Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 27504
Received: 23/07/2024
Respondent: Rurban Estates Limited
Agent: DHA Planning
See section 2.10 of the attached response.
See attached document for the representation.
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 27534
Received: 23/07/2024
Respondent: Westcott Leach Ltd
Agent: DHA Planning
See section 2.10 of the attached representation.
See attachment for the full representation.
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 27590
Received: 23/07/2024
Respondent: Southern Housing
We support the spatial development strategy in principle as it brings together the research and conclusions from the Development Strategy Background Paper. RDC should consider placing greater emphasis on collaborative working with neighbouring authorities and with ESCC. While we note the Development Strategy Background Paper includes a section regarding the duty to co-operate at 6.8 and some others references to working with ESCC (paragraph 5.14), there is little reference to this in the draft plan. Given the strategy involves a combination of options, it’s important that ESCC has input regarding the transport impacts and service provision. We also consider close working with HBC necessary to ensure the approach remains deliverable. This is especially important as the strategy involves development within the Hastings Fringes area, which will place a strain on the infrastructure and services of both Hastings and Rother.
We also support the note at the end of the strategy (marked with an*), which states the housing and employment targets will be minimum figures. The purpose of a local plan should be to deliver sustainable development rather than restrict positive growth. The supporting text appears to focus more on employment and economic development than housing. RDC should consider introducing more discussion regarding housing to highlight its importance, particularly its role in stimulating employment and economic growth.
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 27692
Received: 23/07/2024
Respondent: Mr Clive Garland
In summary, the full text submission raises concerns over development in Rother, commenting on:
- A loss of high street businesses in Bexhill, particularly the banks;
- A lack of capacity in the doctors surgeries;
- Concerns over the over-development of Rother as a whole;
- Concerns over conflicts between the development strategy and the Climate Emergency and Biodiversity Crisis;
- Questioning how the healthy, sustainable and inclusive approach can work when aspects such as traffic from construction and new residents will increase;
- Poor transport links, especially road and rail that have historically been poor; and
- Questioning the deliverability of the A21 corridor improvements.
My comments on the Draft Local Plan are more of a general nature, therefore I will not be referring to any questions number, paragraph number, policy or section.
Having attended one of the Rother consultation sessions it soon became abundantly clear that anyone would have sufficient time to read or digest all there was available; on a numerous boards, naps, booklets, etc., within the time period the session was open. Others in attendance agreed with this.
I'm sure I am wasting my time commenting on these proposals, as previous experience has shown me that these consultations are more to pay 'lip service' to the process and ultimately RDC will do exactly what it wants to do!
I was born in Bexhill in 1954. I have lived in the town all my life and I use to work locally. I have seen so many changes to the town, over the years and very few have been, in my opinion, of a beneficial nature.
Most of the banks have left the town and the last Lloyds will close in September 2024. There are numerous vacant shops within Bexhill and other premises, like the Methodist Church, in Sackville Road, closed.
Doctors surgeries in Bexhill have insufficient doctors. Leisure facilities are very tired looking and need substantial investment. In the exhibition I attended I read as much as possible and also spoke to Rother staff.
I have grave concerns about Rother's plans and the LA would just appear to be hell bent on developing as many areas as possible, within their jurisdiction. It seems hard to see how Rother can say they are "working with our communities". I Am sure many people, in the various parts of Rother are opposed to the extend of your plans.
Your display boards acknowledge that we are in a climate emergency, but despite this development on this scale has obviously been in the planning stage for some considerable time. Rother also acknowledge that there is a biodiversity crisis. Plans on this scale will make that even worse; as countryside throughout the area is being lost at an alarming rate.
Rother also say that they are creating healthy, sustainable and inclusive communities. I find this difficult to believe as developing numerous parts of the area will bring construction traffic into many parts of Rother, with all that brings. As mentioned about countryside will be lost. It will bring more traffic and people. So how this can be healthy to us is absolutely beyond me. IN the smaller villages Rother mention sensitive samll-scale developments; what even this means!
Transport links in this area have always been bad whether rail or road and the number of times I have heard about updating the A21. I see now there is a proposal to develop the A21 over a 30 year time-frame. I won't hold my breath. All road links north, east and west have always been appalling.
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 27706
Received: 23/07/2024
Respondent: Bellway Homes
Agent: DHA Planning
See section 3.12 of the attached "DHA Response to RDC Reg 18 Draft Local Plan".
The full submission comprises of:
- DHA Response to RDC Reg 18 Draft Local Plan; and
- Site Location Plan
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 27715
Received: 22/07/2024
Respondent: Zoe Mountier
• Does not conform to national government policy: Most of the land under RDC’s purview is green-belt, most of which, should have not be considered for either housing or traveller site development. The reasons being because of environmental reasons and the absence of the required adequate infrastructure and services provision
`My General comments on the plan are:
• Hard to read/follow plan: The document is not easy to use and is difficult to follow and at over 450 pages in length, is far too long and the important points can easily be overlooked.
• Does not conform to national government policy: Most of the land under RDC’s purview is green-belt, most of which, should have not be considered for either housing or traveller site development. The reasons being because of environmental reasons and the absence of the required adequate infrastructure and services provision
• Need for clear green-belt division between villages being ignored: In particular between the villages of Flimwell and Ticehurst.
I would like to also make the following Points/objections specifically relating to the unsuitability of the field referred to in the Local Plan specified as GYP0002 (on slide 10, “Identifying Sites for Gypsies, Travellers and Travelling Showpeople”) and TIC0039 (on p66, HELAA-Part 2- CHAPTER-5-NORTHERN-Compressed document), respectively.
• The field (TIC0039) has already been prevously been marked as unsuitable for a housing development , please see document; HELAA-PART 2-CHAPTER-5-NORTHERN-COMPRESSED and therefore should not now be considered suitable for a traveller’s site encampment (GYP0002) for the reasons given in that judgment by RDC but I would also like to raise the following additional points:
• The land, as well as the ancient woodland that surrounds it, is home to home to many speices of native wildlife and rare plants. The area is currently home to barn owls, kestrels, woodpeckers, falcons, buzzards and other wild birds and also some small animals such as shrews and hedgehogs.
• The field is prone to flooding and becomes very waterlogged and boggy at the bottom, every winter.
• The field is at a steep incline.
The access points to the field would be dangerous, as it joins a 40mph road that is situated on a corner, on a hill, and would be dangerous not only for those emerging from the site but also to existing road users.
• The private road that provides access to Ketley Wood Lodge is too narrow to sustain large traveller vehicles.
• There is a lack of basic amenities to support a travelling community in Flimwell. Apart from the artisan smokery shop and an ice parlor, there are no food shops within a mile radis. There is also no Doctor’s surgeries, dentists, chemists, post offices and garages for fuel in Flimwell. And with no footpaths, the only way to access these services safely is via car as also public transport services are at a minimal in the area. A primary school is also only assesable via road in the same manor.
• It is in an area that is mimalising light pollution with litte or no street lighting
• Difficult/impossible to safeguard the protection of the ancient woodland from, pollution, fires and general damage and this would have a catastrophic effect upon resident wildlife.
I understand and empathise that accommodation has to be made for new housing and traveller sites in Rother, but please focus on the brown field areas first where the infrustraure is in place and only consider areas of green belt in case of urgent need.
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 27718
Received: 23/07/2024
Respondent: Colony Developments Ltd
Agent: Apt Planning Ltd
Our views on Development Strategy.
1.1 The Development Strategy should comply with the new Labour Government manifesto commitment for mandatory housing targets that will deliver 300,000 new homes per year over 5 years = 1.5 million new homes, based on revisions to the NPPF.
1.2 This could be achieved by adoption of the Standard Method. The HELDA report accepted that there were no exceptional circumstances for not using the Standard Method in Rother, which would result in a local housing need of 737 homes per year plus a 20% buffer. But it is inconsistent in also considering household formation would justify a significantly reduced level of growth.
1.3 The justification for this approach is that the HELDA report identifies Rother population growth declining from +12% in 1980-1990, to +6% in 2000 - 2010, and +3% in 2010-2020. The Development Strategy needs to reverse this declining trend to boost housing supply, to comply with the NPPF. An attainable level was achieved in the 1980-1990s.
1.4 There is a specific local housing need for older people with the HELDA report noting that Rother has the 2nd highest median age, after North Norfolk, in England. The forecast increase in population aged 75+ is +82%. The local level of services needed to support this rural population will require an increase in the younger population aged 0-65 years.
1.5 Practically the only Development Strategy that would reverse the decline of population aged 0-65 years, would be by using the Standard Method, as shown in the HELDA report.
1.6 Both the Vale of White Horse and South Oxfordshire Districts have Green Belt and National Landscape( AONB) constraints. But both Districts have adopted Local Plans that increased house completions from c.200 homes per year to c.800-1,000 homes per year. This has led to local services being improved and an increase in younger population aged 0-65 years.
1. Question 51 on page 111 of Draft Local Plan.
Our views on Development Strategy.
1.1 The Development Strategy should comply with the new Labour Government manifesto commitment for mandatory housing targets that will deliver 300,000 new homes per year over 5 years = 1.5 million new homes, based on revisions to the NPPF.
1.2 This could be achieved by adoption of the Standard Method. The HELDA report accepted that there were no exceptional circumstances for not using the Standard Method in Rother, which would result in a local housing need of 737 homes per year plus a 20% buffer. But it is inconsistent in also considering household formation would justify a significantly reduced level of growth.
1.3 The justification for this approach is that the HELDA report identifies Rother population growth declining from +12% in 1980-1990, to +6% in 2000 - 2010, and +3% in 2010-2020. The Development Strategy needs to reverse this declining trend to boost housing supply, to comply with the NPPF. An attainable level was achieved in the 1980-1990s.
1.4 There is a specific local housing need for older people with the HELDA report noting that Rother has the 2nd highest median age, after North Norfolk, in England. The forecast increase in population aged 75+ is +82%. The local level of services needed to support this rural population will require an increase in the younger population aged 0-65 years.
1.5 Practically the only Development Strategy that would reverse the decline of population aged 0-65 years, would be by using the Standard Method, as shown in the HELDA report.
1.6 Both the Vale of White Horse and South Oxfordshire Districts have Green Belt and National Landscape( AONB) constraints. But both Districts have adopted Local Plans that increased house completions from c.200 homes per year to c.800-1,000 homes per year. This has led to local services being improved and an increase in younger population aged 0-65 years.
2. Questions 68-70 on the vision for Northern Rother.
2.1 The vision takes insufficient account of the proximity to a large range of services in Heathfield, c.3 kms to the north west of the District boundary.
2.2 The Draft Local Plan accepts that Burwash, Burwash Common and Burwash Weald are linked ridge-topped villages along the A265.
The NPPF supports development in linked villages where services in one village are supported by the population in linked villages. The Development Strategy does not reflect that these are linked villages with a population of c.3,000 population.
2.3 The three linked villages should be assessed together, rather than separately.
A larger scale of development could then be justified in keeping with the character of three linked villages with a population of c.3,000 people.
2.4 The HEMA report should have considered that land at Linkway, Vicarage Road, Burwash Common was suitable for development, because development constraints could be resolved in a detailed planning application, and the site is more closely related to the existing built up area on A265 and Vicarage Road/Vicarage Lane.
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 27848
Received: 23/07/2024
Respondent: Mr Alex Ainslie
Agent: Bidwells
2.2.1 The proposed spatial development strategy of the Draft Local Plan includes a range of figures for minimum housing delivery. The lower figure of 5,158 dwellings (258 per year) is based on the total housing delivery from “identified sites”, which includes current allocations and sites with planning permission. The higher minimum figure presented in the Draft Local Plan is 7,287 dwellings (364 per year). This figure includes identified sites alongside the total capacity of “potential additional sites” that are identified in the draft HELAA.
2.2.2 We object to the use of the lower figure (5,158), as it is not ambitious enough to base housing delivery targets up to 2040 on already allocated and permitted sites. The new Local Plan should be exploring all options for maximising housing delivery in sustainable and deliverable locations, in line with Spatial Objective 4 so that the District is prepared to respond to the housing crisis in a meaningful way. The minimum housing delivery figure should therefore reflect the inclusion of suitable sites that are currently in the ‘potential sites’ category.
2.2.3 It is stated within paragraph 5.3 of the Draft Local Plan that: “The 2014 Core Strategy planned for a growth level of at least 5,700 dwellings between 2011 and 2028 which works out at 335 homes per year. The actual number of houses built each year since has averaged 219 (net additional dwellings per year). By contrast, Rother’s minimum local housing need (LHN) figure, defined using the national standard method calculation is 733 dwellings per year (2023 Base date).”
2.2.4 Over the Core Strategy period so far, Rother has failed to deliver against the housing targets set. It is clear that the Council needs to be ambitious in their identification and allocation of housing sites.
2.2.5 The Overall Spatial Development Strategy includes that Bexhill will continue to be a town that acts as the main transport and community hub. The Strategy proposes to focus growth in seven broad locations, including in West and North Bexhill in order to “consolidate Bexhill as the most sustainable town, within the capacities of the existing transport network”. We agree with this spatial development strategy as Bexhill is the most sustainable place for significant new development in the District.
See the two attachments which comprise the representation from Bidwells LLP on behalf of the landowner of HELAA Site BEX0050: Land south of Barnhorn Road which comments on the Local Plan itself as well as the suitability of site BEX0050.
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 27865
Received: 23/07/2024
Respondent: Mr Graham Edenborough
Agent: Rubix Estates
The Standard Method Local Housing Need (LHN) figure for Rother is 773 dpa (2023 base date) or
727 dpa (2024 base date). The Hastings & Rother Housing and Economic Development Needs
Assessment (HEDNA) Update (2024) identifies an affordable housing need (net) of 325 dpa, and
some 2,054 households are on the Rother Housing Register.
ONS datasets indicate that the latest median housing affordability ratio (2023) for Rother is 11.44,
having risen from 8.83 in 2013, and 7.77 in 2003. The lower-quartile affordability ratio is now 12.84,
rising from 10.53 in 2013 and 7.03 in 2003. Paragraph 8.21 of the Draft Local Plan cites the HEDNA’s
analysis regarding housing affordability. This notes that 44% of newly forming households earn less
than the amount needed to rent a lower-quartile property on the open market. Likewise, 94% earn
less than the amount needed to buy a lower-quartile open market dwelling.
The level of housing need is then significant, and affordability pressures are, therefore, serious and
widespread. Whilst Rother’s position is not unique, the current LHN for the district is also far higher
than the adopted (out-of-date) Core Strategy requirement (averaged at 335 dpa). Moreover, the
adopted Core Strategy requirement did not, in any case, fully address the scale of housing needs
identified in the (now defunct) South East Plan. Notwithstanding the HEDNA’s commentary on the
efficacy of the Standard Method, there can be no dispute that Rother (and the Rother-Hastings HMA)
represents an area of high housing need.
Despite the above, the proposed Spatial Strategy (as presented on pages 112 and 113 of the
consultation document) proposes only;
“a minimum of [5,158 to 7,287] dwellings, at an average rate of [258 to 364] per year.”
In other words, the Plan seeks to deliver between a third and just below half of the level of housing
need identified through the Standard Method calculation. Moreover, the net annual need for affordable
housing of 325 dpa (as identified in the HEDNA Update) is also likely to exceed the total (i.e., market
and affordable) annual housing target envisaged in the Draft Local Plan.
Draft Policy HOU2 ‘Affordable Housing’ does not yet specify the percentage of affordable housing
sought from market-led residential developments. However, depending on the conclusions of a future
Plan-wide viability assessment, the tariff is likely to be between 30% and 50%. As such, it is selfevident that only a fraction of overall affordable housing needs will be addressed through the Plan’s
current proposals.
As a separate point, and despite the analysis in the HEDNA Update (in particular, in paragraphs 6.32
to 6.49), RDC does not appear to argue that exceptional circumstances exist to justify a deviation from the Standard Method (as per NPPF paragraph 61) and the minimum Local Housing Need figure
arrived through it. It is the Standard Method LHN figure that should, therefore, be taken to represent
the Objective Assessment of Need.
Rather than seeking to make the case that there are exceptional circumstances justifying a departure
from the Standard Method, the Council instead contends that it is constraints found within the Planarea that prevent identified needs from being met. Indeed, in paragraphs 5.1 to 5.8, the Plan suggests
that the prevalence of areas at high risk of flooding, designated habitat sites and areas of highlandscape value, means that housing needs cannot be met in full, without resulting in unacceptable
impacts.
Rubix Estates recognises that parts of the Plan-area are subject to environmental constraints.
However, it is not accepted that there are no further opportunities to meet housing needs either in full
or at least to a much greater extent.
For example, within the HELAA (2024), the availability of a significant number of sites is listed as
‘unknown’, with these, therefore, being discounted when they might otherwise be suitable for meeting
needs. Many sites are also judged to be ‘unsuitable’ when it is clear from the Site Assessment
commentary (in the HELAA) that their suitability or unsuitability is finely balanced. Likewise, many
sites that are judged to be potentially suitable have had their estimated capacity and/or developable
area reduced when compared to the promoter’s / landowner’s estimate.
A more specific concern is that the HELAA (and, by extension, the Draft Local Plan) has taken a
‘policy-on’ approach to the evaluation of site constraints. Whilst that may be appropriate for statutory
designations (e.g., National Landscape), local, non-statutory designations should be treated
differently.
The above suggests that there is scope to refresh the HELAA evaluation to bring forward additional
sites. In this context, it must be recognised that the socioeconomic consequences of not fully meeting
housing needs (and to the degree currently envisaged) will have real-world consequences. Housing
affordability will worsen, and issues such as overcrowding and the suppression of household
formation will fail to be addressed. Broader consequences will arise in relation to intergenerational
inequality, declining social mobility and hindered economic productivity.
See full representation as attachment
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 27931
Received: 23/07/2024
Respondent: Mrs Catherine Nicholls
In short, the summary of many hours of reading:
Housing should be confined to brown/grey field sites, in urban surroundings that can cope with the demands of contemporary living, before greenfield sites (especially the HWNL) are even considered.
The Local Plan does not set any limits on anything so cannot possibly have any value as a plan for sustainable development. Development with no limits is unsustainable.
Please provide a map of the development boundary for Catsfield. (For example page 224, DaSA adopted 2019). Maps like this provide clarity for the lay-person rather than struggling through huge documents such as the Draft Local Plan, the HELAA reports, HEDNA etc. but unable to locate any meaningful maps.
Please accept this response to your consultation on the draft local plan for Rother 2020-2040 as your online consultation webpage is difficult to navigate and I became totally lost in the bureaucratic jargon and only managed to reach page 260 before burn-out.
The Draft itself is difficult to decipher what is actually being said, requires much cross referencing with other lengthy, confusing documents and I have had to deal with this draft in a ‘bite-size’ manageable way so may well miss important points, which I hope others will pick up on.
In short, the summary of many hours of reading:
Housing should be confined to brown/grey field sites, in urban surroundings that can cope with the demands of contemporary living, before greenfield sites (especially the HWNL) are even considered.
The Local Plan does not set any limits on anything so cannot possibly have any value as a plan for sustainable development. Development with no limits is unsustainable.
Please provide a map of the development boundary for Catsfield. (For example page 224, DaSA adopted 2019). Maps like this provide clarity for the lay-person rather than struggling through huge documents such as the Draft Local Plan, the HELAA reports, HEDNA etc. but unable to locate any meaningful maps.
RESPONSE TO QUESTIONS:
Q2. What are your views on proposed twin Overall Priorities to be ‘Green to the Core’ and ‘Live Well Locally’?
I have to disagree that RDCs vision is achievable. On the face of it the vision appears to indicate a respect for the environment and the rural communities within, but simply introducing the word ‘green’ does not equal sustainability and, likewise, the word ‘well’ is simply subjective. Therefore, rather than slogans which are open to interpretation or challenge by developers with their eye on today’s profit not tomorrow’s generations, perhaps something a little less open to subjective interpretation would be better. Ie. Today’s priority is tomorrow’s environment. It is clear that we need to protect our environment, both natural and built, because we won’t get a second chance tomorrow. The High Weald National Landscape must be protected as this will be our legacy to following generations – this is sustainability. A climate emergency and protecting our National Landscape is in absolute contrast to the aims of profit-driven developers and speculators, so the question is, how will RDC make developers/speculators adhere to these twin priorities and share their vision?
Regarding Catsfield where I live: The proposed number and design of dwellings on CAT0001 and CAT0016 sites in the HELAA report is really too large for the rural character of the village to subsume into the settlement and should be decreased. Large housing estates will urbanise the rural character - already seen in Ninfield in Wealden district. Therefore, such large housing estates are neither ‘green to the core’ nor beneficial to residents.
Why has Catsfield been singled out to provide 60 new dwellings when other villages have a nil target? How is this figure determined? Is the development boundary for Catsfield being altered without resident’s knowledge?
Q3. What are your views on the key issues (listed at paragraph 2.13) that have been identified and is there anything significant missing?
Simply carving up the country-side will not make houses affordable. Brown/grey field sites must be used before green spaces.
For instance, BEX008 is earmarked for industrial use. Why isn’t the site earmarked for residential buildings if there is a national housing crisis? The infrastructure is already in place.
The site MOU0012 is a vacant industrial site - why is the landowner not incentivised to free up this site? Is he holding out for residential planning?
I understand RDC has a partnership with Hastings. Have they audited empty brownfield sites and properties together, such as the old Post Office, that could be refurbished for residential dwellings?
What is significantly missing is a clear brown/greyfield register for the area if RDC is to conserve its special landscapes such a the HHWNL. Such a register should be in the public domain.
Q22. What are your views on the Council’s proposed policy for Biodiversity Net Gain?
Conserving special landscapes like the HW National Landscape will not be achieved by building more houses over it. By definition house building cannot leave the natural environment in a measurably better state than it was beforehand. BNG can only be achieved on brown/greyfield sites. Brownfield/grey sites should be used first and RDC should make this clear in the Local Plan. Please provide the brownfield maps to the public.
Q25. What are your views on the Council’s proposed policy for the High Weald National Landscape? Q26. Are there any alternatives or additional points the Council should be considering.
Hopefully, these policies will protect the HWNL. However, for the policy to be sustainable there must be clear limits and boundaries and there is not! Therefore, the policy has little value without limits.
Q27. What are your views on the Council’s proposed policy on compact development?
I am unsure what ‘compact development’ means in practice. I assume it means making the best use of infrastructure by building in those areas, predominantly urban, where infrastructure is already in place, which makes sense. In rural villages, like Catsfield, infrastructure is poor. Public transport is non-existent in Catsfield and residents rely on private vehicles to get to work, to shop etc. usually over poorly maintained roads and lanes. No mobile signal is available in the village and no fibre WiFi is available. Drains overflow, water pressure is low or nonexistent and the village regularly suffers from power cuts. This is all down to poor, unmaintained infrastructure but I made the choice not to live in an urban environment with its good infrastructure but enjoy our wonderful countryside of Sussex.
Again, housing should be confined to brown/grey field sites, in urban surroundings that can cope with the demands of contemporary living and if that is what ‘compact development’ means then I support that.
Q28. What are your views on the area types and densities proposed as a key driver to Live Well Locally?
Please advise where the current map of the development boundary around Catsfield can be found? 25-45 dwellings per hectare makes little sense to ordinary residents - please clarify before I can comment.
Q51. What are your views on the Council’s preferred spatial development options? Q52. Do you have any comments on the merits of the alternative Spatial Development Options, that do not form part of the preferred development options – as explained in the background paper? Q53. Are there any other development options that the Council should consider as part of its Local Plan?
These concepts are confusing to the ordinary resident and need to be explained in clear English. I cannot comment on something that is so confusing.
Q62. What are your views on the vision for Battle and surrounding settlements?
RDC’s target of 60 houses for the small village of Catsfield does not correspond with Rother’s vision quoted from Page 140 - 'Sensitive small-scale development will be delivered in villages surrounding Battle, at densities consistent with the surrounding area, where it is sustainable and does not negatively impact the setting of the High Weald NL.’
Needs a total rethink regarding the number of dwellings. However, Page 145 - para 5.60/61 introduces the idea that the target of 60 houses for Catsfield is purely hypothetical!
Q77. Do you agree with the principal identified by the Council of achieving a stepped housing delivery with greater levels of delivery planned for later in the plan period?
How will RDC incentivise developers to adhere to this principal? Without strict limits this principal is unachievable! Page 177 identifies a problem with land-banking by developers - 'there have been significant delays in the build out of sites.’ This practise needs to be penalised as it affects the price mechanism of houses thus pushing up prices. How is RDC tackling the issue of land-banking?
Q82. What are your views on the Council’s approach to development boundaries?
Page 186, para 5.119 - 'This Local Plan will review each settlement’s boundary, especially in relation to potential allocation sites.’ How can residents possibly comment on something they have not seen? Please produce the Development Boundary map for Catsfield so I can make an informed comment.
Q103. Do you feel that this policy is sufficient to protect open space?
No. The policies have no limits so developers will perpetually challenge them - mission creep.
Q104. What are your views on the Council's proposed policy on public rights of way?
PRoWs are a historic right and should remain. Not diverted nor ignored nor moved surreptitiously (which has been seen in Catsfield). New PRoW are always welcome!
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 27993
Received: 23/07/2024
Respondent: Mr Giles Cartwright
Number of people: 4
Agent: Rubix Estates
The Standard Method Local Housing Need (LHN) figure for Rother is 773 dpa (2023 base date) or
727 dpa (2024 base date). The Hastings & Rother Housing and Economic Development Needs
Assessment (HEDNA) Update (2024) identifies an affordable housing need (net) of 325 dpa, and
some 2,054 households are on the Rother Housing Register.
National Policy
A new Labour government was elected on 4 July 2024 and it has been confirmed that they will be
pushing a growth agenda. On the 8 July and In her first speech as Chancellor, Rachel Reeves laid
out plans to rebuild Britain and make every part of the country better off.
Immediate reforms to the planning system are expected with a new National Planning Policy
Framework (NPPF) consultation expected shortly outlining "a new growth-focused approach to the
planning system".
It is expected that all Local Authorities will be required to meet “regularly” meet their housing targets.
Rother District Council can only identify a housing land supply of 2.79 years and therefore there the
district is facing a significant housing shortage.
The Council should closely monitor any changes to the planning system during the production of the
new Local Plan with a pro-growth stance a key driver given the lack of a five year housing land
supply.
ONS datasets indicate that the latest median housing affordability ratio (2023) for Rother is 11.44,
having risen from 8.83 in 2013, and 7.77 in 2003. The lower-quartile affordability ratio is now 12.84,
rising from 10.53 in 2013 and 7.03 in 2003. Paragraph 8.21 of the Draft Local Plan cites the
HEDNA’s analysis regarding housing affordability. This notes that 44% of newly forming households
earn less than the amount needed to rent a lower-quartile property on the open market. Likewise,
94% earn less than the amount needed to buy a lower-quartile open market dwelling.
The level of housing need is then significant, and affordability pressures are, therefore, serious and
widespread. Whilst Rother’s position is not unique, the current LHN for the district is also far higher
than the adopted (out-of-date) Core Strategy requirement (averaged at 335 dpa). Moreover, the
adopted Core Strategy requirement did not, in any case, fully address the scale of housing needs
identified in the (now defunct) South East Plan. Notwithstanding the HEDNA’s commentary on the
efficacy of the Standard Method, there can be no dispute that Rother (and the Rother-Hastings HMA)
represents an area of high housing need.
Despite the above, the proposed Spatial Strategy (as presented on pages 112 and 113 of the
consultation document) proposes only;
“a minimum of [5,158 to 7,287] dwellings, at an average rate of [258 to 364] per year.”
In other words, the Plan seeks to deliver between a third and just below half of the level of housing
need identified through the Standard Method calculation. Moreover, the net annual need for
affordable housing of 325 dpa (as identified in the HEDNA Update) is also likely to exceed the total
(i.e., market and affordable) annual housing target envisaged in the Draft Local Plan.
Draft Policy HOU2 ‘Affordable Housing’ does not yet specify the percentage of affordable housing
sought from market-led residential developments. However, depending on the conclusions of a future
Plan-wide viability assessment, the tariff is likely to be between 30% and 50%. As such, it is selfevident that only a fraction of overall affordable housing needs will be addressed through the Plan’s
current proposals.
As a separate point, and despite the analysis in the HEDNA Update (in particular, in paragraphs 6.32
to 6.49), RDC does not appear to argue that exceptional circumstances exist to justify a deviation
from the Standard Method (as per NPPF paragraph 61) and the minimum Local Housing Need figure
arrived through it. It is the Standard Method LHN figure that should, therefore, be taken to represent
the Objective Assessment of Need.
Rather than seeking to make the case that there are exceptional circumstances justifying a departure
from the Standard Method, the Council instead contends that it is constraints found within the Planarea that prevent identified needs from being met. Indeed, in paragraphs 5.1 to 5.8, the Plan suggests that the prevalence of areas at high risk of flooding, designated habitat sites and areas of
high-landscape value, means that housing needs cannot be met in full, without resulting in
unacceptable impacts.
Rubix Estates recognises that parts of the Plan-area are subject to environmental constraints.
However, it is not accepted that there are no further opportunities to meet housing needs either in full
or at least to a much greater extent.
For example, within the HELAA (2024), the availability of a significant number of sites is listed as
‘unknown’, with these, therefore, being discounted when they might otherwise be suitable for
meeting needs. Many sites are also judged to be ‘unsuitable’ when it is clear from the Site
Assessment commentary (in the HELAA) that their suitability or unsuitability is finely balanced.
Likewise, many sites that are judged to be potentially suitable have had their estimated capacity
and/or developable area reduced when compared to the promoter’s / landowner’s estimate.
A more specific concern is that the HELAA (and, by extension, the Draft Local Plan) has taken a
‘policy-on’ approach to the evaluation of site constraints. Whilst that may be appropriate for statutory
designations (e.g., National Landscape), local, non-statutory designations should be treated
differently.
The above suggests that there is scope to refresh the HELAA evaluation to bring forward additional
sites. In this context, it must be recognised that the socioeconomic consequences of not fully
meeting housing needs (and to the degree currently envisaged) will have real-world consequences.
Housing affordability will worsen, and issues such as overcrowding and the suppression of
household formation will fail to be addressed. Broader consequences will arise in relation to
intergenerational inequality, declining social mobility and hindered economic productivity.
Please refer to document attached
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 27998
Received: 22/07/2024
Respondent: Persimmon Homes Ltd
Agent: Judith Ashton Associates
Having reviewed the housing requirement against the standard method and the advice in the PPG about the need to consider the application of a cap, the Local Housing Need in Rother is reduced from 842 to 733 dpa. That said, while the cap reduces the minimum number generated by the standard method, it does not reduce housing need itself. Therefore, strategic policies adopted with a cap applied may require an early review and updating to ensure that any housing need above the capped level is planned for as soon as is reasonably possible. The PPG is clear that the standard method is a minimum number and that in areas where the cap reduces the local housing need “consideration can still be given to whether a higher level of need could realistically be delivered. This may help prevent authorities from having to undertake an early review of the relevant policies”.
I write with reference to the above. I act for Persimmon Homes who have an interest in a sound plan being delivered for Rother.
Having regard thereto, having reviewed the Regulation 18 Draft Local Plan (April 2024), and associated evidence base, especially the Sustainability Appraisal - Interim Report (SA) and associated appendices, Housing and Economic Land Availability Assessment (HELAA), Local Housing and Economic Needs Assessment (HEDNA), Development Strategy Background Paper (DSBP), Housing Background Paper (BP), Settlement Study (SS), and Infrastructure Delivery Plan (IDP), and Viability Assessment and CiL Review (VA); we have the following comments on the Draft Regulation 18 Rother Local Plan (April 2024), and associated evidence base.
1 The Plan Period
1.1 We note that the 2024 LDS suggests adoption of the Local Plan (Regulation 26) in Quarter 3 2026/27. As a result, the plan period advocated in policy SS2 will be less than 15 years from adoption. In order to comply with paragraph 22 of the NPPF, the plan period should we believe start at 1st April 2023 and be extended to 31st March 2042 as this will ensure it looks ahead for a minimum of 15 years from adoption. As a result, additional housing allocations need to be made to help address this additional requirement.
2 The Housing Requirement, Supply and Trajectory
2.1
Local Housing Need, and the Minimum Housing Requirement
2.1.1 We note that the proposed overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa.
2.1.2
Having reviewed the housing requirement against the standard method and the advice in the PPG about the need to consider the application of a cap, we note that adopting the standard methodology, and adjusting the figures to the base date of the local plan and using the latest local affordability ratio, the position is as set out below.
Step 1: Setting the Baseline
Household Projection = 523.41 dwellings per annum
Step 2: Adjustment for
Affordability
Local Affordability Ratio = 13.822
Adjustment Factor = 1.61 𝐴𝑑𝑗𝑢𝑠𝑡𝑚𝑒𝑛𝑡 𝑓𝑎𝑐𝑡𝑜𝑟=(13.82−44) 𝑥 0.25+1
Minimum Local Housing need
523.4
x 1.61 = 842.6
2.1.3
As set out in section 5 of the HEDNA a cap is applied to limit the level of increase, depending upon the stage that the local authority is at with regards to its strategic policies for housing. Where the policies have been adopted within the last 5 years, the LHN figure is capped at 40% above the average annual housing requirement figure as set out in the existing policies. Where the relevant policies were adopted more than 5 years ago (as is the case in Rother), the LHN is capped at 40% above whichever is higher of:
• The average annual projected household growth identified in Step 1; or
• The average annual housing requirement figure as set out in the most recently adopted strategic policies.
Having done this, we note the following:
40% cap
The average annual projected household growth identified in Step 1
523.4
732.7
The average annual housing requirement figure as set out in the most recently adopted strategic policies
3353
469
2.1.4 Given the above the LHN in Rother is reduced from 842 dpa to 733 dpa. That said, while the cap reduces the minimum number generated by the standard method, it does not reduce housing need itself. Therefore, strategic policies adopted with a cap applied may require an early review and updating to ensure that any housing need above the capped level is planned for as soon as is reasonably possible. The PPG is clear that the standard method is a minimum number and that in areas such as Wealden where the cap reduces the local housing need “consideration can still be given to whether a higher level of need could realistically be delivered. This may help prevent authorities from having to undertake an early review of the relevant policies”4. For Rother this would mean considering whether to deliver 842dpa. It is also important to note that the LHN figure is a minimum starting point, and it does not produce the Housing Requirement5.
2.1.5
In the context of the above, we note that the overall spatial development strategy in looking to deliver a minimum of 5,158 to 7,286 dwellings over the plan period is in effect only looking to deliver between 35% and 50% of the capped LHN.
2.1.6
We further note that the HEDNA is clear in the executive summary on both the scale of the LHN (737dpa at the time), and the findings of the housing growth scenario, indicating that there are ‘no exceptional local circumstances’ that would justify deviating from the Standard Method in Rother.
2.1.7
Whilst the inference in the plan is that the level of housing growth that is proposed is supply led (i.e. reflects the level of suitable sites assessed through the HELAA process) and constrained by the High Weald AONB, the Pevensey levels, the Strategic Gaps around Hastings and the SSSI around Rye, this is adopting a policy on approach to a situation that should be policy off.
2.1.8
Thus, not only is it unclear why the plan is not looking to deliver the LHN as identified in the HEDNA, but why it has not also looked at the uncapped need given the issues surrounding the unmet needs of its neighbours (see below). PPG6 identified a number of circumstances where it might be appropriate to plan for a higher housing need figure than the Standard Method indicates. Such circumstances can include:
• Instances where housing need is likely to exceed past trends; and
• Where the authority agrees to address unmet need arising from neighbouring authorities.
2.1.9 The PPG is not exhaustive in its examples as to what may be a sound reason for considering an uplift. Matters such as a high affordability ratio that is following a rising trend, along with significant affordable housing need, and of course the importance of ensuring an adequate buffer to cater for under supply, or instances where the Plan strategy fails to deliver as expected, are all sound reasons for considering an uplift.
2.1.10
In the context of the above we note that the SA in section 5, in reviewing the Spatial Development Strategy Options, does not appear to look at different scales of growth relative to the LHN (both capped and uncapped) or the implications of only delivering the scale of housing proposed, just a variety of different spatial options where the scale of development is unquantified, despite the fact one of the SA objectives is that ‘More opportunities are provided for everyone to be in a suitable home to meet their needs.’ The above belies the evidence base and the various reasons why the council need to meet their LHN / an uplift to the LHN should be considered further, as summarised in the commentary below.
2.1.11 The reasons for uplifting the LHN should be set into two categories, firstly those that indicate an uplift is required for the District itself and secondly any uplift that might arise from meeting unmet need from neighbouring authorities.
Affordability
2.1.12 Rother is an inherently unaffordable place to live as acknowledged at paras 1.15, 8.20 and 8.21 of the Reg 18 Plan which refer to the issues of the significant deterioration in affordability within the district The HEDNA (2024) identifies a significant need for affordable housing in Rother in the Plan period. This is due to a high, and increasing, house-price to earnings (affordability) ratio, meaning that growth in house prices is significantly outstripping growth in wages, and housing is becoming less affordable for people who live, work, and retire within the district.
2.1.13 To this end, we note, when looking at the ONS ‘House Price to Workplace-Based Earnings Ratio - March 2024’ that the ratio of median house price to median gross annual workplace-based earnings by local authority district, England, and Wales, 1997 to 2023 indicates that the ratio of median house price to median gross annual workplace-based earnings in RDC has increased significantly over the past 10 years from 10.53 to 12.847.
2.1.14 The rapid increase in the affordability ratio is clear evidence of the lack of housing delivery that has taken place over the last 10-year period within the District. Failing to deliver the LHN will only increase the rate of decline in affordability. For an improvement in the affordability situation to occur, decisive action is required through the provision of more housing over and above the capped LHN.
2.1.15 The matter of affordability alone clearly indicates that the Council should be planning for more than the capped LHN.
Affordable Housing Need
2.1.16 Linked to the issue of affordability is the significant need for affordable housing identified in the District. A symptom of a rising affordability ratio is the fact that more members of society are priced out of the open market and consequently require affordable housing in one form or another. Again, the Council acknowledges this in the Draft Plan and in the Feb 2024 HEDNA that accompanies the consultation pack.
2.1.17 The HEDNA indicates that the total net annual affordable housing need for the period 2021 to 2044 is 325 dpa, which is equivalent to 44% of the capped LHN figure (based on 733 dpa). Whilst policy HOU2 does not indicate what level of affordable provision the council will be looking to deliver, policy LHN2 of the adopted core strategy looks to deliver 30% affordable housing on sites in Bexhill and Hastings Fringe, and Rye, 35% in Battle and 40% in the rural areas. Even if the Council were to adopt a 40% requirement across the board, this will only be triggered for those sites that meet the qualifying criteria. It is therefore highly unlikely that the affordable housing need will be met. Indeed, given the decreasing trend in terms of affordability set out above, the gross affordable housing need of 325 dpa is highly likely to increase over the plan period, leading to an increase in the net shortfall and in turn a higher number of people in need and on the Council’s housing waiting list.
2.1.18 Whilst the councils latest AMR does not provide any information on affordable housing delivery, we note that the Governments Affordable housing supply statistics (AHS) 2022-23 table 1011C indicates that over the past 10 years RDC only delivered 887 affordable completions. An average of 89 (rounded up) affordable completions per annum, which just 27% of the average annual affordable need of 325 affordable dwellings per annum identified in the HNA. JAA table 1a – Affordable Housing Provision 2013 - 2023
13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 Total
Total affordable dwellings 80 123 103 20 56 60 130 126 15 174
887
2.1.19 Furthermore, whilst if you compare the level of affordable provision against total housing completions over the past 5 years this averages 38.7% of total housing completions, it fluctuates significantly and prior to this was averaging significantly less. JAA table 1b – Affordable Housing Provision as a percentage of overall housing delivery 2016 - 2023
18-19 19-20 20-21 21-22 22-23 Total
Net additional dwellings
255 247 175 237
390
1,304
Total affordable dwellings
60
130
126
15
174
505
% of total
23.5%
52.6%
72%
6.3%
44.6%
38.7%
2.1.20 Given the above, even if one assumes an average of 38%, this suggests that the plan would need to deliver over 8558 dpa to meet the identified affordable housing needs of the District.
2.1.21
Whilst we are not advocating this level of growth, the above demonstrates the need for the plan to deliver the LHN in full/ an uplift to the LHN figure to boost the supply of open market and affordable homes and thus help address the affordable housing needs of the District. Said approach would also reflect on spatial objective 4 – to respond to the housing crisis and help facilitate the delivery of housing to meet the needs of different groups in the community, by maximising the potential opportunities for residential development in sustainable and deliverable locations, helping to deliver affordable housing, and ensuring development is viable and supports growth in the district by providing certainty for developers through site allocations and clear planning policies.
2.1.22
The SA in reviewing the merits of the alternative spatial options appears to have paid little regard to these fundamental points.
Past Under Delivery
2.1.23
We note the Councils Five Year Housing Land Supply Statement – 1 April 2023 (published in December 2023) suggests that the Council is able to demonstrate a 3.09 year housing land supply for the period 01/04/23 to 31/03/28, and that the HDT results for 2022, as published in December 2023 was, as set out below, just 41%.
JAA table 2 - Result of 2022 Housing Delivery Test
Area Number of homes required Total number of homes required Number of homes delivered Total number of homes delivered Housing Delivery Test: 2022 measurement Housing Delivery Test: 2022 consequence 2019-20 2020-21 2021- 22 2019-20 2020-21 2021- 22
Rother 363 490 740
1593 247 175 239 661 41% Presumption
2.1.24
We further note that RDC housing delivery has over the past few years been somewhat mixed, with the Council failing to meet their annual housing requirement on a number of occasions, which has led to a deficit that suggests that there has been a record of under delivery that should be addressed by an uplift to the LHN figure.
A Buffer
2.1.25
Given the issues of the affordability and the affordable housing needs of the district identified above, as well as the issue of past underdeliver rates, we feel that at the very least a buffer should be built into the housing requirement for the Plan. Introducing a buffer into the housing requirement would ensure that the Council plans positively for the future in a manner that at least meets the minimum LHN rather than the capped figure, or indeed the ‘capacity’ based figure it currently looks
to deliver. This would in reality also provide an uplift to reflect the acute affordability problem and in turn the rising affordable housing need. Given the time horizon of the plan, the Council should also consider the need for flexibility to be built into the strategy so that it can be resilient to unforeseen changes that may occur during the latter years of the plan period.
2.1.26
To this end, we would stress the need for the SA to not only look at various Spatial Development Strategies, but to express these in the context of overall housing provision and assess not only a strategy that reflects the capped LHN, but both the uncapped LHN and indeed something that falls short of the capped LHN so that the effects of all reasonable alternatives are properly taken into consideration. As currently drafted the SA does not in our opinion adequately addresses the issues raised above or look to address the issue of unmet needs from adjacent authorities – see below.
2.1.27
Having regard to the above we consider a buffer of circa 10% i.e. circa 1,4669 additional dwellings should be added to the capped LHN over the plan period to ensure the Plan proceeds on a robust footing.10
2.2
Unmet Need
2.2.1 We note that the Reg 18 Plan makes no specific reference to the Duty to Cooperate (DtC) with neighbouring authorities over the issue of unmet need, there being no reference to the unmet needs of neighbours either. We also note that whilst the HEDNA recognises the fact that Hastings and Rother, together with their intrinsic sub-areas, comprise a self-contained Housing Market Area and Functional Economic Market Area, it does not comment upon the relationship of the HMA to adjacent HMA’s and their unmet need, there being only passing recognition of the fact that Wealden is within the influence of and overlapped by the Hastings and Rother HMA. Nor is there any commentary on how Rothers reg 18 Plan will look to address the unmet needs of Hastings, despite the joint statement agreed with Hastings BC on p16 of the Reg 18 Plan.
2.2.2
Similarly, whilst the Housing Background Paper advises at para 5.14 that the Council is committed to its duties in relation to the Duty to Co-operate, and in summer 2020 prepared a Duty to Co-operate Action Plan which outlines how and at what stage it intends to engage and consult with organisations on the development of the Local Plan, the Engagement and Duty to Cooperate Statement in commenting upon the engagement to date with Hastings BC, and in particular the matter of housing need, merely says at para 6.11 that ‘ The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 481 for Hastings. Hastings Borough Council made a formal request to Rother District Council on 3rd December 2021, along with requests other authorities, as to whether Rother could accommodate any of Hastings’ residual unmet need.’
2.2.3
This does not confirm the scale of Hastings unmet need, which we understand to be in the region of 5,525 dwellings11 or Rothers response to Hasting’s request, and as such does not suggest active, ongoing, and constructive engagement.
2.2.4
Similarly, in commenting upon engagement with Wealden, para 6.23 of the Engagement and Duty to Cooperate Statement advises that: ‘The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 1,212 for Wealden, however, in
their respective Plans, Rother has set an annual target of between additional 243-343 dwellings per annum, while Wealden sets a per annum target of and additional. Both sets of targets fall short of the need figures derived from the Standard Methodology. At this stage in Plan development, neither district has yet made a request in respect of unmet need.’
2.2.5
As is clear from the above Wealden’s target of 22,800 dwellings has actually been omitted from the document, as has reference to the implications in terms of Wealden’s unmet need of 7,071 dwellings12. .
2.2.6
Not only does the Engagement and Duty to Cooperate Statement fail to address the issue of how this unmet need will be tackled, but also makes it clear that Rother has not yet made a request to surrounding districts in respect of its unmet need, this despite the fact Wealden have for example just completed their reg 18 consultation. Again, this does not suggest active, ongoing, and constructive engagement, or due regard to the implications of the increasing scale of unmet need that is emerging in this part of East Sussex, a matter one would have expected the SA to have regard to in terms of the wider social, economic, and environmental consequences.
2.2.7
The lack of any MoU or SoCG with Hastings BC given their request of 3.1.21 is also of concern, as is the current lack of Mou or SoCG with Wealden DC, albeit we note one is in preparation and will we assume be available for scrutiny at Reg 19.
2.2.8
As the council will be aware, in order to demonstrate that the consultation on strategic cross boundary issues such as housing and unmet needs has been effective, continuous and ongoing, and the requirements of the Duty to Cooperate (DtC) have been addressed in terms of the overall housing requirement, MoU or SoCG will need to be produced and reviewed and updated regularly if they are to be relied upon.
2.2.9
Only through a rigorous approach to the issue of the DtC will the Council be able to demonstrate that its housing requirement is right, and that the spatial strategy is correct in its approach to growth. As things stand, we do not believe there to be sufficient evidence in place to demonstrate the DtC has been complied with, and as such can only conclude that the plan is legally flawed.
Conclusions on the Housing Requirement
2.2.10
Not only are the Council failing to meet their LHN as calculated by reference to the Standard Method i.e. 14,660 dwellings (733 dpa), but the shortfall of 7,374 – 9,502 dwellings is between 50% and 65% of the capped LHN. This is a significant shortfall exacerbated by the fact the LHN is a capped figure, and as the PPG is clear the LHN is only the starting point.
2.2.11
There are a range of factors relevant to the calculation of the housing requirement for the Draft Plan that the Council needs to consider when arriving at its overall housing requirement. These include:
• The inherent lack of affordability and the increasing affordability ratios;
• The poor levels of affordable housing delivery, and attendant increasing need for affordable homes; and • The importance of including a buffer above the LHN to ensure adequate housing delivery particularly given the Council’s historically poor track record of delivery as set out above.
2.2.12
When these factors are properly scrutinised, they demonstrate clear and rational reasons as to why there should be an uplift to the LHN. Having regard to the above Persimmon Homes t believe that at the very least the plan should provide for the uncapped need i.e. 733 dpa to ensure the Plan proceeds on a robust footing. Over a plan period of 1st April 2020 to 31st March 2042 this would equate to some 16,126 dwellings, circa 8,840 - 10,968 dwellings more than the plan is currently looking to provide for.
2.2.13
Setting the housing requirement at this level would significantly improve the affordability situation within the District and would deliver more affordable homes for those members of the community in the most need.
2.2.14
It is clear that the SA has as yet to assess the merits of delivering the LHN in full, a higher figure or indeed a lower one. It is also clear from the Engagement and Duty to Cooperate Statement that the council have yet to fully assess the effects of their neighbours’ unmet needs or to explore through the DtC, whether any of their neighbours could assist.
