying with the new duty in the planning policy plan-making process is available at CRoW-s.85-duty-guidance-for-LPAs_NLA-Briefing-Nov-24.pdf

Conserving and enhancing the natural beauty of the High Weald National Landscape (HWNL) will normally mean avoiding harm, and conserving and enhancing the character components identified in the AONB Management Plan; supporting the Management Plan Objectives as set out for each of these; and following any Management Plan Actions set out for each.

It is therefore important that this new duty is reflected in the language and content of the Local Plan throughout, including in the commitment to any particular housing requirement figure, the spatial strategy, policy direction and ambition, and the evaluation of any proposed site allocations.

The above comments are advisory and are the professional views of the HWNL Unit’s Planning & Design Advisor on the potential impacts on the High Weald landscape. They are not necessarily the views of the HWNL Joint Advisory Committee.


Please see attached documents including HWNL response letter and Appendix 1.

Support

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 29636

Received: 18/03/2026

Respondent: East Sussex County Council

Representation Summary:

Please see attached: East Sussex County Council Representations on the Rother Local Plan ‘Development Strategy and Site Allocations Draft (Regulation 18) Version’ consultation

Full text:

Please see attached: East Sussex County Council Representations on the Rother Local Plan ‘Development Strategy and Site Allocations Draft (Regulation 18) Version’ consultation

Support

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 29844

Received: 20/03/2026

Respondent: Mrs Rosalyn Day

Representation Summary:

New site policies are mostly acceptable other than:
Affordable housing should be the higher value of either HOU2 or the Crowhurst NP
Enlarging the size of CR1 may increase flooding/drainage pressure downstream of the site beyond what the developer can mitigate for in a cost effective manner.

Full text:

CR1 - I feel that the increase in density per hectare is acceptable as new housing is needed. However, I am not sure about the increase in size of the site to include the area that currently includes farm buildings. The work done by the during the Neighbourhood Plan was clear that residents wanted several small sites rather than fewer large ones. The NP delivers this. It is also not clear that the extra land is in fact available. If it does not come forward, what happens to the extra housing numbers? I would also prefer the policy to need the number of affordable homes to be the greater of Policy HOU2 and the Neighbourhood Plan. I believe that rural villages have a worse issue for younger people being able to afford to stay local than other areas so if the NP requires a higher percentage of affordable housing, this should be included. There are flooding issues just downstream of the development. Increasing the size too much may affect flooding/drainage beyond what the developer is able to mitigate for (in a cost effective manner without , for example, affordable housing numbers being affected). Otherwise, fairly happy with the policy.
CR2 - Happy with the policy other than again saying that affordable housing percentage should be the higher value between HOU2 and the NP.

Support

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 30303

Received: 20/03/2026

Respondent: Town and Country Planning Solutions

Representation Summary:

I support Policy CR1. Please see attached supporting statement.

Full text:

I support Local Plan Policy CR1. Please see attached supporting statement.

Attachments:

Object

Rother Local Plan 2025-2042 – Development Strategy and Site Allocations

Representation ID: 30901

Received: 20/03/2026

Respondent: Pevensey & Cuckmere WLMB

Agent: Pevensey & Cuckmere WLMB

Representation Summary:

Policy text for Part 4 Site Allocations is not consistent when referring to the application of ENV 2 at each site. Sustainable Drainage should apply to all new development, not a select few within the local plan for example CR1
correctly states that ENV 2 applies to the site but no mention of the policy in CR2.

Full text:

Draft Rother Local Plan 2025-2042 Consultation
Thank you for sharing the Draft Rother Local Plan 2025-2042 with the Pevensey and
Cuckmere Water Level Management Board, after reading the document we have made
some observations and have the following comments:
The draft Environmental Policy ENV2 recognises the role Internal Drainage Boards play in
ensuring water is appropriately managed within their districts as well as the need to reduce
flood risk and promote the benefits of blue /green infrastructure. The PCWLMB recognises
this as an important strategic objective for Rother District Council.
However, it is noted that policy text for Part 4 Site Allocations is not consistent when referring
to the application of ENV 2 at each site. Sustainable Drainage should apply to all new
development, not a select few within the local plan for example BX20 correctly states that
ENV 2 applies to the site while there is no mention of the policy in BX19. And like wise CR1
correctly states that ENV 2 applies to the site but no mention of the policy in CR2.
ENV 2 recognises that drainage systems should allow for ongoing maintenance. However,
the proposed development should also reserve adequate space for access and maintenance
of Sustainable Drainage Systems and other water bodies within the sites. This is to ensure
that the water bodies and drainage system can be maintained and operated safely and
sustainably for the lifetime of the development. This should apply to all development sites,
including those in the PCWLMB’s catchment area.
Development sites in West Bexhill Growth Area discharge their water to watercourses in the
Pevensey Levels whose drainage is supplemented by pumping during extreme rainfall
events. These pumps were installed in the 1970s and have reached the end of their design
life with limited funding available for their replacement. There is, therefore, a likelihood that
these watercourses will have high water levels over long periods in winter where drainage
systems might struggle to discharge water into the watercourses. During such periods,
drainage systems should have been designed to take that into account to ensure it does not
result in flooding on or offsite. In addition, the PCWLMB has a byelaw that requires anyone increasing the flow or volume of
water discharged into its drainage district to agree the discharge rates with the Board prior to
making the discharge. Applicants should seek pre-applications with the Board and LLFA at
the earliest opportunity for all sites within the water level management board’s catchment
area. This applies West Bexhill Growth Area, North Bexhill Growth Area, parts of Central
Urban Area, Catsfield and Crowhurst
There is little opportunity for infiltration in the catchment area of the water level management
board due to impermeable geologies and high / perched groundwater. Therefore, space
should be considered when designing surface water drainage as a lager area could be
required for attenuation prior to discharge to a waterbody.
The PCWLMB will also take into consideration water quality passing into the Boards
drainage district especially in the Pevensey Levels. This is because there are a number of
species within the watercourses that are dependent on clean water.