2.3 Housing Supply
2.3.1. Nowhere in the Reg 18 Plan is there a trajectory setting out how the housing requirement will be met or a rolling five year housing land supply maintained. Thus, in terms of supply all that is available is the information set out within table 34 of the Reg 18 Plan which indicates that the housing supply comprises the following:
Source of housing supply
a
Constructed 1 April 2020 – 31 March 2023
802
b
Known completions and commencements on large sites since 1 April 2023
340
c
With Planning Permission
1,693
d
DaSA & Neighbourhood Plan allocations without permission brought forward
1,660
e
Additional HELAA potential sites
2,129
f
Windfall projection (across the district)
663
Total Range
5,15813- 7,28714
2.3.2 In reviewing the above there is nowhere in the evidence base where one can review and assess the deliverability of those sites with outstanding planning permission that have yet to start on site, allocated sites without permissions or the additional HELLA sites. The councils Housing Land Supply and Housing Trajectory (April 2023 position statement), within its appendices provides details of the following:
•
Delivery by financial year of large site permissions (2,140 of which 1261 are only have outline consent))
•
Delivery by financial year of large sites delegated to approve subject to S106 (555, of which only 2 sites delivering 17 dwellings are for full planning permission, the majority being outline schemes))
•
Delivery by financial year of DaSA allocations (520, of which an appeal for one site for 40 dwellings has been dismissed)) •
Delivery by financial year of Neighbourhood Plan allocations (253 of which sites delivering only 34 are subject to applications)) and
•
Small site permissions (316)
2.3.4 As the above does not tally with the figures in table 34 it is impossible to scrutinise the housing land supply properly and ensure it is truly deliverable. All we can note is that the number of large sites with outline permission only that are due to start delivering in the next 5 years seems rather high, as do the number of large sites with a resolution to grant outline permission subject to S106. We would also ask that the next iteration of the plan the council produce a more detailed evidence base to demonstrate that the proposed commitments will deliver as suggested and that the council can maintain a robust and rolling 5 year housing land supply.
2.3.5 In the context of the above, we would suggest that the Council consider further whether a buffer of say 10% should be applied to those sites with planning permission that have yet to commence to take into account any potential non-delivery/ delay in delivery of the dwellings contained within this category which at 1,693 equates to nearly a third of the supply15. Similarly, the sites contained within the DaSA & Neighbourhood Plan allocations without permission, which equate to a comparable proportion of the total supply. Alternatively, the Council need to undertake a more detailed critique of the proposed commitments to ensure what is being put forward is truly deliverable within the plan period. Either way we believe this would generate the need to find land to accommodate a further 335 dwellings16.
2.3.6. Turning to windfalls, para 5.131 of the reg 18 plan indicates that windfall development forms an important part of the councils housing land supply and that the Council will continue to rely on windfall development as part of its development strategy. To this end table 34 of the Reg 18 Plan reports a figure of 663 windfalls over the plan period, and proposed policy DEV5 suggests a windfall development projection of 39 dwellings per annum for the plan period17. This is however slightly at odds with the findings of Table 3 of the councils Housing Land Supply and Housing Trajectory (April 2023 position statement), which suggests an annual average of 45 windfalls a year. Clearly clarity is required on this, as whilst para 6.9 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) suggests that work is currently underway on producing an updated windfall methodology background paper in support of the new Local Plan, which will reassess the likely contribution from windfall sites in the future, as well as the period over which any allowance should be applied, no such document appears within the evidence base. As the council will be aware, they will, in accordance with para 72 of the NPPF, need to provide compelling evidence that the windfall trajectory is a reliable source of supply, and cannot just rely upon a headline review of past windfall delivery rates without any analysis of expected future trends.
2.3.7 Finally in terms of the additional HELAA potential sites, we note that the HELLA in listing Identified Sites (existing allocations and sites with planning permission), and Potential Sites (Sites are potentially suitable, potentially available and potentially deliverable, subject to further assessment or investigation), discounts an unquantified number of ‘Other Potentially Suitable Sites Where Availability is Unknown’ and Rejected Sites (sites assessed as currently unsuitable/ unavailable/ unachievable), and that it is unclear how releasing some of these sites would come to enabling the council to meet their LHN if the assessment criteria were reviewed/ the sites themselves reassessed in terms of the overall area to be developed/ development capacity were reviewed. Given the scale of the unmet need we would respectfully suggest that no stone should be left unturned in looking to achieve the LHN and that whilst not all of the rejected sites will be acceptable, some may, with further consideration, have been suitable, such that the overall quantum of deliverable sites and thus the plans ‘capacity’ based housing figure could be higher. We would thus recommend that in order to demonstrate the housing supply figure is fully justified the council provide further evidence to this effect at Reg 19.
Conclusions on the Housing Supply
2.3.8 Having reviewed the component parts of the Housing Land Supply as best we can given the lack of available evidence to justify the position set out in table 34 of the Reg 18 Plan, we note that the figures relied upon to meet the Councils proposed ‘capacity’ based housing requirement require:
➢
100% reliance on all current commitments (existing detailed, and outline permissions, as well as sites with a resolution to grant and sites allocated in the DaSA and Neighbourhood Plans). This is not justified and a 10% buffer should be introduced to allow for non-delivery/ slower than expected delivery i.e. circa 335 dwellings.
➢
100% of the proposed housing sites delivering the quantum proposed within the plan period. This is however subject to all of said sites being found acceptable by the Local Plan Inspector/ site promoters confirming the sites can deliver this quantum of development in light of all the other policy requirements set out in the plan, such that a contingency may be sensible.
➢
663 dwellings to come forward as windfalls. The proposed windfall allowance is not based on a credible evidence base and is not justified. At 9 - 13% of the residual requirement, it is a significant part of the overall supply and needs to be reviewed to ensure a realistic approach is adopted at Reg 19.
2.3.9 As a result of the above, we would submit that as the predicted supply is effectively dictating the overall requirements – i.e. we are looking at a ‘capacity’ based housing requirement, the fact there is no flexibility in the proposed supply is of grave concern as in effect the overall supply could be a lot less than predicted unless additional sites are added in to address our concerns about the commitments, and windfalls and help provide a buffer / address the issues of affordability and DtC we have raised above. As it stands the plan would be incapable of accommodating any fluctuations in the market and could leave the council open to speculative applications very early in the plan period. The council’s assessment of potential housing sites in the HELLA and SA needs to be reviewed and no stone left unturned when it comes to identifying sites and addressing perceived constraints. Likewise, the councils rational for the yields they have attributed to the proposed allocations needs to be fully justified as, as we explain below, we do not think they are when the policy requirements set out in the draft plan are properly taken into consideration.
3
The need for a Stepped Trajectory
3.1 We note that para 5.102 of the Reg 18 Plan suggests that the Council would require a considerable step change in housing delivery in order to deliver a significant uplift compared to current and historic delivery rates over the last ten years. Figure 37 then illustrates that over the past 12 years the council have on average delivered 219dpa, albeit in the last two years they have delivered 237 and 390 dpa, respectively. Whilst the LHA at 733dpa would require a sea change in delivery, the current proposition, of a supply led target of 258 – 364dpa is clearly within the realms of that which has been achieved of late – reflecting the indeed, if the trajectory in appendix 7 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) is correct the council are anticipating an average of 544 dpa following over the next 5 years18: whilst this tails off after 28/29, this is because the trajectory is based on existing commitments (permissions and allocations) if, with a new plan in place additional sites were allocated, there is no reason why higher levels of growth could not be sustained longer term. There is thus no justification within the evidence base to support a stepped trajectory. Indeed para 5.102 of the Reg 18 Plan appears to suggest that delivery rates have been significantly impacted by the economic downturn and the effect of the coronavirus pandemic in recent years, such that while a number of current allocated sites have been permitted there have been significant delays in the build out of sites. This does not support a stepped trajectory it merely justifies past performance which with an economic upturn should begin to ensure a more robust and steady supply. Furthermore, as two thirds of the proposed supply is already committed there can be no justification for a stepped trajectory.
4
The Growth Options for Sub Areas
4.1 Whilst having no direct interest in the growth options, we do note that when looking at figure 33 that a considerable amount of the proposed growth, both committed and proposed through the additional sites identified through the HELAA that 46% of the proposed growth is in and around Bexhill, with only 9% being directed towards Battle, only 3.6% to the hastings fringe. Whilst we acknowledge that Bexhill is the least constrained of the main centres, one has to wonder if this is a sustainable approach, especially given the public transport links and level of services available in the likes of Battle and Robertsbridge. Comparing figure 35 of the Reg 18 Plan (the opportunities for housing growth) with Figure 12 of the settlement study (part 1) (Settlement Sustainability Score Table), the level of growth proposed in the Sustainable and Moderately Sustainable settlements seems to be significantly less than that proposed in Bexhill, which whilst it is the only ‘Highly Sustainable’ settlement seems somewhat out of proportion and one has to wonder whether this could lead to market saturation and actually prejudice housing land supply.
5
Development Principles Policies
5.1 We note that DEV2 requires: ‘Planning applications (whether in outline or full format) must relate to an entire development site to ensure a comprehensive approach, including where sites are in multiple ownerships.
When an outline application is submitted, a masterplan defining key parameters for the entire site must be submitted by the applicant to indicate how the overall development of the site can be achieved.’
5.2 Where sites are in multiple ownership, we would suggest that as long as a framework masterplan covering the whole site, and an infrastructure delivery strategy has been agreed, either through the site promoters and the council or via an SPD, there should be nothing to stop one party looking to promote their site in advance. As long as the application reflects the framework masterplan and s106 proceeds in accordance with the infrastructure delivery plan we fail to see how this would prejudice the plan. Indeed, it may well allow sites to proceed more quickly and thus actively assist the council in their housing land supply. 5.3 We note that DEV3 indicates that: ‘Development boundaries define the area within sustainable settlements where development will be permitted, provided it is consistent with this Local Plan.
Priority shall be given to reuse of brownfield sites, in order to make efficient use of previously developed land in sustainable settlements. Some greenfield development will be necessary in order to deliver housing and employment need, but this will be limited to inside development boundaries.’
5.4 Whilst in the first instance we assume the development boundaries will be redrawn to reflect the proposed allocations, we would also suggest that given the shortfall in the housing land supply, that the council should look to have a criterion based policy that enables development immediately adjacent to the limits of built development subject to certain criteria. For example, within Mid Sussex, policy DP6 provides for:
The growth of settlements will be supported where this meets identified local housing, employment, and community needs. Outside defined built-up area boundaries, the expansion of settlements will be supported where:
1. The site is allocated in the District Plan, a Neighbourhood Plan, or subsequent Development Plan Document or where the proposed development is for fewer than 10 dwellings; and
2. The site is contiguous with an existing built up area of the settlement; and
3. The development is demonstrated to be sustainable, including by reference to the settlement hierarchy.
The developer will need to satisfy the Council that:
• The proposal does not represent an underdevelopment of the site with regard to Policy DP26: Character and Design; or
• A large site is not brought forward in phases that individually meet the threshold but cumulatively does not.
5.5 A similar policy approach would we believe be appropriate here and would assist the council in meeting their LHN.
5.6 We note that DEV5 refers to the windfall rate of 39dpa. Given our comments above, this will need to be properly justified within the evidence base for the Reg 19 Plan.
5.7 Turning to DEV6, and the Strategic Green Gaps, the current strategic gap between Bexhill and Hastings should not be seen as a constraint on development on a par with the AONB or any other NPPF footnote 7 constraint, and should not in our opinion be carried over from the current core strategy without first being reviewed to establish if they can accommodate some growth to assist the council in meeting their LHN/ meeting the unmet needs of their neighbours, especially Hastings.
6
Health and Wellbeing Policies
6.1 We note that policy HWB2 requires a HIA to be undertaken on all applications for development of 100 (+) dwellings/ sites of more than 5ha. Whilst Persimmon Homes would agree that HIA are an essential part of plan making to ensure the Council understand the health outcomes of its strategy and is thus able to ensure these are effectively addressed, this should be achieved through the preparation of a whole plan HIA which will help inform the Council that the policies the plan contains address the key health outcomes for the area. As the plan and the policies it contains has been prepared to address the key health issues it is unnecessary for future development proposals that accord with this plan to undertake a separate HIA. If a development meets the policies in the plan, then it is by default addressing the health outcomes already identified by the Council. A HIA as part of the application would merely be repetition of the work the council has already undertaken. The only circumstance where an HIA may be appropriate would be for a larger unallocated site where the impacts may not have been fully considered by the council as part of the plan wide HIA. Policy HWB2 needs to be revised accordingly.
6.2 We also note that criterion 5 of HWB5 requires developments of 300 (+) dwellings to provide playing pitches on site in line with the recommendations of Rother’s Playing Pitch and Built Facilities Strategy and Sport England’s standards. Whilst not opposing this criterion, Persimmon Homes would suggest that the following is added to criterion 5 ‘unless evidence suggests that this is unachievable” as a sites topography may not make this possible/ economies of scale may mean providing / contribution to offsite provision is in certain circumstances preferable; or that this would fetter a developer’s ability to deliver BNG on site as such facilities do not assist in trying to deliver BNG. Indeed, they can actively prejudice it.
7
Infrastructure Policies
7.1 We note that policy INF1 (A) indicates that ‘Where new infrastructure capacity is required, it must be demonstrated that it can be delivered upfront or early in the development phasing.’ As the councils will be aware, the question of the supply of utilities to support development (including residential development) is a matter that is dealt with through separate statutory regimes. Providers such as the water and energy companies are required, among other things, to ensure a supply of services adequate to meet the needs of the plan-led system. As such policy INF41 (A) should not require applicants for planning permission to demonstrate that there is sufficient capacity with regard to provision of utilities such as water and power. Furthermore, when considering other infrastructure requirements, the policy should have regard to the cash flow implications of this criteria and be caveated accordingly.
8 Housing Policies
HOU1 Mixed and Balanced Communities
8.1 In noting the unit mix proposed in policy HOU1, we would in the first instance question the extent to which policy HOU1 should look to be prescriptive on the market housing to be delivered across the district for the whole of the plan period; rather the Council should recognise the need for flexibility, as per the NPPF and PPG, as the fact is the needs of the area may well change over the lifetime of the plan, particularly given the current uncertainty in the housing market, and that different areas will inevitably deliver different forms of housing i.e. apartments within more urban town centre locations and family housing in suburban areas; and that it is the combination of the two that will ultimately address the overall need.
HOU2 Affordable Housing
8.2 We note that no percentage has been provided in this policy to clarify the level of affordable provision to be provided on qualifying sites. We look forward to seeing and being able to comment upon the final requirement at Reg 19. In addition, we note that policy HOU28 also looks to see the affordable units well-integrated and designed to the same high quality to create tenure-neutral and socially inclusive homes and spaces; and that the affordable housing should be apportioned individually or in small clusters and where this is not proposed it should be robustly justified. Whilst we appreciate and support the need to ensure integration and to create more balanced communities, that has to be weighed against the management objectives of the affordable provider, who often find small clusters to be inefficient, such that this requirement needs to provide for those instances where the affordable provider feels a different approach is justified in that particular instance. HOU8 Access Standards
8.3 We note that policy HOU8 requires all new homes to be NDSS, and that as has already been established in the adopted development plan, there is a requirement for all new dwellings in the district to be M4(2) compliant, and 5% of affordable dwellings to meet M4(3)(2)(b) standards where a need exists. In addition, however, policy HOU8 includes a requirement for 5% of new market housing to meet the “wheelchair adaptable dwellings” standard in Part M4(3)(2)(a). Whilst para 8.71 of the plan suggests that these policy expectations are justified by the district’s ageing population and levels of disability, and the need for homes to appropriately meet the demands of occupiers throughout their lifetimes, this is not in our opinion clear and convincing evidence to justify this requirement and as such we would submit that this part of policy HOU8 should be deleted.
HOU9 – Specialist Housing for the Elderly
8.4 We note that policy HOU9 requires all developments of 100 (+) dwellings to set aside at least 10% of the total number of dwellings as specialist housing for older people. It is not clear whether this is in addition to, or as part of, the requirement also being set out in policy HOU8, or whether this could just be bungalows, or buildings that have to have communal areas. As drafted the policy is unclear and thus ineffective. In addition, subject to clarity it could be overly onerous when coupled with other requirements and thus likely to affect a sites viability.
HOU12 Self-Build and Custom Housebuilding
8.5 We note that policy H0U12 requires 5% Self/ Custom-Build Housing on all sites of 20 dwellings (+). Whilst the councils Self-build and Custom Housebuilding (SCHB) Headline Data Report 202319 indicates that as of 30.10.23 there were 197 individuals and 3 associations on the self-build and custom housebuilding register, it is not clear from the evidence base how many plots would be required if the existing commitments were taking into consideration. This needs to be established to ensure the proposed policy is justified and will be effective in meeting the outstanding demand.
8.6 In the context of the above, whilst noting the scale of the demand, we understand that before seeking to require the proposed developments to provide a proportion of the homes delivered as self-build plots the Council will need to examine other opportunities for meeting the needs of those who want to self-build. Under the Self Build & Custom Housebuilding Act 2015 and para 63 of the NPPF (2023), it is the Councils responsibility to ensure that sufficient permissions are given to meet demand. Further detail is provided in paragraph 57-014 of PPG with regard to the Council’s duties and whilst this recognises that it should take account of self-build registers when preparing planning policies, it also outlines that consideration needs to be given by Councils to the disposal of their own assets in order to meet the need for self-build plots or whether self-build could support the regeneration of brownfield sites. A need for self-build plots should not automatically lead to a policy requiring their provision on sites of 20 (+) dwellings. PPG also notes at paragraph 57-025 that local authorities should be encouraging developers and landowners to consider providing plots for self-build and custom house building but makes no reference to requiring their provision. The Government clearly sees the role of the local authority as working to identify opportunities with developers rather than placing responsibility on to the development industry. 8.7 The Council will also need to consider whether it is feasible that all sites of 20 (+) dwellings can deliver self-build plots. Often, especially on the larger sites, there are multiple contractors and large machinery operating on-site, and the development of single plots by individuals operating alongside this construction activity raises both practical and health & safety concerns. Any differential between the lead-in times / build out rates of self & custom build plots and the wider site may lead to construction work outside of specified working hours, building materials stored outside of designated compound areas and unfinished plots next to completed and occupied dwellings, resulting in consumer dissatisfaction. Whilst some sites may be able to locate self-build plots in a manner that reduces these potential risks, on others this will be impossible with developers unable to co-ordinate the provision of self & custom build plots with the development of the wider site. Such concerns must be given full consideration by the Council when preparing any policies on self-build to be included in the Local Plan.
8.8 Having regard to the above we would submit that the requirement to deliver 5% Self/ Custom-Build Housing on all sites of 20 (+) dwellings is likely to deliver very little in the way of tangible benefits, whilst creating significant difficulties for the builders involved. It would be a lot more effective for the Council to identify self-build sites or allocate certain sites to deliver a higher proportion of Self/ Custom-Build Housing.
8.9 Given the above we would suggest that the council review their requirements and are more explicit as to what they want, where and why, as at present policy HOU12 does not look to be properly justified or effective.
9 Green to the Core
GTC1: Net Zero Development Standards
9.1 We note that policy GTC1 requires all residential development to achieve: ‘a) LETI Total Energy Use Intensity (TEUI) Target for Operational Energy of 35 kWh/m2/year (GIA).
b) For new buildings, a 4-star Home Quality Mark (HQM) score; or for conversions to residential development, a Building Research Establishment Environmental Assessment Method (BREEAM)
‘Excellent’ standard as minimum.
c) A maximum space heating demand for new buildings (small scale housing) of 15 kWh/m2 per year.
d) If LETI, Home Quality Mark or BREEAM is updated or replaced during the plan period the equivalent replacement requirements will be applied.
9.2 It goes on to advise that ‘to demonstrate compliance, a Building Research Establishment (BRE) Home Quality Mark post-construction assessment or similar must be undertaken at practical completion.’
9.3 And that in terms of embodied carbon: ‘All new development proposals must demonstrate, through an energy statement, how the following embodied carbon standards will be met:
(i) All residential development must achieve a LETI C rating for embodied carbon emissions, equating to 600 kgCO2/m2 upfront embodied carbon and 970 kgCO2/m2 total embodied carbon.
From 1 January 2030, a LETI A rating must be achieved, equating to 300 kgCO2/m2 upfront embodied carbon and 450 kgCO2/m2 total embodied carbon.’
9.4 Whilst Persimmon Homes support the Government’s approach set out in the Future Homes Standard, we note that the Government have set out a clear roadmap as to how low carbon homes will, alongside the decarbonisation of the national grid, ensure that the Government can meet its commitments to net zero by 2050; and that the way forward being taken by the Government recognises that the improvements in energy efficiency of new homes should be a transition which ensures that new homes continue to come forward to meet housing needs whilst still being sufficiently challenging to significantly reduce the carbon emissions of new homes from 2025. This is set out explicitly in the Written Ministerial Statement of the Minister of State for Housing on the 13th December 2023, when he indicated that:
‘The improvement in standards already in force, alongside the ones which are due in 2025, demonstrates the Government’s commitment to ensuring new properties have a much lower impact on the environment in the future. In this context, the Government does not expect plan-makers to set local energy efficiency standards for buildings that go beyond current or planned buildings regulations. The proliferation of multiple, local standards by local authority area can add further costs to building new homes by adding complexity and undermining economies of scale. Any planning policies that propose local energy efficiency standards for buildings that go beyond current or planned buildings regulation should be rejected at examination if they do not have a well-reasoned and robustly costed rationale that ensures:
That development remains viable, and the impact on housing supply and affordability is considered in accordance with the National Planning Policy Framework.
The additional requirement is expressed as a percentage uplift of a dwelling’s Target Emissions Rate (TER) calculated using a specified version of the Standard Assessment Procedure (SAP).’20
9.5 As the council will be aware, the challenge to the WMS have been dismissed. Given the above, whilst the aspirations in Policy GTC1 are worthy and Persimmon Homes are committed to the delivery of Zero Carbon Homes/ Carbon Neutrality on all their sites, wherever it is practical and viable to do so, there is in our opinion no need for additional standards to be placed on developments through additional Local Plan policies that vary from that required in national government guidance. The plan has to acknowledge the implications of the transitional period and the need for flexibility during this period, in accordance with the aims and objectives of national policy. As such, not only is policy GTC1 overly complex and likely to impact on delivery/ viability, it is also clearly inconsistent with the approach advocated in the WMS. As a result, and having regard to our comments below on the lack of any Viability Assessment to support the reg 18 plan and the associated assessment of the implications of the emerging local plan policy on Net Zero Carbon, we would suggest that Policy GTC1 revert to the requirements set out in Building Regs.
GTC7: Local Nature Recovery Areas
9.6 We note this policy requires all new development to meet the objectives of the East Sussex (including Brighton and Hove) Local Nature Recovery Strategy (LNRS). We do not believe it is inappropriate to require all new development to meet the objectives set out in a document that is not a development plan document. Whilst the council can suggest that development has regard to the LNRS it is not consistent with national policy to require them to meet these objectives. It would also be perverse to require all new developments to adhere to a set of objectives that the council itself only has a duty to have regard to in its decision-making processes. We would therefore recommend that this policy is amended to advise that all new development has regard to the objectives set out in the LNRS
GTC8: Biodiversity Net Gain
9.7 We note that policy GTC8 requires al qualifying development proposals to deliver at least a 20% measurable biodiversity net gain attributable to the development. Whilst there does not appear to be any justification as to why a 20% BNG requirement is needed, such that we would submit the policy is unsound; Persimmon Homes are committed to doing as much as possible to meet the councils’ aspirations and as such would suggest that rather than require development to deliver at least 20% BNG, the Council recognises in policy that the 10% mandatory requirement is a minimum and that they will look favourably on development that seeks to go beyond this figure. If, however, the 20% BNG requirement is retained the council need to set out that where 20% is not deliverable it will seek to negotiate the viable level that can be provided over the 10% minimum required by the Environment Act 2021.
9.8 Such an approach would facilitate an element of flexibility that would take account of the potential implications delivering 20% BNG may have on viability/ overall dwelling numbers and would thus ensure a more effective policy approach, that is consistent with the aims and objectives of national policy as set out in the biodiversity net gain planning practice guidance of 14 February 2024 which at 006 Reference ID: 74-006-2024 states:
‘Plan-makers may seek a higher percentage than the statutory objective of 10% biodiversity net gain, either on an area-wide basis or for specific allocations for development. However, such policies will need to be evidenced including as to local need for a higher percentage, local opportunities for a higher percentage and any impacts on viability for development. Consideration will also need to be given to how the policy will be implemented.’ My emphasis.
9.9 In the context of the above the council need to have regard to the ecological baseline and the difficulties delivering 10% BNG, let alone 20% can have where the baseline is already high, such that offsite credits will be required, the level of which for smaller sites would be financially prohibitive such that the actual capacity of said sites may needs to be revisited. To this end we are aware of anecdotal evidence that suggests that to deliver 20% BNG a sites net to gross will fall from circa 75 to circa 65%, which can as a result impact on its overall development capacity and the councils associated housing land supply.
9.10 Notwithstanding our thoughts on the justification behind the 20% BNG requirements and its associated implications on a site’s development capacity, as well as its viability, there needs to be more in the plan to ensure the provision of a strategic network of sites that can deliver BNG offsite in Rother or within the same national character area (NCA); as whilst important in delivering 10% this is even more important if the Council introduces 20% BNG. At present there is little evidence that there will be sufficient local offsite credits in the short and medium term to support schemes that cannot deliver a 10/ 20% BNG on site. Nor is there any recognition of the fact that by requiring a 20% net gain the council are effectively adding to the pressure on the market for credits as more sites will be required to purchase offsite credits to meet this higher level of BNG. This increases costs and will more than likely delay sites that cannot secure these. Whilst we recognise the fact that there is the option of buying national credits, the cost of these is set well above the market to promote local solutions and will impact significantly on the viability of development meaning many developers will have to wait until local credits are available, which will prejudice the councils rolling 5 year housing land supply position.
10 Landscape Character
10.1 We note that policy LAN2 requires a CAVAT assessment to be submitted with all applications impacting on an individual or groups of trees in order to quantify their public amenity value. This is in our opinion totally unjustified and would question why a standard tree surveys would not suffice in the first instance, with a CAVAT assessment only being required where a tree of particular individual or group value is to be lost. 11 The SA of the Development Strategy
11.1 As set out above we note that the SA in scoring the Development Strategy, at Figures 11 and 12 does not actually comment upon the quantum of development the different options would deliver and how this would relate to the LHN, or indeed address the issue of the unmet needs of neighbours. Given SA objective 8 on housing this is somewhat surprising, as is the fact that no one option appears to have been chosen as the preferred option; albeit SDO3B (Bexhill Greenfield Growth Option 2: with New Multi-modal Transport Corridor) appears to score most favourable, followed by SDO6 (Brownfield Intensification and Redevelopment), which as it would totally fail to meet the LHN seems somewhat perverse, especially when figure 11 scores it as ‘Option supports the objective, or elements of the objective on balance, although effects may be minor’. Surely it would be ‘Option appears to conflict with the objective on balance and may result in minor adverse effects’ or indeed even ‘Potentially significant adverse effects’. Similarly, the scoring of SDO11 (Growth in settlements with train stations or sustainable transport alternatives) in figure 12 seems somewhat odd21 given its based on sustainable transport. To this end we also note that in a number of occasions, SOD4 and SOD5 for instance, growth is said to be resisted by virtue of land availability based on environmental and topographical constraints. Given the scale of unmet need currently proposed we would respectively suggest the council need to do more to establish whether additional land in these areas is available/ could be developed as no stone should be left unturned in trying to meet the LHN. As it stands, the SA lacks the necessary robustness required as it is impossible to assess the impact and weigh benefits and harm of each development strategy without know scale of delivery associated with each option.
11.2 Having regard to the above we feel it’s imperative that if the SA is to be effective the next iteration needs to assess the Development Strategy in the context of the LHN and how the council are to accommodate this/ the implications of not accommodating it/ over delivering to address adjacent authorities’ unmet needs.
12 The Infrastructure Delivery Plan Viability Assessment
12.1 We are surprised to note that whilst an Infrastructure Delivery Plan (IDP) has been produced to support the Reg 18 Plan, as well as an Infrastructure Background Paper, there is no Viability Appraisal (VA) of the plan. Not only does the lack of a VA makes it difficult to comment on the proposed policies, but it also raises questions about the aspirations of the IDP i.e. how these have been tested, and whether they are realistic and deliverable. If the plan is predicated on the aspirations of the IDP then the whole plans approach is also open to debate as how can it be said to be justified and effective if it has not been subject to a robust VA.
13 Conclusions on Reg 18 Plan
13.1 We are concerned that the scale of growth proposed in the overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa, which is significantly less than the capped LHN of 733dpa/ the uncapped LHN of 850 dpa. In our opinion there is no justification for promoting a lower housing target than the capped LHN given the aims and objectives of national government guidance and the affordability issues that exist within the district, that the plan says it wants to address. The scale of the potential shortfall (between 7,286 and 9,502 dwellings over the plan period22) is significant, and will we fear be exacerbated if the predicted supply does not deliver as forecast. Nowhere does the plan, or the evidence base demonstrate how this will be addressed. In addition, it does not appear to have been raised with adjacent authorities through discussions on the DtC. Nor does the plan/ its evidence base demonstrate how the acute levels of unmet housing need that exist within the area are to be addressed through constructive and active engagement so as to meet legal duties imposed by the DtC.
13.2 Similarly we are concerned that no evidence has been provided to demonstrate how the housing requirement will be met or how a rolling five year housing land supply will be achieved. The deliverability of the existing commitments needs to be demonstrated more evidentially than it has to date. Likewise, the evidence needs to be provided to demonstrate that the proposed allocations will deliver the quantum of development suggested when expected; and the plan needs to encompass compelling evidence to support the windfall rates expected rather than rely on historic trends.
13.3 We would also suggest that the plan period needs to be reviewed so that it provides for 15 years from adoption (i.e. till 31st March 2042).
13.4 Turning to the Development Strategy, the justification behind the Development Strategy and the clear preference for concentrating growth in and around Bexhill is not clear, the SA being silent on the quantum of development each Development Strategy could deliver and how the overall strategy related to the LHN.
13.5 In addition to the above we also have specific concerns about policies DEV2 (Comprehensive Development and Masterplanning), DEV3 (Development Boundaries), DEV5 (Development on Small Sites and Windfall), DEV6 (Strategic Green Gaps), HWB 2 (Health Impact Assessments), INF1 (Strategic Infrastructure Requirements), HOU1 (Mixed and Balanced Communities), HOU2 (Affordable Housing), HOU12 (Self-Build and Custom Housebuilding) , GTC1 (Net Zero Building Standards) and GTC8 (Biodiversity Net Gain), all of which we do not believe to be properly justified or consistent with national planning policy guidance as drafted.
In the context of the above we would like to highlight Persimmon Homes desire to work with Rother District Council on progressing a sound plan and that to this end we are happy to meet with officers to discuss our reps on the housing requirement, supply and trajectory and the other policies contained in the Reg 18 Plan/ its supporting evidence base.
Yours sincerely
JUDITH ASHTON
Judith Ashton Associates
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28001
Received: 22/07/2024
Respondent: Persimmon Homes Ltd
Agent: Judith Ashton Associates
we note that the overall spatial development strategy in looking to deliver a minimum of 5,158 to 7,286 dwellings over the plan period is in effect only looking to deliver between 35% and 50% of the capped LHN. Whilst the inference in the plan is that the level of housing growth that is proposed is supply led (i.e. reflects the level of suitable sites assessed through the HELAA process) and constrained by the High Weald AONB, the Pevensey levels, the Strategic Gaps around Hastings and the SSSI around Rye, this is adopting a policy on approach to a situation that should be policy off. Thus, not only is it unclear why the plan is not looking to deliver the LHN as identified in the HEDNA, but why it has not also looked at the uncapped need given the issues surrounding the unmet needs of its neighbours.
I write with reference to the above. I act for Persimmon Homes who have an interest in a sound plan being delivered for Rother.
Having regard thereto, having reviewed the Regulation 18 Draft Local Plan (April 2024), and associated evidence base, especially the Sustainability Appraisal - Interim Report (SA) and associated appendices, Housing and Economic Land Availability Assessment (HELAA), Local Housing and Economic Needs Assessment (HEDNA), Development Strategy Background Paper (DSBP), Housing Background Paper (BP), Settlement Study (SS), and Infrastructure Delivery Plan (IDP), and Viability Assessment and CiL Review (VA); we have the following comments on the Draft Regulation 18 Rother Local Plan (April 2024), and associated evidence base.
1 The Plan Period
1.1 We note that the 2024 LDS suggests adoption of the Local Plan (Regulation 26) in Quarter 3 2026/27. As a result, the plan period advocated in policy SS2 will be less than 15 years from adoption. In order to comply with paragraph 22 of the NPPF, the plan period should we believe start at 1st April 2023 and be extended to 31st March 2042 as this will ensure it looks ahead for a minimum of 15 years from adoption. As a result, additional housing allocations need to be made to help address this additional requirement.
2 The Housing Requirement, Supply and Trajectory
2.1
Local Housing Need, and the Minimum Housing Requirement
2.1.1 We note that the proposed overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa.
2.1.2
Having reviewed the housing requirement against the standard method and the advice in the PPG about the need to consider the application of a cap, we note that adopting the standard methodology, and adjusting the figures to the base date of the local plan and using the latest local affordability ratio, the position is as set out below.
Step 1: Setting the Baseline
Household Projection = 523.41 dwellings per annum
Step 2: Adjustment for
Affordability
Local Affordability Ratio = 13.822
Adjustment Factor = 1.61 𝐴𝑑𝑗𝑢𝑠𝑡𝑚𝑒𝑛𝑡 𝑓𝑎𝑐𝑡𝑜𝑟=(13.82−44) 𝑥 0.25+1
Minimum Local Housing need
523.4
x 1.61 = 842.6
2.1.3
As set out in section 5 of the HEDNA a cap is applied to limit the level of increase, depending upon the stage that the local authority is at with regards to its strategic policies for housing. Where the policies have been adopted within the last 5 years, the LHN figure is capped at 40% above the average annual housing requirement figure as set out in the existing policies. Where the relevant policies were adopted more than 5 years ago (as is the case in Rother), the LHN is capped at 40% above whichever is higher of:
• The average annual projected household growth identified in Step 1; or
• The average annual housing requirement figure as set out in the most recently adopted strategic policies.
Having done this, we note the following:
40% cap
The average annual projected household growth identified in Step 1
523.4
732.7
The average annual housing requirement figure as set out in the most recently adopted strategic policies
3353
469
2.1.4 Given the above the LHN in Rother is reduced from 842 dpa to 733 dpa. That said, while the cap reduces the minimum number generated by the standard method, it does not reduce housing need itself. Therefore, strategic policies adopted with a cap applied may require an early review and updating to ensure that any housing need above the capped level is planned for as soon as is reasonably possible. The PPG is clear that the standard method is a minimum number and that in areas such as Wealden where the cap reduces the local housing need “consideration can still be given to whether a higher level of need could realistically be delivered. This may help prevent authorities from having to undertake an early review of the relevant policies”4. For Rother this would mean considering whether to deliver 842dpa. It is also important to note that the LHN figure is a minimum starting point, and it does not produce the Housing Requirement5.
2.1.5
In the context of the above, we note that the overall spatial development strategy in looking to deliver a minimum of 5,158 to 7,286 dwellings over the plan period is in effect only looking to deliver between 35% and 50% of the capped LHN.
2.1.6
We further note that the HEDNA is clear in the executive summary on both the scale of the LHN (737dpa at the time), and the findings of the housing growth scenario, indicating that there are ‘no exceptional local circumstances’ that would justify deviating from the Standard Method in Rother.
2.1.7
Whilst the inference in the plan is that the level of housing growth that is proposed is supply led (i.e. reflects the level of suitable sites assessed through the HELAA process) and constrained by the High Weald AONB, the Pevensey levels, the Strategic Gaps around Hastings and the SSSI around Rye, this is adopting a policy on approach to a situation that should be policy off.
2.1.8
Thus, not only is it unclear why the plan is not looking to deliver the LHN as identified in the HEDNA, but why it has not also looked at the uncapped need given the issues surrounding the unmet needs of its neighbours (see below). PPG6 identified a number of circumstances where it might be appropriate to plan for a higher housing need figure than the Standard Method indicates. Such circumstances can include:
• Instances where housing need is likely to exceed past trends; and
• Where the authority agrees to address unmet need arising from neighbouring authorities.
2.1.9 The PPG is not exhaustive in its examples as to what may be a sound reason for considering an uplift. Matters such as a high affordability ratio that is following a rising trend, along with significant affordable housing need, and of course the importance of ensuring an adequate buffer to cater for under supply, or instances where the Plan strategy fails to deliver as expected, are all sound reasons for considering an uplift.
2.1.10
In the context of the above we note that the SA in section 5, in reviewing the Spatial Development Strategy Options, does not appear to look at different scales of growth relative to the LHN (both capped and uncapped) or the implications of only delivering the scale of housing proposed, just a variety of different spatial options where the scale of development is unquantified, despite the fact one of the SA objectives is that ‘More opportunities are provided for everyone to be in a suitable home to meet their needs.’ The above belies the evidence base and the various reasons why the council need to meet their LHN / an uplift to the LHN should be considered further, as summarised in the commentary below.
2.1.11 The reasons for uplifting the LHN should be set into two categories, firstly those that indicate an uplift is required for the District itself and secondly any uplift that might arise from meeting unmet need from neighbouring authorities.
Affordability
2.1.12 Rother is an inherently unaffordable place to live as acknowledged at paras 1.15, 8.20 and 8.21 of the Reg 18 Plan which refer to the issues of the significant deterioration in affordability within the district The HEDNA (2024) identifies a significant need for affordable housing in Rother in the Plan period. This is due to a high, and increasing, house-price to earnings (affordability) ratio, meaning that growth in house prices is significantly outstripping growth in wages, and housing is becoming less affordable for people who live, work, and retire within the district.
2.1.13 To this end, we note, when looking at the ONS ‘House Price to Workplace-Based Earnings Ratio - March 2024’ that the ratio of median house price to median gross annual workplace-based earnings by local authority district, England, and Wales, 1997 to 2023 indicates that the ratio of median house price to median gross annual workplace-based earnings in RDC has increased significantly over the past 10 years from 10.53 to 12.847.
2.1.14 The rapid increase in the affordability ratio is clear evidence of the lack of housing delivery that has taken place over the last 10-year period within the District. Failing to deliver the LHN will only increase the rate of decline in affordability. For an improvement in the affordability situation to occur, decisive action is required through the provision of more housing over and above the capped LHN.
2.1.15 The matter of affordability alone clearly indicates that the Council should be planning for more than the capped LHN.
Affordable Housing Need
2.1.16 Linked to the issue of affordability is the significant need for affordable housing identified in the District. A symptom of a rising affordability ratio is the fact that more members of society are priced out of the open market and consequently require affordable housing in one form or another. Again, the Council acknowledges this in the Draft Plan and in the Feb 2024 HEDNA that accompanies the consultation pack.
2.1.17 The HEDNA indicates that the total net annual affordable housing need for the period 2021 to 2044 is 325 dpa, which is equivalent to 44% of the capped LHN figure (based on 733 dpa). Whilst policy HOU2 does not indicate what level of affordable provision the council will be looking to deliver, policy LHN2 of the adopted core strategy looks to deliver 30% affordable housing on sites in Bexhill and Hastings Fringe, and Rye, 35% in Battle and 40% in the rural areas. Even if the Council were to adopt a 40% requirement across the board, this will only be triggered for those sites that meet the qualifying criteria. It is therefore highly unlikely that the affordable housing need will be met. Indeed, given the decreasing trend in terms of affordability set out above, the gross affordable housing need of 325 dpa is highly likely to increase over the plan period, leading to an increase in the net shortfall and in turn a higher number of people in need and on the Council’s housing waiting list.
2.1.18 Whilst the councils latest AMR does not provide any information on affordable housing delivery, we note that the Governments Affordable housing supply statistics (AHS) 2022-23 table 1011C indicates that over the past 10 years RDC only delivered 887 affordable completions. An average of 89 (rounded up) affordable completions per annum, which just 27% of the average annual affordable need of 325 affordable dwellings per annum identified in the HNA. JAA table 1a – Affordable Housing Provision 2013 - 2023
13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 Total
Total affordable dwellings 80 123 103 20 56 60 130 126 15 174
887
2.1.19 Furthermore, whilst if you compare the level of affordable provision against total housing completions over the past 5 years this averages 38.7% of total housing completions, it fluctuates significantly and prior to this was averaging significantly less. JAA table 1b – Affordable Housing Provision as a percentage of overall housing delivery 2016 - 2023
18-19 19-20 20-21 21-22 22-23 Total
Net additional dwellings
255 247 175 237
390
1,304
Total affordable dwellings
60
130
126
15
174
505
% of total
23.5%
52.6%
72%
6.3%
44.6%
38.7%
2.1.20 Given the above, even if one assumes an average of 38%, this suggests that the plan would need to deliver over 8558 dpa to meet the identified affordable housing needs of the District.
2.1.21
Whilst we are not advocating this level of growth, the above demonstrates the need for the plan to deliver the LHN in full/ an uplift to the LHN figure to boost the supply of open market and affordable homes and thus help address the affordable housing needs of the District. Said approach would also reflect on spatial objective 4 – to respond to the housing crisis and help facilitate the delivery of housing to meet the needs of different groups in the community, by maximising the potential opportunities for residential development in sustainable and deliverable locations, helping to deliver affordable housing, and ensuring development is viable and supports growth in the district by providing certainty for developers through site allocations and clear planning policies.
2.1.22
The SA in reviewing the merits of the alternative spatial options appears to have paid little regard to these fundamental points.
Past Under Delivery
2.1.23
We note the Councils Five Year Housing Land Supply Statement – 1 April 2023 (published in December 2023) suggests that the Council is able to demonstrate a 3.09 year housing land supply for the period 01/04/23 to 31/03/28, and that the HDT results for 2022, as published in December 2023 was, as set out below, just 41%.
JAA table 2 - Result of 2022 Housing Delivery Test
Area Number of homes required Total number of homes required Number of homes delivered Total number of homes delivered Housing Delivery Test: 2022 measurement Housing Delivery Test: 2022 consequence 2019-20 2020-21 2021- 22 2019-20 2020-21 2021- 22
Rother 363 490 740
1593 247 175 239 661 41% Presumption
2.1.24
We further note that RDC housing delivery has over the past few years been somewhat mixed, with the Council failing to meet their annual housing requirement on a number of occasions, which has led to a deficit that suggests that there has been a record of under delivery that should be addressed by an uplift to the LHN figure.
A Buffer
2.1.25
Given the issues of the affordability and the affordable housing needs of the district identified above, as well as the issue of past underdeliver rates, we feel that at the very least a buffer should be built into the housing requirement for the Plan. Introducing a buffer into the housing requirement would ensure that the Council plans positively for the future in a manner that at least meets the minimum LHN rather than the capped figure, or indeed the ‘capacity’ based figure it currently looks
to deliver. This would in reality also provide an uplift to reflect the acute affordability problem and in turn the rising affordable housing need. Given the time horizon of the plan, the Council should also consider the need for flexibility to be built into the strategy so that it can be resilient to unforeseen changes that may occur during the latter years of the plan period.
2.1.26
To this end, we would stress the need for the SA to not only look at various Spatial Development Strategies, but to express these in the context of overall housing provision and assess not only a strategy that reflects the capped LHN, but both the uncapped LHN and indeed something that falls short of the capped LHN so that the effects of all reasonable alternatives are properly taken into consideration. As currently drafted the SA does not in our opinion adequately addresses the issues raised above or look to address the issue of unmet needs from adjacent authorities – see below.
2.1.27
Having regard to the above we consider a buffer of circa 10% i.e. circa 1,4669 additional dwellings should be added to the capped LHN over the plan period to ensure the Plan proceeds on a robust footing.10
2.2
Unmet Need
2.2.1 We note that the Reg 18 Plan makes no specific reference to the Duty to Cooperate (DtC) with neighbouring authorities over the issue of unmet need, there being no reference to the unmet needs of neighbours either. We also note that whilst the HEDNA recognises the fact that Hastings and Rother, together with their intrinsic sub-areas, comprise a self-contained Housing Market Area and Functional Economic Market Area, it does not comment upon the relationship of the HMA to adjacent HMA’s and their unmet need, there being only passing recognition of the fact that Wealden is within the influence of and overlapped by the Hastings and Rother HMA. Nor is there any commentary on how Rothers reg 18 Plan will look to address the unmet needs of Hastings, despite the joint statement agreed with Hastings BC on p16 of the Reg 18 Plan.
2.2.2
Similarly, whilst the Housing Background Paper advises at para 5.14 that the Council is committed to its duties in relation to the Duty to Co-operate, and in summer 2020 prepared a Duty to Co-operate Action Plan which outlines how and at what stage it intends to engage and consult with organisations on the development of the Local Plan, the Engagement and Duty to Cooperate Statement in commenting upon the engagement to date with Hastings BC, and in particular the matter of housing need, merely says at para 6.11 that ‘ The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 481 for Hastings. Hastings Borough Council made a formal request to Rother District Council on 3rd December 2021, along with requests other authorities, as to whether Rother could accommodate any of Hastings’ residual unmet need.’
2.2.3
This does not confirm the scale of Hastings unmet need, which we understand to be in the region of 5,525 dwellings11 or Rothers response to Hasting’s request, and as such does not suggest active, ongoing, and constructive engagement.
2.2.4
Similarly, in commenting upon engagement with Wealden, para 6.23 of the Engagement and Duty to Cooperate Statement advises that: ‘The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 1,212 for Wealden, however, in
their respective Plans, Rother has set an annual target of between additional 243-343 dwellings per annum, while Wealden sets a per annum target of and additional. Both sets of targets fall short of the need figures derived from the Standard Methodology. At this stage in Plan development, neither district has yet made a request in respect of unmet need.’
2.2.5
As is clear from the above Wealden’s target of 22,800 dwellings has actually been omitted from the document, as has reference to the implications in terms of Wealden’s unmet need of 7,071 dwellings12. .
2.2.6
Not only does the Engagement and Duty to Cooperate Statement fail to address the issue of how this unmet need will be tackled, but also makes it clear that Rother has not yet made a request to surrounding districts in respect of its unmet need, this despite the fact Wealden have for example just completed their reg 18 consultation. Again, this does not suggest active, ongoing, and constructive engagement, or due regard to the implications of the increasing scale of unmet need that is emerging in this part of East Sussex, a matter one would have expected the SA to have regard to in terms of the wider social, economic, and environmental consequences.
2.2.7
The lack of any MoU or SoCG with Hastings BC given their request of 3.1.21 is also of concern, as is the current lack of Mou or SoCG with Wealden DC, albeit we note one is in preparation and will we assume be available for scrutiny at Reg 19.
2.2.8
As the council will be aware, in order to demonstrate that the consultation on strategic cross boundary issues such as housing and unmet needs has been effective, continuous and ongoing, and the requirements of the Duty to Cooperate (DtC) have been addressed in terms of the overall housing requirement, MoU or SoCG will need to be produced and reviewed and updated regularly if they are to be relied upon.
2.2.9
Only through a rigorous approach to the issue of the DtC will the Council be able to demonstrate that its housing requirement is right, and that the spatial strategy is correct in its approach to growth. As things stand, we do not believe there to be sufficient evidence in place to demonstrate the DtC has been complied with, and as such can only conclude that the plan is legally flawed.
Conclusions on the Housing Requirement
2.2.10
Not only are the Council failing to meet their LHN as calculated by reference to the Standard Method i.e. 14,660 dwellings (733 dpa), but the shortfall of 7,374 – 9,502 dwellings is between 50% and 65% of the capped LHN. This is a significant shortfall exacerbated by the fact the LHN is a capped figure, and as the PPG is clear the LHN is only the starting point.
2.2.11
There are a range of factors relevant to the calculation of the housing requirement for the Draft Plan that the Council needs to consider when arriving at its overall housing requirement. These include:
• The inherent lack of affordability and the increasing affordability ratios;
• The poor levels of affordable housing delivery, and attendant increasing need for affordable homes; and • The importance of including a buffer above the LHN to ensure adequate housing delivery particularly given the Council’s historically poor track record of delivery as set out above.
2.2.12
When these factors are properly scrutinised, they demonstrate clear and rational reasons as to why there should be an uplift to the LHN. Having regard to the above Persimmon Homes t believe that at the very least the plan should provide for the uncapped need i.e. 733 dpa to ensure the Plan proceeds on a robust footing. Over a plan period of 1st April 2020 to 31st March 2042 this would equate to some 16,126 dwellings, circa 8,840 - 10,968 dwellings more than the plan is currently looking to provide for.
2.2.13
Setting the housing requirement at this level would significantly improve the affordability situation within the District and would deliver more affordable homes for those members of the community in the most need.
2.2.14
It is clear that the SA has as yet to assess the merits of delivering the LHN in full, a higher figure or indeed a lower one. It is also clear from the Engagement and Duty to Cooperate Statement that the council have yet to fully assess the effects of their neighbours’ unmet needs or to explore through the DtC, whether any of their neighbours could assist.
2.3 Housing Supply
2.3.1. Nowhere in the Reg 18 Plan is there a trajectory setting out how the housing requirement will be met or a rolling five year housing land supply maintained. Thus, in terms of supply all that is available is the information set out within table 34 of the Reg 18 Plan which indicates that the housing supply comprises the following:
Source of housing supply
a
Constructed 1 April 2020 – 31 March 2023
802
b
Known completions and commencements on large sites since 1 April 2023
340
c
With Planning Permission
1,693
d
DaSA & Neighbourhood Plan allocations without permission brought forward
1,660
e
Additional HELAA potential sites
2,129
f
Windfall projection (across the district)
663
Total Range
5,15813- 7,28714
2.3.2 In reviewing the above there is nowhere in the evidence base where one can review and assess the deliverability of those sites with outstanding planning permission that have yet to start on site, allocated sites without permissions or the additional HELLA sites. The councils Housing Land Supply and Housing Trajectory (April 2023 position statement), within its appendices provides details of the following:
•
Delivery by financial year of large site permissions (2,140 of which 1261 are only have outline consent))
•
Delivery by financial year of large sites delegated to approve subject to S106 (555, of which only 2 sites delivering 17 dwellings are for full planning permission, the majority being outline schemes))
•
Delivery by financial year of DaSA allocations (520, of which an appeal for one site for 40 dwellings has been dismissed)) •
Delivery by financial year of Neighbourhood Plan allocations (253 of which sites delivering only 34 are subject to applications)) and
•
Small site permissions (316)
2.3.4 As the above does not tally with the figures in table 34 it is impossible to scrutinise the housing land supply properly and ensure it is truly deliverable. All we can note is that the number of large sites with outline permission only that are due to start delivering in the next 5 years seems rather high, as do the number of large sites with a resolution to grant outline permission subject to S106. We would also ask that the next iteration of the plan the council produce a more detailed evidence base to demonstrate that the proposed commitments will deliver as suggested and that the council can maintain a robust and rolling 5 year housing land supply.
2.3.5 In the context of the above, we would suggest that the Council consider further whether a buffer of say 10% should be applied to those sites with planning permission that have yet to commence to take into account any potential non-delivery/ delay in delivery of the dwellings contained within this category which at 1,693 equates to nearly a third of the supply15. Similarly, the sites contained within the DaSA & Neighbourhood Plan allocations without permission, which equate to a comparable proportion of the total supply. Alternatively, the Council need to undertake a more detailed critique of the proposed commitments to ensure what is being put forward is truly deliverable within the plan period. Either way we believe this would generate the need to find land to accommodate a further 335 dwellings16.
2.3.6. Turning to windfalls, para 5.131 of the reg 18 plan indicates that windfall development forms an important part of the councils housing land supply and that the Council will continue to rely on windfall development as part of its development strategy. To this end table 34 of the Reg 18 Plan reports a figure of 663 windfalls over the plan period, and proposed policy DEV5 suggests a windfall development projection of 39 dwellings per annum for the plan period17. This is however slightly at odds with the findings of Table 3 of the councils Housing Land Supply and Housing Trajectory (April 2023 position statement), which suggests an annual average of 45 windfalls a year. Clearly clarity is required on this, as whilst para 6.9 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) suggests that work is currently underway on producing an updated windfall methodology background paper in support of the new Local Plan, which will reassess the likely contribution from windfall sites in the future, as well as the period over which any allowance should be applied, no such document appears within the evidence base. As the council will be aware, they will, in accordance with para 72 of the NPPF, need to provide compelling evidence that the windfall trajectory is a reliable source of supply, and cannot just rely upon a headline review of past windfall delivery rates without any analysis of expected future trends.
2.3.7 Finally in terms of the additional HELAA potential sites, we note that the HELLA in listing Identified Sites (existing allocations and sites with planning permission), and Potential Sites (Sites are potentially suitable, potentially available and potentially deliverable, subject to further assessment or investigation), discounts an unquantified number of ‘Other Potentially Suitable Sites Where Availability is Unknown’ and Rejected Sites (sites assessed as currently unsuitable/ unavailable/ unachievable), and that it is unclear how releasing some of these sites would come to enabling the council to meet their LHN if the assessment criteria were reviewed/ the sites themselves reassessed in terms of the overall area to be developed/ development capacity were reviewed. Given the scale of the unmet need we would respectfully suggest that no stone should be left unturned in looking to achieve the LHN and that whilst not all of the rejected sites will be acceptable, some may, with further consideration, have been suitable, such that the overall quantum of deliverable sites and thus the plans ‘capacity’ based housing figure could be higher. We would thus recommend that in order to demonstrate the housing supply figure is fully justified the council provide further evidence to this effect at Reg 19.
Conclusions on the Housing Supply
2.3.8 Having reviewed the component parts of the Housing Land Supply as best we can given the lack of available evidence to justify the position set out in table 34 of the Reg 18 Plan, we note that the figures relied upon to meet the Councils proposed ‘capacity’ based housing requirement require:
➢
100% reliance on all current commitments (existing detailed, and outline permissions, as well as sites with a resolution to grant and sites allocated in the DaSA and Neighbourhood Plans). This is not justified and a 10% buffer should be introduced to allow for non-delivery/ slower than expected delivery i.e. circa 335 dwellings.
➢
100% of the proposed housing sites delivering the quantum proposed within the plan period. This is however subject to all of said sites being found acceptable by the Local Plan Inspector/ site promoters confirming the sites can deliver this quantum of development in light of all the other policy requirements set out in the plan, such that a contingency may be sensible.
➢
663 dwellings to come forward as windfalls. The proposed windfall allowance is not based on a credible evidence base and is not justified. At 9 - 13% of the residual requirement, it is a significant part of the overall supply and needs to be reviewed to ensure a realistic approach is adopted at Reg 19.
2.3.9 As a result of the above, we would submit that as the predicted supply is effectively dictating the overall requirements – i.e. we are looking at a ‘capacity’ based housing requirement, the fact there is no flexibility in the proposed supply is of grave concern as in effect the overall supply could be a lot less than predicted unless additional sites are added in to address our concerns about the commitments, and windfalls and help provide a buffer / address the issues of affordability and DtC we have raised above. As it stands the plan would be incapable of accommodating any fluctuations in the market and could leave the council open to speculative applications very early in the plan period. The council’s assessment of potential housing sites in the HELLA and SA needs to be reviewed and no stone left unturned when it comes to identifying sites and addressing perceived constraints. Likewise, the councils rational for the yields they have attributed to the proposed allocations needs to be fully justified as, as we explain below, we do not think they are when the policy requirements set out in the draft plan are properly taken into consideration.
3
The need for a Stepped Trajectory
3.1 We note that para 5.102 of the Reg 18 Plan suggests that the Council would require a considerable step change in housing delivery in order to deliver a significant uplift compared to current and historic delivery rates over the last ten years. Figure 37 then illustrates that over the past 12 years the council have on average delivered 219dpa, albeit in the last two years they have delivered 237 and 390 dpa, respectively. Whilst the LHA at 733dpa would require a sea change in delivery, the current proposition, of a supply led target of 258 – 364dpa is clearly within the realms of that which has been achieved of late – reflecting the indeed, if the trajectory in appendix 7 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) is correct the council are anticipating an average of 544 dpa following over the next 5 years18: whilst this tails off after 28/29, this is because the trajectory is based on existing commitments (permissions and allocations) if, with a new plan in place additional sites were allocated, there is no reason why higher levels of growth could not be sustained longer term. There is thus no justification within the evidence base to support a stepped trajectory. Indeed para 5.102 of the Reg 18 Plan appears to suggest that delivery rates have been significantly impacted by the economic downturn and the effect of the coronavirus pandemic in recent years, such that while a number of current allocated sites have been permitted there have been significant delays in the build out of sites. This does not support a stepped trajectory it merely justifies past performance which with an economic upturn should begin to ensure a more robust and steady supply. Furthermore, as two thirds of the proposed supply is already committed there can be no justification for a stepped trajectory.
4
The Growth Options for Sub Areas
4.1 Whilst having no direct interest in the growth options, we do note that when looking at figure 33 that a considerable amount of the proposed growth, both committed and proposed through the additional sites identified through the HELAA that 46% of the proposed growth is in and around Bexhill, with only 9% being directed towards Battle, only 3.6% to the hastings fringe. Whilst we acknowledge that Bexhill is the least constrained of the main centres, one has to wonder if this is a sustainable approach, especially given the public transport links and level of services available in the likes of Battle and Robertsbridge. Comparing figure 35 of the Reg 18 Plan (the opportunities for housing growth) with Figure 12 of the settlement study (part 1) (Settlement Sustainability Score Table), the level of growth proposed in the Sustainable and Moderately Sustainable settlements seems to be significantly less than that proposed in Bexhill, which whilst it is the only ‘Highly Sustainable’ settlement seems somewhat out of proportion and one has to wonder whether this could lead to market saturation and actually prejudice housing land supply.
5
Development Principles Policies
5.1 We note that DEV2 requires: ‘Planning applications (whether in outline or full format) must relate to an entire development site to ensure a comprehensive approach, including where sites are in multiple ownerships.
When an outline application is submitted, a masterplan defining key parameters for the entire site must be submitted by the applicant to indicate how the overall development of the site can be achieved.’
5.2 Where sites are in multiple ownership, we would suggest that as long as a framework masterplan covering the whole site, and an infrastructure delivery strategy has been agreed, either through the site promoters and the council or via an SPD, there should be nothing to stop one party looking to promote their site in advance. As long as the application reflects the framework masterplan and s106 proceeds in accordance with the infrastructure delivery plan we fail to see how this would prejudice the plan. Indeed, it may well allow sites to proceed more quickly and thus actively assist the council in their housing land supply. 5.3 We note that DEV3 indicates that: ‘Development boundaries define the area within sustainable settlements where development will be permitted, provided it is consistent with this Local Plan.
Priority shall be given to reuse of brownfield sites, in order to make efficient use of previously developed land in sustainable settlements. Some greenfield development will be necessary in order to deliver housing and employment need, but this will be limited to inside development boundaries.’
5.4 Whilst in the first instance we assume the development boundaries will be redrawn to reflect the proposed allocations, we would also suggest that given the shortfall in the housing land supply, that the council should look to have a criterion based policy that enables development immediately adjacent to the limits of built development subject to certain criteria. For example, within Mid Sussex, policy DP6 provides for:
The growth of settlements will be supported where this meets identified local housing, employment, and community needs. Outside defined built-up area boundaries, the expansion of settlements will be supported where:
1. The site is allocated in the District Plan, a Neighbourhood Plan, or subsequent Development Plan Document or where the proposed development is for fewer than 10 dwellings; and
2. The site is contiguous with an existing built up area of the settlement; and
3. The development is demonstrated to be sustainable, including by reference to the settlement hierarchy.
The developer will need to satisfy the Council that:
• The proposal does not represent an underdevelopment of the site with regard to Policy DP26: Character and Design; or
• A large site is not brought forward in phases that individually meet the threshold but cumulatively does not.
5.5 A similar policy approach would we believe be appropriate here and would assist the council in meeting their LHN.
5.6 We note that DEV5 refers to the windfall rate of 39dpa. Given our comments above, this will need to be properly justified within the evidence base for the Reg 19 Plan.
5.7 Turning to DEV6, and the Strategic Green Gaps, the current strategic gap between Bexhill and Hastings should not be seen as a constraint on development on a par with the AONB or any other NPPF footnote 7 constraint, and should not in our opinion be carried over from the current core strategy without first being reviewed to establish if they can accommodate some growth to assist the council in meeting their LHN/ meeting the unmet needs of their neighbours, especially Hastings.
6
Health and Wellbeing Policies
6.1 We note that policy HWB2 requires a HIA to be undertaken on all applications for development of 100 (+) dwellings/ sites of more than 5ha. Whilst Persimmon Homes would agree that HIA are an essential part of plan making to ensure the Council understand the health outcomes of its strategy and is thus able to ensure these are effectively addressed, this should be achieved through the preparation of a whole plan HIA which will help inform the Council that the policies the plan contains address the key health outcomes for the area. As the plan and the policies it contains has been prepared to address the key health issues it is unnecessary for future development proposals that accord with this plan to undertake a separate HIA. If a development meets the policies in the plan, then it is by default addressing the health outcomes already identified by the Council. A HIA as part of the application would merely be repetition of the work the council has already undertaken. The only circumstance where an HIA may be appropriate would be for a larger unallocated site where the impacts may not have been fully considered by the council as part of the plan wide HIA. Policy HWB2 needs to be revised accordingly.
6.2 We also note that criterion 5 of HWB5 requires developments of 300 (+) dwellings to provide playing pitches on site in line with the recommendations of Rother’s Playing Pitch and Built Facilities Strategy and Sport England’s standards. Whilst not opposing this criterion, Persimmon Homes would suggest that the following is added to criterion 5 ‘unless evidence suggests that this is unachievable” as a sites topography may not make this possible/ economies of scale may mean providing / contribution to offsite provision is in certain circumstances preferable; or that this would fetter a developer’s ability to deliver BNG on site as such facilities do not assist in trying to deliver BNG. Indeed, they can actively prejudice it.
7
Infrastructure Policies
7.1 We note that policy INF1 (A) indicates that ‘Where new infrastructure capacity is required, it must be demonstrated that it can be delivered upfront or early in the development phasing.’ As the councils will be aware, the question of the supply of utilities to support development (including residential development) is a matter that is dealt with through separate statutory regimes. Providers such as the water and energy companies are required, among other things, to ensure a supply of services adequate to meet the needs of the plan-led system. As such policy INF41 (A) should not require applicants for planning permission to demonstrate that there is sufficient capacity with regard to provision of utilities such as water and power. Furthermore, when considering other infrastructure requirements, the policy should have regard to the cash flow implications of this criteria and be caveated accordingly.
8 Housing Policies
HOU1 Mixed and Balanced Communities
8.1 In noting the unit mix proposed in policy HOU1, we would in the first instance question the extent to which policy HOU1 should look to be prescriptive on the market housing to be delivered across the district for the whole of the plan period; rather the Council should recognise the need for flexibility, as per the NPPF and PPG, as the fact is the needs of the area may well change over the lifetime of the plan, particularly given the current uncertainty in the housing market, and that different areas will inevitably deliver different forms of housing i.e. apartments within more urban town centre locations and family housing in suburban areas; and that it is the combination of the two that will ultimately address the overall need.
HOU2 Affordable Housing
8.2 We note that no percentage has been provided in this policy to clarify the level of affordable provision to be provided on qualifying sites. We look forward to seeing and being able to comment upon the final requirement at Reg 19. In addition, we note that policy HOU28 also looks to see the affordable units well-integrated and designed to the same high quality to create tenure-neutral and socially inclusive homes and spaces; and that the affordable housing should be apportioned individually or in small clusters and where this is not proposed it should be robustly justified. Whilst we appreciate and support the need to ensure integration and to create more balanced communities, that has to be weighed against the management objectives of the affordable provider, who often find small clusters to be inefficient, such that this requirement needs to provide for those instances where the affordable provider feels a different approach is justified in that particular instance. HOU8 Access Standards
8.3 We note that policy HOU8 requires all new homes to be NDSS, and that as has already been established in the adopted development plan, there is a requirement for all new dwellings in the district to be M4(2) compliant, and 5% of affordable dwellings to meet M4(3)(2)(b) standards where a need exists. In addition, however, policy HOU8 includes a requirement for 5% of new market housing to meet the “wheelchair adaptable dwellings” standard in Part M4(3)(2)(a). Whilst para 8.71 of the plan suggests that these policy expectations are justified by the district’s ageing population and levels of disability, and the need for homes to appropriately meet the demands of occupiers throughout their lifetimes, this is not in our opinion clear and convincing evidence to justify this requirement and as such we would submit that this part of policy HOU8 should be deleted.
HOU9 – Specialist Housing for the Elderly
8.4 We note that policy HOU9 requires all developments of 100 (+) dwellings to set aside at least 10% of the total number of dwellings as specialist housing for older people. It is not clear whether this is in addition to, or as part of, the requirement also being set out in policy HOU8, or whether this could just be bungalows, or buildings that have to have communal areas. As drafted the policy is unclear and thus ineffective. In addition, subject to clarity it could be overly onerous when coupled with other requirements and thus likely to affect a sites viability.
HOU12 Self-Build and Custom Housebuilding
8.5 We note that policy H0U12 requires 5% Self/ Custom-Build Housing on all sites of 20 dwellings (+). Whilst the councils Self-build and Custom Housebuilding (SCHB) Headline Data Report 202319 indicates that as of 30.10.23 there were 197 individuals and 3 associations on the self-build and custom housebuilding register, it is not clear from the evidence base how many plots would be required if the existing commitments were taking into consideration. This needs to be established to ensure the proposed policy is justified and will be effective in meeting the outstanding demand.
8.6 In the context of the above, whilst noting the scale of the demand, we understand that before seeking to require the proposed developments to provide a proportion of the homes delivered as self-build plots the Council will need to examine other opportunities for meeting the needs of those who want to self-build. Under the Self Build & Custom Housebuilding Act 2015 and para 63 of the NPPF (2023), it is the Councils responsibility to ensure that sufficient permissions are given to meet demand. Further detail is provided in paragraph 57-014 of PPG with regard to the Council’s duties and whilst this recognises that it should take account of self-build registers when preparing planning policies, it also outlines that consideration needs to be given by Councils to the disposal of their own assets in order to meet the need for self-build plots or whether self-build could support the regeneration of brownfield sites. A need for self-build plots should not automatically lead to a policy requiring their provision on sites of 20 (+) dwellings. PPG also notes at paragraph 57-025 that local authorities should be encouraging developers and landowners to consider providing plots for self-build and custom house building but makes no reference to requiring their provision. The Government clearly sees the role of the local authority as working to identify opportunities with developers rather than placing responsibility on to the development industry. 8.7 The Council will also need to consider whether it is feasible that all sites of 20 (+) dwellings can deliver self-build plots. Often, especially on the larger sites, there are multiple contractors and large machinery operating on-site, and the development of single plots by individuals operating alongside this construction activity raises both practical and health & safety concerns. Any differential between the lead-in times / build out rates of self & custom build plots and the wider site may lead to construction work outside of specified working hours, building materials stored outside of designated compound areas and unfinished plots next to completed and occupied dwellings, resulting in consumer dissatisfaction. Whilst some sites may be able to locate self-build plots in a manner that reduces these potential risks, on others this will be impossible with developers unable to co-ordinate the provision of self & custom build plots with the development of the wider site. Such concerns must be given full consideration by the Council when preparing any policies on self-build to be included in the Local Plan.
8.8 Having regard to the above we would submit that the requirement to deliver 5% Self/ Custom-Build Housing on all sites of 20 (+) dwellings is likely to deliver very little in the way of tangible benefits, whilst creating significant difficulties for the builders involved. It would be a lot more effective for the Council to identify self-build sites or allocate certain sites to deliver a higher proportion of Self/ Custom-Build Housing.
8.9 Given the above we would suggest that the council review their requirements and are more explicit as to what they want, where and why, as at present policy HOU12 does not look to be properly justified or effective.
9 Green to the Core
GTC1: Net Zero Development Standards
9.1 We note that policy GTC1 requires all residential development to achieve: ‘a) LETI Total Energy Use Intensity (TEUI) Target for Operational Energy of 35 kWh/m2/year (GIA).
b) For new buildings, a 4-star Home Quality Mark (HQM) score; or for conversions to residential development, a Building Research Establishment Environmental Assessment Method (BREEAM)
‘Excellent’ standard as minimum.
c) A maximum space heating demand for new buildings (small scale housing) of 15 kWh/m2 per year.
d) If LETI, Home Quality Mark or BREEAM is updated or replaced during the plan period the equivalent replacement requirements will be applied.
9.2 It goes on to advise that ‘to demonstrate compliance, a Building Research Establishment (BRE) Home Quality Mark post-construction assessment or similar must be undertaken at practical completion.’
9.3 And that in terms of embodied carbon: ‘All new development proposals must demonstrate, through an energy statement, how the following embodied carbon standards will be met:
(i) All residential development must achieve a LETI C rating for embodied carbon emissions, equating to 600 kgCO2/m2 upfront embodied carbon and 970 kgCO2/m2 total embodied carbon.
From 1 January 2030, a LETI A rating must be achieved, equating to 300 kgCO2/m2 upfront embodied carbon and 450 kgCO2/m2 total embodied carbon.’
9.4 Whilst Persimmon Homes support the Government’s approach set out in the Future Homes Standard, we note that the Government have set out a clear roadmap as to how low carbon homes will, alongside the decarbonisation of the national grid, ensure that the Government can meet its commitments to net zero by 2050; and that the way forward being taken by the Government recognises that the improvements in energy efficiency of new homes should be a transition which ensures that new homes continue to come forward to meet housing needs whilst still being sufficiently challenging to significantly reduce the carbon emissions of new homes from 2025. This is set out explicitly in the Written Ministerial Statement of the Minister of State for Housing on the 13th December 2023, when he indicated that:
‘The improvement in standards already in force, alongside the ones which are due in 2025, demonstrates the Government’s commitment to ensuring new properties have a much lower impact on the environment in the future. In this context, the Government does not expect plan-makers to set local energy efficiency standards for buildings that go beyond current or planned buildings regulations. The proliferation of multiple, local standards by local authority area can add further costs to building new homes by adding complexity and undermining economies of scale. Any planning policies that propose local energy efficiency standards for buildings that go beyond current or planned buildings regulation should be rejected at examination if they do not have a well-reasoned and robustly costed rationale that ensures:
That development remains viable, and the impact on housing supply and affordability is considered in accordance with the National Planning Policy Framework.
The additional requirement is expressed as a percentage uplift of a dwelling’s Target Emissions Rate (TER) calculated using a specified version of the Standard Assessment Procedure (SAP).’20
9.5 As the council will be aware, the challenge to the WMS have been dismissed. Given the above, whilst the aspirations in Policy GTC1 are worthy and Persimmon Homes are committed to the delivery of Zero Carbon Homes/ Carbon Neutrality on all their sites, wherever it is practical and viable to do so, there is in our opinion no need for additional standards to be placed on developments through additional Local Plan policies that vary from that required in national government guidance. The plan has to acknowledge the implications of the transitional period and the need for flexibility during this period, in accordance with the aims and objectives of national policy. As such, not only is policy GTC1 overly complex and likely to impact on delivery/ viability, it is also clearly inconsistent with the approach advocated in the WMS. As a result, and having regard to our comments below on the lack of any Viability Assessment to support the reg 18 plan and the associated assessment of the implications of the emerging local plan policy on Net Zero Carbon, we would suggest that Policy GTC1 revert to the requirements set out in Building Regs.
GTC7: Local Nature Recovery Areas
9.6 We note this policy requires all new development to meet the objectives of the East Sussex (including Brighton and Hove) Local Nature Recovery Strategy (LNRS). We do not believe it is inappropriate to require all new development to meet the objectives set out in a document that is not a development plan document. Whilst the council can suggest that development has regard to the LNRS it is not consistent with national policy to require them to meet these objectives. It would also be perverse to require all new developments to adhere to a set of objectives that the council itself only has a duty to have regard to in its decision-making processes. We would therefore recommend that this policy is amended to advise that all new development has regard to the objectives set out in the LNRS
GTC8: Biodiversity Net Gain
9.7 We note that policy GTC8 requires al qualifying development proposals to deliver at least a 20% measurable biodiversity net gain attributable to the development. Whilst there does not appear to be any justification as to why a 20% BNG requirement is needed, such that we would submit the policy is unsound; Persimmon Homes are committed to doing as much as possible to meet the councils’ aspirations and as such would suggest that rather than require development to deliver at least 20% BNG, the Council recognises in policy that the 10% mandatory requirement is a minimum and that they will look favourably on development that seeks to go beyond this figure. If, however, the 20% BNG requirement is retained the council need to set out that where 20% is not deliverable it will seek to negotiate the viable level that can be provided over the 10% minimum required by the Environment Act 2021.
9.8 Such an approach would facilitate an element of flexibility that would take account of the potential implications delivering 20% BNG may have on viability/ overall dwelling numbers and would thus ensure a more effective policy approach, that is consistent with the aims and objectives of national policy as set out in the biodiversity net gain planning practice guidance of 14 February 2024 which at 006 Reference ID: 74-006-2024 states:
‘Plan-makers may seek a higher percentage than the statutory objective of 10% biodiversity net gain, either on an area-wide basis or for specific allocations for development. However, such policies will need to be evidenced including as to local need for a higher percentage, local opportunities for a higher percentage and any impacts on viability for development. Consideration will also need to be given to how the policy will be implemented.’ My emphasis.
9.9 In the context of the above the council need to have regard to the ecological baseline and the difficulties delivering 10% BNG, let alone 20% can have where the baseline is already high, such that offsite credits will be required, the level of which for smaller sites would be financially prohibitive such that the actual capacity of said sites may needs to be revisited. To this end we are aware of anecdotal evidence that suggests that to deliver 20% BNG a sites net to gross will fall from circa 75 to circa 65%, which can as a result impact on its overall development capacity and the councils associated housing land supply.
9.10 Notwithstanding our thoughts on the justification behind the 20% BNG requirements and its associated implications on a site’s development capacity, as well as its viability, there needs to be more in the plan to ensure the provision of a strategic network of sites that can deliver BNG offsite in Rother or within the same national character area (NCA); as whilst important in delivering 10% this is even more important if the Council introduces 20% BNG. At present there is little evidence that there will be sufficient local offsite credits in the short and medium term to support schemes that cannot deliver a 10/ 20% BNG on site. Nor is there any recognition of the fact that by requiring a 20% net gain the council are effectively adding to the pressure on the market for credits as more sites will be required to purchase offsite credits to meet this higher level of BNG. This increases costs and will more than likely delay sites that cannot secure these. Whilst we recognise the fact that there is the option of buying national credits, the cost of these is set well above the market to promote local solutions and will impact significantly on the viability of development meaning many developers will have to wait until local credits are available, which will prejudice the councils rolling 5 year housing land supply position.
10 Landscape Character
10.1 We note that policy LAN2 requires a CAVAT assessment to be submitted with all applications impacting on an individual or groups of trees in order to quantify their public amenity value. This is in our opinion totally unjustified and would question why a standard tree surveys would not suffice in the first instance, with a CAVAT assessment only being required where a tree of particular individual or group value is to be lost. 11 The SA of the Development Strategy
11.1 As set out above we note that the SA in scoring the Development Strategy, at Figures 11 and 12 does not actually comment upon the quantum of development the different options would deliver and how this would relate to the LHN, or indeed address the issue of the unmet needs of neighbours. Given SA objective 8 on housing this is somewhat surprising, as is the fact that no one option appears to have been chosen as the preferred option; albeit SDO3B (Bexhill Greenfield Growth Option 2: with New Multi-modal Transport Corridor) appears to score most favourable, followed by SDO6 (Brownfield Intensification and Redevelopment), which as it would totally fail to meet the LHN seems somewhat perverse, especially when figure 11 scores it as ‘Option supports the objective, or elements of the objective on balance, although effects may be minor’. Surely it would be ‘Option appears to conflict with the objective on balance and may result in minor adverse effects’ or indeed even ‘Potentially significant adverse effects’. Similarly, the scoring of SDO11 (Growth in settlements with train stations or sustainable transport alternatives) in figure 12 seems somewhat odd21 given its based on sustainable transport. To this end we also note that in a number of occasions, SOD4 and SOD5 for instance, growth is said to be resisted by virtue of land availability based on environmental and topographical constraints. Given the scale of unmet need currently proposed we would respectively suggest the council need to do more to establish whether additional land in these areas is available/ could be developed as no stone should be left unturned in trying to meet the LHN. As it stands, the SA lacks the necessary robustness required as it is impossible to assess the impact and weigh benefits and harm of each development strategy without know scale of delivery associated with each option.
11.2 Having regard to the above we feel it’s imperative that if the SA is to be effective the next iteration needs to assess the Development Strategy in the context of the LHN and how the council are to accommodate this/ the implications of not accommodating it/ over delivering to address adjacent authorities’ unmet needs.
12 The Infrastructure Delivery Plan Viability Assessment
12.1 We are surprised to note that whilst an Infrastructure Delivery Plan (IDP) has been produced to support the Reg 18 Plan, as well as an Infrastructure Background Paper, there is no Viability Appraisal (VA) of the plan. Not only does the lack of a VA makes it difficult to comment on the proposed policies, but it also raises questions about the aspirations of the IDP i.e. how these have been tested, and whether they are realistic and deliverable. If the plan is predicated on the aspirations of the IDP then the whole plans approach is also open to debate as how can it be said to be justified and effective if it has not been subject to a robust VA.
13 Conclusions on Reg 18 Plan
13.1 We are concerned that the scale of growth proposed in the overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa, which is significantly less than the capped LHN of 733dpa/ the uncapped LHN of 850 dpa. In our opinion there is no justification for promoting a lower housing target than the capped LHN given the aims and objectives of national government guidance and the affordability issues that exist within the district, that the plan says it wants to address. The scale of the potential shortfall (between 7,286 and 9,502 dwellings over the plan period22) is significant, and will we fear be exacerbated if the predicted supply does not deliver as forecast. Nowhere does the plan, or the evidence base demonstrate how this will be addressed. In addition, it does not appear to have been raised with adjacent authorities through discussions on the DtC. Nor does the plan/ its evidence base demonstrate how the acute levels of unmet housing need that exist within the area are to be addressed through constructive and active engagement so as to meet legal duties imposed by the DtC.
13.2 Similarly we are concerned that no evidence has been provided to demonstrate how the housing requirement will be met or how a rolling five year housing land supply will be achieved. The deliverability of the existing commitments needs to be demonstrated more evidentially than it has to date. Likewise, the evidence needs to be provided to demonstrate that the proposed allocations will deliver the quantum of development suggested when expected; and the plan needs to encompass compelling evidence to support the windfall rates expected rather than rely on historic trends.
13.3 We would also suggest that the plan period needs to be reviewed so that it provides for 15 years from adoption (i.e. till 31st March 2042).
13.4 Turning to the Development Strategy, the justification behind the Development Strategy and the clear preference for concentrating growth in and around Bexhill is not clear, the SA being silent on the quantum of development each Development Strategy could deliver and how the overall strategy related to the LHN.
13.5 In addition to the above we also have specific concerns about policies DEV2 (Comprehensive Development and Masterplanning), DEV3 (Development Boundaries), DEV5 (Development on Small Sites and Windfall), DEV6 (Strategic Green Gaps), HWB 2 (Health Impact Assessments), INF1 (Strategic Infrastructure Requirements), HOU1 (Mixed and Balanced Communities), HOU2 (Affordable Housing), HOU12 (Self-Build and Custom Housebuilding) , GTC1 (Net Zero Building Standards) and GTC8 (Biodiversity Net Gain), all of which we do not believe to be properly justified or consistent with national planning policy guidance as drafted.
In the context of the above we would like to highlight Persimmon Homes desire to work with Rother District Council on progressing a sound plan and that to this end we are happy to meet with officers to discuss our reps on the housing requirement, supply and trajectory and the other policies contained in the Reg 18 Plan/ its supporting evidence base.
Yours sincerely
JUDITH ASHTON
Judith Ashton Associates
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28002
Received: 22/07/2024
Respondent: Persimmon Homes Ltd
Agent: Judith Ashton Associates
PPG6 identified a number of circumstances where it might be appropriate to plan for a higher housing need figure than the Standard Method indicates. Such circumstances can include:
• Instances where housing need is likely to exceed past trends; and
• Where the authority agrees to address unmet need arising from neighbouring authorities. Matters such as a high affordability ratio that is following a rising trend, along with significant affordable housing need, and of course the importance of ensuring an adequate buffer to cater for under supply, or instances where the Plan strategy fails to deliver as expected, are all sound reasons for considering an uplift. The matter of affordability alone clearly indicates that the Council should be planning for more than the capped LHN, together with the high affordable housing need, and past under delivery of housing.
I write with reference to the above. I act for Persimmon Homes who have an interest in a sound plan being delivered for Rother.
Having regard thereto, having reviewed the Regulation 18 Draft Local Plan (April 2024), and associated evidence base, especially the Sustainability Appraisal - Interim Report (SA) and associated appendices, Housing and Economic Land Availability Assessment (HELAA), Local Housing and Economic Needs Assessment (HEDNA), Development Strategy Background Paper (DSBP), Housing Background Paper (BP), Settlement Study (SS), and Infrastructure Delivery Plan (IDP), and Viability Assessment and CiL Review (VA); we have the following comments on the Draft Regulation 18 Rother Local Plan (April 2024), and associated evidence base.
1 The Plan Period
1.1 We note that the 2024 LDS suggests adoption of the Local Plan (Regulation 26) in Quarter 3 2026/27. As a result, the plan period advocated in policy SS2 will be less than 15 years from adoption. In order to comply with paragraph 22 of the NPPF, the plan period should we believe start at 1st April 2023 and be extended to 31st March 2042 as this will ensure it looks ahead for a minimum of 15 years from adoption. As a result, additional housing allocations need to be made to help address this additional requirement.
2 The Housing Requirement, Supply and Trajectory
2.1
Local Housing Need, and the Minimum Housing Requirement
2.1.1 We note that the proposed overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa.
2.1.2
Having reviewed the housing requirement against the standard method and the advice in the PPG about the need to consider the application of a cap, we note that adopting the standard methodology, and adjusting the figures to the base date of the local plan and using the latest local affordability ratio, the position is as set out below.
Step 1: Setting the Baseline
Household Projection = 523.41 dwellings per annum
Step 2: Adjustment for
Affordability
Local Affordability Ratio = 13.822
Adjustment Factor = 1.61 𝐴𝑑𝑗𝑢𝑠𝑡𝑚𝑒𝑛𝑡 𝑓𝑎𝑐𝑡𝑜𝑟=(13.82−44) 𝑥 0.25+1
Minimum Local Housing need
523.4
x 1.61 = 842.6
2.1.3
As set out in section 5 of the HEDNA a cap is applied to limit the level of increase, depending upon the stage that the local authority is at with regards to its strategic policies for housing. Where the policies have been adopted within the last 5 years, the LHN figure is capped at 40% above the average annual housing requirement figure as set out in the existing policies. Where the relevant policies were adopted more than 5 years ago (as is the case in Rother), the LHN is capped at 40% above whichever is higher of:
• The average annual projected household growth identified in Step 1; or
• The average annual housing requirement figure as set out in the most recently adopted strategic policies.
Having done this, we note the following:
40% cap
The average annual projected household growth identified in Step 1
523.4
732.7
The average annual housing requirement figure as set out in the most recently adopted strategic policies
3353
469
2.1.4 Given the above the LHN in Rother is reduced from 842 dpa to 733 dpa. That said, while the cap reduces the minimum number generated by the standard method, it does not reduce housing need itself. Therefore, strategic policies adopted with a cap applied may require an early review and updating to ensure that any housing need above the capped level is planned for as soon as is reasonably possible. The PPG is clear that the standard method is a minimum number and that in areas such as Wealden where the cap reduces the local housing need “consideration can still be given to whether a higher level of need could realistically be delivered. This may help prevent authorities from having to undertake an early review of the relevant policies”4. For Rother this would mean considering whether to deliver 842dpa. It is also important to note that the LHN figure is a minimum starting point, and it does not produce the Housing Requirement5.
2.1.5
In the context of the above, we note that the overall spatial development strategy in looking to deliver a minimum of 5,158 to 7,286 dwellings over the plan period is in effect only looking to deliver between 35% and 50% of the capped LHN.
2.1.6
We further note that the HEDNA is clear in the executive summary on both the scale of the LHN (737dpa at the time), and the findings of the housing growth scenario, indicating that there are ‘no exceptional local circumstances’ that would justify deviating from the Standard Method in Rother.
2.1.7
Whilst the inference in the plan is that the level of housing growth that is proposed is supply led (i.e. reflects the level of suitable sites assessed through the HELAA process) and constrained by the High Weald AONB, the Pevensey levels, the Strategic Gaps around Hastings and the SSSI around Rye, this is adopting a policy on approach to a situation that should be policy off.
2.1.8
Thus, not only is it unclear why the plan is not looking to deliver the LHN as identified in the HEDNA, but why it has not also looked at the uncapped need given the issues surrounding the unmet needs of its neighbours (see below). PPG6 identified a number of circumstances where it might be appropriate to plan for a higher housing need figure than the Standard Method indicates. Such circumstances can include:
• Instances where housing need is likely to exceed past trends; and
• Where the authority agrees to address unmet need arising from neighbouring authorities.
2.1.9 The PPG is not exhaustive in its examples as to what may be a sound reason for considering an uplift. Matters such as a high affordability ratio that is following a rising trend, along with significant affordable housing need, and of course the importance of ensuring an adequate buffer to cater for under supply, or instances where the Plan strategy fails to deliver as expected, are all sound reasons for considering an uplift.
2.1.10
In the context of the above we note that the SA in section 5, in reviewing the Spatial Development Strategy Options, does not appear to look at different scales of growth relative to the LHN (both capped and uncapped) or the implications of only delivering the scale of housing proposed, just a variety of different spatial options where the scale of development is unquantified, despite the fact one of the SA objectives is that ‘More opportunities are provided for everyone to be in a suitable home to meet their needs.’ The above belies the evidence base and the various reasons why the council need to meet their LHN / an uplift to the LHN should be considered further, as summarised in the commentary below.
2.1.11 The reasons for uplifting the LHN should be set into two categories, firstly those that indicate an uplift is required for the District itself and secondly any uplift that might arise from meeting unmet need from neighbouring authorities.
Affordability
2.1.12 Rother is an inherently unaffordable place to live as acknowledged at paras 1.15, 8.20 and 8.21 of the Reg 18 Plan which refer to the issues of the significant deterioration in affordability within the district The HEDNA (2024) identifies a significant need for affordable housing in Rother in the Plan period. This is due to a high, and increasing, house-price to earnings (affordability) ratio, meaning that growth in house prices is significantly outstripping growth in wages, and housing is becoming less affordable for people who live, work, and retire within the district.
2.1.13 To this end, we note, when looking at the ONS ‘House Price to Workplace-Based Earnings Ratio - March 2024’ that the ratio of median house price to median gross annual workplace-based earnings by local authority district, England, and Wales, 1997 to 2023 indicates that the ratio of median house price to median gross annual workplace-based earnings in RDC has increased significantly over the past 10 years from 10.53 to 12.847.
2.1.14 The rapid increase in the affordability ratio is clear evidence of the lack of housing delivery that has taken place over the last 10-year period within the District. Failing to deliver the LHN will only increase the rate of decline in affordability. For an improvement in the affordability situation to occur, decisive action is required through the provision of more housing over and above the capped LHN.
2.1.15 The matter of affordability alone clearly indicates that the Council should be planning for more than the capped LHN.
Affordable Housing Need
2.1.16 Linked to the issue of affordability is the significant need for affordable housing identified in the District. A symptom of a rising affordability ratio is the fact that more members of society are priced out of the open market and consequently require affordable housing in one form or another. Again, the Council acknowledges this in the Draft Plan and in the Feb 2024 HEDNA that accompanies the consultation pack.
2.1.17 The HEDNA indicates that the total net annual affordable housing need for the period 2021 to 2044 is 325 dpa, which is equivalent to 44% of the capped LHN figure (based on 733 dpa). Whilst policy HOU2 does not indicate what level of affordable provision the council will be looking to deliver, policy LHN2 of the adopted core strategy looks to deliver 30% affordable housing on sites in Bexhill and Hastings Fringe, and Rye, 35% in Battle and 40% in the rural areas. Even if the Council were to adopt a 40% requirement across the board, this will only be triggered for those sites that meet the qualifying criteria. It is therefore highly unlikely that the affordable housing need will be met. Indeed, given the decreasing trend in terms of affordability set out above, the gross affordable housing need of 325 dpa is highly likely to increase over the plan period, leading to an increase in the net shortfall and in turn a higher number of people in need and on the Council’s housing waiting list.
2.1.18 Whilst the councils latest AMR does not provide any information on affordable housing delivery, we note that the Governments Affordable housing supply statistics (AHS) 2022-23 table 1011C indicates that over the past 10 years RDC only delivered 887 affordable completions. An average of 89 (rounded up) affordable completions per annum, which just 27% of the average annual affordable need of 325 affordable dwellings per annum identified in the HNA. JAA table 1a – Affordable Housing Provision 2013 - 2023
13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 Total
Total affordable dwellings 80 123 103 20 56 60 130 126 15 174
887
2.1.19 Furthermore, whilst if you compare the level of affordable provision against total housing completions over the past 5 years this averages 38.7% of total housing completions, it fluctuates significantly and prior to this was averaging significantly less. JAA table 1b – Affordable Housing Provision as a percentage of overall housing delivery 2016 - 2023
18-19 19-20 20-21 21-22 22-23 Total
Net additional dwellings
255 247 175 237
390
1,304
Total affordable dwellings
60
130
126
15
174
505
% of total
23.5%
52.6%
72%
6.3%
44.6%
38.7%
2.1.20 Given the above, even if one assumes an average of 38%, this suggests that the plan would need to deliver over 8558 dpa to meet the identified affordable housing needs of the District.
2.1.21
Whilst we are not advocating this level of growth, the above demonstrates the need for the plan to deliver the LHN in full/ an uplift to the LHN figure to boost the supply of open market and affordable homes and thus help address the affordable housing needs of the District. Said approach would also reflect on spatial objective 4 – to respond to the housing crisis and help facilitate the delivery of housing to meet the needs of different groups in the community, by maximising the potential opportunities for residential development in sustainable and deliverable locations, helping to deliver affordable housing, and ensuring development is viable and supports growth in the district by providing certainty for developers through site allocations and clear planning policies.
2.1.22
The SA in reviewing the merits of the alternative spatial options appears to have paid little regard to these fundamental points.
Past Under Delivery
2.1.23
We note the Councils Five Year Housing Land Supply Statement – 1 April 2023 (published in December 2023) suggests that the Council is able to demonstrate a 3.09 year housing land supply for the period 01/04/23 to 31/03/28, and that the HDT results for 2022, as published in December 2023 was, as set out below, just 41%.
JAA table 2 - Result of 2022 Housing Delivery Test
Area Number of homes required Total number of homes required Number of homes delivered Total number of homes delivered Housing Delivery Test: 2022 measurement Housing Delivery Test: 2022 consequence 2019-20 2020-21 2021- 22 2019-20 2020-21 2021- 22
Rother 363 490 740
1593 247 175 239 661 41% Presumption
2.1.24
We further note that RDC housing delivery has over the past few years been somewhat mixed, with the Council failing to meet their annual housing requirement on a number of occasions, which has led to a deficit that suggests that there has been a record of under delivery that should be addressed by an uplift to the LHN figure.
A Buffer
2.1.25
Given the issues of the affordability and the affordable housing needs of the district identified above, as well as the issue of past underdeliver rates, we feel that at the very least a buffer should be built into the housing requirement for the Plan. Introducing a buffer into the housing requirement would ensure that the Council plans positively for the future in a manner that at least meets the minimum LHN rather than the capped figure, or indeed the ‘capacity’ based figure it currently looks
to deliver. This would in reality also provide an uplift to reflect the acute affordability problem and in turn the rising affordable housing need. Given the time horizon of the plan, the Council should also consider the need for flexibility to be built into the strategy so that it can be resilient to unforeseen changes that may occur during the latter years of the plan period.
2.1.26
To this end, we would stress the need for the SA to not only look at various Spatial Development Strategies, but to express these in the context of overall housing provision and assess not only a strategy that reflects the capped LHN, but both the uncapped LHN and indeed something that falls short of the capped LHN so that the effects of all reasonable alternatives are properly taken into consideration. As currently drafted the SA does not in our opinion adequately addresses the issues raised above or look to address the issue of unmet needs from adjacent authorities – see below.
2.1.27
Having regard to the above we consider a buffer of circa 10% i.e. circa 1,4669 additional dwellings should be added to the capped LHN over the plan period to ensure the Plan proceeds on a robust footing.10
2.2
Unmet Need
2.2.1 We note that the Reg 18 Plan makes no specific reference to the Duty to Cooperate (DtC) with neighbouring authorities over the issue of unmet need, there being no reference to the unmet needs of neighbours either. We also note that whilst the HEDNA recognises the fact that Hastings and Rother, together with their intrinsic sub-areas, comprise a self-contained Housing Market Area and Functional Economic Market Area, it does not comment upon the relationship of the HMA to adjacent HMA’s and their unmet need, there being only passing recognition of the fact that Wealden is within the influence of and overlapped by the Hastings and Rother HMA. Nor is there any commentary on how Rothers reg 18 Plan will look to address the unmet needs of Hastings, despite the joint statement agreed with Hastings BC on p16 of the Reg 18 Plan.
2.2.2
Similarly, whilst the Housing Background Paper advises at para 5.14 that the Council is committed to its duties in relation to the Duty to Co-operate, and in summer 2020 prepared a Duty to Co-operate Action Plan which outlines how and at what stage it intends to engage and consult with organisations on the development of the Local Plan, the Engagement and Duty to Cooperate Statement in commenting upon the engagement to date with Hastings BC, and in particular the matter of housing need, merely says at para 6.11 that ‘ The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 481 for Hastings. Hastings Borough Council made a formal request to Rother District Council on 3rd December 2021, along with requests other authorities, as to whether Rother could accommodate any of Hastings’ residual unmet need.’
2.2.3
This does not confirm the scale of Hastings unmet need, which we understand to be in the region of 5,525 dwellings11 or Rothers response to Hasting’s request, and as such does not suggest active, ongoing, and constructive engagement.
2.2.4
Similarly, in commenting upon engagement with Wealden, para 6.23 of the Engagement and Duty to Cooperate Statement advises that: ‘The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 1,212 for Wealden, however, in
their respective Plans, Rother has set an annual target of between additional 243-343 dwellings per annum, while Wealden sets a per annum target of and additional. Both sets of targets fall short of the need figures derived from the Standard Methodology. At this stage in Plan development, neither district has yet made a request in respect of unmet need.’
2.2.5
As is clear from the above Wealden’s target of 22,800 dwellings has actually been omitted from the document, as has reference to the implications in terms of Wealden’s unmet need of 7,071 dwellings12. .
2.2.6
Not only does the Engagement and Duty to Cooperate Statement fail to address the issue of how this unmet need will be tackled, but also makes it clear that Rother has not yet made a request to surrounding districts in respect of its unmet need, this despite the fact Wealden have for example just completed their reg 18 consultation. Again, this does not suggest active, ongoing, and constructive engagement, or due regard to the implications of the increasing scale of unmet need that is emerging in this part of East Sussex, a matter one would have expected the SA to have regard to in terms of the wider social, economic, and environmental consequences.
2.2.7
The lack of any MoU or SoCG with Hastings BC given their request of 3.1.21 is also of concern, as is the current lack of Mou or SoCG with Wealden DC, albeit we note one is in preparation and will we assume be available for scrutiny at Reg 19.
2.2.8
As the council will be aware, in order to demonstrate that the consultation on strategic cross boundary issues such as housing and unmet needs has been effective, continuous and ongoing, and the requirements of the Duty to Cooperate (DtC) have been addressed in terms of the overall housing requirement, MoU or SoCG will need to be produced and reviewed and updated regularly if they are to be relied upon.
2.2.9
Only through a rigorous approach to the issue of the DtC will the Council be able to demonstrate that its housing requirement is right, and that the spatial strategy is correct in its approach to growth. As things stand, we do not believe there to be sufficient evidence in place to demonstrate the DtC has been complied with, and as such can only conclude that the plan is legally flawed.
Conclusions on the Housing Requirement
2.2.10
Not only are the Council failing to meet their LHN as calculated by reference to the Standard Method i.e. 14,660 dwellings (733 dpa), but the shortfall of 7,374 – 9,502 dwellings is between 50% and 65% of the capped LHN. This is a significant shortfall exacerbated by the fact the LHN is a capped figure, and as the PPG is clear the LHN is only the starting point.
2.2.11
There are a range of factors relevant to the calculation of the housing requirement for the Draft Plan that the Council needs to consider when arriving at its overall housing requirement. These include:
• The inherent lack of affordability and the increasing affordability ratios;
• The poor levels of affordable housing delivery, and attendant increasing need for affordable homes; and • The importance of including a buffer above the LHN to ensure adequate housing delivery particularly given the Council’s historically poor track record of delivery as set out above.
2.2.12
When these factors are properly scrutinised, they demonstrate clear and rational reasons as to why there should be an uplift to the LHN. Having regard to the above Persimmon Homes t believe that at the very least the plan should provide for the uncapped need i.e. 733 dpa to ensure the Plan proceeds on a robust footing. Over a plan period of 1st April 2020 to 31st March 2042 this would equate to some 16,126 dwellings, circa 8,840 - 10,968 dwellings more than the plan is currently looking to provide for.
2.2.13
Setting the housing requirement at this level would significantly improve the affordability situation within the District and would deliver more affordable homes for those members of the community in the most need.
2.2.14
It is clear that the SA has as yet to assess the merits of delivering the LHN in full, a higher figure or indeed a lower one. It is also clear from the Engagement and Duty to Cooperate Statement that the council have yet to fully assess the effects of their neighbours’ unmet needs or to explore through the DtC, whether any of their neighbours could assist.
2.3 Housing Supply
2.3.1. Nowhere in the Reg 18 Plan is there a trajectory setting out how the housing requirement will be met or a rolling five year housing land supply maintained. Thus, in terms of supply all that is available is the information set out within table 34 of the Reg 18 Plan which indicates that the housing supply comprises the following:
Source of housing supply
a
Constructed 1 April 2020 – 31 March 2023
802
b
Known completions and commencements on large sites since 1 April 2023
340
c
With Planning Permission
1,693
d
DaSA & Neighbourhood Plan allocations without permission brought forward
1,660
e
Additional HELAA potential sites
2,129
f
Windfall projection (across the district)
663
Total Range
5,15813- 7,28714
2.3.2 In reviewing the above there is nowhere in the evidence base where one can review and assess the deliverability of those sites with outstanding planning permission that have yet to start on site, allocated sites without permissions or the additional HELLA sites. The councils Housing Land Supply and Housing Trajectory (April 2023 position statement), within its appendices provides details of the following:
•
Delivery by financial year of large site permissions (2,140 of which 1261 are only have outline consent))
•
Delivery by financial year of large sites delegated to approve subject to S106 (555, of which only 2 sites delivering 17 dwellings are for full planning permission, the majority being outline schemes))
•
Delivery by financial year of DaSA allocations (520, of which an appeal for one site for 40 dwellings has been dismissed)) •
Delivery by financial year of Neighbourhood Plan allocations (253 of which sites delivering only 34 are subject to applications)) and
•
Small site permissions (316)
2.3.4 As the above does not tally with the figures in table 34 it is impossible to scrutinise the housing land supply properly and ensure it is truly deliverable. All we can note is that the number of large sites with outline permission only that are due to start delivering in the next 5 years seems rather high, as do the number of large sites with a resolution to grant outline permission subject to S106. We would also ask that the next iteration of the plan the council produce a more detailed evidence base to demonstrate that the proposed commitments will deliver as suggested and that the council can maintain a robust and rolling 5 year housing land supply.
2.3.5 In the context of the above, we would suggest that the Council consider further whether a buffer of say 10% should be applied to those sites with planning permission that have yet to commence to take into account any potential non-delivery/ delay in delivery of the dwellings contained within this category which at 1,693 equates to nearly a third of the supply15. Similarly, the sites contained within the DaSA & Neighbourhood Plan allocations without permission, which equate to a comparable proportion of the total supply. Alternatively, the Council need to undertake a more detailed critique of the proposed commitments to ensure what is being put forward is truly deliverable within the plan period. Either way we believe this would generate the need to find land to accommodate a further 335 dwellings16.
2.3.6. Turning to windfalls, para 5.131 of the reg 18 plan indicates that windfall development forms an important part of the councils housing land supply and that the Council will continue to rely on windfall development as part of its development strategy. To this end table 34 of the Reg 18 Plan reports a figure of 663 windfalls over the plan period, and proposed policy DEV5 suggests a windfall development projection of 39 dwellings per annum for the plan period17. This is however slightly at odds with the findings of Table 3 of the councils Housing Land Supply and Housing Trajectory (April 2023 position statement), which suggests an annual average of 45 windfalls a year. Clearly clarity is required on this, as whilst para 6.9 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) suggests that work is currently underway on producing an updated windfall methodology background paper in support of the new Local Plan, which will reassess the likely contribution from windfall sites in the future, as well as the period over which any allowance should be applied, no such document appears within the evidence base. As the council will be aware, they will, in accordance with para 72 of the NPPF, need to provide compelling evidence that the windfall trajectory is a reliable source of supply, and cannot just rely upon a headline review of past windfall delivery rates without any analysis of expected future trends.
2.3.7 Finally in terms of the additional HELAA potential sites, we note that the HELLA in listing Identified Sites (existing allocations and sites with planning permission), and Potential Sites (Sites are potentially suitable, potentially available and potentially deliverable, subject to further assessment or investigation), discounts an unquantified number of ‘Other Potentially Suitable Sites Where Availability is Unknown’ and Rejected Sites (sites assessed as currently unsuitable/ unavailable/ unachievable), and that it is unclear how releasing some of these sites would come to enabling the council to meet their LHN if the assessment criteria were reviewed/ the sites themselves reassessed in terms of the overall area to be developed/ development capacity were reviewed. Given the scale of the unmet need we would respectfully suggest that no stone should be left unturned in looking to achieve the LHN and that whilst not all of the rejected sites will be acceptable, some may, with further consideration, have been suitable, such that the overall quantum of deliverable sites and thus the plans ‘capacity’ based housing figure could be higher. We would thus recommend that in order to demonstrate the housing supply figure is fully justified the council provide further evidence to this effect at Reg 19.
Conclusions on the Housing Supply
2.3.8 Having reviewed the component parts of the Housing Land Supply as best we can given the lack of available evidence to justify the position set out in table 34 of the Reg 18 Plan, we note that the figures relied upon to meet the Councils proposed ‘capacity’ based housing requirement require:
➢
100% reliance on all current commitments (existing detailed, and outline permissions, as well as sites with a resolution to grant and sites allocated in the DaSA and Neighbourhood Plans). This is not justified and a 10% buffer should be introduced to allow for non-delivery/ slower than expected delivery i.e. circa 335 dwellings.
➢
100% of the proposed housing sites delivering the quantum proposed within the plan period. This is however subject to all of said sites being found acceptable by the Local Plan Inspector/ site promoters confirming the sites can deliver this quantum of development in light of all the other policy requirements set out in the plan, such that a contingency may be sensible.
➢
663 dwellings to come forward as windfalls. The proposed windfall allowance is not based on a credible evidence base and is not justified. At 9 - 13% of the residual requirement, it is a significant part of the overall supply and needs to be reviewed to ensure a realistic approach is adopted at Reg 19.
2.3.9 As a result of the above, we would submit that as the predicted supply is effectively dictating the overall requirements – i.e. we are looking at a ‘capacity’ based housing requirement, the fact there is no flexibility in the proposed supply is of grave concern as in effect the overall supply could be a lot less than predicted unless additional sites are added in to address our concerns about the commitments, and windfalls and help provide a buffer / address the issues of affordability and DtC we have raised above. As it stands the plan would be incapable of accommodating any fluctuations in the market and could leave the council open to speculative applications very early in the plan period. The council’s assessment of potential housing sites in the HELLA and SA needs to be reviewed and no stone left unturned when it comes to identifying sites and addressing perceived constraints. Likewise, the councils rational for the yields they have attributed to the proposed allocations needs to be fully justified as, as we explain below, we do not think they are when the policy requirements set out in the draft plan are properly taken into consideration.
3
The need for a Stepped Trajectory
3.1 We note that para 5.102 of the Reg 18 Plan suggests that the Council would require a considerable step change in housing delivery in order to deliver a significant uplift compared to current and historic delivery rates over the last ten years. Figure 37 then illustrates that over the past 12 years the council have on average delivered 219dpa, albeit in the last two years they have delivered 237 and 390 dpa, respectively. Whilst the LHA at 733dpa would require a sea change in delivery, the current proposition, of a supply led target of 258 – 364dpa is clearly within the realms of that which has been achieved of late – reflecting the indeed, if the trajectory in appendix 7 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) is correct the council are anticipating an average of 544 dpa following over the next 5 years18: whilst this tails off after 28/29, this is because the trajectory is based on existing commitments (permissions and allocations) if, with a new plan in place additional sites were allocated, there is no reason why higher levels of growth could not be sustained longer term. There is thus no justification within the evidence base to support a stepped trajectory. Indeed para 5.102 of the Reg 18 Plan appears to suggest that delivery rates have been significantly impacted by the economic downturn and the effect of the coronavirus pandemic in recent years, such that while a number of current allocated sites have been permitted there have been significant delays in the build out of sites. This does not support a stepped trajectory it merely justifies past performance which with an economic upturn should begin to ensure a more robust and steady supply. Furthermore, as two thirds of the proposed supply is already committed there can be no justification for a stepped trajectory.
4
The Growth Options for Sub Areas
4.1 Whilst having no direct interest in the growth options, we do note that when looking at figure 33 that a considerable amount of the proposed growth, both committed and proposed through the additional sites identified through the HELAA that 46% of the proposed growth is in and around Bexhill, with only 9% being directed towards Battle, only 3.6% to the hastings fringe. Whilst we acknowledge that Bexhill is the least constrained of the main centres, one has to wonder if this is a sustainable approach, especially given the public transport links and level of services available in the likes of Battle and Robertsbridge. Comparing figure 35 of the Reg 18 Plan (the opportunities for housing growth) with Figure 12 of the settlement study (part 1) (Settlement Sustainability Score Table), the level of growth proposed in the Sustainable and Moderately Sustainable settlements seems to be significantly less than that proposed in Bexhill, which whilst it is the only ‘Highly Sustainable’ settlement seems somewhat out of proportion and one has to wonder whether this could lead to market saturation and actually prejudice housing land supply.
5
Development Principles Policies
5.1 We note that DEV2 requires: ‘Planning applications (whether in outline or full format) must relate to an entire development site to ensure a comprehensive approach, including where sites are in multiple ownerships.
When an outline application is submitted, a masterplan defining key parameters for the entire site must be submitted by the applicant to indicate how the overall development of the site can be achieved.’
5.2 Where sites are in multiple ownership, we would suggest that as long as a framework masterplan covering the whole site, and an infrastructure delivery strategy has been agreed, either through the site promoters and the council or via an SPD, there should be nothing to stop one party looking to promote their site in advance. As long as the application reflects the framework masterplan and s106 proceeds in accordance with the infrastructure delivery plan we fail to see how this would prejudice the plan. Indeed, it may well allow sites to proceed more quickly and thus actively assist the council in their housing land supply. 5.3 We note that DEV3 indicates that: ‘Development boundaries define the area within sustainable settlements where development will be permitted, provided it is consistent with this Local Plan.
Priority shall be given to reuse of brownfield sites, in order to make efficient use of previously developed land in sustainable settlements. Some greenfield development will be necessary in order to deliver housing and employment need, but this will be limited to inside development boundaries.’
5.4 Whilst in the first instance we assume the development boundaries will be redrawn to reflect the proposed allocations, we would also suggest that given the shortfall in the housing land supply, that the council should look to have a criterion based policy that enables development immediately adjacent to the limits of built development subject to certain criteria. For example, within Mid Sussex, policy DP6 provides for:
The growth of settlements will be supported where this meets identified local housing, employment, and community needs. Outside defined built-up area boundaries, the expansion of settlements will be supported where:
1. The site is allocated in the District Plan, a Neighbourhood Plan, or subsequent Development Plan Document or where the proposed development is for fewer than 10 dwellings; and
2. The site is contiguous with an existing built up area of the settlement; and
3. The development is demonstrated to be sustainable, including by reference to the settlement hierarchy.
The developer will need to satisfy the Council that:
• The proposal does not represent an underdevelopment of the site with regard to Policy DP26: Character and Design; or
• A large site is not brought forward in phases that individually meet the threshold but cumulatively does not.
5.5 A similar policy approach would we believe be appropriate here and would assist the council in meeting their LHN.
5.6 We note that DEV5 refers to the windfall rate of 39dpa. Given our comments above, this will need to be properly justified within the evidence base for the Reg 19 Plan.
5.7 Turning to DEV6, and the Strategic Green Gaps, the current strategic gap between Bexhill and Hastings should not be seen as a constraint on development on a par with the AONB or any other NPPF footnote 7 constraint, and should not in our opinion be carried over from the current core strategy without first being reviewed to establish if they can accommodate some growth to assist the council in meeting their LHN/ meeting the unmet needs of their neighbours, especially Hastings.
6
Health and Wellbeing Policies
6.1 We note that policy HWB2 requires a HIA to be undertaken on all applications for development of 100 (+) dwellings/ sites of more than 5ha. Whilst Persimmon Homes would agree that HIA are an essential part of plan making to ensure the Council understand the health outcomes of its strategy and is thus able to ensure these are effectively addressed, this should be achieved through the preparation of a whole plan HIA which will help inform the Council that the policies the plan contains address the key health outcomes for the area. As the plan and the policies it contains has been prepared to address the key health issues it is unnecessary for future development proposals that accord with this plan to undertake a separate HIA. If a development meets the policies in the plan, then it is by default addressing the health outcomes already identified by the Council. A HIA as part of the application would merely be repetition of the work the council has already undertaken. The only circumstance where an HIA may be appropriate would be for a larger unallocated site where the impacts may not have been fully considered by the council as part of the plan wide HIA. Policy HWB2 needs to be revised accordingly.
6.2 We also note that criterion 5 of HWB5 requires developments of 300 (+) dwellings to provide playing pitches on site in line with the recommendations of Rother’s Playing Pitch and Built Facilities Strategy and Sport England’s standards. Whilst not opposing this criterion, Persimmon Homes would suggest that the following is added to criterion 5 ‘unless evidence suggests that this is unachievable” as a sites topography may not make this possible/ economies of scale may mean providing / contribution to offsite provision is in certain circumstances preferable; or that this would fetter a developer’s ability to deliver BNG on site as such facilities do not assist in trying to deliver BNG. Indeed, they can actively prejudice it.
7
Infrastructure Policies
7.1 We note that policy INF1 (A) indicates that ‘Where new infrastructure capacity is required, it must be demonstrated that it can be delivered upfront or early in the development phasing.’ As the councils will be aware, the question of the supply of utilities to support development (including residential development) is a matter that is dealt with through separate statutory regimes. Providers such as the water and energy companies are required, among other things, to ensure a supply of services adequate to meet the needs of the plan-led system. As such policy INF41 (A) should not require applicants for planning permission to demonstrate that there is sufficient capacity with regard to provision of utilities such as water and power. Furthermore, when considering other infrastructure requirements, the policy should have regard to the cash flow implications of this criteria and be caveated accordingly.
8 Housing Policies
HOU1 Mixed and Balanced Communities
8.1 In noting the unit mix proposed in policy HOU1, we would in the first instance question the extent to which policy HOU1 should look to be prescriptive on the market housing to be delivered across the district for the whole of the plan period; rather the Council should recognise the need for flexibility, as per the NPPF and PPG, as the fact is the needs of the area may well change over the lifetime of the plan, particularly given the current uncertainty in the housing market, and that different areas will inevitably deliver different forms of housing i.e. apartments within more urban town centre locations and family housing in suburban areas; and that it is the combination of the two that will ultimately address the overall need.
HOU2 Affordable Housing
8.2 We note that no percentage has been provided in this policy to clarify the level of affordable provision to be provided on qualifying sites. We look forward to seeing and being able to comment upon the final requirement at Reg 19. In addition, we note that policy HOU28 also looks to see the affordable units well-integrated and designed to the same high quality to create tenure-neutral and socially inclusive homes and spaces; and that the affordable housing should be apportioned individually or in small clusters and where this is not proposed it should be robustly justified. Whilst we appreciate and support the need to ensure integration and to create more balanced communities, that has to be weighed against the management objectives of the affordable provider, who often find small clusters to be inefficient, such that this requirement needs to provide for those instances where the affordable provider feels a different approach is justified in that particular instance. HOU8 Access Standards
8.3 We note that policy HOU8 requires all new homes to be NDSS, and that as has already been established in the adopted development plan, there is a requirement for all new dwellings in the district to be M4(2) compliant, and 5% of affordable dwellings to meet M4(3)(2)(b) standards where a need exists. In addition, however, policy HOU8 includes a requirement for 5% of new market housing to meet the “wheelchair adaptable dwellings” standard in Part M4(3)(2)(a). Whilst para 8.71 of the plan suggests that these policy expectations are justified by the district’s ageing population and levels of disability, and the need for homes to appropriately meet the demands of occupiers throughout their lifetimes, this is not in our opinion clear and convincing evidence to justify this requirement and as such we would submit that this part of policy HOU8 should be deleted.
HOU9 – Specialist Housing for the Elderly
8.4 We note that policy HOU9 requires all developments of 100 (+) dwellings to set aside at least 10% of the total number of dwellings as specialist housing for older people. It is not clear whether this is in addition to, or as part of, the requirement also being set out in policy HOU8, or whether this could just be bungalows, or buildings that have to have communal areas. As drafted the policy is unclear and thus ineffective. In addition, subject to clarity it could be overly onerous when coupled with other requirements and thus likely to affect a sites viability.
HOU12 Self-Build and Custom Housebuilding
8.5 We note that policy H0U12 requires 5% Self/ Custom-Build Housing on all sites of 20 dwellings (+). Whilst the councils Self-build and Custom Housebuilding (SCHB) Headline Data Report 202319 indicates that as of 30.10.23 there were 197 individuals and 3 associations on the self-build and custom housebuilding register, it is not clear from the evidence base how many plots would be required if the existing commitments were taking into consideration. This needs to be established to ensure the proposed policy is justified and will be effective in meeting the outstanding demand.
8.6 In the context of the above, whilst noting the scale of the demand, we understand that before seeking to require the proposed developments to provide a proportion of the homes delivered as self-build plots the Council will need to examine other opportunities for meeting the needs of those who want to self-build. Under the Self Build & Custom Housebuilding Act 2015 and para 63 of the NPPF (2023), it is the Councils responsibility to ensure that sufficient permissions are given to meet demand. Further detail is provided in paragraph 57-014 of PPG with regard to the Council’s duties and whilst this recognises that it should take account of self-build registers when preparing planning policies, it also outlines that consideration needs to be given by Councils to the disposal of their own assets in order to meet the need for self-build plots or whether self-build could support the regeneration of brownfield sites. A need for self-build plots should not automatically lead to a policy requiring their provision on sites of 20 (+) dwellings. PPG also notes at paragraph 57-025 that local authorities should be encouraging developers and landowners to consider providing plots for self-build and custom house building but makes no reference to requiring their provision. The Government clearly sees the role of the local authority as working to identify opportunities with developers rather than placing responsibility on to the development industry. 8.7 The Council will also need to consider whether it is feasible that all sites of 20 (+) dwellings can deliver self-build plots. Often, especially on the larger sites, there are multiple contractors and large machinery operating on-site, and the development of single plots by individuals operating alongside this construction activity raises both practical and health & safety concerns. Any differential between the lead-in times / build out rates of self & custom build plots and the wider site may lead to construction work outside of specified working hours, building materials stored outside of designated compound areas and unfinished plots next to completed and occupied dwellings, resulting in consumer dissatisfaction. Whilst some sites may be able to locate self-build plots in a manner that reduces these potential risks, on others this will be impossible with developers unable to co-ordinate the provision of self & custom build plots with the development of the wider site. Such concerns must be given full consideration by the Council when preparing any policies on self-build to be included in the Local Plan.
8.8 Having regard to the above we would submit that the requirement to deliver 5% Self/ Custom-Build Housing on all sites of 20 (+) dwellings is likely to deliver very little in the way of tangible benefits, whilst creating significant difficulties for the builders involved. It would be a lot more effective for the Council to identify self-build sites or allocate certain sites to deliver a higher proportion of Self/ Custom-Build Housing.
8.9 Given the above we would suggest that the council review their requirements and are more explicit as to what they want, where and why, as at present policy HOU12 does not look to be properly justified or effective.
9 Green to the Core
GTC1: Net Zero Development Standards
9.1 We note that policy GTC1 requires all residential development to achieve: ‘a) LETI Total Energy Use Intensity (TEUI) Target for Operational Energy of 35 kWh/m2/year (GIA).
b) For new buildings, a 4-star Home Quality Mark (HQM) score; or for conversions to residential development, a Building Research Establishment Environmental Assessment Method (BREEAM)
‘Excellent’ standard as minimum.
c) A maximum space heating demand for new buildings (small scale housing) of 15 kWh/m2 per year.
d) If LETI, Home Quality Mark or BREEAM is updated or replaced during the plan period the equivalent replacement requirements will be applied.
9.2 It goes on to advise that ‘to demonstrate compliance, a Building Research Establishment (BRE) Home Quality Mark post-construction assessment or similar must be undertaken at practical completion.’
9.3 And that in terms of embodied carbon: ‘All new development proposals must demonstrate, through an energy statement, how the following embodied carbon standards will be met:
(i) All residential development must achieve a LETI C rating for embodied carbon emissions, equating to 600 kgCO2/m2 upfront embodied carbon and 970 kgCO2/m2 total embodied carbon.
From 1 January 2030, a LETI A rating must be achieved, equating to 300 kgCO2/m2 upfront embodied carbon and 450 kgCO2/m2 total embodied carbon.’
9.4 Whilst Persimmon Homes support the Government’s approach set out in the Future Homes Standard, we note that the Government have set out a clear roadmap as to how low carbon homes will, alongside the decarbonisation of the national grid, ensure that the Government can meet its commitments to net zero by 2050; and that the way forward being taken by the Government recognises that the improvements in energy efficiency of new homes should be a transition which ensures that new homes continue to come forward to meet housing needs whilst still being sufficiently challenging to significantly reduce the carbon emissions of new homes from 2025. This is set out explicitly in the Written Ministerial Statement of the Minister of State for Housing on the 13th December 2023, when he indicated that:
‘The improvement in standards already in force, alongside the ones which are due in 2025, demonstrates the Government’s commitment to ensuring new properties have a much lower impact on the environment in the future. In this context, the Government does not expect plan-makers to set local energy efficiency standards for buildings that go beyond current or planned buildings regulations. The proliferation of multiple, local standards by local authority area can add further costs to building new homes by adding complexity and undermining economies of scale. Any planning policies that propose local energy efficiency standards for buildings that go beyond current or planned buildings regulation should be rejected at examination if they do not have a well-reasoned and robustly costed rationale that ensures:
That development remains viable, and the impact on housing supply and affordability is considered in accordance with the National Planning Policy Framework.
The additional requirement is expressed as a percentage uplift of a dwelling’s Target Emissions Rate (TER) calculated using a specified version of the Standard Assessment Procedure (SAP).’20
9.5 As the council will be aware, the challenge to the WMS have been dismissed. Given the above, whilst the aspirations in Policy GTC1 are worthy and Persimmon Homes are committed to the delivery of Zero Carbon Homes/ Carbon Neutrality on all their sites, wherever it is practical and viable to do so, there is in our opinion no need for additional standards to be placed on developments through additional Local Plan policies that vary from that required in national government guidance. The plan has to acknowledge the implications of the transitional period and the need for flexibility during this period, in accordance with the aims and objectives of national policy. As such, not only is policy GTC1 overly complex and likely to impact on delivery/ viability, it is also clearly inconsistent with the approach advocated in the WMS. As a result, and having regard to our comments below on the lack of any Viability Assessment to support the reg 18 plan and the associated assessment of the implications of the emerging local plan policy on Net Zero Carbon, we would suggest that Policy GTC1 revert to the requirements set out in Building Regs.
GTC7: Local Nature Recovery Areas
9.6 We note this policy requires all new development to meet the objectives of the East Sussex (including Brighton and Hove) Local Nature Recovery Strategy (LNRS). We do not believe it is inappropriate to require all new development to meet the objectives set out in a document that is not a development plan document. Whilst the council can suggest that development has regard to the LNRS it is not consistent with national policy to require them to meet these objectives. It would also be perverse to require all new developments to adhere to a set of objectives that the council itself only has a duty to have regard to in its decision-making processes. We would therefore recommend that this policy is amended to advise that all new development has regard to the objectives set out in the LNRS
GTC8: Biodiversity Net Gain
9.7 We note that policy GTC8 requires al qualifying development proposals to deliver at least a 20% measurable biodiversity net gain attributable to the development. Whilst there does not appear to be any justification as to why a 20% BNG requirement is needed, such that we would submit the policy is unsound; Persimmon Homes are committed to doing as much as possible to meet the councils’ aspirations and as such would suggest that rather than require development to deliver at least 20% BNG, the Council recognises in policy that the 10% mandatory requirement is a minimum and that they will look favourably on development that seeks to go beyond this figure. If, however, the 20% BNG requirement is retained the council need to set out that where 20% is not deliverable it will seek to negotiate the viable level that can be provided over the 10% minimum required by the Environment Act 2021.
9.8 Such an approach would facilitate an element of flexibility that would take account of the potential implications delivering 20% BNG may have on viability/ overall dwelling numbers and would thus ensure a more effective policy approach, that is consistent with the aims and objectives of national policy as set out in the biodiversity net gain planning practice guidance of 14 February 2024 which at 006 Reference ID: 74-006-2024 states:
‘Plan-makers may seek a higher percentage than the statutory objective of 10% biodiversity net gain, either on an area-wide basis or for specific allocations for development. However, such policies will need to be evidenced including as to local need for a higher percentage, local opportunities for a higher percentage and any impacts on viability for development. Consideration will also need to be given to how the policy will be implemented.’ My emphasis.
9.9 In the context of the above the council need to have regard to the ecological baseline and the difficulties delivering 10% BNG, let alone 20% can have where the baseline is already high, such that offsite credits will be required, the level of which for smaller sites would be financially prohibitive such that the actual capacity of said sites may needs to be revisited. To this end we are aware of anecdotal evidence that suggests that to deliver 20% BNG a sites net to gross will fall from circa 75 to circa 65%, which can as a result impact on its overall development capacity and the councils associated housing land supply.
9.10 Notwithstanding our thoughts on the justification behind the 20% BNG requirements and its associated implications on a site’s development capacity, as well as its viability, there needs to be more in the plan to ensure the provision of a strategic network of sites that can deliver BNG offsite in Rother or within the same national character area (NCA); as whilst important in delivering 10% this is even more important if the Council introduces 20% BNG. At present there is little evidence that there will be sufficient local offsite credits in the short and medium term to support schemes that cannot deliver a 10/ 20% BNG on site. Nor is there any recognition of the fact that by requiring a 20% net gain the council are effectively adding to the pressure on the market for credits as more sites will be required to purchase offsite credits to meet this higher level of BNG. This increases costs and will more than likely delay sites that cannot secure these. Whilst we recognise the fact that there is the option of buying national credits, the cost of these is set well above the market to promote local solutions and will impact significantly on the viability of development meaning many developers will have to wait until local credits are available, which will prejudice the councils rolling 5 year housing land supply position.
10 Landscape Character
10.1 We note that policy LAN2 requires a CAVAT assessment to be submitted with all applications impacting on an individual or groups of trees in order to quantify their public amenity value. This is in our opinion totally unjustified and would question why a standard tree surveys would not suffice in the first instance, with a CAVAT assessment only being required where a tree of particular individual or group value is to be lost. 11 The SA of the Development Strategy
11.1 As set out above we note that the SA in scoring the Development Strategy, at Figures 11 and 12 does not actually comment upon the quantum of development the different options would deliver and how this would relate to the LHN, or indeed address the issue of the unmet needs of neighbours. Given SA objective 8 on housing this is somewhat surprising, as is the fact that no one option appears to have been chosen as the preferred option; albeit SDO3B (Bexhill Greenfield Growth Option 2: with New Multi-modal Transport Corridor) appears to score most favourable, followed by SDO6 (Brownfield Intensification and Redevelopment), which as it would totally fail to meet the LHN seems somewhat perverse, especially when figure 11 scores it as ‘Option supports the objective, or elements of the objective on balance, although effects may be minor’. Surely it would be ‘Option appears to conflict with the objective on balance and may result in minor adverse effects’ or indeed even ‘Potentially significant adverse effects’. Similarly, the scoring of SDO11 (Growth in settlements with train stations or sustainable transport alternatives) in figure 12 seems somewhat odd21 given its based on sustainable transport. To this end we also note that in a number of occasions, SOD4 and SOD5 for instance, growth is said to be resisted by virtue of land availability based on environmental and topographical constraints. Given the scale of unmet need currently proposed we would respectively suggest the council need to do more to establish whether additional land in these areas is available/ could be developed as no stone should be left unturned in trying to meet the LHN. As it stands, the SA lacks the necessary robustness required as it is impossible to assess the impact and weigh benefits and harm of each development strategy without know scale of delivery associated with each option.
11.2 Having regard to the above we feel it’s imperative that if the SA is to be effective the next iteration needs to assess the Development Strategy in the context of the LHN and how the council are to accommodate this/ the implications of not accommodating it/ over delivering to address adjacent authorities’ unmet needs.
12 The Infrastructure Delivery Plan Viability Assessment
12.1 We are surprised to note that whilst an Infrastructure Delivery Plan (IDP) has been produced to support the Reg 18 Plan, as well as an Infrastructure Background Paper, there is no Viability Appraisal (VA) of the plan. Not only does the lack of a VA makes it difficult to comment on the proposed policies, but it also raises questions about the aspirations of the IDP i.e. how these have been tested, and whether they are realistic and deliverable. If the plan is predicated on the aspirations of the IDP then the whole plans approach is also open to debate as how can it be said to be justified and effective if it has not been subject to a robust VA.
13 Conclusions on Reg 18 Plan
13.1 We are concerned that the scale of growth proposed in the overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa, which is significantly less than the capped LHN of 733dpa/ the uncapped LHN of 850 dpa. In our opinion there is no justification for promoting a lower housing target than the capped LHN given the aims and objectives of national government guidance and the affordability issues that exist within the district, that the plan says it wants to address. The scale of the potential shortfall (between 7,286 and 9,502 dwellings over the plan period22) is significant, and will we fear be exacerbated if the predicted supply does not deliver as forecast. Nowhere does the plan, or the evidence base demonstrate how this will be addressed. In addition, it does not appear to have been raised with adjacent authorities through discussions on the DtC. Nor does the plan/ its evidence base demonstrate how the acute levels of unmet housing need that exist within the area are to be addressed through constructive and active engagement so as to meet legal duties imposed by the DtC.
13.2 Similarly we are concerned that no evidence has been provided to demonstrate how the housing requirement will be met or how a rolling five year housing land supply will be achieved. The deliverability of the existing commitments needs to be demonstrated more evidentially than it has to date. Likewise, the evidence needs to be provided to demonstrate that the proposed allocations will deliver the quantum of development suggested when expected; and the plan needs to encompass compelling evidence to support the windfall rates expected rather than rely on historic trends.
13.3 We would also suggest that the plan period needs to be reviewed so that it provides for 15 years from adoption (i.e. till 31st March 2042).
13.4 Turning to the Development Strategy, the justification behind the Development Strategy and the clear preference for concentrating growth in and around Bexhill is not clear, the SA being silent on the quantum of development each Development Strategy could deliver and how the overall strategy related to the LHN.
13.5 In addition to the above we also have specific concerns about policies DEV2 (Comprehensive Development and Masterplanning), DEV3 (Development Boundaries), DEV5 (Development on Small Sites and Windfall), DEV6 (Strategic Green Gaps), HWB 2 (Health Impact Assessments), INF1 (Strategic Infrastructure Requirements), HOU1 (Mixed and Balanced Communities), HOU2 (Affordable Housing), HOU12 (Self-Build and Custom Housebuilding) , GTC1 (Net Zero Building Standards) and GTC8 (Biodiversity Net Gain), all of which we do not believe to be properly justified or consistent with national planning policy guidance as drafted.
In the context of the above we would like to highlight Persimmon Homes desire to work with Rother District Council on progressing a sound plan and that to this end we are happy to meet with officers to discuss our reps on the housing requirement, supply and trajectory and the other policies contained in the Reg 18 Plan/ its supporting evidence base.
Yours sincerely
JUDITH ASHTON
Judith Ashton Associates
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28004
Received: 22/07/2024
Respondent: Persimmon Homes Ltd
Agent: Judith Ashton Associates
The rapid increase in the affordability ratio is clear evidence of the lack of housing delivery that has taken place over the last 10-year period within the District. Failing to deliver the LHN will only increase the rate of decline in affordability. For an improvement in the affordability situation to occur, decisive action is required through the provision of more housing over and above the capped LHN. The matter of affordability alone clearly indicates that the Council should be planning for more than the capped LHN.
I write with reference to the above. I act for Persimmon Homes who have an interest in a sound plan being delivered for Rother.
Having regard thereto, having reviewed the Regulation 18 Draft Local Plan (April 2024), and associated evidence base, especially the Sustainability Appraisal - Interim Report (SA) and associated appendices, Housing and Economic Land Availability Assessment (HELAA), Local Housing and Economic Needs Assessment (HEDNA), Development Strategy Background Paper (DSBP), Housing Background Paper (BP), Settlement Study (SS), and Infrastructure Delivery Plan (IDP), and Viability Assessment and CiL Review (VA); we have the following comments on the Draft Regulation 18 Rother Local Plan (April 2024), and associated evidence base.
1 The Plan Period
1.1 We note that the 2024 LDS suggests adoption of the Local Plan (Regulation 26) in Quarter 3 2026/27. As a result, the plan period advocated in policy SS2 will be less than 15 years from adoption. In order to comply with paragraph 22 of the NPPF, the plan period should we believe start at 1st April 2023 and be extended to 31st March 2042 as this will ensure it looks ahead for a minimum of 15 years from adoption. As a result, additional housing allocations need to be made to help address this additional requirement.
2 The Housing Requirement, Supply and Trajectory
2.1
Local Housing Need, and the Minimum Housing Requirement
2.1.1 We note that the proposed overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa.
2.1.2
Having reviewed the housing requirement against the standard method and the advice in the PPG about the need to consider the application of a cap, we note that adopting the standard methodology, and adjusting the figures to the base date of the local plan and using the latest local affordability ratio, the position is as set out below.
Step 1: Setting the Baseline
Household Projection = 523.41 dwellings per annum
Step 2: Adjustment for
Affordability
Local Affordability Ratio = 13.822
Adjustment Factor = 1.61 𝐴𝑑𝑗𝑢𝑠𝑡𝑚𝑒𝑛𝑡 𝑓𝑎𝑐𝑡𝑜𝑟=(13.82−44) 𝑥 0.25+1
Minimum Local Housing need
523.4
x 1.61 = 842.6
2.1.3
As set out in section 5 of the HEDNA a cap is applied to limit the level of increase, depending upon the stage that the local authority is at with regards to its strategic policies for housing. Where the policies have been adopted within the last 5 years, the LHN figure is capped at 40% above the average annual housing requirement figure as set out in the existing policies. Where the relevant policies were adopted more than 5 years ago (as is the case in Rother), the LHN is capped at 40% above whichever is higher of:
• The average annual projected household growth identified in Step 1; or
• The average annual housing requirement figure as set out in the most recently adopted strategic policies.
Having done this, we note the following:
40% cap
The average annual projected household growth identified in Step 1
523.4
732.7
The average annual housing requirement figure as set out in the most recently adopted strategic policies
3353
469
2.1.4 Given the above the LHN in Rother is reduced from 842 dpa to 733 dpa. That said, while the cap reduces the minimum number generated by the standard method, it does not reduce housing need itself. Therefore, strategic policies adopted with a cap applied may require an early review and updating to ensure that any housing need above the capped level is planned for as soon as is reasonably possible. The PPG is clear that the standard method is a minimum number and that in areas such as Wealden where the cap reduces the local housing need “consideration can still be given to whether a higher level of need could realistically be delivered. This may help prevent authorities from having to undertake an early review of the relevant policies”4. For Rother this would mean considering whether to deliver 842dpa. It is also important to note that the LHN figure is a minimum starting point, and it does not produce the Housing Requirement5.
2.1.5
In the context of the above, we note that the overall spatial development strategy in looking to deliver a minimum of 5,158 to 7,286 dwellings over the plan period is in effect only looking to deliver between 35% and 50% of the capped LHN.
2.1.6
We further note that the HEDNA is clear in the executive summary on both the scale of the LHN (737dpa at the time), and the findings of the housing growth scenario, indicating that there are ‘no exceptional local circumstances’ that would justify deviating from the Standard Method in Rother.
2.1.7
Whilst the inference in the plan is that the level of housing growth that is proposed is supply led (i.e. reflects the level of suitable sites assessed through the HELAA process) and constrained by the High Weald AONB, the Pevensey levels, the Strategic Gaps around Hastings and the SSSI around Rye, this is adopting a policy on approach to a situation that should be policy off.
2.1.8
Thus, not only is it unclear why the plan is not looking to deliver the LHN as identified in the HEDNA, but why it has not also looked at the uncapped need given the issues surrounding the unmet needs of its neighbours (see below). PPG6 identified a number of circumstances where it might be appropriate to plan for a higher housing need figure than the Standard Method indicates. Such circumstances can include:
• Instances where housing need is likely to exceed past trends; and
• Where the authority agrees to address unmet need arising from neighbouring authorities.
2.1.9 The PPG is not exhaustive in its examples as to what may be a sound reason for considering an uplift. Matters such as a high affordability ratio that is following a rising trend, along with significant affordable housing need, and of course the importance of ensuring an adequate buffer to cater for under supply, or instances where the Plan strategy fails to deliver as expected, are all sound reasons for considering an uplift.
2.1.10
In the context of the above we note that the SA in section 5, in reviewing the Spatial Development Strategy Options, does not appear to look at different scales of growth relative to the LHN (both capped and uncapped) or the implications of only delivering the scale of housing proposed, just a variety of different spatial options where the scale of development is unquantified, despite the fact one of the SA objectives is that ‘More opportunities are provided for everyone to be in a suitable home to meet their needs.’ The above belies the evidence base and the various reasons why the council need to meet their LHN / an uplift to the LHN should be considered further, as summarised in the commentary below.
2.1.11 The reasons for uplifting the LHN should be set into two categories, firstly those that indicate an uplift is required for the District itself and secondly any uplift that might arise from meeting unmet need from neighbouring authorities.
Affordability
2.1.12 Rother is an inherently unaffordable place to live as acknowledged at paras 1.15, 8.20 and 8.21 of the Reg 18 Plan which refer to the issues of the significant deterioration in affordability within the district The HEDNA (2024) identifies a significant need for affordable housing in Rother in the Plan period. This is due to a high, and increasing, house-price to earnings (affordability) ratio, meaning that growth in house prices is significantly outstripping growth in wages, and housing is becoming less affordable for people who live, work, and retire within the district.
2.1.13 To this end, we note, when looking at the ONS ‘House Price to Workplace-Based Earnings Ratio - March 2024’ that the ratio of median house price to median gross annual workplace-based earnings by local authority district, England, and Wales, 1997 to 2023 indicates that the ratio of median house price to median gross annual workplace-based earnings in RDC has increased significantly over the past 10 years from 10.53 to 12.847.
2.1.14 The rapid increase in the affordability ratio is clear evidence of the lack of housing delivery that has taken place over the last 10-year period within the District. Failing to deliver the LHN will only increase the rate of decline in affordability. For an improvement in the affordability situation to occur, decisive action is required through the provision of more housing over and above the capped LHN.
2.1.15 The matter of affordability alone clearly indicates that the Council should be planning for more than the capped LHN.
Affordable Housing Need
2.1.16 Linked to the issue of affordability is the significant need for affordable housing identified in the District. A symptom of a rising affordability ratio is the fact that more members of society are priced out of the open market and consequently require affordable housing in one form or another. Again, the Council acknowledges this in the Draft Plan and in the Feb 2024 HEDNA that accompanies the consultation pack.
2.1.17 The HEDNA indicates that the total net annual affordable housing need for the period 2021 to 2044 is 325 dpa, which is equivalent to 44% of the capped LHN figure (based on 733 dpa). Whilst policy HOU2 does not indicate what level of affordable provision the council will be looking to deliver, policy LHN2 of the adopted core strategy looks to deliver 30% affordable housing on sites in Bexhill and Hastings Fringe, and Rye, 35% in Battle and 40% in the rural areas. Even if the Council were to adopt a 40% requirement across the board, this will only be triggered for those sites that meet the qualifying criteria. It is therefore highly unlikely that the affordable housing need will be met. Indeed, given the decreasing trend in terms of affordability set out above, the gross affordable housing need of 325 dpa is highly likely to increase over the plan period, leading to an increase in the net shortfall and in turn a higher number of people in need and on the Council’s housing waiting list.
2.1.18 Whilst the councils latest AMR does not provide any information on affordable housing delivery, we note that the Governments Affordable housing supply statistics (AHS) 2022-23 table 1011C indicates that over the past 10 years RDC only delivered 887 affordable completions. An average of 89 (rounded up) affordable completions per annum, which just 27% of the average annual affordable need of 325 affordable dwellings per annum identified in the HNA. JAA table 1a – Affordable Housing Provision 2013 - 2023
13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 Total
Total affordable dwellings 80 123 103 20 56 60 130 126 15 174
887
2.1.19 Furthermore, whilst if you compare the level of affordable provision against total housing completions over the past 5 years this averages 38.7% of total housing completions, it fluctuates significantly and prior to this was averaging significantly less. JAA table 1b – Affordable Housing Provision as a percentage of overall housing delivery 2016 - 2023
18-19 19-20 20-21 21-22 22-23 Total
Net additional dwellings
255 247 175 237
390
1,304
Total affordable dwellings
60
130
126
15
174
505
% of total
23.5%
52.6%
72%
6.3%
44.6%
38.7%
2.1.20 Given the above, even if one assumes an average of 38%, this suggests that the plan would need to deliver over 8558 dpa to meet the identified affordable housing needs of the District.
2.1.21
Whilst we are not advocating this level of growth, the above demonstrates the need for the plan to deliver the LHN in full/ an uplift to the LHN figure to boost the supply of open market and affordable homes and thus help address the affordable housing needs of the District. Said approach would also reflect on spatial objective 4 – to respond to the housing crisis and help facilitate the delivery of housing to meet the needs of different groups in the community, by maximising the potential opportunities for residential development in sustainable and deliverable locations, helping to deliver affordable housing, and ensuring development is viable and supports growth in the district by providing certainty for developers through site allocations and clear planning policies.
2.1.22
The SA in reviewing the merits of the alternative spatial options appears to have paid little regard to these fundamental points.
Past Under Delivery
2.1.23
We note the Councils Five Year Housing Land Supply Statement – 1 April 2023 (published in December 2023) suggests that the Council is able to demonstrate a 3.09 year housing land supply for the period 01/04/23 to 31/03/28, and that the HDT results for 2022, as published in December 2023 was, as set out below, just 41%.
JAA table 2 - Result of 2022 Housing Delivery Test
Area Number of homes required Total number of homes required Number of homes delivered Total number of homes delivered Housing Delivery Test: 2022 measurement Housing Delivery Test: 2022 consequence 2019-20 2020-21 2021- 22 2019-20 2020-21 2021- 22
Rother 363 490 740
1593 247 175 239 661 41% Presumption
2.1.24
We further note that RDC housing delivery has over the past few years been somewhat mixed, with the Council failing to meet their annual housing requirement on a number of occasions, which has led to a deficit that suggests that there has been a record of under delivery that should be addressed by an uplift to the LHN figure.
A Buffer
2.1.25
Given the issues of the affordability and the affordable housing needs of the district identified above, as well as the issue of past underdeliver rates, we feel that at the very least a buffer should be built into the housing requirement for the Plan. Introducing a buffer into the housing requirement would ensure that the Council plans positively for the future in a manner that at least meets the minimum LHN rather than the capped figure, or indeed the ‘capacity’ based figure it currently looks
to deliver. This would in reality also provide an uplift to reflect the acute affordability problem and in turn the rising affordable housing need. Given the time horizon of the plan, the Council should also consider the need for flexibility to be built into the strategy so that it can be resilient to unforeseen changes that may occur during the latter years of the plan period.
2.1.26
To this end, we would stress the need for the SA to not only look at various Spatial Development Strategies, but to express these in the context of overall housing provision and assess not only a strategy that reflects the capped LHN, but both the uncapped LHN and indeed something that falls short of the capped LHN so that the effects of all reasonable alternatives are properly taken into consideration. As currently drafted the SA does not in our opinion adequately addresses the issues raised above or look to address the issue of unmet needs from adjacent authorities – see below.
2.1.27
Having regard to the above we consider a buffer of circa 10% i.e. circa 1,4669 additional dwellings should be added to the capped LHN over the plan period to ensure the Plan proceeds on a robust footing.10
2.2
Unmet Need
2.2.1 We note that the Reg 18 Plan makes no specific reference to the Duty to Cooperate (DtC) with neighbouring authorities over the issue of unmet need, there being no reference to the unmet needs of neighbours either. We also note that whilst the HEDNA recognises the fact that Hastings and Rother, together with their intrinsic sub-areas, comprise a self-contained Housing Market Area and Functional Economic Market Area, it does not comment upon the relationship of the HMA to adjacent HMA’s and their unmet need, there being only passing recognition of the fact that Wealden is within the influence of and overlapped by the Hastings and Rother HMA. Nor is there any commentary on how Rothers reg 18 Plan will look to address the unmet needs of Hastings, despite the joint statement agreed with Hastings BC on p16 of the Reg 18 Plan.
2.2.2
Similarly, whilst the Housing Background Paper advises at para 5.14 that the Council is committed to its duties in relation to the Duty to Co-operate, and in summer 2020 prepared a Duty to Co-operate Action Plan which outlines how and at what stage it intends to engage and consult with organisations on the development of the Local Plan, the Engagement and Duty to Cooperate Statement in commenting upon the engagement to date with Hastings BC, and in particular the matter of housing need, merely says at para 6.11 that ‘ The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 481 for Hastings. Hastings Borough Council made a formal request to Rother District Council on 3rd December 2021, along with requests other authorities, as to whether Rother could accommodate any of Hastings’ residual unmet need.’
2.2.3
This does not confirm the scale of Hastings unmet need, which we understand to be in the region of 5,525 dwellings11 or Rothers response to Hasting’s request, and as such does not suggest active, ongoing, and constructive engagement.
2.2.4
Similarly, in commenting upon engagement with Wealden, para 6.23 of the Engagement and Duty to Cooperate Statement advises that: ‘The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 1,212 for Wealden, however, in
their respective Plans, Rother has set an annual target of between additional 243-343 dwellings per annum, while Wealden sets a per annum target of and additional. Both sets of targets fall short of the need figures derived from the Standard Methodology. At this stage in Plan development, neither district has yet made a request in respect of unmet need.’
2.2.5
As is clear from the above Wealden’s target of 22,800 dwellings has actually been omitted from the document, as has reference to the implications in terms of Wealden’s unmet need of 7,071 dwellings12. .
2.2.6
Not only does the Engagement and Duty to Cooperate Statement fail to address the issue of how this unmet need will be tackled, but also makes it clear that Rother has not yet made a request to surrounding districts in respect of its unmet need, this despite the fact Wealden have for example just completed their reg 18 consultation. Again, this does not suggest active, ongoing, and constructive engagement, or due regard to the implications of the increasing scale of unmet need that is emerging in this part of East Sussex, a matter one would have expected the SA to have regard to in terms of the wider social, economic, and environmental consequences.
2.2.7
The lack of any MoU or SoCG with Hastings BC given their request of 3.1.21 is also of concern, as is the current lack of Mou or SoCG with Wealden DC, albeit we note one is in preparation and will we assume be available for scrutiny at Reg 19.
2.2.8
As the council will be aware, in order to demonstrate that the consultation on strategic cross boundary issues such as housing and unmet needs has been effective, continuous and ongoing, and the requirements of the Duty to Cooperate (DtC) have been addressed in terms of the overall housing requirement, MoU or SoCG will need to be produced and reviewed and updated regularly if they are to be relied upon.
2.2.9
Only through a rigorous approach to the issue of the DtC will the Council be able to demonstrate that its housing requirement is right, and that the spatial strategy is correct in its approach to growth. As things stand, we do not believe there to be sufficient evidence in place to demonstrate the DtC has been complied with, and as such can only conclude that the plan is legally flawed.
Conclusions on the Housing Requirement
2.2.10
Not only are the Council failing to meet their LHN as calculated by reference to the Standard Method i.e. 14,660 dwellings (733 dpa), but the shortfall of 7,374 – 9,502 dwellings is between 50% and 65% of the capped LHN. This is a significant shortfall exacerbated by the fact the LHN is a capped figure, and as the PPG is clear the LHN is only the starting point.
2.2.11
There are a range of factors relevant to the calculation of the housing requirement for the Draft Plan that the Council needs to consider when arriving at its overall housing requirement. These include:
• The inherent lack of affordability and the increasing affordability ratios;
• The poor levels of affordable housing delivery, and attendant increasing need for affordable homes; and • The importance of including a buffer above the LHN to ensure adequate housing delivery particularly given the Council’s historically poor track record of delivery as set out above.
2.2.12
When these factors are properly scrutinised, they demonstrate clear and rational reasons as to why there should be an uplift to the LHN. Having regard to the above Persimmon Homes t believe that at the very least the plan should provide for the uncapped need i.e. 733 dpa to ensure the Plan proceeds on a robust footing. Over a plan period of 1st April 2020 to 31st March 2042 this would equate to some 16,126 dwellings, circa 8,840 - 10,968 dwellings more than the plan is currently looking to provide for.
2.2.13
Setting the housing requirement at this level would significantly improve the affordability situation within the District and would deliver more affordable homes for those members of the community in the most need.
2.2.14
It is clear that the SA has as yet to assess the merits of delivering the LHN in full, a higher figure or indeed a lower one. It is also clear from the Engagement and Duty to Cooperate Statement that the council have yet to fully assess the effects of their neighbours’ unmet needs or to explore through the DtC, whether any of their neighbours could assist.
2.3 Housing Supply
2.3.1. Nowhere in the Reg 18 Plan is there a trajectory setting out how the housing requirement will be met or a rolling five year housing land supply maintained. Thus, in terms of supply all that is available is the information set out within table 34 of the Reg 18 Plan which indicates that the housing supply comprises the following:
Source of housing supply
a
Constructed 1 April 2020 – 31 March 2023
802
b
Known completions and commencements on large sites since 1 April 2023
340
c
With Planning Permission
1,693
d
DaSA & Neighbourhood Plan allocations without permission brought forward
1,660
e
Additional HELAA potential sites
2,129
f
Windfall projection (across the district)
663
Total Range
5,15813- 7,28714
2.3.2 In reviewing the above there is nowhere in the evidence base where one can review and assess the deliverability of those sites with outstanding planning permission that have yet to start on site, allocated sites without permissions or the additional HELLA sites. The councils Housing Land Supply and Housing Trajectory (April 2023 position statement), within its appendices provides details of the following:
•
Delivery by financial year of large site permissions (2,140 of which 1261 are only have outline consent))
•
Delivery by financial year of large sites delegated to approve subject to S106 (555, of which only 2 sites delivering 17 dwellings are for full planning permission, the majority being outline schemes))
•
Delivery by financial year of DaSA allocations (520, of which an appeal for one site for 40 dwellings has been dismissed)) •
Delivery by financial year of Neighbourhood Plan allocations (253 of which sites delivering only 34 are subject to applications)) and
•
Small site permissions (316)
2.3.4 As the above does not tally with the figures in table 34 it is impossible to scrutinise the housing land supply properly and ensure it is truly deliverable. All we can note is that the number of large sites with outline permission only that are due to start delivering in the next 5 years seems rather high, as do the number of large sites with a resolution to grant outline permission subject to S106. We would also ask that the next iteration of the plan the council produce a more detailed evidence base to demonstrate that the proposed commitments will deliver as suggested and that the council can maintain a robust and rolling 5 year housing land supply.
2.3.5 In the context of the above, we would suggest that the Council consider further whether a buffer of say 10% should be applied to those sites with planning permission that have yet to commence to take into account any potential non-delivery/ delay in delivery of the dwellings contained within this category which at 1,693 equates to nearly a third of the supply15. Similarly, the sites contained within the DaSA & Neighbourhood Plan allocations without permission, which equate to a comparable proportion of the total supply. Alternatively, the Council need to undertake a more detailed critique of the proposed commitments to ensure what is being put forward is truly deliverable within the plan period. Either way we believe this would generate the need to find land to accommodate a further 335 dwellings16.
2.3.6. Turning to windfalls, para 5.131 of the reg 18 plan indicates that windfall development forms an important part of the councils housing land supply and that the Council will continue to rely on windfall development as part of its development strategy. To this end table 34 of the Reg 18 Plan reports a figure of 663 windfalls over the plan period, and proposed policy DEV5 suggests a windfall development projection of 39 dwellings per annum for the plan period17. This is however slightly at odds with the findings of Table 3 of the councils Housing Land Supply and Housing Trajectory (April 2023 position statement), which suggests an annual average of 45 windfalls a year. Clearly clarity is required on this, as whilst para 6.9 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) suggests that work is currently underway on producing an updated windfall methodology background paper in support of the new Local Plan, which will reassess the likely contribution from windfall sites in the future, as well as the period over which any allowance should be applied, no such document appears within the evidence base. As the council will be aware, they will, in accordance with para 72 of the NPPF, need to provide compelling evidence that the windfall trajectory is a reliable source of supply, and cannot just rely upon a headline review of past windfall delivery rates without any analysis of expected future trends.
2.3.7 Finally in terms of the additional HELAA potential sites, we note that the HELLA in listing Identified Sites (existing allocations and sites with planning permission), and Potential Sites (Sites are potentially suitable, potentially available and potentially deliverable, subject to further assessment or investigation), discounts an unquantified number of ‘Other Potentially Suitable Sites Where Availability is Unknown’ and Rejected Sites (sites assessed as currently unsuitable/ unavailable/ unachievable), and that it is unclear how releasing some of these sites would come to enabling the council to meet their LHN if the assessment criteria were reviewed/ the sites themselves reassessed in terms of the overall area to be developed/ development capacity were reviewed. Given the scale of the unmet need we would respectfully suggest that no stone should be left unturned in looking to achieve the LHN and that whilst not all of the rejected sites will be acceptable, some may, with further consideration, have been suitable, such that the overall quantum of deliverable sites and thus the plans ‘capacity’ based housing figure could be higher. We would thus recommend that in order to demonstrate the housing supply figure is fully justified the council provide further evidence to this effect at Reg 19.
Conclusions on the Housing Supply
2.3.8 Having reviewed the component parts of the Housing Land Supply as best we can given the lack of available evidence to justify the position set out in table 34 of the Reg 18 Plan, we note that the figures relied upon to meet the Councils proposed ‘capacity’ based housing requirement require:
➢
100% reliance on all current commitments (existing detailed, and outline permissions, as well as sites with a resolution to grant and sites allocated in the DaSA and Neighbourhood Plans). This is not justified and a 10% buffer should be introduced to allow for non-delivery/ slower than expected delivery i.e. circa 335 dwellings.
➢
100% of the proposed housing sites delivering the quantum proposed within the plan period. This is however subject to all of said sites being found acceptable by the Local Plan Inspector/ site promoters confirming the sites can deliver this quantum of development in light of all the other policy requirements set out in the plan, such that a contingency may be sensible.
➢
663 dwellings to come forward as windfalls. The proposed windfall allowance is not based on a credible evidence base and is not justified. At 9 - 13% of the residual requirement, it is a significant part of the overall supply and needs to be reviewed to ensure a realistic approach is adopted at Reg 19.
2.3.9 As a result of the above, we would submit that as the predicted supply is effectively dictating the overall requirements – i.e. we are looking at a ‘capacity’ based housing requirement, the fact there is no flexibility in the proposed supply is of grave concern as in effect the overall supply could be a lot less than predicted unless additional sites are added in to address our concerns about the commitments, and windfalls and help provide a buffer / address the issues of affordability and DtC we have raised above. As it stands the plan would be incapable of accommodating any fluctuations in the market and could leave the council open to speculative applications very early in the plan period. The council’s assessment of potential housing sites in the HELLA and SA needs to be reviewed and no stone left unturned when it comes to identifying sites and addressing perceived constraints. Likewise, the councils rational for the yields they have attributed to the proposed allocations needs to be fully justified as, as we explain below, we do not think they are when the policy requirements set out in the draft plan are properly taken into consideration.
3
The need for a Stepped Trajectory
3.1 We note that para 5.102 of the Reg 18 Plan suggests that the Council would require a considerable step change in housing delivery in order to deliver a significant uplift compared to current and historic delivery rates over the last ten years. Figure 37 then illustrates that over the past 12 years the council have on average delivered 219dpa, albeit in the last two years they have delivered 237 and 390 dpa, respectively. Whilst the LHA at 733dpa would require a sea change in delivery, the current proposition, of a supply led target of 258 – 364dpa is clearly within the realms of that which has been achieved of late – reflecting the indeed, if the trajectory in appendix 7 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) is correct the council are anticipating an average of 544 dpa following over the next 5 years18: whilst this tails off after 28/29, this is because the trajectory is based on existing commitments (permissions and allocations) if, with a new plan in place additional sites were allocated, there is no reason why higher levels of growth could not be sustained longer term. There is thus no justification within the evidence base to support a stepped trajectory. Indeed para 5.102 of the Reg 18 Plan appears to suggest that delivery rates have been significantly impacted by the economic downturn and the effect of the coronavirus pandemic in recent years, such that while a number of current allocated sites have been permitted there have been significant delays in the build out of sites. This does not support a stepped trajectory it merely justifies past performance which with an economic upturn should begin to ensure a more robust and steady supply. Furthermore, as two thirds of the proposed supply is already committed there can be no justification for a stepped trajectory.
4
The Growth Options for Sub Areas
4.1 Whilst having no direct interest in the growth options, we do note that when looking at figure 33 that a considerable amount of the proposed growth, both committed and proposed through the additional sites identified through the HELAA that 46% of the proposed growth is in and around Bexhill, with only 9% being directed towards Battle, only 3.6% to the hastings fringe. Whilst we acknowledge that Bexhill is the least constrained of the main centres, one has to wonder if this is a sustainable approach, especially given the public transport links and level of services available in the likes of Battle and Robertsbridge. Comparing figure 35 of the Reg 18 Plan (the opportunities for housing growth) with Figure 12 of the settlement study (part 1) (Settlement Sustainability Score Table), the level of growth proposed in the Sustainable and Moderately Sustainable settlements seems to be significantly less than that proposed in Bexhill, which whilst it is the only ‘Highly Sustainable’ settlement seems somewhat out of proportion and one has to wonder whether this could lead to market saturation and actually prejudice housing land supply.
5
Development Principles Policies
5.1 We note that DEV2 requires: ‘Planning applications (whether in outline or full format) must relate to an entire development site to ensure a comprehensive approach, including where sites are in multiple ownerships.
When an outline application is submitted, a masterplan defining key parameters for the entire site must be submitted by the applicant to indicate how the overall development of the site can be achieved.’
5.2 Where sites are in multiple ownership, we would suggest that as long as a framework masterplan covering the whole site, and an infrastructure delivery strategy has been agreed, either through the site promoters and the council or via an SPD, there should be nothing to stop one party looking to promote their site in advance. As long as the application reflects the framework masterplan and s106 proceeds in accordance with the infrastructure delivery plan we fail to see how this would prejudice the plan. Indeed, it may well allow sites to proceed more quickly and thus actively assist the council in their housing land supply. 5.3 We note that DEV3 indicates that: ‘Development boundaries define the area within sustainable settlements where development will be permitted, provided it is consistent with this Local Plan.
Priority shall be given to reuse of brownfield sites, in order to make efficient use of previously developed land in sustainable settlements. Some greenfield development will be necessary in order to deliver housing and employment need, but this will be limited to inside development boundaries.’
5.4 Whilst in the first instance we assume the development boundaries will be redrawn to reflect the proposed allocations, we would also suggest that given the shortfall in the housing land supply, that the council should look to have a criterion based policy that enables development immediately adjacent to the limits of built development subject to certain criteria. For example, within Mid Sussex, policy DP6 provides for:
The growth of settlements will be supported where this meets identified local housing, employment, and community needs. Outside defined built-up area boundaries, the expansion of settlements will be supported where:
1. The site is allocated in the District Plan, a Neighbourhood Plan, or subsequent Development Plan Document or where the proposed development is for fewer than 10 dwellings; and
2. The site is contiguous with an existing built up area of the settlement; and
3. The development is demonstrated to be sustainable, including by reference to the settlement hierarchy.
The developer will need to satisfy the Council that:
• The proposal does not represent an underdevelopment of the site with regard to Policy DP26: Character and Design; or
• A large site is not brought forward in phases that individually meet the threshold but cumulatively does not.
5.5 A similar policy approach would we believe be appropriate here and would assist the council in meeting their LHN.
5.6 We note that DEV5 refers to the windfall rate of 39dpa. Given our comments above, this will need to be properly justified within the evidence base for the Reg 19 Plan.
5.7 Turning to DEV6, and the Strategic Green Gaps, the current strategic gap between Bexhill and Hastings should not be seen as a constraint on development on a par with the AONB or any other NPPF footnote 7 constraint, and should not in our opinion be carried over from the current core strategy without first being reviewed to establish if they can accommodate some growth to assist the council in meeting their LHN/ meeting the unmet needs of their neighbours, especially Hastings.
6
Health and Wellbeing Policies
6.1 We note that policy HWB2 requires a HIA to be undertaken on all applications for development of 100 (+) dwellings/ sites of more than 5ha. Whilst Persimmon Homes would agree that HIA are an essential part of plan making to ensure the Council understand the health outcomes of its strategy and is thus able to ensure these are effectively addressed, this should be achieved through the preparation of a whole plan HIA which will help inform the Council that the policies the plan contains address the key health outcomes for the area. As the plan and the policies it contains has been prepared to address the key health issues it is unnecessary for future development proposals that accord with this plan to undertake a separate HIA. If a development meets the policies in the plan, then it is by default addressing the health outcomes already identified by the Council. A HIA as part of the application would merely be repetition of the work the council has already undertaken. The only circumstance where an HIA may be appropriate would be for a larger unallocated site where the impacts may not have been fully considered by the council as part of the plan wide HIA. Policy HWB2 needs to be revised accordingly.
6.2 We also note that criterion 5 of HWB5 requires developments of 300 (+) dwellings to provide playing pitches on site in line with the recommendations of Rother’s Playing Pitch and Built Facilities Strategy and Sport England’s standards. Whilst not opposing this criterion, Persimmon Homes would suggest that the following is added to criterion 5 ‘unless evidence suggests that this is unachievable” as a sites topography may not make this possible/ economies of scale may mean providing / contribution to offsite provision is in certain circumstances preferable; or that this would fetter a developer’s ability to deliver BNG on site as such facilities do not assist in trying to deliver BNG. Indeed, they can actively prejudice it.
7
Infrastructure Policies
7.1 We note that policy INF1 (A) indicates that ‘Where new infrastructure capacity is required, it must be demonstrated that it can be delivered upfront or early in the development phasing.’ As the councils will be aware, the question of the supply of utilities to support development (including residential development) is a matter that is dealt with through separate statutory regimes. Providers such as the water and energy companies are required, among other things, to ensure a supply of services adequate to meet the needs of the plan-led system. As such policy INF41 (A) should not require applicants for planning permission to demonstrate that there is sufficient capacity with regard to provision of utilities such as water and power. Furthermore, when considering other infrastructure requirements, the policy should have regard to the cash flow implications of this criteria and be caveated accordingly.
8 Housing Policies
HOU1 Mixed and Balanced Communities
8.1 In noting the unit mix proposed in policy HOU1, we would in the first instance question the extent to which policy HOU1 should look to be prescriptive on the market housing to be delivered across the district for the whole of the plan period; rather the Council should recognise the need for flexibility, as per the NPPF and PPG, as the fact is the needs of the area may well change over the lifetime of the plan, particularly given the current uncertainty in the housing market, and that different areas will inevitably deliver different forms of housing i.e. apartments within more urban town centre locations and family housing in suburban areas; and that it is the combination of the two that will ultimately address the overall need.
HOU2 Affordable Housing
8.2 We note that no percentage has been provided in this policy to clarify the level of affordable provision to be provided on qualifying sites. We look forward to seeing and being able to comment upon the final requirement at Reg 19. In addition, we note that policy HOU28 also looks to see the affordable units well-integrated and designed to the same high quality to create tenure-neutral and socially inclusive homes and spaces; and that the affordable housing should be apportioned individually or in small clusters and where this is not proposed it should be robustly justified. Whilst we appreciate and support the need to ensure integration and to create more balanced communities, that has to be weighed against the management objectives of the affordable provider, who often find small clusters to be inefficient, such that this requirement needs to provide for those instances where the affordable provider feels a different approach is justified in that particular instance. HOU8 Access Standards
8.3 We note that policy HOU8 requires all new homes to be NDSS, and that as has already been established in the adopted development plan, there is a requirement for all new dwellings in the district to be M4(2) compliant, and 5% of affordable dwellings to meet M4(3)(2)(b) standards where a need exists. In addition, however, policy HOU8 includes a requirement for 5% of new market housing to meet the “wheelchair adaptable dwellings” standard in Part M4(3)(2)(a). Whilst para 8.71 of the plan suggests that these policy expectations are justified by the district’s ageing population and levels of disability, and the need for homes to appropriately meet the demands of occupiers throughout their lifetimes, this is not in our opinion clear and convincing evidence to justify this requirement and as such we would submit that this part of policy HOU8 should be deleted.
HOU9 – Specialist Housing for the Elderly
8.4 We note that policy HOU9 requires all developments of 100 (+) dwellings to set aside at least 10% of the total number of dwellings as specialist housing for older people. It is not clear whether this is in addition to, or as part of, the requirement also being set out in policy HOU8, or whether this could just be bungalows, or buildings that have to have communal areas. As drafted the policy is unclear and thus ineffective. In addition, subject to clarity it could be overly onerous when coupled with other requirements and thus likely to affect a sites viability.
HOU12 Self-Build and Custom Housebuilding
8.5 We note that policy H0U12 requires 5% Self/ Custom-Build Housing on all sites of 20 dwellings (+). Whilst the councils Self-build and Custom Housebuilding (SCHB) Headline Data Report 202319 indicates that as of 30.10.23 there were 197 individuals and 3 associations on the self-build and custom housebuilding register, it is not clear from the evidence base how many plots would be required if the existing commitments were taking into consideration. This needs to be established to ensure the proposed policy is justified and will be effective in meeting the outstanding demand.
8.6 In the context of the above, whilst noting the scale of the demand, we understand that before seeking to require the proposed developments to provide a proportion of the homes delivered as self-build plots the Council will need to examine other opportunities for meeting the needs of those who want to self-build. Under the Self Build & Custom Housebuilding Act 2015 and para 63 of the NPPF (2023), it is the Councils responsibility to ensure that sufficient permissions are given to meet demand. Further detail is provided in paragraph 57-014 of PPG with regard to the Council’s duties and whilst this recognises that it should take account of self-build registers when preparing planning policies, it also outlines that consideration needs to be given by Councils to the disposal of their own assets in order to meet the need for self-build plots or whether self-build could support the regeneration of brownfield sites. A need for self-build plots should not automatically lead to a policy requiring their provision on sites of 20 (+) dwellings. PPG also notes at paragraph 57-025 that local authorities should be encouraging developers and landowners to consider providing plots for self-build and custom house building but makes no reference to requiring their provision. The Government clearly sees the role of the local authority as working to identify opportunities with developers rather than placing responsibility on to the development industry. 8.7 The Council will also need to consider whether it is feasible that all sites of 20 (+) dwellings can deliver self-build plots. Often, especially on the larger sites, there are multiple contractors and large machinery operating on-site, and the development of single plots by individuals operating alongside this construction activity raises both practical and health & safety concerns. Any differential between the lead-in times / build out rates of self & custom build plots and the wider site may lead to construction work outside of specified working hours, building materials stored outside of designated compound areas and unfinished plots next to completed and occupied dwellings, resulting in consumer dissatisfaction. Whilst some sites may be able to locate self-build plots in a manner that reduces these potential risks, on others this will be impossible with developers unable to co-ordinate the provision of self & custom build plots with the development of the wider site. Such concerns must be given full consideration by the Council when preparing any policies on self-build to be included in the Local Plan.
8.8 Having regard to the above we would submit that the requirement to deliver 5% Self/ Custom-Build Housing on all sites of 20 (+) dwellings is likely to deliver very little in the way of tangible benefits, whilst creating significant difficulties for the builders involved. It would be a lot more effective for the Council to identify self-build sites or allocate certain sites to deliver a higher proportion of Self/ Custom-Build Housing.
8.9 Given the above we would suggest that the council review their requirements and are more explicit as to what they want, where and why, as at present policy HOU12 does not look to be properly justified or effective.
9 Green to the Core
GTC1: Net Zero Development Standards
9.1 We note that policy GTC1 requires all residential development to achieve: ‘a) LETI Total Energy Use Intensity (TEUI) Target for Operational Energy of 35 kWh/m2/year (GIA).
b) For new buildings, a 4-star Home Quality Mark (HQM) score; or for conversions to residential development, a Building Research Establishment Environmental Assessment Method (BREEAM)
‘Excellent’ standard as minimum.
c) A maximum space heating demand for new buildings (small scale housing) of 15 kWh/m2 per year.
d) If LETI, Home Quality Mark or BREEAM is updated or replaced during the plan period the equivalent replacement requirements will be applied.
9.2 It goes on to advise that ‘to demonstrate compliance, a Building Research Establishment (BRE) Home Quality Mark post-construction assessment or similar must be undertaken at practical completion.’
9.3 And that in terms of embodied carbon: ‘All new development proposals must demonstrate, through an energy statement, how the following embodied carbon standards will be met:
(i) All residential development must achieve a LETI C rating for embodied carbon emissions, equating to 600 kgCO2/m2 upfront embodied carbon and 970 kgCO2/m2 total embodied carbon.
From 1 January 2030, a LETI A rating must be achieved, equating to 300 kgCO2/m2 upfront embodied carbon and 450 kgCO2/m2 total embodied carbon.’
9.4 Whilst Persimmon Homes support the Government’s approach set out in the Future Homes Standard, we note that the Government have set out a clear roadmap as to how low carbon homes will, alongside the decarbonisation of the national grid, ensure that the Government can meet its commitments to net zero by 2050; and that the way forward being taken by the Government recognises that the improvements in energy efficiency of new homes should be a transition which ensures that new homes continue to come forward to meet housing needs whilst still being sufficiently challenging to significantly reduce the carbon emissions of new homes from 2025. This is set out explicitly in the Written Ministerial Statement of the Minister of State for Housing on the 13th December 2023, when he indicated that:
‘The improvement in standards already in force, alongside the ones which are due in 2025, demonstrates the Government’s commitment to ensuring new properties have a much lower impact on the environment in the future. In this context, the Government does not expect plan-makers to set local energy efficiency standards for buildings that go beyond current or planned buildings regulations. The proliferation of multiple, local standards by local authority area can add further costs to building new homes by adding complexity and undermining economies of scale. Any planning policies that propose local energy efficiency standards for buildings that go beyond current or planned buildings regulation should be rejected at examination if they do not have a well-reasoned and robustly costed rationale that ensures:
That development remains viable, and the impact on housing supply and affordability is considered in accordance with the National Planning Policy Framework.
The additional requirement is expressed as a percentage uplift of a dwelling’s Target Emissions Rate (TER) calculated using a specified version of the Standard Assessment Procedure (SAP).’20
9.5 As the council will be aware, the challenge to the WMS have been dismissed. Given the above, whilst the aspirations in Policy GTC1 are worthy and Persimmon Homes are committed to the delivery of Zero Carbon Homes/ Carbon Neutrality on all their sites, wherever it is practical and viable to do so, there is in our opinion no need for additional standards to be placed on developments through additional Local Plan policies that vary from that required in national government guidance. The plan has to acknowledge the implications of the transitional period and the need for flexibility during this period, in accordance with the aims and objectives of national policy. As such, not only is policy GTC1 overly complex and likely to impact on delivery/ viability, it is also clearly inconsistent with the approach advocated in the WMS. As a result, and having regard to our comments below on the lack of any Viability Assessment to support the reg 18 plan and the associated assessment of the implications of the emerging local plan policy on Net Zero Carbon, we would suggest that Policy GTC1 revert to the requirements set out in Building Regs.
GTC7: Local Nature Recovery Areas
9.6 We note this policy requires all new development to meet the objectives of the East Sussex (including Brighton and Hove) Local Nature Recovery Strategy (LNRS). We do not believe it is inappropriate to require all new development to meet the objectives set out in a document that is not a development plan document. Whilst the council can suggest that development has regard to the LNRS it is not consistent with national policy to require them to meet these objectives. It would also be perverse to require all new developments to adhere to a set of objectives that the council itself only has a duty to have regard to in its decision-making processes. We would therefore recommend that this policy is amended to advise that all new development has regard to the objectives set out in the LNRS
GTC8: Biodiversity Net Gain
9.7 We note that policy GTC8 requires al qualifying development proposals to deliver at least a 20% measurable biodiversity net gain attributable to the development. Whilst there does not appear to be any justification as to why a 20% BNG requirement is needed, such that we would submit the policy is unsound; Persimmon Homes are committed to doing as much as possible to meet the councils’ aspirations and as such would suggest that rather than require development to deliver at least 20% BNG, the Council recognises in policy that the 10% mandatory requirement is a minimum and that they will look favourably on development that seeks to go beyond this figure. If, however, the 20% BNG requirement is retained the council need to set out that where 20% is not deliverable it will seek to negotiate the viable level that can be provided over the 10% minimum required by the Environment Act 2021.
9.8 Such an approach would facilitate an element of flexibility that would take account of the potential implications delivering 20% BNG may have on viability/ overall dwelling numbers and would thus ensure a more effective policy approach, that is consistent with the aims and objectives of national policy as set out in the biodiversity net gain planning practice guidance of 14 February 2024 which at 006 Reference ID: 74-006-2024 states:
‘Plan-makers may seek a higher percentage than the statutory objective of 10% biodiversity net gain, either on an area-wide basis or for specific allocations for development. However, such policies will need to be evidenced including as to local need for a higher percentage, local opportunities for a higher percentage and any impacts on viability for development. Consideration will also need to be given to how the policy will be implemented.’ My emphasis.
9.9 In the context of the above the council need to have regard to the ecological baseline and the difficulties delivering 10% BNG, let alone 20% can have where the baseline is already high, such that offsite credits will be required, the level of which for smaller sites would be financially prohibitive such that the actual capacity of said sites may needs to be revisited. To this end we are aware of anecdotal evidence that suggests that to deliver 20% BNG a sites net to gross will fall from circa 75 to circa 65%, which can as a result impact on its overall development capacity and the councils associated housing land supply.
9.10 Notwithstanding our thoughts on the justification behind the 20% BNG requirements and its associated implications on a site’s development capacity, as well as its viability, there needs to be more in the plan to ensure the provision of a strategic network of sites that can deliver BNG offsite in Rother or within the same national character area (NCA); as whilst important in delivering 10% this is even more important if the Council introduces 20% BNG. At present there is little evidence that there will be sufficient local offsite credits in the short and medium term to support schemes that cannot deliver a 10/ 20% BNG on site. Nor is there any recognition of the fact that by requiring a 20% net gain the council are effectively adding to the pressure on the market for credits as more sites will be required to purchase offsite credits to meet this higher level of BNG. This increases costs and will more than likely delay sites that cannot secure these. Whilst we recognise the fact that there is the option of buying national credits, the cost of these is set well above the market to promote local solutions and will impact significantly on the viability of development meaning many developers will have to wait until local credits are available, which will prejudice the councils rolling 5 year housing land supply position.
10 Landscape Character
10.1 We note that policy LAN2 requires a CAVAT assessment to be submitted with all applications impacting on an individual or groups of trees in order to quantify their public amenity value. This is in our opinion totally unjustified and would question why a standard tree surveys would not suffice in the first instance, with a CAVAT assessment only being required where a tree of particular individual or group value is to be lost. 11 The SA of the Development Strategy
11.1 As set out above we note that the SA in scoring the Development Strategy, at Figures 11 and 12 does not actually comment upon the quantum of development the different options would deliver and how this would relate to the LHN, or indeed address the issue of the unmet needs of neighbours. Given SA objective 8 on housing this is somewhat surprising, as is the fact that no one option appears to have been chosen as the preferred option; albeit SDO3B (Bexhill Greenfield Growth Option 2: with New Multi-modal Transport Corridor) appears to score most favourable, followed by SDO6 (Brownfield Intensification and Redevelopment), which as it would totally fail to meet the LHN seems somewhat perverse, especially when figure 11 scores it as ‘Option supports the objective, or elements of the objective on balance, although effects may be minor’. Surely it would be ‘Option appears to conflict with the objective on balance and may result in minor adverse effects’ or indeed even ‘Potentially significant adverse effects’. Similarly, the scoring of SDO11 (Growth in settlements with train stations or sustainable transport alternatives) in figure 12 seems somewhat odd21 given its based on sustainable transport. To this end we also note that in a number of occasions, SOD4 and SOD5 for instance, growth is said to be resisted by virtue of land availability based on environmental and topographical constraints. Given the scale of unmet need currently proposed we would respectively suggest the council need to do more to establish whether additional land in these areas is available/ could be developed as no stone should be left unturned in trying to meet the LHN. As it stands, the SA lacks the necessary robustness required as it is impossible to assess the impact and weigh benefits and harm of each development strategy without know scale of delivery associated with each option.
11.2 Having regard to the above we feel it’s imperative that if the SA is to be effective the next iteration needs to assess the Development Strategy in the context of the LHN and how the council are to accommodate this/ the implications of not accommodating it/ over delivering to address adjacent authorities’ unmet needs.
12 The Infrastructure Delivery Plan Viability Assessment
12.1 We are surprised to note that whilst an Infrastructure Delivery Plan (IDP) has been produced to support the Reg 18 Plan, as well as an Infrastructure Background Paper, there is no Viability Appraisal (VA) of the plan. Not only does the lack of a VA makes it difficult to comment on the proposed policies, but it also raises questions about the aspirations of the IDP i.e. how these have been tested, and whether they are realistic and deliverable. If the plan is predicated on the aspirations of the IDP then the whole plans approach is also open to debate as how can it be said to be justified and effective if it has not been subject to a robust VA.
13 Conclusions on Reg 18 Plan
13.1 We are concerned that the scale of growth proposed in the overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa, which is significantly less than the capped LHN of 733dpa/ the uncapped LHN of 850 dpa. In our opinion there is no justification for promoting a lower housing target than the capped LHN given the aims and objectives of national government guidance and the affordability issues that exist within the district, that the plan says it wants to address. The scale of the potential shortfall (between 7,286 and 9,502 dwellings over the plan period22) is significant, and will we fear be exacerbated if the predicted supply does not deliver as forecast. Nowhere does the plan, or the evidence base demonstrate how this will be addressed. In addition, it does not appear to have been raised with adjacent authorities through discussions on the DtC. Nor does the plan/ its evidence base demonstrate how the acute levels of unmet housing need that exist within the area are to be addressed through constructive and active engagement so as to meet legal duties imposed by the DtC.
13.2 Similarly we are concerned that no evidence has been provided to demonstrate how the housing requirement will be met or how a rolling five year housing land supply will be achieved. The deliverability of the existing commitments needs to be demonstrated more evidentially than it has to date. Likewise, the evidence needs to be provided to demonstrate that the proposed allocations will deliver the quantum of development suggested when expected; and the plan needs to encompass compelling evidence to support the windfall rates expected rather than rely on historic trends.
13.3 We would also suggest that the plan period needs to be reviewed so that it provides for 15 years from adoption (i.e. till 31st March 2042).
13.4 Turning to the Development Strategy, the justification behind the Development Strategy and the clear preference for concentrating growth in and around Bexhill is not clear, the SA being silent on the quantum of development each Development Strategy could deliver and how the overall strategy related to the LHN.
13.5 In addition to the above we also have specific concerns about policies DEV2 (Comprehensive Development and Masterplanning), DEV3 (Development Boundaries), DEV5 (Development on Small Sites and Windfall), DEV6 (Strategic Green Gaps), HWB 2 (Health Impact Assessments), INF1 (Strategic Infrastructure Requirements), HOU1 (Mixed and Balanced Communities), HOU2 (Affordable Housing), HOU12 (Self-Build and Custom Housebuilding) , GTC1 (Net Zero Building Standards) and GTC8 (Biodiversity Net Gain), all of which we do not believe to be properly justified or consistent with national planning policy guidance as drafted.
In the context of the above we would like to highlight Persimmon Homes desire to work with Rother District Council on progressing a sound plan and that to this end we are happy to meet with officers to discuss our reps on the housing requirement, supply and trajectory and the other policies contained in the Reg 18 Plan/ its supporting evidence base.
Yours sincerely
JUDITH ASHTON
Judith Ashton Associates
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28005
Received: 22/07/2024
Respondent: Persimmon Homes Ltd
Agent: Judith Ashton Associates
There is a need for the plan to deliver the LHN in full/ an uplift to the LHN figure to boost the supply of open market and affordable homes and thus help address the affordable housing needs of the District. Said approach would also reflect on spatial objective 4 (in the Sustainability Appraisal) – to respond to the housing crisis and help facilitate the delivery of housing to meet the needs of different groups in the community, by maximising the potential opportunities for residential development in sustainable and deliverable locations, helping to deliver affordable housing, and ensuring development is viable and supports growth in the district by providing certainty for developers through site allocations and clear planning policies.
I write with reference to the above. I act for Persimmon Homes who have an interest in a sound plan being delivered for Rother.
Having regard thereto, having reviewed the Regulation 18 Draft Local Plan (April 2024), and associated evidence base, especially the Sustainability Appraisal - Interim Report (SA) and associated appendices, Housing and Economic Land Availability Assessment (HELAA), Local Housing and Economic Needs Assessment (HEDNA), Development Strategy Background Paper (DSBP), Housing Background Paper (BP), Settlement Study (SS), and Infrastructure Delivery Plan (IDP), and Viability Assessment and CiL Review (VA); we have the following comments on the Draft Regulation 18 Rother Local Plan (April 2024), and associated evidence base.
1 The Plan Period
1.1 We note that the 2024 LDS suggests adoption of the Local Plan (Regulation 26) in Quarter 3 2026/27. As a result, the plan period advocated in policy SS2 will be less than 15 years from adoption. In order to comply with paragraph 22 of the NPPF, the plan period should we believe start at 1st April 2023 and be extended to 31st March 2042 as this will ensure it looks ahead for a minimum of 15 years from adoption. As a result, additional housing allocations need to be made to help address this additional requirement.
2 The Housing Requirement, Supply and Trajectory
2.1
Local Housing Need, and the Minimum Housing Requirement
2.1.1 We note that the proposed overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa.
2.1.2
Having reviewed the housing requirement against the standard method and the advice in the PPG about the need to consider the application of a cap, we note that adopting the standard methodology, and adjusting the figures to the base date of the local plan and using the latest local affordability ratio, the position is as set out below.
Step 1: Setting the Baseline
Household Projection = 523.41 dwellings per annum
Step 2: Adjustment for
Affordability
Local Affordability Ratio = 13.822
Adjustment Factor = 1.61 𝐴𝑑𝑗𝑢𝑠𝑡𝑚𝑒𝑛𝑡 𝑓𝑎𝑐𝑡𝑜𝑟=(13.82−44) 𝑥 0.25+1
Minimum Local Housing need
523.4
x 1.61 = 842.6
2.1.3
As set out in section 5 of the HEDNA a cap is applied to limit the level of increase, depending upon the stage that the local authority is at with regards to its strategic policies for housing. Where the policies have been adopted within the last 5 years, the LHN figure is capped at 40% above the average annual housing requirement figure as set out in the existing policies. Where the relevant policies were adopted more than 5 years ago (as is the case in Rother), the LHN is capped at 40% above whichever is higher of:
• The average annual projected household growth identified in Step 1; or
• The average annual housing requirement figure as set out in the most recently adopted strategic policies.
Having done this, we note the following:
40% cap
The average annual projected household growth identified in Step 1
523.4
732.7
The average annual housing requirement figure as set out in the most recently adopted strategic policies
3353
469
2.1.4 Given the above the LHN in Rother is reduced from 842 dpa to 733 dpa. That said, while the cap reduces the minimum number generated by the standard method, it does not reduce housing need itself. Therefore, strategic policies adopted with a cap applied may require an early review and updating to ensure that any housing need above the capped level is planned for as soon as is reasonably possible. The PPG is clear that the standard method is a minimum number and that in areas such as Wealden where the cap reduces the local housing need “consideration can still be given to whether a higher level of need could realistically be delivered. This may help prevent authorities from having to undertake an early review of the relevant policies”4. For Rother this would mean considering whether to deliver 842dpa. It is also important to note that the LHN figure is a minimum starting point, and it does not produce the Housing Requirement5.
2.1.5
In the context of the above, we note that the overall spatial development strategy in looking to deliver a minimum of 5,158 to 7,286 dwellings over the plan period is in effect only looking to deliver between 35% and 50% of the capped LHN.
2.1.6
We further note that the HEDNA is clear in the executive summary on both the scale of the LHN (737dpa at the time), and the findings of the housing growth scenario, indicating that there are ‘no exceptional local circumstances’ that would justify deviating from the Standard Method in Rother.
2.1.7
Whilst the inference in the plan is that the level of housing growth that is proposed is supply led (i.e. reflects the level of suitable sites assessed through the HELAA process) and constrained by the High Weald AONB, the Pevensey levels, the Strategic Gaps around Hastings and the SSSI around Rye, this is adopting a policy on approach to a situation that should be policy off.
2.1.8
Thus, not only is it unclear why the plan is not looking to deliver the LHN as identified in the HEDNA, but why it has not also looked at the uncapped need given the issues surrounding the unmet needs of its neighbours (see below). PPG6 identified a number of circumstances where it might be appropriate to plan for a higher housing need figure than the Standard Method indicates. Such circumstances can include:
• Instances where housing need is likely to exceed past trends; and
• Where the authority agrees to address unmet need arising from neighbouring authorities.
2.1.9 The PPG is not exhaustive in its examples as to what may be a sound reason for considering an uplift. Matters such as a high affordability ratio that is following a rising trend, along with significant affordable housing need, and of course the importance of ensuring an adequate buffer to cater for under supply, or instances where the Plan strategy fails to deliver as expected, are all sound reasons for considering an uplift.
2.1.10
In the context of the above we note that the SA in section 5, in reviewing the Spatial Development Strategy Options, does not appear to look at different scales of growth relative to the LHN (both capped and uncapped) or the implications of only delivering the scale of housing proposed, just a variety of different spatial options where the scale of development is unquantified, despite the fact one of the SA objectives is that ‘More opportunities are provided for everyone to be in a suitable home to meet their needs.’ The above belies the evidence base and the various reasons why the council need to meet their LHN / an uplift to the LHN should be considered further, as summarised in the commentary below.
2.1.11 The reasons for uplifting the LHN should be set into two categories, firstly those that indicate an uplift is required for the District itself and secondly any uplift that might arise from meeting unmet need from neighbouring authorities.
Affordability
2.1.12 Rother is an inherently unaffordable place to live as acknowledged at paras 1.15, 8.20 and 8.21 of the Reg 18 Plan which refer to the issues of the significant deterioration in affordability within the district The HEDNA (2024) identifies a significant need for affordable housing in Rother in the Plan period. This is due to a high, and increasing, house-price to earnings (affordability) ratio, meaning that growth in house prices is significantly outstripping growth in wages, and housing is becoming less affordable for people who live, work, and retire within the district.
2.1.13 To this end, we note, when looking at the ONS ‘House Price to Workplace-Based Earnings Ratio - March 2024’ that the ratio of median house price to median gross annual workplace-based earnings by local authority district, England, and Wales, 1997 to 2023 indicates that the ratio of median house price to median gross annual workplace-based earnings in RDC has increased significantly over the past 10 years from 10.53 to 12.847.
2.1.14 The rapid increase in the affordability ratio is clear evidence of the lack of housing delivery that has taken place over the last 10-year period within the District. Failing to deliver the LHN will only increase the rate of decline in affordability. For an improvement in the affordability situation to occur, decisive action is required through the provision of more housing over and above the capped LHN.
2.1.15 The matter of affordability alone clearly indicates that the Council should be planning for more than the capped LHN.
Affordable Housing Need
2.1.16 Linked to the issue of affordability is the significant need for affordable housing identified in the District. A symptom of a rising affordability ratio is the fact that more members of society are priced out of the open market and consequently require affordable housing in one form or another. Again, the Council acknowledges this in the Draft Plan and in the Feb 2024 HEDNA that accompanies the consultation pack.
2.1.17 The HEDNA indicates that the total net annual affordable housing need for the period 2021 to 2044 is 325 dpa, which is equivalent to 44% of the capped LHN figure (based on 733 dpa). Whilst policy HOU2 does not indicate what level of affordable provision the council will be looking to deliver, policy LHN2 of the adopted core strategy looks to deliver 30% affordable housing on sites in Bexhill and Hastings Fringe, and Rye, 35% in Battle and 40% in the rural areas. Even if the Council were to adopt a 40% requirement across the board, this will only be triggered for those sites that meet the qualifying criteria. It is therefore highly unlikely that the affordable housing need will be met. Indeed, given the decreasing trend in terms of affordability set out above, the gross affordable housing need of 325 dpa is highly likely to increase over the plan period, leading to an increase in the net shortfall and in turn a higher number of people in need and on the Council’s housing waiting list.
2.1.18 Whilst the councils latest AMR does not provide any information on affordable housing delivery, we note that the Governments Affordable housing supply statistics (AHS) 2022-23 table 1011C indicates that over the past 10 years RDC only delivered 887 affordable completions. An average of 89 (rounded up) affordable completions per annum, which just 27% of the average annual affordable need of 325 affordable dwellings per annum identified in the HNA. JAA table 1a – Affordable Housing Provision 2013 - 2023
13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 Total
Total affordable dwellings 80 123 103 20 56 60 130 126 15 174
887
2.1.19 Furthermore, whilst if you compare the level of affordable provision against total housing completions over the past 5 years this averages 38.7% of total housing completions, it fluctuates significantly and prior to this was averaging significantly less. JAA table 1b – Affordable Housing Provision as a percentage of overall housing delivery 2016 - 2023
18-19 19-20 20-21 21-22 22-23 Total
Net additional dwellings
255 247 175 237
390
1,304
Total affordable dwellings
60
130
126
15
174
505
% of total
23.5%
52.6%
72%
6.3%
44.6%
38.7%
2.1.20 Given the above, even if one assumes an average of 38%, this suggests that the plan would need to deliver over 8558 dpa to meet the identified affordable housing needs of the District.
2.1.21
Whilst we are not advocating this level of growth, the above demonstrates the need for the plan to deliver the LHN in full/ an uplift to the LHN figure to boost the supply of open market and affordable homes and thus help address the affordable housing needs of the District. Said approach would also reflect on spatial objective 4 – to respond to the housing crisis and help facilitate the delivery of housing to meet the needs of different groups in the community, by maximising the potential opportunities for residential development in sustainable and deliverable locations, helping to deliver affordable housing, and ensuring development is viable and supports growth in the district by providing certainty for developers through site allocations and clear planning policies.
2.1.22
The SA in reviewing the merits of the alternative spatial options appears to have paid little regard to these fundamental points.
Past Under Delivery
2.1.23
We note the Councils Five Year Housing Land Supply Statement – 1 April 2023 (published in December 2023) suggests that the Council is able to demonstrate a 3.09 year housing land supply for the period 01/04/23 to 31/03/28, and that the HDT results for 2022, as published in December 2023 was, as set out below, just 41%.
JAA table 2 - Result of 2022 Housing Delivery Test
Area Number of homes required Total number of homes required Number of homes delivered Total number of homes delivered Housing Delivery Test: 2022 measurement Housing Delivery Test: 2022 consequence 2019-20 2020-21 2021- 22 2019-20 2020-21 2021- 22
Rother 363 490 740
1593 247 175 239 661 41% Presumption
2.1.24
We further note that RDC housing delivery has over the past few years been somewhat mixed, with the Council failing to meet their annual housing requirement on a number of occasions, which has led to a deficit that suggests that there has been a record of under delivery that should be addressed by an uplift to the LHN figure.
A Buffer
2.1.25
Given the issues of the affordability and the affordable housing needs of the district identified above, as well as the issue of past underdeliver rates, we feel that at the very least a buffer should be built into the housing requirement for the Plan. Introducing a buffer into the housing requirement would ensure that the Council plans positively for the future in a manner that at least meets the minimum LHN rather than the capped figure, or indeed the ‘capacity’ based figure it currently looks
to deliver. This would in reality also provide an uplift to reflect the acute affordability problem and in turn the rising affordable housing need. Given the time horizon of the plan, the Council should also consider the need for flexibility to be built into the strategy so that it can be resilient to unforeseen changes that may occur during the latter years of the plan period.
2.1.26
To this end, we would stress the need for the SA to not only look at various Spatial Development Strategies, but to express these in the context of overall housing provision and assess not only a strategy that reflects the capped LHN, but both the uncapped LHN and indeed something that falls short of the capped LHN so that the effects of all reasonable alternatives are properly taken into consideration. As currently drafted the SA does not in our opinion adequately addresses the issues raised above or look to address the issue of unmet needs from adjacent authorities – see below.
2.1.27
Having regard to the above we consider a buffer of circa 10% i.e. circa 1,4669 additional dwellings should be added to the capped LHN over the plan period to ensure the Plan proceeds on a robust footing.10
2.2
Unmet Need
2.2.1 We note that the Reg 18 Plan makes no specific reference to the Duty to Cooperate (DtC) with neighbouring authorities over the issue of unmet need, there being no reference to the unmet needs of neighbours either. We also note that whilst the HEDNA recognises the fact that Hastings and Rother, together with their intrinsic sub-areas, comprise a self-contained Housing Market Area and Functional Economic Market Area, it does not comment upon the relationship of the HMA to adjacent HMA’s and their unmet need, there being only passing recognition of the fact that Wealden is within the influence of and overlapped by the Hastings and Rother HMA. Nor is there any commentary on how Rothers reg 18 Plan will look to address the unmet needs of Hastings, despite the joint statement agreed with Hastings BC on p16 of the Reg 18 Plan.
2.2.2
Similarly, whilst the Housing Background Paper advises at para 5.14 that the Council is committed to its duties in relation to the Duty to Co-operate, and in summer 2020 prepared a Duty to Co-operate Action Plan which outlines how and at what stage it intends to engage and consult with organisations on the development of the Local Plan, the Engagement and Duty to Cooperate Statement in commenting upon the engagement to date with Hastings BC, and in particular the matter of housing need, merely says at para 6.11 that ‘ The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 481 for Hastings. Hastings Borough Council made a formal request to Rother District Council on 3rd December 2021, along with requests other authorities, as to whether Rother could accommodate any of Hastings’ residual unmet need.’
2.2.3
This does not confirm the scale of Hastings unmet need, which we understand to be in the region of 5,525 dwellings11 or Rothers response to Hasting’s request, and as such does not suggest active, ongoing, and constructive engagement.
2.2.4
Similarly, in commenting upon engagement with Wealden, para 6.23 of the Engagement and Duty to Cooperate Statement advises that: ‘The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 1,212 for Wealden, however, in
their respective Plans, Rother has set an annual target of between additional 243-343 dwellings per annum, while Wealden sets a per annum target of and additional. Both sets of targets fall short of the need figures derived from the Standard Methodology. At this stage in Plan development, neither district has yet made a request in respect of unmet need.’
2.2.5
As is clear from the above Wealden’s target of 22,800 dwellings has actually been omitted from the document, as has reference to the implications in terms of Wealden’s unmet need of 7,071 dwellings12. .
2.2.6
Not only does the Engagement and Duty to Cooperate Statement fail to address the issue of how this unmet need will be tackled, but also makes it clear that Rother has not yet made a request to surrounding districts in respect of its unmet need, this despite the fact Wealden have for example just completed their reg 18 consultation. Again, this does not suggest active, ongoing, and constructive engagement, or due regard to the implications of the increasing scale of unmet need that is emerging in this part of East Sussex, a matter one would have expected the SA to have regard to in terms of the wider social, economic, and environmental consequences.
2.2.7
The lack of any MoU or SoCG with Hastings BC given their request of 3.1.21 is also of concern, as is the current lack of Mou or SoCG with Wealden DC, albeit we note one is in preparation and will we assume be available for scrutiny at Reg 19.
2.2.8
As the council will be aware, in order to demonstrate that the consultation on strategic cross boundary issues such as housing and unmet needs has been effective, continuous and ongoing, and the requirements of the Duty to Cooperate (DtC) have been addressed in terms of the overall housing requirement, MoU or SoCG will need to be produced and reviewed and updated regularly if they are to be relied upon.
2.2.9
Only through a rigorous approach to the issue of the DtC will the Council be able to demonstrate that its housing requirement is right, and that the spatial strategy is correct in its approach to growth. As things stand, we do not believe there to be sufficient evidence in place to demonstrate the DtC has been complied with, and as such can only conclude that the plan is legally flawed.
Conclusions on the Housing Requirement
2.2.10
Not only are the Council failing to meet their LHN as calculated by reference to the Standard Method i.e. 14,660 dwellings (733 dpa), but the shortfall of 7,374 – 9,502 dwellings is between 50% and 65% of the capped LHN. This is a significant shortfall exacerbated by the fact the LHN is a capped figure, and as the PPG is clear the LHN is only the starting point.
2.2.11
There are a range of factors relevant to the calculation of the housing requirement for the Draft Plan that the Council needs to consider when arriving at its overall housing requirement. These include:
• The inherent lack of affordability and the increasing affordability ratios;
• The poor levels of affordable housing delivery, and attendant increasing need for affordable homes; and • The importance of including a buffer above the LHN to ensure adequate housing delivery particularly given the Council’s historically poor track record of delivery as set out above.
2.2.12
When these factors are properly scrutinised, they demonstrate clear and rational reasons as to why there should be an uplift to the LHN. Having regard to the above Persimmon Homes t believe that at the very least the plan should provide for the uncapped need i.e. 733 dpa to ensure the Plan proceeds on a robust footing. Over a plan period of 1st April 2020 to 31st March 2042 this would equate to some 16,126 dwellings, circa 8,840 - 10,968 dwellings more than the plan is currently looking to provide for.
2.2.13
Setting the housing requirement at this level would significantly improve the affordability situation within the District and would deliver more affordable homes for those members of the community in the most need.
2.2.14
It is clear that the SA has as yet to assess the merits of delivering the LHN in full, a higher figure or indeed a lower one. It is also clear from the Engagement and Duty to Cooperate Statement that the council have yet to fully assess the effects of their neighbours’ unmet needs or to explore through the DtC, whether any of their neighbours could assist.
2.3 Housing Supply
2.3.1. Nowhere in the Reg 18 Plan is there a trajectory setting out how the housing requirement will be met or a rolling five year housing land supply maintained. Thus, in terms of supply all that is available is the information set out within table 34 of the Reg 18 Plan which indicates that the housing supply comprises the following:
Source of housing supply
a
Constructed 1 April 2020 – 31 March 2023
802
b
Known completions and commencements on large sites since 1 April 2023
340
c
With Planning Permission
1,693
d
DaSA & Neighbourhood Plan allocations without permission brought forward
1,660
e
Additional HELAA potential sites
2,129
f
Windfall projection (across the district)
663
Total Range
5,15813- 7,28714
2.3.2 In reviewing the above there is nowhere in the evidence base where one can review and assess the deliverability of those sites with outstanding planning permission that have yet to start on site, allocated sites without permissions or the additional HELLA sites. The councils Housing Land Supply and Housing Trajectory (April 2023 position statement), within its appendices provides details of the following:
•
Delivery by financial year of large site permissions (2,140 of which 1261 are only have outline consent))
•
Delivery by financial year of large sites delegated to approve subject to S106 (555, of which only 2 sites delivering 17 dwellings are for full planning permission, the majority being outline schemes))
•
Delivery by financial year of DaSA allocations (520, of which an appeal for one site for 40 dwellings has been dismissed)) •
Delivery by financial year of Neighbourhood Plan allocations (253 of which sites delivering only 34 are subject to applications)) and
•
Small site permissions (316)
2.3.4 As the above does not tally with the figures in table 34 it is impossible to scrutinise the housing land supply properly and ensure it is truly deliverable. All we can note is that the number of large sites with outline permission only that are due to start delivering in the next 5 years seems rather high, as do the number of large sites with a resolution to grant outline permission subject to S106. We would also ask that the next iteration of the plan the council produce a more detailed evidence base to demonstrate that the proposed commitments will deliver as suggested and that the council can maintain a robust and rolling 5 year housing land supply.
2.3.5 In the context of the above, we would suggest that the Council consider further whether a buffer of say 10% should be applied to those sites with planning permission that have yet to commence to take into account any potential non-delivery/ delay in delivery of the dwellings contained within this category which at 1,693 equates to nearly a third of the supply15. Similarly, the sites contained within the DaSA & Neighbourhood Plan allocations without permission, which equate to a comparable proportion of the total supply. Alternatively, the Council need to undertake a more detailed critique of the proposed commitments to ensure what is being put forward is truly deliverable within the plan period. Either way we believe this would generate the need to find land to accommodate a further 335 dwellings16.
2.3.6. Turning to windfalls, para 5.131 of the reg 18 plan indicates that windfall development forms an important part of the councils housing land supply and that the Council will continue to rely on windfall development as part of its development strategy. To this end table 34 of the Reg 18 Plan reports a figure of 663 windfalls over the plan period, and proposed policy DEV5 suggests a windfall development projection of 39 dwellings per annum for the plan period17. This is however slightly at odds with the findings of Table 3 of the councils Housing Land Supply and Housing Trajectory (April 2023 position statement), which suggests an annual average of 45 windfalls a year. Clearly clarity is required on this, as whilst para 6.9 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) suggests that work is currently underway on producing an updated windfall methodology background paper in support of the new Local Plan, which will reassess the likely contribution from windfall sites in the future, as well as the period over which any allowance should be applied, no such document appears within the evidence base. As the council will be aware, they will, in accordance with para 72 of the NPPF, need to provide compelling evidence that the windfall trajectory is a reliable source of supply, and cannot just rely upon a headline review of past windfall delivery rates without any analysis of expected future trends.
2.3.7 Finally in terms of the additional HELAA potential sites, we note that the HELLA in listing Identified Sites (existing allocations and sites with planning permission), and Potential Sites (Sites are potentially suitable, potentially available and potentially deliverable, subject to further assessment or investigation), discounts an unquantified number of ‘Other Potentially Suitable Sites Where Availability is Unknown’ and Rejected Sites (sites assessed as currently unsuitable/ unavailable/ unachievable), and that it is unclear how releasing some of these sites would come to enabling the council to meet their LHN if the assessment criteria were reviewed/ the sites themselves reassessed in terms of the overall area to be developed/ development capacity were reviewed. Given the scale of the unmet need we would respectfully suggest that no stone should be left unturned in looking to achieve the LHN and that whilst not all of the rejected sites will be acceptable, some may, with further consideration, have been suitable, such that the overall quantum of deliverable sites and thus the plans ‘capacity’ based housing figure could be higher. We would thus recommend that in order to demonstrate the housing supply figure is fully justified the council provide further evidence to this effect at Reg 19.
Conclusions on the Housing Supply
2.3.8 Having reviewed the component parts of the Housing Land Supply as best we can given the lack of available evidence to justify the position set out in table 34 of the Reg 18 Plan, we note that the figures relied upon to meet the Councils proposed ‘capacity’ based housing requirement require:
➢
100% reliance on all current commitments (existing detailed, and outline permissions, as well as sites with a resolution to grant and sites allocated in the DaSA and Neighbourhood Plans). This is not justified and a 10% buffer should be introduced to allow for non-delivery/ slower than expected delivery i.e. circa 335 dwellings.
➢
100% of the proposed housing sites delivering the quantum proposed within the plan period. This is however subject to all of said sites being found acceptable by the Local Plan Inspector/ site promoters confirming the sites can deliver this quantum of development in light of all the other policy requirements set out in the plan, such that a contingency may be sensible.
➢
663 dwellings to come forward as windfalls. The proposed windfall allowance is not based on a credible evidence base and is not justified. At 9 - 13% of the residual requirement, it is a significant part of the overall supply and needs to be reviewed to ensure a realistic approach is adopted at Reg 19.
2.3.9 As a result of the above, we would submit that as the predicted supply is effectively dictating the overall requirements – i.e. we are looking at a ‘capacity’ based housing requirement, the fact there is no flexibility in the proposed supply is of grave concern as in effect the overall supply could be a lot less than predicted unless additional sites are added in to address our concerns about the commitments, and windfalls and help provide a buffer / address the issues of affordability and DtC we have raised above. As it stands the plan would be incapable of accommodating any fluctuations in the market and could leave the council open to speculative applications very early in the plan period. The council’s assessment of potential housing sites in the HELLA and SA needs to be reviewed and no stone left unturned when it comes to identifying sites and addressing perceived constraints. Likewise, the councils rational for the yields they have attributed to the proposed allocations needs to be fully justified as, as we explain below, we do not think they are when the policy requirements set out in the draft plan are properly taken into consideration.
3
The need for a Stepped Trajectory
3.1 We note that para 5.102 of the Reg 18 Plan suggests that the Council would require a considerable step change in housing delivery in order to deliver a significant uplift compared to current and historic delivery rates over the last ten years. Figure 37 then illustrates that over the past 12 years the council have on average delivered 219dpa, albeit in the last two years they have delivered 237 and 390 dpa, respectively. Whilst the LHA at 733dpa would require a sea change in delivery, the current proposition, of a supply led target of 258 – 364dpa is clearly within the realms of that which has been achieved of late – reflecting the indeed, if the trajectory in appendix 7 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) is correct the council are anticipating an average of 544 dpa following over the next 5 years18: whilst this tails off after 28/29, this is because the trajectory is based on existing commitments (permissions and allocations) if, with a new plan in place additional sites were allocated, there is no reason why higher levels of growth could not be sustained longer term. There is thus no justification within the evidence base to support a stepped trajectory. Indeed para 5.102 of the Reg 18 Plan appears to suggest that delivery rates have been significantly impacted by the economic downturn and the effect of the coronavirus pandemic in recent years, such that while a number of current allocated sites have been permitted there have been significant delays in the build out of sites. This does not support a stepped trajectory it merely justifies past performance which with an economic upturn should begin to ensure a more robust and steady supply. Furthermore, as two thirds of the proposed supply is already committed there can be no justification for a stepped trajectory.
4
The Growth Options for Sub Areas
4.1 Whilst having no direct interest in the growth options, we do note that when looking at figure 33 that a considerable amount of the proposed growth, both committed and proposed through the additional sites identified through the HELAA that 46% of the proposed growth is in and around Bexhill, with only 9% being directed towards Battle, only 3.6% to the hastings fringe. Whilst we acknowledge that Bexhill is the least constrained of the main centres, one has to wonder if this is a sustainable approach, especially given the public transport links and level of services available in the likes of Battle and Robertsbridge. Comparing figure 35 of the Reg 18 Plan (the opportunities for housing growth) with Figure 12 of the settlement study (part 1) (Settlement Sustainability Score Table), the level of growth proposed in the Sustainable and Moderately Sustainable settlements seems to be significantly less than that proposed in Bexhill, which whilst it is the only ‘Highly Sustainable’ settlement seems somewhat out of proportion and one has to wonder whether this could lead to market saturation and actually prejudice housing land supply.
5
Development Principles Policies
5.1 We note that DEV2 requires: ‘Planning applications (whether in outline or full format) must relate to an entire development site to ensure a comprehensive approach, including where sites are in multiple ownerships.
When an outline application is submitted, a masterplan defining key parameters for the entire site must be submitted by the applicant to indicate how the overall development of the site can be achieved.’
5.2 Where sites are in multiple ownership, we would suggest that as long as a framework masterplan covering the whole site, and an infrastructure delivery strategy has been agreed, either through the site promoters and the council or via an SPD, there should be nothing to stop one party looking to promote their site in advance. As long as the application reflects the framework masterplan and s106 proceeds in accordance with the infrastructure delivery plan we fail to see how this would prejudice the plan. Indeed, it may well allow sites to proceed more quickly and thus actively assist the council in their housing land supply. 5.3 We note that DEV3 indicates that: ‘Development boundaries define the area within sustainable settlements where development will be permitted, provided it is consistent with this Local Plan.
Priority shall be given to reuse of brownfield sites, in order to make efficient use of previously developed land in sustainable settlements. Some greenfield development will be necessary in order to deliver housing and employment need, but this will be limited to inside development boundaries.’
5.4 Whilst in the first instance we assume the development boundaries will be redrawn to reflect the proposed allocations, we would also suggest that given the shortfall in the housing land supply, that the council should look to have a criterion based policy that enables development immediately adjacent to the limits of built development subject to certain criteria. For example, within Mid Sussex, policy DP6 provides for:
The growth of settlements will be supported where this meets identified local housing, employment, and community needs. Outside defined built-up area boundaries, the expansion of settlements will be supported where:
1. The site is allocated in the District Plan, a Neighbourhood Plan, or subsequent Development Plan Document or where the proposed development is for fewer than 10 dwellings; and
2. The site is contiguous with an existing built up area of the settlement; and
3. The development is demonstrated to be sustainable, including by reference to the settlement hierarchy.
The developer will need to satisfy the Council that:
• The proposal does not represent an underdevelopment of the site with regard to Policy DP26: Character and Design; or
• A large site is not brought forward in phases that individually meet the threshold but cumulatively does not.
5.5 A similar policy approach would we believe be appropriate here and would assist the council in meeting their LHN.
5.6 We note that DEV5 refers to the windfall rate of 39dpa. Given our comments above, this will need to be properly justified within the evidence base for the Reg 19 Plan.
5.7 Turning to DEV6, and the Strategic Green Gaps, the current strategic gap between Bexhill and Hastings should not be seen as a constraint on development on a par with the AONB or any other NPPF footnote 7 constraint, and should not in our opinion be carried over from the current core strategy without first being reviewed to establish if they can accommodate some growth to assist the council in meeting their LHN/ meeting the unmet needs of their neighbours, especially Hastings.
6
Health and Wellbeing Policies
6.1 We note that policy HWB2 requires a HIA to be undertaken on all applications for development of 100 (+) dwellings/ sites of more than 5ha. Whilst Persimmon Homes would agree that HIA are an essential part of plan making to ensure the Council understand the health outcomes of its strategy and is thus able to ensure these are effectively addressed, this should be achieved through the preparation of a whole plan HIA which will help inform the Council that the policies the plan contains address the key health outcomes for the area. As the plan and the policies it contains has been prepared to address the key health issues it is unnecessary for future development proposals that accord with this plan to undertake a separate HIA. If a development meets the policies in the plan, then it is by default addressing the health outcomes already identified by the Council. A HIA as part of the application would merely be repetition of the work the council has already undertaken. The only circumstance where an HIA may be appropriate would be for a larger unallocated site where the impacts may not have been fully considered by the council as part of the plan wide HIA. Policy HWB2 needs to be revised accordingly.
6.2 We also note that criterion 5 of HWB5 requires developments of 300 (+) dwellings to provide playing pitches on site in line with the recommendations of Rother’s Playing Pitch and Built Facilities Strategy and Sport England’s standards. Whilst not opposing this criterion, Persimmon Homes would suggest that the following is added to criterion 5 ‘unless evidence suggests that this is unachievable” as a sites topography may not make this possible/ economies of scale may mean providing / contribution to offsite provision is in certain circumstances preferable; or that this would fetter a developer’s ability to deliver BNG on site as such facilities do not assist in trying to deliver BNG. Indeed, they can actively prejudice it.
7
Infrastructure Policies
7.1 We note that policy INF1 (A) indicates that ‘Where new infrastructure capacity is required, it must be demonstrated that it can be delivered upfront or early in the development phasing.’ As the councils will be aware, the question of the supply of utilities to support development (including residential development) is a matter that is dealt with through separate statutory regimes. Providers such as the water and energy companies are required, among other things, to ensure a supply of services adequate to meet the needs of the plan-led system. As such policy INF41 (A) should not require applicants for planning permission to demonstrate that there is sufficient capacity with regard to provision of utilities such as water and power. Furthermore, when considering other infrastructure requirements, the policy should have regard to the cash flow implications of this criteria and be caveated accordingly.
8 Housing Policies
HOU1 Mixed and Balanced Communities
8.1 In noting the unit mix proposed in policy HOU1, we would in the first instance question the extent to which policy HOU1 should look to be prescriptive on the market housing to be delivered across the district for the whole of the plan period; rather the Council should recognise the need for flexibility, as per the NPPF and PPG, as the fact is the needs of the area may well change over the lifetime of the plan, particularly given the current uncertainty in the housing market, and that different areas will inevitably deliver different forms of housing i.e. apartments within more urban town centre locations and family housing in suburban areas; and that it is the combination of the two that will ultimately address the overall need.
HOU2 Affordable Housing
8.2 We note that no percentage has been provided in this policy to clarify the level of affordable provision to be provided on qualifying sites. We look forward to seeing and being able to comment upon the final requirement at Reg 19. In addition, we note that policy HOU28 also looks to see the affordable units well-integrated and designed to the same high quality to create tenure-neutral and socially inclusive homes and spaces; and that the affordable housing should be apportioned individually or in small clusters and where this is not proposed it should be robustly justified. Whilst we appreciate and support the need to ensure integration and to create more balanced communities, that has to be weighed against the management objectives of the affordable provider, who often find small clusters to be inefficient, such that this requirement needs to provide for those instances where the affordable provider feels a different approach is justified in that particular instance. HOU8 Access Standards
8.3 We note that policy HOU8 requires all new homes to be NDSS, and that as has already been established in the adopted development plan, there is a requirement for all new dwellings in the district to be M4(2) compliant, and 5% of affordable dwellings to meet M4(3)(2)(b) standards where a need exists. In addition, however, policy HOU8 includes a requirement for 5% of new market housing to meet the “wheelchair adaptable dwellings” standard in Part M4(3)(2)(a). Whilst para 8.71 of the plan suggests that these policy expectations are justified by the district’s ageing population and levels of disability, and the need for homes to appropriately meet the demands of occupiers throughout their lifetimes, this is not in our opinion clear and convincing evidence to justify this requirement and as such we would submit that this part of policy HOU8 should be deleted.
HOU9 – Specialist Housing for the Elderly
8.4 We note that policy HOU9 requires all developments of 100 (+) dwellings to set aside at least 10% of the total number of dwellings as specialist housing for older people. It is not clear whether this is in addition to, or as part of, the requirement also being set out in policy HOU8, or whether this could just be bungalows, or buildings that have to have communal areas. As drafted the policy is unclear and thus ineffective. In addition, subject to clarity it could be overly onerous when coupled with other requirements and thus likely to affect a sites viability.
HOU12 Self-Build and Custom Housebuilding
8.5 We note that policy H0U12 requires 5% Self/ Custom-Build Housing on all sites of 20 dwellings (+). Whilst the councils Self-build and Custom Housebuilding (SCHB) Headline Data Report 202319 indicates that as of 30.10.23 there were 197 individuals and 3 associations on the self-build and custom housebuilding register, it is not clear from the evidence base how many plots would be required if the existing commitments were taking into consideration. This needs to be established to ensure the proposed policy is justified and will be effective in meeting the outstanding demand.
8.6 In the context of the above, whilst noting the scale of the demand, we understand that before seeking to require the proposed developments to provide a proportion of the homes delivered as self-build plots the Council will need to examine other opportunities for meeting the needs of those who want to self-build. Under the Self Build & Custom Housebuilding Act 2015 and para 63 of the NPPF (2023), it is the Councils responsibility to ensure that sufficient permissions are given to meet demand. Further detail is provided in paragraph 57-014 of PPG with regard to the Council’s duties and whilst this recognises that it should take account of self-build registers when preparing planning policies, it also outlines that consideration needs to be given by Councils to the disposal of their own assets in order to meet the need for self-build plots or whether self-build could support the regeneration of brownfield sites. A need for self-build plots should not automatically lead to a policy requiring their provision on sites of 20 (+) dwellings. PPG also notes at paragraph 57-025 that local authorities should be encouraging developers and landowners to consider providing plots for self-build and custom house building but makes no reference to requiring their provision. The Government clearly sees the role of the local authority as working to identify opportunities with developers rather than placing responsibility on to the development industry. 8.7 The Council will also need to consider whether it is feasible that all sites of 20 (+) dwellings can deliver self-build plots. Often, especially on the larger sites, there are multiple contractors and large machinery operating on-site, and the development of single plots by individuals operating alongside this construction activity raises both practical and health & safety concerns. Any differential between the lead-in times / build out rates of self & custom build plots and the wider site may lead to construction work outside of specified working hours, building materials stored outside of designated compound areas and unfinished plots next to completed and occupied dwellings, resulting in consumer dissatisfaction. Whilst some sites may be able to locate self-build plots in a manner that reduces these potential risks, on others this will be impossible with developers unable to co-ordinate the provision of self & custom build plots with the development of the wider site. Such concerns must be given full consideration by the Council when preparing any policies on self-build to be included in the Local Plan.
8.8 Having regard to the above we would submit that the requirement to deliver 5% Self/ Custom-Build Housing on all sites of 20 (+) dwellings is likely to deliver very little in the way of tangible benefits, whilst creating significant difficulties for the builders involved. It would be a lot more effective for the Council to identify self-build sites or allocate certain sites to deliver a higher proportion of Self/ Custom-Build Housing.
8.9 Given the above we would suggest that the council review their requirements and are more explicit as to what they want, where and why, as at present policy HOU12 does not look to be properly justified or effective.
9 Green to the Core
GTC1: Net Zero Development Standards
9.1 We note that policy GTC1 requires all residential development to achieve: ‘a) LETI Total Energy Use Intensity (TEUI) Target for Operational Energy of 35 kWh/m2/year (GIA).
b) For new buildings, a 4-star Home Quality Mark (HQM) score; or for conversions to residential development, a Building Research Establishment Environmental Assessment Method (BREEAM)
‘Excellent’ standard as minimum.
c) A maximum space heating demand for new buildings (small scale housing) of 15 kWh/m2 per year.
d) If LETI, Home Quality Mark or BREEAM is updated or replaced during the plan period the equivalent replacement requirements will be applied.
9.2 It goes on to advise that ‘to demonstrate compliance, a Building Research Establishment (BRE) Home Quality Mark post-construction assessment or similar must be undertaken at practical completion.’
9.3 And that in terms of embodied carbon: ‘All new development proposals must demonstrate, through an energy statement, how the following embodied carbon standards will be met:
(i) All residential development must achieve a LETI C rating for embodied carbon emissions, equating to 600 kgCO2/m2 upfront embodied carbon and 970 kgCO2/m2 total embodied carbon.
From 1 January 2030, a LETI A rating must be achieved, equating to 300 kgCO2/m2 upfront embodied carbon and 450 kgCO2/m2 total embodied carbon.’
9.4 Whilst Persimmon Homes support the Government’s approach set out in the Future Homes Standard, we note that the Government have set out a clear roadmap as to how low carbon homes will, alongside the decarbonisation of the national grid, ensure that the Government can meet its commitments to net zero by 2050; and that the way forward being taken by the Government recognises that the improvements in energy efficiency of new homes should be a transition which ensures that new homes continue to come forward to meet housing needs whilst still being sufficiently challenging to significantly reduce the carbon emissions of new homes from 2025. This is set out explicitly in the Written Ministerial Statement of the Minister of State for Housing on the 13th December 2023, when he indicated that:
‘The improvement in standards already in force, alongside the ones which are due in 2025, demonstrates the Government’s commitment to ensuring new properties have a much lower impact on the environment in the future. In this context, the Government does not expect plan-makers to set local energy efficiency standards for buildings that go beyond current or planned buildings regulations. The proliferation of multiple, local standards by local authority area can add further costs to building new homes by adding complexity and undermining economies of scale. Any planning policies that propose local energy efficiency standards for buildings that go beyond current or planned buildings regulation should be rejected at examination if they do not have a well-reasoned and robustly costed rationale that ensures:
That development remains viable, and the impact on housing supply and affordability is considered in accordance with the National Planning Policy Framework.
The additional requirement is expressed as a percentage uplift of a dwelling’s Target Emissions Rate (TER) calculated using a specified version of the Standard Assessment Procedure (SAP).’20
9.5 As the council will be aware, the challenge to the WMS have been dismissed. Given the above, whilst the aspirations in Policy GTC1 are worthy and Persimmon Homes are committed to the delivery of Zero Carbon Homes/ Carbon Neutrality on all their sites, wherever it is practical and viable to do so, there is in our opinion no need for additional standards to be placed on developments through additional Local Plan policies that vary from that required in national government guidance. The plan has to acknowledge the implications of the transitional period and the need for flexibility during this period, in accordance with the aims and objectives of national policy. As such, not only is policy GTC1 overly complex and likely to impact on delivery/ viability, it is also clearly inconsistent with the approach advocated in the WMS. As a result, and having regard to our comments below on the lack of any Viability Assessment to support the reg 18 plan and the associated assessment of the implications of the emerging local plan policy on Net Zero Carbon, we would suggest that Policy GTC1 revert to the requirements set out in Building Regs.
GTC7: Local Nature Recovery Areas
9.6 We note this policy requires all new development to meet the objectives of the East Sussex (including Brighton and Hove) Local Nature Recovery Strategy (LNRS). We do not believe it is inappropriate to require all new development to meet the objectives set out in a document that is not a development plan document. Whilst the council can suggest that development has regard to the LNRS it is not consistent with national policy to require them to meet these objectives. It would also be perverse to require all new developments to adhere to a set of objectives that the council itself only has a duty to have regard to in its decision-making processes. We would therefore recommend that this policy is amended to advise that all new development has regard to the objectives set out in the LNRS
GTC8: Biodiversity Net Gain
9.7 We note that policy GTC8 requires al qualifying development proposals to deliver at least a 20% measurable biodiversity net gain attributable to the development. Whilst there does not appear to be any justification as to why a 20% BNG requirement is needed, such that we would submit the policy is unsound; Persimmon Homes are committed to doing as much as possible to meet the councils’ aspirations and as such would suggest that rather than require development to deliver at least 20% BNG, the Council recognises in policy that the 10% mandatory requirement is a minimum and that they will look favourably on development that seeks to go beyond this figure. If, however, the 20% BNG requirement is retained the council need to set out that where 20% is not deliverable it will seek to negotiate the viable level that can be provided over the 10% minimum required by the Environment Act 2021.
9.8 Such an approach would facilitate an element of flexibility that would take account of the potential implications delivering 20% BNG may have on viability/ overall dwelling numbers and would thus ensure a more effective policy approach, that is consistent with the aims and objectives of national policy as set out in the biodiversity net gain planning practice guidance of 14 February 2024 which at 006 Reference ID: 74-006-2024 states:
‘Plan-makers may seek a higher percentage than the statutory objective of 10% biodiversity net gain, either on an area-wide basis or for specific allocations for development. However, such policies will need to be evidenced including as to local need for a higher percentage, local opportunities for a higher percentage and any impacts on viability for development. Consideration will also need to be given to how the policy will be implemented.’ My emphasis.
9.9 In the context of the above the council need to have regard to the ecological baseline and the difficulties delivering 10% BNG, let alone 20% can have where the baseline is already high, such that offsite credits will be required, the level of which for smaller sites would be financially prohibitive such that the actual capacity of said sites may needs to be revisited. To this end we are aware of anecdotal evidence that suggests that to deliver 20% BNG a sites net to gross will fall from circa 75 to circa 65%, which can as a result impact on its overall development capacity and the councils associated housing land supply.
9.10 Notwithstanding our thoughts on the justification behind the 20% BNG requirements and its associated implications on a site’s development capacity, as well as its viability, there needs to be more in the plan to ensure the provision of a strategic network of sites that can deliver BNG offsite in Rother or within the same national character area (NCA); as whilst important in delivering 10% this is even more important if the Council introduces 20% BNG. At present there is little evidence that there will be sufficient local offsite credits in the short and medium term to support schemes that cannot deliver a 10/ 20% BNG on site. Nor is there any recognition of the fact that by requiring a 20% net gain the council are effectively adding to the pressure on the market for credits as more sites will be required to purchase offsite credits to meet this higher level of BNG. This increases costs and will more than likely delay sites that cannot secure these. Whilst we recognise the fact that there is the option of buying national credits, the cost of these is set well above the market to promote local solutions and will impact significantly on the viability of development meaning many developers will have to wait until local credits are available, which will prejudice the councils rolling 5 year housing land supply position.
10 Landscape Character
10.1 We note that policy LAN2 requires a CAVAT assessment to be submitted with all applications impacting on an individual or groups of trees in order to quantify their public amenity value. This is in our opinion totally unjustified and would question why a standard tree surveys would not suffice in the first instance, with a CAVAT assessment only being required where a tree of particular individual or group value is to be lost. 11 The SA of the Development Strategy
11.1 As set out above we note that the SA in scoring the Development Strategy, at Figures 11 and 12 does not actually comment upon the quantum of development the different options would deliver and how this would relate to the LHN, or indeed address the issue of the unmet needs of neighbours. Given SA objective 8 on housing this is somewhat surprising, as is the fact that no one option appears to have been chosen as the preferred option; albeit SDO3B (Bexhill Greenfield Growth Option 2: with New Multi-modal Transport Corridor) appears to score most favourable, followed by SDO6 (Brownfield Intensification and Redevelopment), which as it would totally fail to meet the LHN seems somewhat perverse, especially when figure 11 scores it as ‘Option supports the objective, or elements of the objective on balance, although effects may be minor’. Surely it would be ‘Option appears to conflict with the objective on balance and may result in minor adverse effects’ or indeed even ‘Potentially significant adverse effects’. Similarly, the scoring of SDO11 (Growth in settlements with train stations or sustainable transport alternatives) in figure 12 seems somewhat odd21 given its based on sustainable transport. To this end we also note that in a number of occasions, SOD4 and SOD5 for instance, growth is said to be resisted by virtue of land availability based on environmental and topographical constraints. Given the scale of unmet need currently proposed we would respectively suggest the council need to do more to establish whether additional land in these areas is available/ could be developed as no stone should be left unturned in trying to meet the LHN. As it stands, the SA lacks the necessary robustness required as it is impossible to assess the impact and weigh benefits and harm of each development strategy without know scale of delivery associated with each option.
11.2 Having regard to the above we feel it’s imperative that if the SA is to be effective the next iteration needs to assess the Development Strategy in the context of the LHN and how the council are to accommodate this/ the implications of not accommodating it/ over delivering to address adjacent authorities’ unmet needs.
12 The Infrastructure Delivery Plan Viability Assessment
12.1 We are surprised to note that whilst an Infrastructure Delivery Plan (IDP) has been produced to support the Reg 18 Plan, as well as an Infrastructure Background Paper, there is no Viability Appraisal (VA) of the plan. Not only does the lack of a VA makes it difficult to comment on the proposed policies, but it also raises questions about the aspirations of the IDP i.e. how these have been tested, and whether they are realistic and deliverable. If the plan is predicated on the aspirations of the IDP then the whole plans approach is also open to debate as how can it be said to be justified and effective if it has not been subject to a robust VA.
13 Conclusions on Reg 18 Plan
13.1 We are concerned that the scale of growth proposed in the overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa, which is significantly less than the capped LHN of 733dpa/ the uncapped LHN of 850 dpa. In our opinion there is no justification for promoting a lower housing target than the capped LHN given the aims and objectives of national government guidance and the affordability issues that exist within the district, that the plan says it wants to address. The scale of the potential shortfall (between 7,286 and 9,502 dwellings over the plan period22) is significant, and will we fear be exacerbated if the predicted supply does not deliver as forecast. Nowhere does the plan, or the evidence base demonstrate how this will be addressed. In addition, it does not appear to have been raised with adjacent authorities through discussions on the DtC. Nor does the plan/ its evidence base demonstrate how the acute levels of unmet housing need that exist within the area are to be addressed through constructive and active engagement so as to meet legal duties imposed by the DtC.
13.2 Similarly we are concerned that no evidence has been provided to demonstrate how the housing requirement will be met or how a rolling five year housing land supply will be achieved. The deliverability of the existing commitments needs to be demonstrated more evidentially than it has to date. Likewise, the evidence needs to be provided to demonstrate that the proposed allocations will deliver the quantum of development suggested when expected; and the plan needs to encompass compelling evidence to support the windfall rates expected rather than rely on historic trends.
13.3 We would also suggest that the plan period needs to be reviewed so that it provides for 15 years from adoption (i.e. till 31st March 2042).
13.4 Turning to the Development Strategy, the justification behind the Development Strategy and the clear preference for concentrating growth in and around Bexhill is not clear, the SA being silent on the quantum of development each Development Strategy could deliver and how the overall strategy related to the LHN.
13.5 In addition to the above we also have specific concerns about policies DEV2 (Comprehensive Development and Masterplanning), DEV3 (Development Boundaries), DEV5 (Development on Small Sites and Windfall), DEV6 (Strategic Green Gaps), HWB 2 (Health Impact Assessments), INF1 (Strategic Infrastructure Requirements), HOU1 (Mixed and Balanced Communities), HOU2 (Affordable Housing), HOU12 (Self-Build and Custom Housebuilding) , GTC1 (Net Zero Building Standards) and GTC8 (Biodiversity Net Gain), all of which we do not believe to be properly justified or consistent with national planning policy guidance as drafted.
In the context of the above we would like to highlight Persimmon Homes desire to work with Rother District Council on progressing a sound plan and that to this end we are happy to meet with officers to discuss our reps on the housing requirement, supply and trajectory and the other policies contained in the Reg 18 Plan/ its supporting evidence base.
Yours sincerely
JUDITH ASHTON
Judith Ashton Associates
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28006
Received: 22/07/2024
Respondent: Persimmon Homes Ltd
Agent: Judith Ashton Associates
Given the issues of the affordability and the affordable housing needs of the district, as well as the issue of past underdeliver rates, we feel that at the very least a buffer should be built into the housing requirement for the Plan. Introducing a buffer into the housing requirement would ensure that the Council plans positively for the future in a manner that at least meets the minimum LHN rather than the capped figure, or indeed the ‘capacity’ based figure it currently looks to deliver. The Council should also build flexibility into the strategy so that it can be resilient to unforeseen changes that may occur during the latter years of the plan period. We consider a buffer of circa 10% i.e. circa 1,4669 additional dwellings should be added to the capped LHN over the plan period to ensure the Plan proceeds on a robust footing.
I write with reference to the above. I act for Persimmon Homes who have an interest in a sound plan being delivered for Rother.
Having regard thereto, having reviewed the Regulation 18 Draft Local Plan (April 2024), and associated evidence base, especially the Sustainability Appraisal - Interim Report (SA) and associated appendices, Housing and Economic Land Availability Assessment (HELAA), Local Housing and Economic Needs Assessment (HEDNA), Development Strategy Background Paper (DSBP), Housing Background Paper (BP), Settlement Study (SS), and Infrastructure Delivery Plan (IDP), and Viability Assessment and CiL Review (VA); we have the following comments on the Draft Regulation 18 Rother Local Plan (April 2024), and associated evidence base.
1 The Plan Period
1.1 We note that the 2024 LDS suggests adoption of the Local Plan (Regulation 26) in Quarter 3 2026/27. As a result, the plan period advocated in policy SS2 will be less than 15 years from adoption. In order to comply with paragraph 22 of the NPPF, the plan period should we believe start at 1st April 2023 and be extended to 31st March 2042 as this will ensure it looks ahead for a minimum of 15 years from adoption. As a result, additional housing allocations need to be made to help address this additional requirement.
2 The Housing Requirement, Supply and Trajectory
2.1
Local Housing Need, and the Minimum Housing Requirement
2.1.1 We note that the proposed overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa.
2.1.2
Having reviewed the housing requirement against the standard method and the advice in the PPG about the need to consider the application of a cap, we note that adopting the standard methodology, and adjusting the figures to the base date of the local plan and using the latest local affordability ratio, the position is as set out below.
Step 1: Setting the Baseline
Household Projection = 523.41 dwellings per annum
Step 2: Adjustment for
Affordability
Local Affordability Ratio = 13.822
Adjustment Factor = 1.61 𝐴𝑑𝑗𝑢𝑠𝑡𝑚𝑒𝑛𝑡 𝑓𝑎𝑐𝑡𝑜𝑟=(13.82−44) 𝑥 0.25+1
Minimum Local Housing need
523.4
x 1.61 = 842.6
2.1.3
As set out in section 5 of the HEDNA a cap is applied to limit the level of increase, depending upon the stage that the local authority is at with regards to its strategic policies for housing. Where the policies have been adopted within the last 5 years, the LHN figure is capped at 40% above the average annual housing requirement figure as set out in the existing policies. Where the relevant policies were adopted more than 5 years ago (as is the case in Rother), the LHN is capped at 40% above whichever is higher of:
• The average annual projected household growth identified in Step 1; or
• The average annual housing requirement figure as set out in the most recently adopted strategic policies.
Having done this, we note the following:
40% cap
The average annual projected household growth identified in Step 1
523.4
732.7
The average annual housing requirement figure as set out in the most recently adopted strategic policies
3353
469
2.1.4 Given the above the LHN in Rother is reduced from 842 dpa to 733 dpa. That said, while the cap reduces the minimum number generated by the standard method, it does not reduce housing need itself. Therefore, strategic policies adopted with a cap applied may require an early review and updating to ensure that any housing need above the capped level is planned for as soon as is reasonably possible. The PPG is clear that the standard method is a minimum number and that in areas such as Wealden where the cap reduces the local housing need “consideration can still be given to whether a higher level of need could realistically be delivered. This may help prevent authorities from having to undertake an early review of the relevant policies”4. For Rother this would mean considering whether to deliver 842dpa. It is also important to note that the LHN figure is a minimum starting point, and it does not produce the Housing Requirement5.
2.1.5
In the context of the above, we note that the overall spatial development strategy in looking to deliver a minimum of 5,158 to 7,286 dwellings over the plan period is in effect only looking to deliver between 35% and 50% of the capped LHN.
2.1.6
We further note that the HEDNA is clear in the executive summary on both the scale of the LHN (737dpa at the time), and the findings of the housing growth scenario, indicating that there are ‘no exceptional local circumstances’ that would justify deviating from the Standard Method in Rother.
2.1.7
Whilst the inference in the plan is that the level of housing growth that is proposed is supply led (i.e. reflects the level of suitable sites assessed through the HELAA process) and constrained by the High Weald AONB, the Pevensey levels, the Strategic Gaps around Hastings and the SSSI around Rye, this is adopting a policy on approach to a situation that should be policy off.
2.1.8
Thus, not only is it unclear why the plan is not looking to deliver the LHN as identified in the HEDNA, but why it has not also looked at the uncapped need given the issues surrounding the unmet needs of its neighbours (see below). PPG6 identified a number of circumstances where it might be appropriate to plan for a higher housing need figure than the Standard Method indicates. Such circumstances can include:
• Instances where housing need is likely to exceed past trends; and
• Where the authority agrees to address unmet need arising from neighbouring authorities.
2.1.9 The PPG is not exhaustive in its examples as to what may be a sound reason for considering an uplift. Matters such as a high affordability ratio that is following a rising trend, along with significant affordable housing need, and of course the importance of ensuring an adequate buffer to cater for under supply, or instances where the Plan strategy fails to deliver as expected, are all sound reasons for considering an uplift.
2.1.10
In the context of the above we note that the SA in section 5, in reviewing the Spatial Development Strategy Options, does not appear to look at different scales of growth relative to the LHN (both capped and uncapped) or the implications of only delivering the scale of housing proposed, just a variety of different spatial options where the scale of development is unquantified, despite the fact one of the SA objectives is that ‘More opportunities are provided for everyone to be in a suitable home to meet their needs.’ The above belies the evidence base and the various reasons why the council need to meet their LHN / an uplift to the LHN should be considered further, as summarised in the commentary below.
2.1.11 The reasons for uplifting the LHN should be set into two categories, firstly those that indicate an uplift is required for the District itself and secondly any uplift that might arise from meeting unmet need from neighbouring authorities.
Affordability
2.1.12 Rother is an inherently unaffordable place to live as acknowledged at paras 1.15, 8.20 and 8.21 of the Reg 18 Plan which refer to the issues of the significant deterioration in affordability within the district The HEDNA (2024) identifies a significant need for affordable housing in Rother in the Plan period. This is due to a high, and increasing, house-price to earnings (affordability) ratio, meaning that growth in house prices is significantly outstripping growth in wages, and housing is becoming less affordable for people who live, work, and retire within the district.
2.1.13 To this end, we note, when looking at the ONS ‘House Price to Workplace-Based Earnings Ratio - March 2024’ that the ratio of median house price to median gross annual workplace-based earnings by local authority district, England, and Wales, 1997 to 2023 indicates that the ratio of median house price to median gross annual workplace-based earnings in RDC has increased significantly over the past 10 years from 10.53 to 12.847.
2.1.14 The rapid increase in the affordability ratio is clear evidence of the lack of housing delivery that has taken place over the last 10-year period within the District. Failing to deliver the LHN will only increase the rate of decline in affordability. For an improvement in the affordability situation to occur, decisive action is required through the provision of more housing over and above the capped LHN.
2.1.15 The matter of affordability alone clearly indicates that the Council should be planning for more than the capped LHN.
Affordable Housing Need
2.1.16 Linked to the issue of affordability is the significant need for affordable housing identified in the District. A symptom of a rising affordability ratio is the fact that more members of society are priced out of the open market and consequently require affordable housing in one form or another. Again, the Council acknowledges this in the Draft Plan and in the Feb 2024 HEDNA that accompanies the consultation pack.
2.1.17 The HEDNA indicates that the total net annual affordable housing need for the period 2021 to 2044 is 325 dpa, which is equivalent to 44% of the capped LHN figure (based on 733 dpa). Whilst policy HOU2 does not indicate what level of affordable provision the council will be looking to deliver, policy LHN2 of the adopted core strategy looks to deliver 30% affordable housing on sites in Bexhill and Hastings Fringe, and Rye, 35% in Battle and 40% in the rural areas. Even if the Council were to adopt a 40% requirement across the board, this will only be triggered for those sites that meet the qualifying criteria. It is therefore highly unlikely that the affordable housing need will be met. Indeed, given the decreasing trend in terms of affordability set out above, the gross affordable housing need of 325 dpa is highly likely to increase over the plan period, leading to an increase in the net shortfall and in turn a higher number of people in need and on the Council’s housing waiting list.
2.1.18 Whilst the councils latest AMR does not provide any information on affordable housing delivery, we note that the Governments Affordable housing supply statistics (AHS) 2022-23 table 1011C indicates that over the past 10 years RDC only delivered 887 affordable completions. An average of 89 (rounded up) affordable completions per annum, which just 27% of the average annual affordable need of 325 affordable dwellings per annum identified in the HNA. JAA table 1a – Affordable Housing Provision 2013 - 2023
13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 Total
Total affordable dwellings 80 123 103 20 56 60 130 126 15 174
887
2.1.19 Furthermore, whilst if you compare the level of affordable provision against total housing completions over the past 5 years this averages 38.7% of total housing completions, it fluctuates significantly and prior to this was averaging significantly less. JAA table 1b – Affordable Housing Provision as a percentage of overall housing delivery 2016 - 2023
18-19 19-20 20-21 21-22 22-23 Total
Net additional dwellings
255 247 175 237
390
1,304
Total affordable dwellings
60
130
126
15
174
505
% of total
23.5%
52.6%
72%
6.3%
44.6%
38.7%
2.1.20 Given the above, even if one assumes an average of 38%, this suggests that the plan would need to deliver over 8558 dpa to meet the identified affordable housing needs of the District.
2.1.21
Whilst we are not advocating this level of growth, the above demonstrates the need for the plan to deliver the LHN in full/ an uplift to the LHN figure to boost the supply of open market and affordable homes and thus help address the affordable housing needs of the District. Said approach would also reflect on spatial objective 4 – to respond to the housing crisis and help facilitate the delivery of housing to meet the needs of different groups in the community, by maximising the potential opportunities for residential development in sustainable and deliverable locations, helping to deliver affordable housing, and ensuring development is viable and supports growth in the district by providing certainty for developers through site allocations and clear planning policies.
2.1.22
The SA in reviewing the merits of the alternative spatial options appears to have paid little regard to these fundamental points.
Past Under Delivery
2.1.23
We note the Councils Five Year Housing Land Supply Statement – 1 April 2023 (published in December 2023) suggests that the Council is able to demonstrate a 3.09 year housing land supply for the period 01/04/23 to 31/03/28, and that the HDT results for 2022, as published in December 2023 was, as set out below, just 41%.
JAA table 2 - Result of 2022 Housing Delivery Test
Area Number of homes required Total number of homes required Number of homes delivered Total number of homes delivered Housing Delivery Test: 2022 measurement Housing Delivery Test: 2022 consequence 2019-20 2020-21 2021- 22 2019-20 2020-21 2021- 22
Rother 363 490 740
1593 247 175 239 661 41% Presumption
2.1.24
We further note that RDC housing delivery has over the past few years been somewhat mixed, with the Council failing to meet their annual housing requirement on a number of occasions, which has led to a deficit that suggests that there has been a record of under delivery that should be addressed by an uplift to the LHN figure.
A Buffer
2.1.25
Given the issues of the affordability and the affordable housing needs of the district identified above, as well as the issue of past underdeliver rates, we feel that at the very least a buffer should be built into the housing requirement for the Plan. Introducing a buffer into the housing requirement would ensure that the Council plans positively for the future in a manner that at least meets the minimum LHN rather than the capped figure, or indeed the ‘capacity’ based figure it currently looks
to deliver. This would in reality also provide an uplift to reflect the acute affordability problem and in turn the rising affordable housing need. Given the time horizon of the plan, the Council should also consider the need for flexibility to be built into the strategy so that it can be resilient to unforeseen changes that may occur during the latter years of the plan period.
2.1.26
To this end, we would stress the need for the SA to not only look at various Spatial Development Strategies, but to express these in the context of overall housing provision and assess not only a strategy that reflects the capped LHN, but both the uncapped LHN and indeed something that falls short of the capped LHN so that the effects of all reasonable alternatives are properly taken into consideration. As currently drafted the SA does not in our opinion adequately addresses the issues raised above or look to address the issue of unmet needs from adjacent authorities – see below.
2.1.27
Having regard to the above we consider a buffer of circa 10% i.e. circa 1,4669 additional dwellings should be added to the capped LHN over the plan period to ensure the Plan proceeds on a robust footing.10
2.2
Unmet Need
2.2.1 We note that the Reg 18 Plan makes no specific reference to the Duty to Cooperate (DtC) with neighbouring authorities over the issue of unmet need, there being no reference to the unmet needs of neighbours either. We also note that whilst the HEDNA recognises the fact that Hastings and Rother, together with their intrinsic sub-areas, comprise a self-contained Housing Market Area and Functional Economic Market Area, it does not comment upon the relationship of the HMA to adjacent HMA’s and their unmet need, there being only passing recognition of the fact that Wealden is within the influence of and overlapped by the Hastings and Rother HMA. Nor is there any commentary on how Rothers reg 18 Plan will look to address the unmet needs of Hastings, despite the joint statement agreed with Hastings BC on p16 of the Reg 18 Plan.
2.2.2
Similarly, whilst the Housing Background Paper advises at para 5.14 that the Council is committed to its duties in relation to the Duty to Co-operate, and in summer 2020 prepared a Duty to Co-operate Action Plan which outlines how and at what stage it intends to engage and consult with organisations on the development of the Local Plan, the Engagement and Duty to Cooperate Statement in commenting upon the engagement to date with Hastings BC, and in particular the matter of housing need, merely says at para 6.11 that ‘ The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 481 for Hastings. Hastings Borough Council made a formal request to Rother District Council on 3rd December 2021, along with requests other authorities, as to whether Rother could accommodate any of Hastings’ residual unmet need.’
2.2.3
This does not confirm the scale of Hastings unmet need, which we understand to be in the region of 5,525 dwellings11 or Rothers response to Hasting’s request, and as such does not suggest active, ongoing, and constructive engagement.
2.2.4
Similarly, in commenting upon engagement with Wealden, para 6.23 of the Engagement and Duty to Cooperate Statement advises that: ‘The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 1,212 for Wealden, however, in
their respective Plans, Rother has set an annual target of between additional 243-343 dwellings per annum, while Wealden sets a per annum target of and additional. Both sets of targets fall short of the need figures derived from the Standard Methodology. At this stage in Plan development, neither district has yet made a request in respect of unmet need.’
2.2.5
As is clear from the above Wealden’s target of 22,800 dwellings has actually been omitted from the document, as has reference to the implications in terms of Wealden’s unmet need of 7,071 dwellings12. .
2.2.6
Not only does the Engagement and Duty to Cooperate Statement fail to address the issue of how this unmet need will be tackled, but also makes it clear that Rother has not yet made a request to surrounding districts in respect of its unmet need, this despite the fact Wealden have for example just completed their reg 18 consultation. Again, this does not suggest active, ongoing, and constructive engagement, or due regard to the implications of the increasing scale of unmet need that is emerging in this part of East Sussex, a matter one would have expected the SA to have regard to in terms of the wider social, economic, and environmental consequences.
2.2.7
The lack of any MoU or SoCG with Hastings BC given their request of 3.1.21 is also of concern, as is the current lack of Mou or SoCG with Wealden DC, albeit we note one is in preparation and will we assume be available for scrutiny at Reg 19.
2.2.8
As the council will be aware, in order to demonstrate that the consultation on strategic cross boundary issues such as housing and unmet needs has been effective, continuous and ongoing, and the requirements of the Duty to Cooperate (DtC) have been addressed in terms of the overall housing requirement, MoU or SoCG will need to be produced and reviewed and updated regularly if they are to be relied upon.
2.2.9
Only through a rigorous approach to the issue of the DtC will the Council be able to demonstrate that its housing requirement is right, and that the spatial strategy is correct in its approach to growth. As things stand, we do not believe there to be sufficient evidence in place to demonstrate the DtC has been complied with, and as such can only conclude that the plan is legally flawed.
Conclusions on the Housing Requirement
2.2.10
Not only are the Council failing to meet their LHN as calculated by reference to the Standard Method i.e. 14,660 dwellings (733 dpa), but the shortfall of 7,374 – 9,502 dwellings is between 50% and 65% of the capped LHN. This is a significant shortfall exacerbated by the fact the LHN is a capped figure, and as the PPG is clear the LHN is only the starting point.
2.2.11
There are a range of factors relevant to the calculation of the housing requirement for the Draft Plan that the Council needs to consider when arriving at its overall housing requirement. These include:
• The inherent lack of affordability and the increasing affordability ratios;
• The poor levels of affordable housing delivery, and attendant increasing need for affordable homes; and • The importance of including a buffer above the LHN to ensure adequate housing delivery particularly given the Council’s historically poor track record of delivery as set out above.
2.2.12
When these factors are properly scrutinised, they demonstrate clear and rational reasons as to why there should be an uplift to the LHN. Having regard to the above Persimmon Homes t believe that at the very least the plan should provide for the uncapped need i.e. 733 dpa to ensure the Plan proceeds on a robust footing. Over a plan period of 1st April 2020 to 31st March 2042 this would equate to some 16,126 dwellings, circa 8,840 - 10,968 dwellings more than the plan is currently looking to provide for.
2.2.13
Setting the housing requirement at this level would significantly improve the affordability situation within the District and would deliver more affordable homes for those members of the community in the most need.
2.2.14
It is clear that the SA has as yet to assess the merits of delivering the LHN in full, a higher figure or indeed a lower one. It is also clear from the Engagement and Duty to Cooperate Statement that the council have yet to fully assess the effects of their neighbours’ unmet needs or to explore through the DtC, whether any of their neighbours could assist.
2.3 Housing Supply
2.3.1. Nowhere in the Reg 18 Plan is there a trajectory setting out how the housing requirement will be met or a rolling five year housing land supply maintained. Thus, in terms of supply all that is available is the information set out within table 34 of the Reg 18 Plan which indicates that the housing supply comprises the following:
Source of housing supply
a
Constructed 1 April 2020 – 31 March 2023
802
b
Known completions and commencements on large sites since 1 April 2023
340
c
With Planning Permission
1,693
d
DaSA & Neighbourhood Plan allocations without permission brought forward
1,660
e
Additional HELAA potential sites
2,129
f
Windfall projection (across the district)
663
Total Range
5,15813- 7,28714
2.3.2 In reviewing the above there is nowhere in the evidence base where one can review and assess the deliverability of those sites with outstanding planning permission that have yet to start on site, allocated sites without permissions or the additional HELLA sites. The councils Housing Land Supply and Housing Trajectory (April 2023 position statement), within its appendices provides details of the following:
•
Delivery by financial year of large site permissions (2,140 of which 1261 are only have outline consent))
•
Delivery by financial year of large sites delegated to approve subject to S106 (555, of which only 2 sites delivering 17 dwellings are for full planning permission, the majority being outline schemes))
•
Delivery by financial year of DaSA allocations (520, of which an appeal for one site for 40 dwellings has been dismissed)) •
Delivery by financial year of Neighbourhood Plan allocations (253 of which sites delivering only 34 are subject to applications)) and
•
Small site permissions (316)
2.3.4 As the above does not tally with the figures in table 34 it is impossible to scrutinise the housing land supply properly and ensure it is truly deliverable. All we can note is that the number of large sites with outline permission only that are due to start delivering in the next 5 years seems rather high, as do the number of large sites with a resolution to grant outline permission subject to S106. We would also ask that the next iteration of the plan the council produce a more detailed evidence base to demonstrate that the proposed commitments will deliver as suggested and that the council can maintain a robust and rolling 5 year housing land supply.
2.3.5 In the context of the above, we would suggest that the Council consider further whether a buffer of say 10% should be applied to those sites with planning permission that have yet to commence to take into account any potential non-delivery/ delay in delivery of the dwellings contained within this category which at 1,693 equates to nearly a third of the supply15. Similarly, the sites contained within the DaSA & Neighbourhood Plan allocations without permission, which equate to a comparable proportion of the total supply. Alternatively, the Council need to undertake a more detailed critique of the proposed commitments to ensure what is being put forward is truly deliverable within the plan period. Either way we believe this would generate the need to find land to accommodate a further 335 dwellings16.
2.3.6. Turning to windfalls, para 5.131 of the reg 18 plan indicates that windfall development forms an important part of the councils housing land supply and that the Council will continue to rely on windfall development as part of its development strategy. To this end table 34 of the Reg 18 Plan reports a figure of 663 windfalls over the plan period, and proposed policy DEV5 suggests a windfall development projection of 39 dwellings per annum for the plan period17. This is however slightly at odds with the findings of Table 3 of the councils Housing Land Supply and Housing Trajectory (April 2023 position statement), which suggests an annual average of 45 windfalls a year. Clearly clarity is required on this, as whilst para 6.9 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) suggests that work is currently underway on producing an updated windfall methodology background paper in support of the new Local Plan, which will reassess the likely contribution from windfall sites in the future, as well as the period over which any allowance should be applied, no such document appears within the evidence base. As the council will be aware, they will, in accordance with para 72 of the NPPF, need to provide compelling evidence that the windfall trajectory is a reliable source of supply, and cannot just rely upon a headline review of past windfall delivery rates without any analysis of expected future trends.
2.3.7 Finally in terms of the additional HELAA potential sites, we note that the HELLA in listing Identified Sites (existing allocations and sites with planning permission), and Potential Sites (Sites are potentially suitable, potentially available and potentially deliverable, subject to further assessment or investigation), discounts an unquantified number of ‘Other Potentially Suitable Sites Where Availability is Unknown’ and Rejected Sites (sites assessed as currently unsuitable/ unavailable/ unachievable), and that it is unclear how releasing some of these sites would come to enabling the council to meet their LHN if the assessment criteria were reviewed/ the sites themselves reassessed in terms of the overall area to be developed/ development capacity were reviewed. Given the scale of the unmet need we would respectfully suggest that no stone should be left unturned in looking to achieve the LHN and that whilst not all of the rejected sites will be acceptable, some may, with further consideration, have been suitable, such that the overall quantum of deliverable sites and thus the plans ‘capacity’ based housing figure could be higher. We would thus recommend that in order to demonstrate the housing supply figure is fully justified the council provide further evidence to this effect at Reg 19.
Conclusions on the Housing Supply
2.3.8 Having reviewed the component parts of the Housing Land Supply as best we can given the lack of available evidence to justify the position set out in table 34 of the Reg 18 Plan, we note that the figures relied upon to meet the Councils proposed ‘capacity’ based housing requirement require:
➢
100% reliance on all current commitments (existing detailed, and outline permissions, as well as sites with a resolution to grant and sites allocated in the DaSA and Neighbourhood Plans). This is not justified and a 10% buffer should be introduced to allow for non-delivery/ slower than expected delivery i.e. circa 335 dwellings.
➢
100% of the proposed housing sites delivering the quantum proposed within the plan period. This is however subject to all of said sites being found acceptable by the Local Plan Inspector/ site promoters confirming the sites can deliver this quantum of development in light of all the other policy requirements set out in the plan, such that a contingency may be sensible.
➢
663 dwellings to come forward as windfalls. The proposed windfall allowance is not based on a credible evidence base and is not justified. At 9 - 13% of the residual requirement, it is a significant part of the overall supply and needs to be reviewed to ensure a realistic approach is adopted at Reg 19.
2.3.9 As a result of the above, we would submit that as the predicted supply is effectively dictating the overall requirements – i.e. we are looking at a ‘capacity’ based housing requirement, the fact there is no flexibility in the proposed supply is of grave concern as in effect the overall supply could be a lot less than predicted unless additional sites are added in to address our concerns about the commitments, and windfalls and help provide a buffer / address the issues of affordability and DtC we have raised above. As it stands the plan would be incapable of accommodating any fluctuations in the market and could leave the council open to speculative applications very early in the plan period. The council’s assessment of potential housing sites in the HELLA and SA needs to be reviewed and no stone left unturned when it comes to identifying sites and addressing perceived constraints. Likewise, the councils rational for the yields they have attributed to the proposed allocations needs to be fully justified as, as we explain below, we do not think they are when the policy requirements set out in the draft plan are properly taken into consideration.
3
The need for a Stepped Trajectory
3.1 We note that para 5.102 of the Reg 18 Plan suggests that the Council would require a considerable step change in housing delivery in order to deliver a significant uplift compared to current and historic delivery rates over the last ten years. Figure 37 then illustrates that over the past 12 years the council have on average delivered 219dpa, albeit in the last two years they have delivered 237 and 390 dpa, respectively. Whilst the LHA at 733dpa would require a sea change in delivery, the current proposition, of a supply led target of 258 – 364dpa is clearly within the realms of that which has been achieved of late – reflecting the indeed, if the trajectory in appendix 7 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) is correct the council are anticipating an average of 544 dpa following over the next 5 years18: whilst this tails off after 28/29, this is because the trajectory is based on existing commitments (permissions and allocations) if, with a new plan in place additional sites were allocated, there is no reason why higher levels of growth could not be sustained longer term. There is thus no justification within the evidence base to support a stepped trajectory. Indeed para 5.102 of the Reg 18 Plan appears to suggest that delivery rates have been significantly impacted by the economic downturn and the effect of the coronavirus pandemic in recent years, such that while a number of current allocated sites have been permitted there have been significant delays in the build out of sites. This does not support a stepped trajectory it merely justifies past performance which with an economic upturn should begin to ensure a more robust and steady supply. Furthermore, as two thirds of the proposed supply is already committed there can be no justification for a stepped trajectory.
4
The Growth Options for Sub Areas
4.1 Whilst having no direct interest in the growth options, we do note that when looking at figure 33 that a considerable amount of the proposed growth, both committed and proposed through the additional sites identified through the HELAA that 46% of the proposed growth is in and around Bexhill, with only 9% being directed towards Battle, only 3.6% to the hastings fringe. Whilst we acknowledge that Bexhill is the least constrained of the main centres, one has to wonder if this is a sustainable approach, especially given the public transport links and level of services available in the likes of Battle and Robertsbridge. Comparing figure 35 of the Reg 18 Plan (the opportunities for housing growth) with Figure 12 of the settlement study (part 1) (Settlement Sustainability Score Table), the level of growth proposed in the Sustainable and Moderately Sustainable settlements seems to be significantly less than that proposed in Bexhill, which whilst it is the only ‘Highly Sustainable’ settlement seems somewhat out of proportion and one has to wonder whether this could lead to market saturation and actually prejudice housing land supply.
5
Development Principles Policies
5.1 We note that DEV2 requires: ‘Planning applications (whether in outline or full format) must relate to an entire development site to ensure a comprehensive approach, including where sites are in multiple ownerships.
When an outline application is submitted, a masterplan defining key parameters for the entire site must be submitted by the applicant to indicate how the overall development of the site can be achieved.’
5.2 Where sites are in multiple ownership, we would suggest that as long as a framework masterplan covering the whole site, and an infrastructure delivery strategy has been agreed, either through the site promoters and the council or via an SPD, there should be nothing to stop one party looking to promote their site in advance. As long as the application reflects the framework masterplan and s106 proceeds in accordance with the infrastructure delivery plan we fail to see how this would prejudice the plan. Indeed, it may well allow sites to proceed more quickly and thus actively assist the council in their housing land supply. 5.3 We note that DEV3 indicates that: ‘Development boundaries define the area within sustainable settlements where development will be permitted, provided it is consistent with this Local Plan.
Priority shall be given to reuse of brownfield sites, in order to make efficient use of previously developed land in sustainable settlements. Some greenfield development will be necessary in order to deliver housing and employment need, but this will be limited to inside development boundaries.’
5.4 Whilst in the first instance we assume the development boundaries will be redrawn to reflect the proposed allocations, we would also suggest that given the shortfall in the housing land supply, that the council should look to have a criterion based policy that enables development immediately adjacent to the limits of built development subject to certain criteria. For example, within Mid Sussex, policy DP6 provides for:
The growth of settlements will be supported where this meets identified local housing, employment, and community needs. Outside defined built-up area boundaries, the expansion of settlements will be supported where:
1. The site is allocated in the District Plan, a Neighbourhood Plan, or subsequent Development Plan Document or where the proposed development is for fewer than 10 dwellings; and
2. The site is contiguous with an existing built up area of the settlement; and
3. The development is demonstrated to be sustainable, including by reference to the settlement hierarchy.
The developer will need to satisfy the Council that:
• The proposal does not represent an underdevelopment of the site with regard to Policy DP26: Character and Design; or
• A large site is not brought forward in phases that individually meet the threshold but cumulatively does not.
5.5 A similar policy approach would we believe be appropriate here and would assist the council in meeting their LHN.
5.6 We note that DEV5 refers to the windfall rate of 39dpa. Given our comments above, this will need to be properly justified within the evidence base for the Reg 19 Plan.
5.7 Turning to DEV6, and the Strategic Green Gaps, the current strategic gap between Bexhill and Hastings should not be seen as a constraint on development on a par with the AONB or any other NPPF footnote 7 constraint, and should not in our opinion be carried over from the current core strategy without first being reviewed to establish if they can accommodate some growth to assist the council in meeting their LHN/ meeting the unmet needs of their neighbours, especially Hastings.
6
Health and Wellbeing Policies
6.1 We note that policy HWB2 requires a HIA to be undertaken on all applications for development of 100 (+) dwellings/ sites of more than 5ha. Whilst Persimmon Homes would agree that HIA are an essential part of plan making to ensure the Council understand the health outcomes of its strategy and is thus able to ensure these are effectively addressed, this should be achieved through the preparation of a whole plan HIA which will help inform the Council that the policies the plan contains address the key health outcomes for the area. As the plan and the policies it contains has been prepared to address the key health issues it is unnecessary for future development proposals that accord with this plan to undertake a separate HIA. If a development meets the policies in the plan, then it is by default addressing the health outcomes already identified by the Council. A HIA as part of the application would merely be repetition of the work the council has already undertaken. The only circumstance where an HIA may be appropriate would be for a larger unallocated site where the impacts may not have been fully considered by the council as part of the plan wide HIA. Policy HWB2 needs to be revised accordingly.
6.2 We also note that criterion 5 of HWB5 requires developments of 300 (+) dwellings to provide playing pitches on site in line with the recommendations of Rother’s Playing Pitch and Built Facilities Strategy and Sport England’s standards. Whilst not opposing this criterion, Persimmon Homes would suggest that the following is added to criterion 5 ‘unless evidence suggests that this is unachievable” as a sites topography may not make this possible/ economies of scale may mean providing / contribution to offsite provision is in certain circumstances preferable; or that this would fetter a developer’s ability to deliver BNG on site as such facilities do not assist in trying to deliver BNG. Indeed, they can actively prejudice it.
7
Infrastructure Policies
7.1 We note that policy INF1 (A) indicates that ‘Where new infrastructure capacity is required, it must be demonstrated that it can be delivered upfront or early in the development phasing.’ As the councils will be aware, the question of the supply of utilities to support development (including residential development) is a matter that is dealt with through separate statutory regimes. Providers such as the water and energy companies are required, among other things, to ensure a supply of services adequate to meet the needs of the plan-led system. As such policy INF41 (A) should not require applicants for planning permission to demonstrate that there is sufficient capacity with regard to provision of utilities such as water and power. Furthermore, when considering other infrastructure requirements, the policy should have regard to the cash flow implications of this criteria and be caveated accordingly.
8 Housing Policies
HOU1 Mixed and Balanced Communities
8.1 In noting the unit mix proposed in policy HOU1, we would in the first instance question the extent to which policy HOU1 should look to be prescriptive on the market housing to be delivered across the district for the whole of the plan period; rather the Council should recognise the need for flexibility, as per the NPPF and PPG, as the fact is the needs of the area may well change over the lifetime of the plan, particularly given the current uncertainty in the housing market, and that different areas will inevitably deliver different forms of housing i.e. apartments within more urban town centre locations and family housing in suburban areas; and that it is the combination of the two that will ultimately address the overall need.
HOU2 Affordable Housing
8.2 We note that no percentage has been provided in this policy to clarify the level of affordable provision to be provided on qualifying sites. We look forward to seeing and being able to comment upon the final requirement at Reg 19. In addition, we note that policy HOU28 also looks to see the affordable units well-integrated and designed to the same high quality to create tenure-neutral and socially inclusive homes and spaces; and that the affordable housing should be apportioned individually or in small clusters and where this is not proposed it should be robustly justified. Whilst we appreciate and support the need to ensure integration and to create more balanced communities, that has to be weighed against the management objectives of the affordable provider, who often find small clusters to be inefficient, such that this requirement needs to provide for those instances where the affordable provider feels a different approach is justified in that particular instance. HOU8 Access Standards
8.3 We note that policy HOU8 requires all new homes to be NDSS, and that as has already been established in the adopted development plan, there is a requirement for all new dwellings in the district to be M4(2) compliant, and 5% of affordable dwellings to meet M4(3)(2)(b) standards where a need exists. In addition, however, policy HOU8 includes a requirement for 5% of new market housing to meet the “wheelchair adaptable dwellings” standard in Part M4(3)(2)(a). Whilst para 8.71 of the plan suggests that these policy expectations are justified by the district’s ageing population and levels of disability, and the need for homes to appropriately meet the demands of occupiers throughout their lifetimes, this is not in our opinion clear and convincing evidence to justify this requirement and as such we would submit that this part of policy HOU8 should be deleted.
HOU9 – Specialist Housing for the Elderly
8.4 We note that policy HOU9 requires all developments of 100 (+) dwellings to set aside at least 10% of the total number of dwellings as specialist housing for older people. It is not clear whether this is in addition to, or as part of, the requirement also being set out in policy HOU8, or whether this could just be bungalows, or buildings that have to have communal areas. As drafted the policy is unclear and thus ineffective. In addition, subject to clarity it could be overly onerous when coupled with other requirements and thus likely to affect a sites viability.
HOU12 Self-Build and Custom Housebuilding
8.5 We note that policy H0U12 requires 5% Self/ Custom-Build Housing on all sites of 20 dwellings (+). Whilst the councils Self-build and Custom Housebuilding (SCHB) Headline Data Report 202319 indicates that as of 30.10.23 there were 197 individuals and 3 associations on the self-build and custom housebuilding register, it is not clear from the evidence base how many plots would be required if the existing commitments were taking into consideration. This needs to be established to ensure the proposed policy is justified and will be effective in meeting the outstanding demand.
8.6 In the context of the above, whilst noting the scale of the demand, we understand that before seeking to require the proposed developments to provide a proportion of the homes delivered as self-build plots the Council will need to examine other opportunities for meeting the needs of those who want to self-build. Under the Self Build & Custom Housebuilding Act 2015 and para 63 of the NPPF (2023), it is the Councils responsibility to ensure that sufficient permissions are given to meet demand. Further detail is provided in paragraph 57-014 of PPG with regard to the Council’s duties and whilst this recognises that it should take account of self-build registers when preparing planning policies, it also outlines that consideration needs to be given by Councils to the disposal of their own assets in order to meet the need for self-build plots or whether self-build could support the regeneration of brownfield sites. A need for self-build plots should not automatically lead to a policy requiring their provision on sites of 20 (+) dwellings. PPG also notes at paragraph 57-025 that local authorities should be encouraging developers and landowners to consider providing plots for self-build and custom house building but makes no reference to requiring their provision. The Government clearly sees the role of the local authority as working to identify opportunities with developers rather than placing responsibility on to the development industry. 8.7 The Council will also need to consider whether it is feasible that all sites of 20 (+) dwellings can deliver self-build plots. Often, especially on the larger sites, there are multiple contractors and large machinery operating on-site, and the development of single plots by individuals operating alongside this construction activity raises both practical and health & safety concerns. Any differential between the lead-in times / build out rates of self & custom build plots and the wider site may lead to construction work outside of specified working hours, building materials stored outside of designated compound areas and unfinished plots next to completed and occupied dwellings, resulting in consumer dissatisfaction. Whilst some sites may be able to locate self-build plots in a manner that reduces these potential risks, on others this will be impossible with developers unable to co-ordinate the provision of self & custom build plots with the development of the wider site. Such concerns must be given full consideration by the Council when preparing any policies on self-build to be included in the Local Plan.
8.8 Having regard to the above we would submit that the requirement to deliver 5% Self/ Custom-Build Housing on all sites of 20 (+) dwellings is likely to deliver very little in the way of tangible benefits, whilst creating significant difficulties for the builders involved. It would be a lot more effective for the Council to identify self-build sites or allocate certain sites to deliver a higher proportion of Self/ Custom-Build Housing.
8.9 Given the above we would suggest that the council review their requirements and are more explicit as to what they want, where and why, as at present policy HOU12 does not look to be properly justified or effective.
9 Green to the Core
GTC1: Net Zero Development Standards
9.1 We note that policy GTC1 requires all residential development to achieve: ‘a) LETI Total Energy Use Intensity (TEUI) Target for Operational Energy of 35 kWh/m2/year (GIA).
b) For new buildings, a 4-star Home Quality Mark (HQM) score; or for conversions to residential development, a Building Research Establishment Environmental Assessment Method (BREEAM)
‘Excellent’ standard as minimum.
c) A maximum space heating demand for new buildings (small scale housing) of 15 kWh/m2 per year.
d) If LETI, Home Quality Mark or BREEAM is updated or replaced during the plan period the equivalent replacement requirements will be applied.
9.2 It goes on to advise that ‘to demonstrate compliance, a Building Research Establishment (BRE) Home Quality Mark post-construction assessment or similar must be undertaken at practical completion.’
9.3 And that in terms of embodied carbon: ‘All new development proposals must demonstrate, through an energy statement, how the following embodied carbon standards will be met:
(i) All residential development must achieve a LETI C rating for embodied carbon emissions, equating to 600 kgCO2/m2 upfront embodied carbon and 970 kgCO2/m2 total embodied carbon.
From 1 January 2030, a LETI A rating must be achieved, equating to 300 kgCO2/m2 upfront embodied carbon and 450 kgCO2/m2 total embodied carbon.’
9.4 Whilst Persimmon Homes support the Government’s approach set out in the Future Homes Standard, we note that the Government have set out a clear roadmap as to how low carbon homes will, alongside the decarbonisation of the national grid, ensure that the Government can meet its commitments to net zero by 2050; and that the way forward being taken by the Government recognises that the improvements in energy efficiency of new homes should be a transition which ensures that new homes continue to come forward to meet housing needs whilst still being sufficiently challenging to significantly reduce the carbon emissions of new homes from 2025. This is set out explicitly in the Written Ministerial Statement of the Minister of State for Housing on the 13th December 2023, when he indicated that:
‘The improvement in standards already in force, alongside the ones which are due in 2025, demonstrates the Government’s commitment to ensuring new properties have a much lower impact on the environment in the future. In this context, the Government does not expect plan-makers to set local energy efficiency standards for buildings that go beyond current or planned buildings regulations. The proliferation of multiple, local standards by local authority area can add further costs to building new homes by adding complexity and undermining economies of scale. Any planning policies that propose local energy efficiency standards for buildings that go beyond current or planned buildings regulation should be rejected at examination if they do not have a well-reasoned and robustly costed rationale that ensures:
That development remains viable, and the impact on housing supply and affordability is considered in accordance with the National Planning Policy Framework.
The additional requirement is expressed as a percentage uplift of a dwelling’s Target Emissions Rate (TER) calculated using a specified version of the Standard Assessment Procedure (SAP).’20
9.5 As the council will be aware, the challenge to the WMS have been dismissed. Given the above, whilst the aspirations in Policy GTC1 are worthy and Persimmon Homes are committed to the delivery of Zero Carbon Homes/ Carbon Neutrality on all their sites, wherever it is practical and viable to do so, there is in our opinion no need for additional standards to be placed on developments through additional Local Plan policies that vary from that required in national government guidance. The plan has to acknowledge the implications of the transitional period and the need for flexibility during this period, in accordance with the aims and objectives of national policy. As such, not only is policy GTC1 overly complex and likely to impact on delivery/ viability, it is also clearly inconsistent with the approach advocated in the WMS. As a result, and having regard to our comments below on the lack of any Viability Assessment to support the reg 18 plan and the associated assessment of the implications of the emerging local plan policy on Net Zero Carbon, we would suggest that Policy GTC1 revert to the requirements set out in Building Regs.
GTC7: Local Nature Recovery Areas
9.6 We note this policy requires all new development to meet the objectives of the East Sussex (including Brighton and Hove) Local Nature Recovery Strategy (LNRS). We do not believe it is inappropriate to require all new development to meet the objectives set out in a document that is not a development plan document. Whilst the council can suggest that development has regard to the LNRS it is not consistent with national policy to require them to meet these objectives. It would also be perverse to require all new developments to adhere to a set of objectives that the council itself only has a duty to have regard to in its decision-making processes. We would therefore recommend that this policy is amended to advise that all new development has regard to the objectives set out in the LNRS
GTC8: Biodiversity Net Gain
9.7 We note that policy GTC8 requires al qualifying development proposals to deliver at least a 20% measurable biodiversity net gain attributable to the development. Whilst there does not appear to be any justification as to why a 20% BNG requirement is needed, such that we would submit the policy is unsound; Persimmon Homes are committed to doing as much as possible to meet the councils’ aspirations and as such would suggest that rather than require development to deliver at least 20% BNG, the Council recognises in policy that the 10% mandatory requirement is a minimum and that they will look favourably on development that seeks to go beyond this figure. If, however, the 20% BNG requirement is retained the council need to set out that where 20% is not deliverable it will seek to negotiate the viable level that can be provided over the 10% minimum required by the Environment Act 2021.
9.8 Such an approach would facilitate an element of flexibility that would take account of the potential implications delivering 20% BNG may have on viability/ overall dwelling numbers and would thus ensure a more effective policy approach, that is consistent with the aims and objectives of national policy as set out in the biodiversity net gain planning practice guidance of 14 February 2024 which at 006 Reference ID: 74-006-2024 states:
‘Plan-makers may seek a higher percentage than the statutory objective of 10% biodiversity net gain, either on an area-wide basis or for specific allocations for development. However, such policies will need to be evidenced including as to local need for a higher percentage, local opportunities for a higher percentage and any impacts on viability for development. Consideration will also need to be given to how the policy will be implemented.’ My emphasis.
9.9 In the context of the above the council need to have regard to the ecological baseline and the difficulties delivering 10% BNG, let alone 20% can have where the baseline is already high, such that offsite credits will be required, the level of which for smaller sites would be financially prohibitive such that the actual capacity of said sites may needs to be revisited. To this end we are aware of anecdotal evidence that suggests that to deliver 20% BNG a sites net to gross will fall from circa 75 to circa 65%, which can as a result impact on its overall development capacity and the councils associated housing land supply.
9.10 Notwithstanding our thoughts on the justification behind the 20% BNG requirements and its associated implications on a site’s development capacity, as well as its viability, there needs to be more in the plan to ensure the provision of a strategic network of sites that can deliver BNG offsite in Rother or within the same national character area (NCA); as whilst important in delivering 10% this is even more important if the Council introduces 20% BNG. At present there is little evidence that there will be sufficient local offsite credits in the short and medium term to support schemes that cannot deliver a 10/ 20% BNG on site. Nor is there any recognition of the fact that by requiring a 20% net gain the council are effectively adding to the pressure on the market for credits as more sites will be required to purchase offsite credits to meet this higher level of BNG. This increases costs and will more than likely delay sites that cannot secure these. Whilst we recognise the fact that there is the option of buying national credits, the cost of these is set well above the market to promote local solutions and will impact significantly on the viability of development meaning many developers will have to wait until local credits are available, which will prejudice the councils rolling 5 year housing land supply position.
10 Landscape Character
10.1 We note that policy LAN2 requires a CAVAT assessment to be submitted with all applications impacting on an individual or groups of trees in order to quantify their public amenity value. This is in our opinion totally unjustified and would question why a standard tree surveys would not suffice in the first instance, with a CAVAT assessment only being required where a tree of particular individual or group value is to be lost. 11 The SA of the Development Strategy
11.1 As set out above we note that the SA in scoring the Development Strategy, at Figures 11 and 12 does not actually comment upon the quantum of development the different options would deliver and how this would relate to the LHN, or indeed address the issue of the unmet needs of neighbours. Given SA objective 8 on housing this is somewhat surprising, as is the fact that no one option appears to have been chosen as the preferred option; albeit SDO3B (Bexhill Greenfield Growth Option 2: with New Multi-modal Transport Corridor) appears to score most favourable, followed by SDO6 (Brownfield Intensification and Redevelopment), which as it would totally fail to meet the LHN seems somewhat perverse, especially when figure 11 scores it as ‘Option supports the objective, or elements of the objective on balance, although effects may be minor’. Surely it would be ‘Option appears to conflict with the objective on balance and may result in minor adverse effects’ or indeed even ‘Potentially significant adverse effects’. Similarly, the scoring of SDO11 (Growth in settlements with train stations or sustainable transport alternatives) in figure 12 seems somewhat odd21 given its based on sustainable transport. To this end we also note that in a number of occasions, SOD4 and SOD5 for instance, growth is said to be resisted by virtue of land availability based on environmental and topographical constraints. Given the scale of unmet need currently proposed we would respectively suggest the council need to do more to establish whether additional land in these areas is available/ could be developed as no stone should be left unturned in trying to meet the LHN. As it stands, the SA lacks the necessary robustness required as it is impossible to assess the impact and weigh benefits and harm of each development strategy without know scale of delivery associated with each option.
11.2 Having regard to the above we feel it’s imperative that if the SA is to be effective the next iteration needs to assess the Development Strategy in the context of the LHN and how the council are to accommodate this/ the implications of not accommodating it/ over delivering to address adjacent authorities’ unmet needs.
12 The Infrastructure Delivery Plan Viability Assessment
12.1 We are surprised to note that whilst an Infrastructure Delivery Plan (IDP) has been produced to support the Reg 18 Plan, as well as an Infrastructure Background Paper, there is no Viability Appraisal (VA) of the plan. Not only does the lack of a VA makes it difficult to comment on the proposed policies, but it also raises questions about the aspirations of the IDP i.e. how these have been tested, and whether they are realistic and deliverable. If the plan is predicated on the aspirations of the IDP then the whole plans approach is also open to debate as how can it be said to be justified and effective if it has not been subject to a robust VA.
13 Conclusions on Reg 18 Plan
13.1 We are concerned that the scale of growth proposed in the overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa, which is significantly less than the capped LHN of 733dpa/ the uncapped LHN of 850 dpa. In our opinion there is no justification for promoting a lower housing target than the capped LHN given the aims and objectives of national government guidance and the affordability issues that exist within the district, that the plan says it wants to address. The scale of the potential shortfall (between 7,286 and 9,502 dwellings over the plan period22) is significant, and will we fear be exacerbated if the predicted supply does not deliver as forecast. Nowhere does the plan, or the evidence base demonstrate how this will be addressed. In addition, it does not appear to have been raised with adjacent authorities through discussions on the DtC. Nor does the plan/ its evidence base demonstrate how the acute levels of unmet housing need that exist within the area are to be addressed through constructive and active engagement so as to meet legal duties imposed by the DtC.
13.2 Similarly we are concerned that no evidence has been provided to demonstrate how the housing requirement will be met or how a rolling five year housing land supply will be achieved. The deliverability of the existing commitments needs to be demonstrated more evidentially than it has to date. Likewise, the evidence needs to be provided to demonstrate that the proposed allocations will deliver the quantum of development suggested when expected; and the plan needs to encompass compelling evidence to support the windfall rates expected rather than rely on historic trends.
13.3 We would also suggest that the plan period needs to be reviewed so that it provides for 15 years from adoption (i.e. till 31st March 2042).
13.4 Turning to the Development Strategy, the justification behind the Development Strategy and the clear preference for concentrating growth in and around Bexhill is not clear, the SA being silent on the quantum of development each Development Strategy could deliver and how the overall strategy related to the LHN.
13.5 In addition to the above we also have specific concerns about policies DEV2 (Comprehensive Development and Masterplanning), DEV3 (Development Boundaries), DEV5 (Development on Small Sites and Windfall), DEV6 (Strategic Green Gaps), HWB 2 (Health Impact Assessments), INF1 (Strategic Infrastructure Requirements), HOU1 (Mixed and Balanced Communities), HOU2 (Affordable Housing), HOU12 (Self-Build and Custom Housebuilding) , GTC1 (Net Zero Building Standards) and GTC8 (Biodiversity Net Gain), all of which we do not believe to be properly justified or consistent with national planning policy guidance as drafted.
In the context of the above we would like to highlight Persimmon Homes desire to work with Rother District Council on progressing a sound plan and that to this end we are happy to meet with officers to discuss our reps on the housing requirement, supply and trajectory and the other policies contained in the Reg 18 Plan/ its supporting evidence base.
Yours sincerely
JUDITH ASHTON
Judith Ashton Associates
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28010
Received: 22/07/2024
Respondent: Persimmon Homes Ltd
Agent: Judith Ashton Associates
There is nowhere in the evidence base where one can review and assess the deliverability of those sites with outstanding planning permission that have yet to start on site, allocated sites without permissions or the additional HELAA sites. It is impossible to scrutinise the housing land supply properly and ensure it is truly deliverable. the next iteration of the plan should include a more detailed evidence base to demonstrate that the proposed commitments will deliver as suggested and that a robust and rolling 5 year housing land supply can be maintained. In this context, we would suggest that the Council consider further whether a buffer of say 10% should be applied to those sites with planning permission that have yet to commence to take into account any potential non-delivery/ delay in delivery of the dwellings contained within this category which at 1,693 equates to nearly a third of the supply.
I write with reference to the above. I act for Persimmon Homes who have an interest in a sound plan being delivered for Rother.
Having regard thereto, having reviewed the Regulation 18 Draft Local Plan (April 2024), and associated evidence base, especially the Sustainability Appraisal - Interim Report (SA) and associated appendices, Housing and Economic Land Availability Assessment (HELAA), Local Housing and Economic Needs Assessment (HEDNA), Development Strategy Background Paper (DSBP), Housing Background Paper (BP), Settlement Study (SS), and Infrastructure Delivery Plan (IDP), and Viability Assessment and CiL Review (VA); we have the following comments on the Draft Regulation 18 Rother Local Plan (April 2024), and associated evidence base.
1 The Plan Period
1.1 We note that the 2024 LDS suggests adoption of the Local Plan (Regulation 26) in Quarter 3 2026/27. As a result, the plan period advocated in policy SS2 will be less than 15 years from adoption. In order to comply with paragraph 22 of the NPPF, the plan period should we believe start at 1st April 2023 and be extended to 31st March 2042 as this will ensure it looks ahead for a minimum of 15 years from adoption. As a result, additional housing allocations need to be made to help address this additional requirement.
2 The Housing Requirement, Supply and Trajectory
2.1
Local Housing Need, and the Minimum Housing Requirement
2.1.1 We note that the proposed overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa.
2.1.2
Having reviewed the housing requirement against the standard method and the advice in the PPG about the need to consider the application of a cap, we note that adopting the standard methodology, and adjusting the figures to the base date of the local plan and using the latest local affordability ratio, the position is as set out below.
Step 1: Setting the Baseline
Household Projection = 523.41 dwellings per annum
Step 2: Adjustment for
Affordability
Local Affordability Ratio = 13.822
Adjustment Factor = 1.61 𝐴𝑑𝑗𝑢𝑠𝑡𝑚𝑒𝑛𝑡 𝑓𝑎𝑐𝑡𝑜𝑟=(13.82−44) 𝑥 0.25+1
Minimum Local Housing need
523.4
x 1.61 = 842.6
2.1.3
As set out in section 5 of the HEDNA a cap is applied to limit the level of increase, depending upon the stage that the local authority is at with regards to its strategic policies for housing. Where the policies have been adopted within the last 5 years, the LHN figure is capped at 40% above the average annual housing requirement figure as set out in the existing policies. Where the relevant policies were adopted more than 5 years ago (as is the case in Rother), the LHN is capped at 40% above whichever is higher of:
• The average annual projected household growth identified in Step 1; or
• The average annual housing requirement figure as set out in the most recently adopted strategic policies.
Having done this, we note the following:
40% cap
The average annual projected household growth identified in Step 1
523.4
732.7
The average annual housing requirement figure as set out in the most recently adopted strategic policies
3353
469
2.1.4 Given the above the LHN in Rother is reduced from 842 dpa to 733 dpa. That said, while the cap reduces the minimum number generated by the standard method, it does not reduce housing need itself. Therefore, strategic policies adopted with a cap applied may require an early review and updating to ensure that any housing need above the capped level is planned for as soon as is reasonably possible. The PPG is clear that the standard method is a minimum number and that in areas such as Wealden where the cap reduces the local housing need “consideration can still be given to whether a higher level of need could realistically be delivered. This may help prevent authorities from having to undertake an early review of the relevant policies”4. For Rother this would mean considering whether to deliver 842dpa. It is also important to note that the LHN figure is a minimum starting point, and it does not produce the Housing Requirement5.
2.1.5
In the context of the above, we note that the overall spatial development strategy in looking to deliver a minimum of 5,158 to 7,286 dwellings over the plan period is in effect only looking to deliver between 35% and 50% of the capped LHN.
2.1.6
We further note that the HEDNA is clear in the executive summary on both the scale of the LHN (737dpa at the time), and the findings of the housing growth scenario, indicating that there are ‘no exceptional local circumstances’ that would justify deviating from the Standard Method in Rother.
2.1.7
Whilst the inference in the plan is that the level of housing growth that is proposed is supply led (i.e. reflects the level of suitable sites assessed through the HELAA process) and constrained by the High Weald AONB, the Pevensey levels, the Strategic Gaps around Hastings and the SSSI around Rye, this is adopting a policy on approach to a situation that should be policy off.
2.1.8
Thus, not only is it unclear why the plan is not looking to deliver the LHN as identified in the HEDNA, but why it has not also looked at the uncapped need given the issues surrounding the unmet needs of its neighbours (see below). PPG6 identified a number of circumstances where it might be appropriate to plan for a higher housing need figure than the Standard Method indicates. Such circumstances can include:
• Instances where housing need is likely to exceed past trends; and
• Where the authority agrees to address unmet need arising from neighbouring authorities.
2.1.9 The PPG is not exhaustive in its examples as to what may be a sound reason for considering an uplift. Matters such as a high affordability ratio that is following a rising trend, along with significant affordable housing need, and of course the importance of ensuring an adequate buffer to cater for under supply, or instances where the Plan strategy fails to deliver as expected, are all sound reasons for considering an uplift.
2.1.10
In the context of the above we note that the SA in section 5, in reviewing the Spatial Development Strategy Options, does not appear to look at different scales of growth relative to the LHN (both capped and uncapped) or the implications of only delivering the scale of housing proposed, just a variety of different spatial options where the scale of development is unquantified, despite the fact one of the SA objectives is that ‘More opportunities are provided for everyone to be in a suitable home to meet their needs.’ The above belies the evidence base and the various reasons why the council need to meet their LHN / an uplift to the LHN should be considered further, as summarised in the commentary below.
2.1.11 The reasons for uplifting the LHN should be set into two categories, firstly those that indicate an uplift is required for the District itself and secondly any uplift that might arise from meeting unmet need from neighbouring authorities.
Affordability
2.1.12 Rother is an inherently unaffordable place to live as acknowledged at paras 1.15, 8.20 and 8.21 of the Reg 18 Plan which refer to the issues of the significant deterioration in affordability within the district The HEDNA (2024) identifies a significant need for affordable housing in Rother in the Plan period. This is due to a high, and increasing, house-price to earnings (affordability) ratio, meaning that growth in house prices is significantly outstripping growth in wages, and housing is becoming less affordable for people who live, work, and retire within the district.
2.1.13 To this end, we note, when looking at the ONS ‘House Price to Workplace-Based Earnings Ratio - March 2024’ that the ratio of median house price to median gross annual workplace-based earnings by local authority district, England, and Wales, 1997 to 2023 indicates that the ratio of median house price to median gross annual workplace-based earnings in RDC has increased significantly over the past 10 years from 10.53 to 12.847.
2.1.14 The rapid increase in the affordability ratio is clear evidence of the lack of housing delivery that has taken place over the last 10-year period within the District. Failing to deliver the LHN will only increase the rate of decline in affordability. For an improvement in the affordability situation to occur, decisive action is required through the provision of more housing over and above the capped LHN.
2.1.15 The matter of affordability alone clearly indicates that the Council should be planning for more than the capped LHN.
Affordable Housing Need
2.1.16 Linked to the issue of affordability is the significant need for affordable housing identified in the District. A symptom of a rising affordability ratio is the fact that more members of society are priced out of the open market and consequently require affordable housing in one form or another. Again, the Council acknowledges this in the Draft Plan and in the Feb 2024 HEDNA that accompanies the consultation pack.
2.1.17 The HEDNA indicates that the total net annual affordable housing need for the period 2021 to 2044 is 325 dpa, which is equivalent to 44% of the capped LHN figure (based on 733 dpa). Whilst policy HOU2 does not indicate what level of affordable provision the council will be looking to deliver, policy LHN2 of the adopted core strategy looks to deliver 30% affordable housing on sites in Bexhill and Hastings Fringe, and Rye, 35% in Battle and 40% in the rural areas. Even if the Council were to adopt a 40% requirement across the board, this will only be triggered for those sites that meet the qualifying criteria. It is therefore highly unlikely that the affordable housing need will be met. Indeed, given the decreasing trend in terms of affordability set out above, the gross affordable housing need of 325 dpa is highly likely to increase over the plan period, leading to an increase in the net shortfall and in turn a higher number of people in need and on the Council’s housing waiting list.
2.1.18 Whilst the councils latest AMR does not provide any information on affordable housing delivery, we note that the Governments Affordable housing supply statistics (AHS) 2022-23 table 1011C indicates that over the past 10 years RDC only delivered 887 affordable completions. An average of 89 (rounded up) affordable completions per annum, which just 27% of the average annual affordable need of 325 affordable dwellings per annum identified in the HNA. JAA table 1a – Affordable Housing Provision 2013 - 2023
13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 Total
Total affordable dwellings 80 123 103 20 56 60 130 126 15 174
887
2.1.19 Furthermore, whilst if you compare the level of affordable provision against total housing completions over the past 5 years this averages 38.7% of total housing completions, it fluctuates significantly and prior to this was averaging significantly less. JAA table 1b – Affordable Housing Provision as a percentage of overall housing delivery 2016 - 2023
18-19 19-20 20-21 21-22 22-23 Total
Net additional dwellings
255 247 175 237
390
1,304
Total affordable dwellings
60
130
126
15
174
505
% of total
23.5%
52.6%
72%
6.3%
44.6%
38.7%
2.1.20 Given the above, even if one assumes an average of 38%, this suggests that the plan would need to deliver over 8558 dpa to meet the identified affordable housing needs of the District.
2.1.21
Whilst we are not advocating this level of growth, the above demonstrates the need for the plan to deliver the LHN in full/ an uplift to the LHN figure to boost the supply of open market and affordable homes and thus help address the affordable housing needs of the District. Said approach would also reflect on spatial objective 4 – to respond to the housing crisis and help facilitate the delivery of housing to meet the needs of different groups in the community, by maximising the potential opportunities for residential development in sustainable and deliverable locations, helping to deliver affordable housing, and ensuring development is viable and supports growth in the district by providing certainty for developers through site allocations and clear planning policies.
2.1.22
The SA in reviewing the merits of the alternative spatial options appears to have paid little regard to these fundamental points.
Past Under Delivery
2.1.23
We note the Councils Five Year Housing Land Supply Statement – 1 April 2023 (published in December 2023) suggests that the Council is able to demonstrate a 3.09 year housing land supply for the period 01/04/23 to 31/03/28, and that the HDT results for 2022, as published in December 2023 was, as set out below, just 41%.
JAA table 2 - Result of 2022 Housing Delivery Test
Area Number of homes required Total number of homes required Number of homes delivered Total number of homes delivered Housing Delivery Test: 2022 measurement Housing Delivery Test: 2022 consequence 2019-20 2020-21 2021- 22 2019-20 2020-21 2021- 22
Rother 363 490 740
1593 247 175 239 661 41% Presumption
2.1.24
We further note that RDC housing delivery has over the past few years been somewhat mixed, with the Council failing to meet their annual housing requirement on a number of occasions, which has led to a deficit that suggests that there has been a record of under delivery that should be addressed by an uplift to the LHN figure.
A Buffer
2.1.25
Given the issues of the affordability and the affordable housing needs of the district identified above, as well as the issue of past underdeliver rates, we feel that at the very least a buffer should be built into the housing requirement for the Plan. Introducing a buffer into the housing requirement would ensure that the Council plans positively for the future in a manner that at least meets the minimum LHN rather than the capped figure, or indeed the ‘capacity’ based figure it currently looks
to deliver. This would in reality also provide an uplift to reflect the acute affordability problem and in turn the rising affordable housing need. Given the time horizon of the plan, the Council should also consider the need for flexibility to be built into the strategy so that it can be resilient to unforeseen changes that may occur during the latter years of the plan period.
2.1.26
To this end, we would stress the need for the SA to not only look at various Spatial Development Strategies, but to express these in the context of overall housing provision and assess not only a strategy that reflects the capped LHN, but both the uncapped LHN and indeed something that falls short of the capped LHN so that the effects of all reasonable alternatives are properly taken into consideration. As currently drafted the SA does not in our opinion adequately addresses the issues raised above or look to address the issue of unmet needs from adjacent authorities – see below.
2.1.27
Having regard to the above we consider a buffer of circa 10% i.e. circa 1,4669 additional dwellings should be added to the capped LHN over the plan period to ensure the Plan proceeds on a robust footing.10
2.2
Unmet Need
2.2.1 We note that the Reg 18 Plan makes no specific reference to the Duty to Cooperate (DtC) with neighbouring authorities over the issue of unmet need, there being no reference to the unmet needs of neighbours either. We also note that whilst the HEDNA recognises the fact that Hastings and Rother, together with their intrinsic sub-areas, comprise a self-contained Housing Market Area and Functional Economic Market Area, it does not comment upon the relationship of the HMA to adjacent HMA’s and their unmet need, there being only passing recognition of the fact that Wealden is within the influence of and overlapped by the Hastings and Rother HMA. Nor is there any commentary on how Rothers reg 18 Plan will look to address the unmet needs of Hastings, despite the joint statement agreed with Hastings BC on p16 of the Reg 18 Plan.
2.2.2
Similarly, whilst the Housing Background Paper advises at para 5.14 that the Council is committed to its duties in relation to the Duty to Co-operate, and in summer 2020 prepared a Duty to Co-operate Action Plan which outlines how and at what stage it intends to engage and consult with organisations on the development of the Local Plan, the Engagement and Duty to Cooperate Statement in commenting upon the engagement to date with Hastings BC, and in particular the matter of housing need, merely says at para 6.11 that ‘ The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 481 for Hastings. Hastings Borough Council made a formal request to Rother District Council on 3rd December 2021, along with requests other authorities, as to whether Rother could accommodate any of Hastings’ residual unmet need.’
2.2.3
This does not confirm the scale of Hastings unmet need, which we understand to be in the region of 5,525 dwellings11 or Rothers response to Hasting’s request, and as such does not suggest active, ongoing, and constructive engagement.
2.2.4
Similarly, in commenting upon engagement with Wealden, para 6.23 of the Engagement and Duty to Cooperate Statement advises that: ‘The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 1,212 for Wealden, however, in
their respective Plans, Rother has set an annual target of between additional 243-343 dwellings per annum, while Wealden sets a per annum target of and additional. Both sets of targets fall short of the need figures derived from the Standard Methodology. At this stage in Plan development, neither district has yet made a request in respect of unmet need.’
2.2.5
As is clear from the above Wealden’s target of 22,800 dwellings has actually been omitted from the document, as has reference to the implications in terms of Wealden’s unmet need of 7,071 dwellings12. .
2.2.6
Not only does the Engagement and Duty to Cooperate Statement fail to address the issue of how this unmet need will be tackled, but also makes it clear that Rother has not yet made a request to surrounding districts in respect of its unmet need, this despite the fact Wealden have for example just completed their reg 18 consultation. Again, this does not suggest active, ongoing, and constructive engagement, or due regard to the implications of the increasing scale of unmet need that is emerging in this part of East Sussex, a matter one would have expected the SA to have regard to in terms of the wider social, economic, and environmental consequences.
2.2.7
The lack of any MoU or SoCG with Hastings BC given their request of 3.1.21 is also of concern, as is the current lack of Mou or SoCG with Wealden DC, albeit we note one is in preparation and will we assume be available for scrutiny at Reg 19.
2.2.8
As the council will be aware, in order to demonstrate that the consultation on strategic cross boundary issues such as housing and unmet needs has been effective, continuous and ongoing, and the requirements of the Duty to Cooperate (DtC) have been addressed in terms of the overall housing requirement, MoU or SoCG will need to be produced and reviewed and updated regularly if they are to be relied upon.
2.2.9
Only through a rigorous approach to the issue of the DtC will the Council be able to demonstrate that its housing requirement is right, and that the spatial strategy is correct in its approach to growth. As things stand, we do not believe there to be sufficient evidence in place to demonstrate the DtC has been complied with, and as such can only conclude that the plan is legally flawed.
Conclusions on the Housing Requirement
2.2.10
Not only are the Council failing to meet their LHN as calculated by reference to the Standard Method i.e. 14,660 dwellings (733 dpa), but the shortfall of 7,374 – 9,502 dwellings is between 50% and 65% of the capped LHN. This is a significant shortfall exacerbated by the fact the LHN is a capped figure, and as the PPG is clear the LHN is only the starting point.
2.2.11
There are a range of factors relevant to the calculation of the housing requirement for the Draft Plan that the Council needs to consider when arriving at its overall housing requirement. These include:
• The inherent lack of affordability and the increasing affordability ratios;
• The poor levels of affordable housing delivery, and attendant increasing need for affordable homes; and • The importance of including a buffer above the LHN to ensure adequate housing delivery particularly given the Council’s historically poor track record of delivery as set out above.
2.2.12
When these factors are properly scrutinised, they demonstrate clear and rational reasons as to why there should be an uplift to the LHN. Having regard to the above Persimmon Homes t believe that at the very least the plan should provide for the uncapped need i.e. 733 dpa to ensure the Plan proceeds on a robust footing. Over a plan period of 1st April 2020 to 31st March 2042 this would equate to some 16,126 dwellings, circa 8,840 - 10,968 dwellings more than the plan is currently looking to provide for.
2.2.13
Setting the housing requirement at this level would significantly improve the affordability situation within the District and would deliver more affordable homes for those members of the community in the most need.
2.2.14
It is clear that the SA has as yet to assess the merits of delivering the LHN in full, a higher figure or indeed a lower one. It is also clear from the Engagement and Duty to Cooperate Statement that the council have yet to fully assess the effects of their neighbours’ unmet needs or to explore through the DtC, whether any of their neighbours could assist.
2.3 Housing Supply
2.3.1. Nowhere in the Reg 18 Plan is there a trajectory setting out how the housing requirement will be met or a rolling five year housing land supply maintained. Thus, in terms of supply all that is available is the information set out within table 34 of the Reg 18 Plan which indicates that the housing supply comprises the following:
Source of housing supply
a
Constructed 1 April 2020 – 31 March 2023
802
b
Known completions and commencements on large sites since 1 April 2023
340
c
With Planning Permission
1,693
d
DaSA & Neighbourhood Plan allocations without permission brought forward
1,660
e
Additional HELAA potential sites
2,129
f
Windfall projection (across the district)
663
Total Range
5,15813- 7,28714
2.3.2 In reviewing the above there is nowhere in the evidence base where one can review and assess the deliverability of those sites with outstanding planning permission that have yet to start on site, allocated sites without permissions or the additional HELLA sites. The councils Housing Land Supply and Housing Trajectory (April 2023 position statement), within its appendices provides details of the following:
•
Delivery by financial year of large site permissions (2,140 of which 1261 are only have outline consent))
•
Delivery by financial year of large sites delegated to approve subject to S106 (555, of which only 2 sites delivering 17 dwellings are for full planning permission, the majority being outline schemes))
•
Delivery by financial year of DaSA allocations (520, of which an appeal for one site for 40 dwellings has been dismissed)) •
Delivery by financial year of Neighbourhood Plan allocations (253 of which sites delivering only 34 are subject to applications)) and
•
Small site permissions (316)
2.3.4 As the above does not tally with the figures in table 34 it is impossible to scrutinise the housing land supply properly and ensure it is truly deliverable. All we can note is that the number of large sites with outline permission only that are due to start delivering in the next 5 years seems rather high, as do the number of large sites with a resolution to grant outline permission subject to S106. We would also ask that the next iteration of the plan the council produce a more detailed evidence base to demonstrate that the proposed commitments will deliver as suggested and that the council can maintain a robust and rolling 5 year housing land supply.
2.3.5 In the context of the above, we would suggest that the Council consider further whether a buffer of say 10% should be applied to those sites with planning permission that have yet to commence to take into account any potential non-delivery/ delay in delivery of the dwellings contained within this category which at 1,693 equates to nearly a third of the supply15. Similarly, the sites contained within the DaSA & Neighbourhood Plan allocations without permission, which equate to a comparable proportion of the total supply. Alternatively, the Council need to undertake a more detailed critique of the proposed commitments to ensure what is being put forward is truly deliverable within the plan period. Either way we believe this would generate the need to find land to accommodate a further 335 dwellings16.
2.3.6. Turning to windfalls, para 5.131 of the reg 18 plan indicates that windfall development forms an important part of the councils housing land supply and that the Council will continue to rely on windfall development as part of its development strategy. To this end table 34 of the Reg 18 Plan reports a figure of 663 windfalls over the plan period, and proposed policy DEV5 suggests a windfall development projection of 39 dwellings per annum for the plan period17. This is however slightly at odds with the findings of Table 3 of the councils Housing Land Supply and Housing Trajectory (April 2023 position statement), which suggests an annual average of 45 windfalls a year. Clearly clarity is required on this, as whilst para 6.9 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) suggests that work is currently underway on producing an updated windfall methodology background paper in support of the new Local Plan, which will reassess the likely contribution from windfall sites in the future, as well as the period over which any allowance should be applied, no such document appears within the evidence base. As the council will be aware, they will, in accordance with para 72 of the NPPF, need to provide compelling evidence that the windfall trajectory is a reliable source of supply, and cannot just rely upon a headline review of past windfall delivery rates without any analysis of expected future trends.
2.3.7 Finally in terms of the additional HELAA potential sites, we note that the HELLA in listing Identified Sites (existing allocations and sites with planning permission), and Potential Sites (Sites are potentially suitable, potentially available and potentially deliverable, subject to further assessment or investigation), discounts an unquantified number of ‘Other Potentially Suitable Sites Where Availability is Unknown’ and Rejected Sites (sites assessed as currently unsuitable/ unavailable/ unachievable), and that it is unclear how releasing some of these sites would come to enabling the council to meet their LHN if the assessment criteria were reviewed/ the sites themselves reassessed in terms of the overall area to be developed/ development capacity were reviewed. Given the scale of the unmet need we would respectfully suggest that no stone should be left unturned in looking to achieve the LHN and that whilst not all of the rejected sites will be acceptable, some may, with further consideration, have been suitable, such that the overall quantum of deliverable sites and thus the plans ‘capacity’ based housing figure could be higher. We would thus recommend that in order to demonstrate the housing supply figure is fully justified the council provide further evidence to this effect at Reg 19.
Conclusions on the Housing Supply
2.3.8 Having reviewed the component parts of the Housing Land Supply as best we can given the lack of available evidence to justify the position set out in table 34 of the Reg 18 Plan, we note that the figures relied upon to meet the Councils proposed ‘capacity’ based housing requirement require:
➢
100% reliance on all current commitments (existing detailed, and outline permissions, as well as sites with a resolution to grant and sites allocated in the DaSA and Neighbourhood Plans). This is not justified and a 10% buffer should be introduced to allow for non-delivery/ slower than expected delivery i.e. circa 335 dwellings.
➢
100% of the proposed housing sites delivering the quantum proposed within the plan period. This is however subject to all of said sites being found acceptable by the Local Plan Inspector/ site promoters confirming the sites can deliver this quantum of development in light of all the other policy requirements set out in the plan, such that a contingency may be sensible.
➢
663 dwellings to come forward as windfalls. The proposed windfall allowance is not based on a credible evidence base and is not justified. At 9 - 13% of the residual requirement, it is a significant part of the overall supply and needs to be reviewed to ensure a realistic approach is adopted at Reg 19.
2.3.9 As a result of the above, we would submit that as the predicted supply is effectively dictating the overall requirements – i.e. we are looking at a ‘capacity’ based housing requirement, the fact there is no flexibility in the proposed supply is of grave concern as in effect the overall supply could be a lot less than predicted unless additional sites are added in to address our concerns about the commitments, and windfalls and help provide a buffer / address the issues of affordability and DtC we have raised above. As it stands the plan would be incapable of accommodating any fluctuations in the market and could leave the council open to speculative applications very early in the plan period. The council’s assessment of potential housing sites in the HELLA and SA needs to be reviewed and no stone left unturned when it comes to identifying sites and addressing perceived constraints. Likewise, the councils rational for the yields they have attributed to the proposed allocations needs to be fully justified as, as we explain below, we do not think they are when the policy requirements set out in the draft plan are properly taken into consideration.
3
The need for a Stepped Trajectory
3.1 We note that para 5.102 of the Reg 18 Plan suggests that the Council would require a considerable step change in housing delivery in order to deliver a significant uplift compared to current and historic delivery rates over the last ten years. Figure 37 then illustrates that over the past 12 years the council have on average delivered 219dpa, albeit in the last two years they have delivered 237 and 390 dpa, respectively. Whilst the LHA at 733dpa would require a sea change in delivery, the current proposition, of a supply led target of 258 – 364dpa is clearly within the realms of that which has been achieved of late – reflecting the indeed, if the trajectory in appendix 7 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) is correct the council are anticipating an average of 544 dpa following over the next 5 years18: whilst this tails off after 28/29, this is because the trajectory is based on existing commitments (permissions and allocations) if, with a new plan in place additional sites were allocated, there is no reason why higher levels of growth could not be sustained longer term. There is thus no justification within the evidence base to support a stepped trajectory. Indeed para 5.102 of the Reg 18 Plan appears to suggest that delivery rates have been significantly impacted by the economic downturn and the effect of the coronavirus pandemic in recent years, such that while a number of current allocated sites have been permitted there have been significant delays in the build out of sites. This does not support a stepped trajectory it merely justifies past performance which with an economic upturn should begin to ensure a more robust and steady supply. Furthermore, as two thirds of the proposed supply is already committed there can be no justification for a stepped trajectory.
4
The Growth Options for Sub Areas
4.1 Whilst having no direct interest in the growth options, we do note that when looking at figure 33 that a considerable amount of the proposed growth, both committed and proposed through the additional sites identified through the HELAA that 46% of the proposed growth is in and around Bexhill, with only 9% being directed towards Battle, only 3.6% to the hastings fringe. Whilst we acknowledge that Bexhill is the least constrained of the main centres, one has to wonder if this is a sustainable approach, especially given the public transport links and level of services available in the likes of Battle and Robertsbridge. Comparing figure 35 of the Reg 18 Plan (the opportunities for housing growth) with Figure 12 of the settlement study (part 1) (Settlement Sustainability Score Table), the level of growth proposed in the Sustainable and Moderately Sustainable settlements seems to be significantly less than that proposed in Bexhill, which whilst it is the only ‘Highly Sustainable’ settlement seems somewhat out of proportion and one has to wonder whether this could lead to market saturation and actually prejudice housing land supply.
5
Development Principles Policies
5.1 We note that DEV2 requires: ‘Planning applications (whether in outline or full format) must relate to an entire development site to ensure a comprehensive approach, including where sites are in multiple ownerships.
When an outline application is submitted, a masterplan defining key parameters for the entire site must be submitted by the applicant to indicate how the overall development of the site can be achieved.’
5.2 Where sites are in multiple ownership, we would suggest that as long as a framework masterplan covering the whole site, and an infrastructure delivery strategy has been agreed, either through the site promoters and the council or via an SPD, there should be nothing to stop one party looking to promote their site in advance. As long as the application reflects the framework masterplan and s106 proceeds in accordance with the infrastructure delivery plan we fail to see how this would prejudice the plan. Indeed, it may well allow sites to proceed more quickly and thus actively assist the council in their housing land supply. 5.3 We note that DEV3 indicates that: ‘Development boundaries define the area within sustainable settlements where development will be permitted, provided it is consistent with this Local Plan.
Priority shall be given to reuse of brownfield sites, in order to make efficient use of previously developed land in sustainable settlements. Some greenfield development will be necessary in order to deliver housing and employment need, but this will be limited to inside development boundaries.’
5.4 Whilst in the first instance we assume the development boundaries will be redrawn to reflect the proposed allocations, we would also suggest that given the shortfall in the housing land supply, that the council should look to have a criterion based policy that enables development immediately adjacent to the limits of built development subject to certain criteria. For example, within Mid Sussex, policy DP6 provides for:
The growth of settlements will be supported where this meets identified local housing, employment, and community needs. Outside defined built-up area boundaries, the expansion of settlements will be supported where:
1. The site is allocated in the District Plan, a Neighbourhood Plan, or subsequent Development Plan Document or where the proposed development is for fewer than 10 dwellings; and
2. The site is contiguous with an existing built up area of the settlement; and
3. The development is demonstrated to be sustainable, including by reference to the settlement hierarchy.
The developer will need to satisfy the Council that:
• The proposal does not represent an underdevelopment of the site with regard to Policy DP26: Character and Design; or
• A large site is not brought forward in phases that individually meet the threshold but cumulatively does not.
5.5 A similar policy approach would we believe be appropriate here and would assist the council in meeting their LHN.
5.6 We note that DEV5 refers to the windfall rate of 39dpa. Given our comments above, this will need to be properly justified within the evidence base for the Reg 19 Plan.
5.7 Turning to DEV6, and the Strategic Green Gaps, the current strategic gap between Bexhill and Hastings should not be seen as a constraint on development on a par with the AONB or any other NPPF footnote 7 constraint, and should not in our opinion be carried over from the current core strategy without first being reviewed to establish if they can accommodate some growth to assist the council in meeting their LHN/ meeting the unmet needs of their neighbours, especially Hastings.
6
Health and Wellbeing Policies
6.1 We note that policy HWB2 requires a HIA to be undertaken on all applications for development of 100 (+) dwellings/ sites of more than 5ha. Whilst Persimmon Homes would agree that HIA are an essential part of plan making to ensure the Council understand the health outcomes of its strategy and is thus able to ensure these are effectively addressed, this should be achieved through the preparation of a whole plan HIA which will help inform the Council that the policies the plan contains address the key health outcomes for the area. As the plan and the policies it contains has been prepared to address the key health issues it is unnecessary for future development proposals that accord with this plan to undertake a separate HIA. If a development meets the policies in the plan, then it is by default addressing the health outcomes already identified by the Council. A HIA as part of the application would merely be repetition of the work the council has already undertaken. The only circumstance where an HIA may be appropriate would be for a larger unallocated site where the impacts may not have been fully considered by the council as part of the plan wide HIA. Policy HWB2 needs to be revised accordingly.
6.2 We also note that criterion 5 of HWB5 requires developments of 300 (+) dwellings to provide playing pitches on site in line with the recommendations of Rother’s Playing Pitch and Built Facilities Strategy and Sport England’s standards. Whilst not opposing this criterion, Persimmon Homes would suggest that the following is added to criterion 5 ‘unless evidence suggests that this is unachievable” as a sites topography may not make this possible/ economies of scale may mean providing / contribution to offsite provision is in certain circumstances preferable; or that this would fetter a developer’s ability to deliver BNG on site as such facilities do not assist in trying to deliver BNG. Indeed, they can actively prejudice it.
7
Infrastructure Policies
7.1 We note that policy INF1 (A) indicates that ‘Where new infrastructure capacity is required, it must be demonstrated that it can be delivered upfront or early in the development phasing.’ As the councils will be aware, the question of the supply of utilities to support development (including residential development) is a matter that is dealt with through separate statutory regimes. Providers such as the water and energy companies are required, among other things, to ensure a supply of services adequate to meet the needs of the plan-led system. As such policy INF41 (A) should not require applicants for planning permission to demonstrate that there is sufficient capacity with regard to provision of utilities such as water and power. Furthermore, when considering other infrastructure requirements, the policy should have regard to the cash flow implications of this criteria and be caveated accordingly.
8 Housing Policies
HOU1 Mixed and Balanced Communities
8.1 In noting the unit mix proposed in policy HOU1, we would in the first instance question the extent to which policy HOU1 should look to be prescriptive on the market housing to be delivered across the district for the whole of the plan period; rather the Council should recognise the need for flexibility, as per the NPPF and PPG, as the fact is the needs of the area may well change over the lifetime of the plan, particularly given the current uncertainty in the housing market, and that different areas will inevitably deliver different forms of housing i.e. apartments within more urban town centre locations and family housing in suburban areas; and that it is the combination of the two that will ultimately address the overall need.
HOU2 Affordable Housing
8.2 We note that no percentage has been provided in this policy to clarify the level of affordable provision to be provided on qualifying sites. We look forward to seeing and being able to comment upon the final requirement at Reg 19. In addition, we note that policy HOU28 also looks to see the affordable units well-integrated and designed to the same high quality to create tenure-neutral and socially inclusive homes and spaces; and that the affordable housing should be apportioned individually or in small clusters and where this is not proposed it should be robustly justified. Whilst we appreciate and support the need to ensure integration and to create more balanced communities, that has to be weighed against the management objectives of the affordable provider, who often find small clusters to be inefficient, such that this requirement needs to provide for those instances where the affordable provider feels a different approach is justified in that particular instance. HOU8 Access Standards
8.3 We note that policy HOU8 requires all new homes to be NDSS, and that as has already been established in the adopted development plan, there is a requirement for all new dwellings in the district to be M4(2) compliant, and 5% of affordable dwellings to meet M4(3)(2)(b) standards where a need exists. In addition, however, policy HOU8 includes a requirement for 5% of new market housing to meet the “wheelchair adaptable dwellings” standard in Part M4(3)(2)(a). Whilst para 8.71 of the plan suggests that these policy expectations are justified by the district’s ageing population and levels of disability, and the need for homes to appropriately meet the demands of occupiers throughout their lifetimes, this is not in our opinion clear and convincing evidence to justify this requirement and as such we would submit that this part of policy HOU8 should be deleted.
HOU9 – Specialist Housing for the Elderly
8.4 We note that policy HOU9 requires all developments of 100 (+) dwellings to set aside at least 10% of the total number of dwellings as specialist housing for older people. It is not clear whether this is in addition to, or as part of, the requirement also being set out in policy HOU8, or whether this could just be bungalows, or buildings that have to have communal areas. As drafted the policy is unclear and thus ineffective. In addition, subject to clarity it could be overly onerous when coupled with other requirements and thus likely to affect a sites viability.
HOU12 Self-Build and Custom Housebuilding
8.5 We note that policy H0U12 requires 5% Self/ Custom-Build Housing on all sites of 20 dwellings (+). Whilst the councils Self-build and Custom Housebuilding (SCHB) Headline Data Report 202319 indicates that as of 30.10.23 there were 197 individuals and 3 associations on the self-build and custom housebuilding register, it is not clear from the evidence base how many plots would be required if the existing commitments were taking into consideration. This needs to be established to ensure the proposed policy is justified and will be effective in meeting the outstanding demand.
8.6 In the context of the above, whilst noting the scale of the demand, we understand that before seeking to require the proposed developments to provide a proportion of the homes delivered as self-build plots the Council will need to examine other opportunities for meeting the needs of those who want to self-build. Under the Self Build & Custom Housebuilding Act 2015 and para 63 of the NPPF (2023), it is the Councils responsibility to ensure that sufficient permissions are given to meet demand. Further detail is provided in paragraph 57-014 of PPG with regard to the Council’s duties and whilst this recognises that it should take account of self-build registers when preparing planning policies, it also outlines that consideration needs to be given by Councils to the disposal of their own assets in order to meet the need for self-build plots or whether self-build could support the regeneration of brownfield sites. A need for self-build plots should not automatically lead to a policy requiring their provision on sites of 20 (+) dwellings. PPG also notes at paragraph 57-025 that local authorities should be encouraging developers and landowners to consider providing plots for self-build and custom house building but makes no reference to requiring their provision. The Government clearly sees the role of the local authority as working to identify opportunities with developers rather than placing responsibility on to the development industry. 8.7 The Council will also need to consider whether it is feasible that all sites of 20 (+) dwellings can deliver self-build plots. Often, especially on the larger sites, there are multiple contractors and large machinery operating on-site, and the development of single plots by individuals operating alongside this construction activity raises both practical and health & safety concerns. Any differential between the lead-in times / build out rates of self & custom build plots and the wider site may lead to construction work outside of specified working hours, building materials stored outside of designated compound areas and unfinished plots next to completed and occupied dwellings, resulting in consumer dissatisfaction. Whilst some sites may be able to locate self-build plots in a manner that reduces these potential risks, on others this will be impossible with developers unable to co-ordinate the provision of self & custom build plots with the development of the wider site. Such concerns must be given full consideration by the Council when preparing any policies on self-build to be included in the Local Plan.
8.8 Having regard to the above we would submit that the requirement to deliver 5% Self/ Custom-Build Housing on all sites of 20 (+) dwellings is likely to deliver very little in the way of tangible benefits, whilst creating significant difficulties for the builders involved. It would be a lot more effective for the Council to identify self-build sites or allocate certain sites to deliver a higher proportion of Self/ Custom-Build Housing.
8.9 Given the above we would suggest that the council review their requirements and are more explicit as to what they want, where and why, as at present policy HOU12 does not look to be properly justified or effective.
9 Green to the Core
GTC1: Net Zero Development Standards
9.1 We note that policy GTC1 requires all residential development to achieve: ‘a) LETI Total Energy Use Intensity (TEUI) Target for Operational Energy of 35 kWh/m2/year (GIA).
b) For new buildings, a 4-star Home Quality Mark (HQM) score; or for conversions to residential development, a Building Research Establishment Environmental Assessment Method (BREEAM)
‘Excellent’ standard as minimum.
c) A maximum space heating demand for new buildings (small scale housing) of 15 kWh/m2 per year.
d) If LETI, Home Quality Mark or BREEAM is updated or replaced during the plan period the equivalent replacement requirements will be applied.
9.2 It goes on to advise that ‘to demonstrate compliance, a Building Research Establishment (BRE) Home Quality Mark post-construction assessment or similar must be undertaken at practical completion.’
9.3 And that in terms of embodied carbon: ‘All new development proposals must demonstrate, through an energy statement, how the following embodied carbon standards will be met:
(i) All residential development must achieve a LETI C rating for embodied carbon emissions, equating to 600 kgCO2/m2 upfront embodied carbon and 970 kgCO2/m2 total embodied carbon.
From 1 January 2030, a LETI A rating must be achieved, equating to 300 kgCO2/m2 upfront embodied carbon and 450 kgCO2/m2 total embodied carbon.’
9.4 Whilst Persimmon Homes support the Government’s approach set out in the Future Homes Standard, we note that the Government have set out a clear roadmap as to how low carbon homes will, alongside the decarbonisation of the national grid, ensure that the Government can meet its commitments to net zero by 2050; and that the way forward being taken by the Government recognises that the improvements in energy efficiency of new homes should be a transition which ensures that new homes continue to come forward to meet housing needs whilst still being sufficiently challenging to significantly reduce the carbon emissions of new homes from 2025. This is set out explicitly in the Written Ministerial Statement of the Minister of State for Housing on the 13th December 2023, when he indicated that:
‘The improvement in standards already in force, alongside the ones which are due in 2025, demonstrates the Government’s commitment to ensuring new properties have a much lower impact on the environment in the future. In this context, the Government does not expect plan-makers to set local energy efficiency standards for buildings that go beyond current or planned buildings regulations. The proliferation of multiple, local standards by local authority area can add further costs to building new homes by adding complexity and undermining economies of scale. Any planning policies that propose local energy efficiency standards for buildings that go beyond current or planned buildings regulation should be rejected at examination if they do not have a well-reasoned and robustly costed rationale that ensures:
That development remains viable, and the impact on housing supply and affordability is considered in accordance with the National Planning Policy Framework.
The additional requirement is expressed as a percentage uplift of a dwelling’s Target Emissions Rate (TER) calculated using a specified version of the Standard Assessment Procedure (SAP).’20
9.5 As the council will be aware, the challenge to the WMS have been dismissed. Given the above, whilst the aspirations in Policy GTC1 are worthy and Persimmon Homes are committed to the delivery of Zero Carbon Homes/ Carbon Neutrality on all their sites, wherever it is practical and viable to do so, there is in our opinion no need for additional standards to be placed on developments through additional Local Plan policies that vary from that required in national government guidance. The plan has to acknowledge the implications of the transitional period and the need for flexibility during this period, in accordance with the aims and objectives of national policy. As such, not only is policy GTC1 overly complex and likely to impact on delivery/ viability, it is also clearly inconsistent with the approach advocated in the WMS. As a result, and having regard to our comments below on the lack of any Viability Assessment to support the reg 18 plan and the associated assessment of the implications of the emerging local plan policy on Net Zero Carbon, we would suggest that Policy GTC1 revert to the requirements set out in Building Regs.
GTC7: Local Nature Recovery Areas
9.6 We note this policy requires all new development to meet the objectives of the East Sussex (including Brighton and Hove) Local Nature Recovery Strategy (LNRS). We do not believe it is inappropriate to require all new development to meet the objectives set out in a document that is not a development plan document. Whilst the council can suggest that development has regard to the LNRS it is not consistent with national policy to require them to meet these objectives. It would also be perverse to require all new developments to adhere to a set of objectives that the council itself only has a duty to have regard to in its decision-making processes. We would therefore recommend that this policy is amended to advise that all new development has regard to the objectives set out in the LNRS
GTC8: Biodiversity Net Gain
9.7 We note that policy GTC8 requires al qualifying development proposals to deliver at least a 20% measurable biodiversity net gain attributable to the development. Whilst there does not appear to be any justification as to why a 20% BNG requirement is needed, such that we would submit the policy is unsound; Persimmon Homes are committed to doing as much as possible to meet the councils’ aspirations and as such would suggest that rather than require development to deliver at least 20% BNG, the Council recognises in policy that the 10% mandatory requirement is a minimum and that they will look favourably on development that seeks to go beyond this figure. If, however, the 20% BNG requirement is retained the council need to set out that where 20% is not deliverable it will seek to negotiate the viable level that can be provided over the 10% minimum required by the Environment Act 2021.
9.8 Such an approach would facilitate an element of flexibility that would take account of the potential implications delivering 20% BNG may have on viability/ overall dwelling numbers and would thus ensure a more effective policy approach, that is consistent with the aims and objectives of national policy as set out in the biodiversity net gain planning practice guidance of 14 February 2024 which at 006 Reference ID: 74-006-2024 states:
‘Plan-makers may seek a higher percentage than the statutory objective of 10% biodiversity net gain, either on an area-wide basis or for specific allocations for development. However, such policies will need to be evidenced including as to local need for a higher percentage, local opportunities for a higher percentage and any impacts on viability for development. Consideration will also need to be given to how the policy will be implemented.’ My emphasis.
9.9 In the context of the above the council need to have regard to the ecological baseline and the difficulties delivering 10% BNG, let alone 20% can have where the baseline is already high, such that offsite credits will be required, the level of which for smaller sites would be financially prohibitive such that the actual capacity of said sites may needs to be revisited. To this end we are aware of anecdotal evidence that suggests that to deliver 20% BNG a sites net to gross will fall from circa 75 to circa 65%, which can as a result impact on its overall development capacity and the councils associated housing land supply.
9.10 Notwithstanding our thoughts on the justification behind the 20% BNG requirements and its associated implications on a site’s development capacity, as well as its viability, there needs to be more in the plan to ensure the provision of a strategic network of sites that can deliver BNG offsite in Rother or within the same national character area (NCA); as whilst important in delivering 10% this is even more important if the Council introduces 20% BNG. At present there is little evidence that there will be sufficient local offsite credits in the short and medium term to support schemes that cannot deliver a 10/ 20% BNG on site. Nor is there any recognition of the fact that by requiring a 20% net gain the council are effectively adding to the pressure on the market for credits as more sites will be required to purchase offsite credits to meet this higher level of BNG. This increases costs and will more than likely delay sites that cannot secure these. Whilst we recognise the fact that there is the option of buying national credits, the cost of these is set well above the market to promote local solutions and will impact significantly on the viability of development meaning many developers will have to wait until local credits are available, which will prejudice the councils rolling 5 year housing land supply position.
10 Landscape Character
10.1 We note that policy LAN2 requires a CAVAT assessment to be submitted with all applications impacting on an individual or groups of trees in order to quantify their public amenity value. This is in our opinion totally unjustified and would question why a standard tree surveys would not suffice in the first instance, with a CAVAT assessment only being required where a tree of particular individual or group value is to be lost. 11 The SA of the Development Strategy
11.1 As set out above we note that the SA in scoring the Development Strategy, at Figures 11 and 12 does not actually comment upon the quantum of development the different options would deliver and how this would relate to the LHN, or indeed address the issue of the unmet needs of neighbours. Given SA objective 8 on housing this is somewhat surprising, as is the fact that no one option appears to have been chosen as the preferred option; albeit SDO3B (Bexhill Greenfield Growth Option 2: with New Multi-modal Transport Corridor) appears to score most favourable, followed by SDO6 (Brownfield Intensification and Redevelopment), which as it would totally fail to meet the LHN seems somewhat perverse, especially when figure 11 scores it as ‘Option supports the objective, or elements of the objective on balance, although effects may be minor’. Surely it would be ‘Option appears to conflict with the objective on balance and may result in minor adverse effects’ or indeed even ‘Potentially significant adverse effects’. Similarly, the scoring of SDO11 (Growth in settlements with train stations or sustainable transport alternatives) in figure 12 seems somewhat odd21 given its based on sustainable transport. To this end we also note that in a number of occasions, SOD4 and SOD5 for instance, growth is said to be resisted by virtue of land availability based on environmental and topographical constraints. Given the scale of unmet need currently proposed we would respectively suggest the council need to do more to establish whether additional land in these areas is available/ could be developed as no stone should be left unturned in trying to meet the LHN. As it stands, the SA lacks the necessary robustness required as it is impossible to assess the impact and weigh benefits and harm of each development strategy without know scale of delivery associated with each option.
11.2 Having regard to the above we feel it’s imperative that if the SA is to be effective the next iteration needs to assess the Development Strategy in the context of the LHN and how the council are to accommodate this/ the implications of not accommodating it/ over delivering to address adjacent authorities’ unmet needs.
12 The Infrastructure Delivery Plan Viability Assessment
12.1 We are surprised to note that whilst an Infrastructure Delivery Plan (IDP) has been produced to support the Reg 18 Plan, as well as an Infrastructure Background Paper, there is no Viability Appraisal (VA) of the plan. Not only does the lack of a VA makes it difficult to comment on the proposed policies, but it also raises questions about the aspirations of the IDP i.e. how these have been tested, and whether they are realistic and deliverable. If the plan is predicated on the aspirations of the IDP then the whole plans approach is also open to debate as how can it be said to be justified and effective if it has not been subject to a robust VA.
13 Conclusions on Reg 18 Plan
13.1 We are concerned that the scale of growth proposed in the overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa, which is significantly less than the capped LHN of 733dpa/ the uncapped LHN of 850 dpa. In our opinion there is no justification for promoting a lower housing target than the capped LHN given the aims and objectives of national government guidance and the affordability issues that exist within the district, that the plan says it wants to address. The scale of the potential shortfall (between 7,286 and 9,502 dwellings over the plan period22) is significant, and will we fear be exacerbated if the predicted supply does not deliver as forecast. Nowhere does the plan, or the evidence base demonstrate how this will be addressed. In addition, it does not appear to have been raised with adjacent authorities through discussions on the DtC. Nor does the plan/ its evidence base demonstrate how the acute levels of unmet housing need that exist within the area are to be addressed through constructive and active engagement so as to meet legal duties imposed by the DtC.
13.2 Similarly we are concerned that no evidence has been provided to demonstrate how the housing requirement will be met or how a rolling five year housing land supply will be achieved. The deliverability of the existing commitments needs to be demonstrated more evidentially than it has to date. Likewise, the evidence needs to be provided to demonstrate that the proposed allocations will deliver the quantum of development suggested when expected; and the plan needs to encompass compelling evidence to support the windfall rates expected rather than rely on historic trends.
13.3 We would also suggest that the plan period needs to be reviewed so that it provides for 15 years from adoption (i.e. till 31st March 2042).
13.4 Turning to the Development Strategy, the justification behind the Development Strategy and the clear preference for concentrating growth in and around Bexhill is not clear, the SA being silent on the quantum of development each Development Strategy could deliver and how the overall strategy related to the LHN.
13.5 In addition to the above we also have specific concerns about policies DEV2 (Comprehensive Development and Masterplanning), DEV3 (Development Boundaries), DEV5 (Development on Small Sites and Windfall), DEV6 (Strategic Green Gaps), HWB 2 (Health Impact Assessments), INF1 (Strategic Infrastructure Requirements), HOU1 (Mixed and Balanced Communities), HOU2 (Affordable Housing), HOU12 (Self-Build and Custom Housebuilding) , GTC1 (Net Zero Building Standards) and GTC8 (Biodiversity Net Gain), all of which we do not believe to be properly justified or consistent with national planning policy guidance as drafted.
In the context of the above we would like to highlight Persimmon Homes desire to work with Rother District Council on progressing a sound plan and that to this end we are happy to meet with officers to discuss our reps on the housing requirement, supply and trajectory and the other policies contained in the Reg 18 Plan/ its supporting evidence base.
Yours sincerely
JUDITH ASHTON
Judith Ashton Associates
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28011
Received: 22/07/2024
Respondent: Persimmon Homes Ltd
Agent: Judith Ashton Associates
Para 5.131 indicates that windfall development forms an important part of the councils housing land supply and that the Council will continue to rely on windfall development as part of its development strategy. To this end table 34 reports a figure of 663 windfalls over the plan period, and proposed policy DEV5 suggests a windfall development projection of 39 dwellings per annum. This is however slightly at odds with the findings of Table 3 of the councils Housing Land Supply and Housing Trajectory (April 2023 position statement), which suggests an annual average of 45 windfalls a year. As the council will be aware, they will, in accordance with para 72 of the NPPF, need to provide compelling evidence that the windfall trajectory is a reliable source of supply, and cannot just rely upon a headline review of past windfall delivery rates without any analysis of expected future trends.
I write with reference to the above. I act for Persimmon Homes who have an interest in a sound plan being delivered for Rother.
Having regard thereto, having reviewed the Regulation 18 Draft Local Plan (April 2024), and associated evidence base, especially the Sustainability Appraisal - Interim Report (SA) and associated appendices, Housing and Economic Land Availability Assessment (HELAA), Local Housing and Economic Needs Assessment (HEDNA), Development Strategy Background Paper (DSBP), Housing Background Paper (BP), Settlement Study (SS), and Infrastructure Delivery Plan (IDP), and Viability Assessment and CiL Review (VA); we have the following comments on the Draft Regulation 18 Rother Local Plan (April 2024), and associated evidence base.
1 The Plan Period
1.1 We note that the 2024 LDS suggests adoption of the Local Plan (Regulation 26) in Quarter 3 2026/27. As a result, the plan period advocated in policy SS2 will be less than 15 years from adoption. In order to comply with paragraph 22 of the NPPF, the plan period should we believe start at 1st April 2023 and be extended to 31st March 2042 as this will ensure it looks ahead for a minimum of 15 years from adoption. As a result, additional housing allocations need to be made to help address this additional requirement.
2 The Housing Requirement, Supply and Trajectory
2.1
Local Housing Need, and the Minimum Housing Requirement
2.1.1 We note that the proposed overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa.
2.1.2
Having reviewed the housing requirement against the standard method and the advice in the PPG about the need to consider the application of a cap, we note that adopting the standard methodology, and adjusting the figures to the base date of the local plan and using the latest local affordability ratio, the position is as set out below.
Step 1: Setting the Baseline
Household Projection = 523.41 dwellings per annum
Step 2: Adjustment for
Affordability
Local Affordability Ratio = 13.822
Adjustment Factor = 1.61 𝐴𝑑𝑗𝑢𝑠𝑡𝑚𝑒𝑛𝑡 𝑓𝑎𝑐𝑡𝑜𝑟=(13.82−44) 𝑥 0.25+1
Minimum Local Housing need
523.4
x 1.61 = 842.6
2.1.3
As set out in section 5 of the HEDNA a cap is applied to limit the level of increase, depending upon the stage that the local authority is at with regards to its strategic policies for housing. Where the policies have been adopted within the last 5 years, the LHN figure is capped at 40% above the average annual housing requirement figure as set out in the existing policies. Where the relevant policies were adopted more than 5 years ago (as is the case in Rother), the LHN is capped at 40% above whichever is higher of:
• The average annual projected household growth identified in Step 1; or
• The average annual housing requirement figure as set out in the most recently adopted strategic policies.
Having done this, we note the following:
40% cap
The average annual projected household growth identified in Step 1
523.4
732.7
The average annual housing requirement figure as set out in the most recently adopted strategic policies
3353
469
2.1.4 Given the above the LHN in Rother is reduced from 842 dpa to 733 dpa. That said, while the cap reduces the minimum number generated by the standard method, it does not reduce housing need itself. Therefore, strategic policies adopted with a cap applied may require an early review and updating to ensure that any housing need above the capped level is planned for as soon as is reasonably possible. The PPG is clear that the standard method is a minimum number and that in areas such as Wealden where the cap reduces the local housing need “consideration can still be given to whether a higher level of need could realistically be delivered. This may help prevent authorities from having to undertake an early review of the relevant policies”4. For Rother this would mean considering whether to deliver 842dpa. It is also important to note that the LHN figure is a minimum starting point, and it does not produce the Housing Requirement5.
2.1.5
In the context of the above, we note that the overall spatial development strategy in looking to deliver a minimum of 5,158 to 7,286 dwellings over the plan period is in effect only looking to deliver between 35% and 50% of the capped LHN.
2.1.6
We further note that the HEDNA is clear in the executive summary on both the scale of the LHN (737dpa at the time), and the findings of the housing growth scenario, indicating that there are ‘no exceptional local circumstances’ that would justify deviating from the Standard Method in Rother.
2.1.7
Whilst the inference in the plan is that the level of housing growth that is proposed is supply led (i.e. reflects the level of suitable sites assessed through the HELAA process) and constrained by the High Weald AONB, the Pevensey levels, the Strategic Gaps around Hastings and the SSSI around Rye, this is adopting a policy on approach to a situation that should be policy off.
2.1.8
Thus, not only is it unclear why the plan is not looking to deliver the LHN as identified in the HEDNA, but why it has not also looked at the uncapped need given the issues surrounding the unmet needs of its neighbours (see below). PPG6 identified a number of circumstances where it might be appropriate to plan for a higher housing need figure than the Standard Method indicates. Such circumstances can include:
• Instances where housing need is likely to exceed past trends; and
• Where the authority agrees to address unmet need arising from neighbouring authorities.
2.1.9 The PPG is not exhaustive in its examples as to what may be a sound reason for considering an uplift. Matters such as a high affordability ratio that is following a rising trend, along with significant affordable housing need, and of course the importance of ensuring an adequate buffer to cater for under supply, or instances where the Plan strategy fails to deliver as expected, are all sound reasons for considering an uplift.
2.1.10
In the context of the above we note that the SA in section 5, in reviewing the Spatial Development Strategy Options, does not appear to look at different scales of growth relative to the LHN (both capped and uncapped) or the implications of only delivering the scale of housing proposed, just a variety of different spatial options where the scale of development is unquantified, despite the fact one of the SA objectives is that ‘More opportunities are provided for everyone to be in a suitable home to meet their needs.’ The above belies the evidence base and the various reasons why the council need to meet their LHN / an uplift to the LHN should be considered further, as summarised in the commentary below.
2.1.11 The reasons for uplifting the LHN should be set into two categories, firstly those that indicate an uplift is required for the District itself and secondly any uplift that might arise from meeting unmet need from neighbouring authorities.
Affordability
2.1.12 Rother is an inherently unaffordable place to live as acknowledged at paras 1.15, 8.20 and 8.21 of the Reg 18 Plan which refer to the issues of the significant deterioration in affordability within the district The HEDNA (2024) identifies a significant need for affordable housing in Rother in the Plan period. This is due to a high, and increasing, house-price to earnings (affordability) ratio, meaning that growth in house prices is significantly outstripping growth in wages, and housing is becoming less affordable for people who live, work, and retire within the district.
2.1.13 To this end, we note, when looking at the ONS ‘House Price to Workplace-Based Earnings Ratio - March 2024’ that the ratio of median house price to median gross annual workplace-based earnings by local authority district, England, and Wales, 1997 to 2023 indicates that the ratio of median house price to median gross annual workplace-based earnings in RDC has increased significantly over the past 10 years from 10.53 to 12.847.
2.1.14 The rapid increase in the affordability ratio is clear evidence of the lack of housing delivery that has taken place over the last 10-year period within the District. Failing to deliver the LHN will only increase the rate of decline in affordability. For an improvement in the affordability situation to occur, decisive action is required through the provision of more housing over and above the capped LHN.
2.1.15 The matter of affordability alone clearly indicates that the Council should be planning for more than the capped LHN.
Affordable Housing Need
2.1.16 Linked to the issue of affordability is the significant need for affordable housing identified in the District. A symptom of a rising affordability ratio is the fact that more members of society are priced out of the open market and consequently require affordable housing in one form or another. Again, the Council acknowledges this in the Draft Plan and in the Feb 2024 HEDNA that accompanies the consultation pack.
2.1.17 The HEDNA indicates that the total net annual affordable housing need for the period 2021 to 2044 is 325 dpa, which is equivalent to 44% of the capped LHN figure (based on 733 dpa). Whilst policy HOU2 does not indicate what level of affordable provision the council will be looking to deliver, policy LHN2 of the adopted core strategy looks to deliver 30% affordable housing on sites in Bexhill and Hastings Fringe, and Rye, 35% in Battle and 40% in the rural areas. Even if the Council were to adopt a 40% requirement across the board, this will only be triggered for those sites that meet the qualifying criteria. It is therefore highly unlikely that the affordable housing need will be met. Indeed, given the decreasing trend in terms of affordability set out above, the gross affordable housing need of 325 dpa is highly likely to increase over the plan period, leading to an increase in the net shortfall and in turn a higher number of people in need and on the Council’s housing waiting list.
2.1.18 Whilst the councils latest AMR does not provide any information on affordable housing delivery, we note that the Governments Affordable housing supply statistics (AHS) 2022-23 table 1011C indicates that over the past 10 years RDC only delivered 887 affordable completions. An average of 89 (rounded up) affordable completions per annum, which just 27% of the average annual affordable need of 325 affordable dwellings per annum identified in the HNA. JAA table 1a – Affordable Housing Provision 2013 - 2023
13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 Total
Total affordable dwellings 80 123 103 20 56 60 130 126 15 174
887
2.1.19 Furthermore, whilst if you compare the level of affordable provision against total housing completions over the past 5 years this averages 38.7% of total housing completions, it fluctuates significantly and prior to this was averaging significantly less. JAA table 1b – Affordable Housing Provision as a percentage of overall housing delivery 2016 - 2023
18-19 19-20 20-21 21-22 22-23 Total
Net additional dwellings
255 247 175 237
390
1,304
Total affordable dwellings
60
130
126
15
174
505
% of total
23.5%
52.6%
72%
6.3%
44.6%
38.7%
2.1.20 Given the above, even if one assumes an average of 38%, this suggests that the plan would need to deliver over 8558 dpa to meet the identified affordable housing needs of the District.
2.1.21
Whilst we are not advocating this level of growth, the above demonstrates the need for the plan to deliver the LHN in full/ an uplift to the LHN figure to boost the supply of open market and affordable homes and thus help address the affordable housing needs of the District. Said approach would also reflect on spatial objective 4 – to respond to the housing crisis and help facilitate the delivery of housing to meet the needs of different groups in the community, by maximising the potential opportunities for residential development in sustainable and deliverable locations, helping to deliver affordable housing, and ensuring development is viable and supports growth in the district by providing certainty for developers through site allocations and clear planning policies.
2.1.22
The SA in reviewing the merits of the alternative spatial options appears to have paid little regard to these fundamental points.
Past Under Delivery
2.1.23
We note the Councils Five Year Housing Land Supply Statement – 1 April 2023 (published in December 2023) suggests that the Council is able to demonstrate a 3.09 year housing land supply for the period 01/04/23 to 31/03/28, and that the HDT results for 2022, as published in December 2023 was, as set out below, just 41%.
JAA table 2 - Result of 2022 Housing Delivery Test
Area Number of homes required Total number of homes required Number of homes delivered Total number of homes delivered Housing Delivery Test: 2022 measurement Housing Delivery Test: 2022 consequence 2019-20 2020-21 2021- 22 2019-20 2020-21 2021- 22
Rother 363 490 740
1593 247 175 239 661 41% Presumption
2.1.24
We further note that RDC housing delivery has over the past few years been somewhat mixed, with the Council failing to meet their annual housing requirement on a number of occasions, which has led to a deficit that suggests that there has been a record of under delivery that should be addressed by an uplift to the LHN figure.
A Buffer
2.1.25
Given the issues of the affordability and the affordable housing needs of the district identified above, as well as the issue of past underdeliver rates, we feel that at the very least a buffer should be built into the housing requirement for the Plan. Introducing a buffer into the housing requirement would ensure that the Council plans positively for the future in a manner that at least meets the minimum LHN rather than the capped figure, or indeed the ‘capacity’ based figure it currently looks
to deliver. This would in reality also provide an uplift to reflect the acute affordability problem and in turn the rising affordable housing need. Given the time horizon of the plan, the Council should also consider the need for flexibility to be built into the strategy so that it can be resilient to unforeseen changes that may occur during the latter years of the plan period.
2.1.26
To this end, we would stress the need for the SA to not only look at various Spatial Development Strategies, but to express these in the context of overall housing provision and assess not only a strategy that reflects the capped LHN, but both the uncapped LHN and indeed something that falls short of the capped LHN so that the effects of all reasonable alternatives are properly taken into consideration. As currently drafted the SA does not in our opinion adequately addresses the issues raised above or look to address the issue of unmet needs from adjacent authorities – see below.
2.1.27
Having regard to the above we consider a buffer of circa 10% i.e. circa 1,4669 additional dwellings should be added to the capped LHN over the plan period to ensure the Plan proceeds on a robust footing.10
2.2
Unmet Need
2.2.1 We note that the Reg 18 Plan makes no specific reference to the Duty to Cooperate (DtC) with neighbouring authorities over the issue of unmet need, there being no reference to the unmet needs of neighbours either. We also note that whilst the HEDNA recognises the fact that Hastings and Rother, together with their intrinsic sub-areas, comprise a self-contained Housing Market Area and Functional Economic Market Area, it does not comment upon the relationship of the HMA to adjacent HMA’s and their unmet need, there being only passing recognition of the fact that Wealden is within the influence of and overlapped by the Hastings and Rother HMA. Nor is there any commentary on how Rothers reg 18 Plan will look to address the unmet needs of Hastings, despite the joint statement agreed with Hastings BC on p16 of the Reg 18 Plan.
2.2.2
Similarly, whilst the Housing Background Paper advises at para 5.14 that the Council is committed to its duties in relation to the Duty to Co-operate, and in summer 2020 prepared a Duty to Co-operate Action Plan which outlines how and at what stage it intends to engage and consult with organisations on the development of the Local Plan, the Engagement and Duty to Cooperate Statement in commenting upon the engagement to date with Hastings BC, and in particular the matter of housing need, merely says at para 6.11 that ‘ The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 481 for Hastings. Hastings Borough Council made a formal request to Rother District Council on 3rd December 2021, along with requests other authorities, as to whether Rother could accommodate any of Hastings’ residual unmet need.’
2.2.3
This does not confirm the scale of Hastings unmet need, which we understand to be in the region of 5,525 dwellings11 or Rothers response to Hasting’s request, and as such does not suggest active, ongoing, and constructive engagement.
2.2.4
Similarly, in commenting upon engagement with Wealden, para 6.23 of the Engagement and Duty to Cooperate Statement advises that: ‘The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 1,212 for Wealden, however, in
their respective Plans, Rother has set an annual target of between additional 243-343 dwellings per annum, while Wealden sets a per annum target of and additional. Both sets of targets fall short of the need figures derived from the Standard Methodology. At this stage in Plan development, neither district has yet made a request in respect of unmet need.’
2.2.5
As is clear from the above Wealden’s target of 22,800 dwellings has actually been omitted from the document, as has reference to the implications in terms of Wealden’s unmet need of 7,071 dwellings12. .
2.2.6
Not only does the Engagement and Duty to Cooperate Statement fail to address the issue of how this unmet need will be tackled, but also makes it clear that Rother has not yet made a request to surrounding districts in respect of its unmet need, this despite the fact Wealden have for example just completed their reg 18 consultation. Again, this does not suggest active, ongoing, and constructive engagement, or due regard to the implications of the increasing scale of unmet need that is emerging in this part of East Sussex, a matter one would have expected the SA to have regard to in terms of the wider social, economic, and environmental consequences.
2.2.7
The lack of any MoU or SoCG with Hastings BC given their request of 3.1.21 is also of concern, as is the current lack of Mou or SoCG with Wealden DC, albeit we note one is in preparation and will we assume be available for scrutiny at Reg 19.
2.2.8
As the council will be aware, in order to demonstrate that the consultation on strategic cross boundary issues such as housing and unmet needs has been effective, continuous and ongoing, and the requirements of the Duty to Cooperate (DtC) have been addressed in terms of the overall housing requirement, MoU or SoCG will need to be produced and reviewed and updated regularly if they are to be relied upon.
2.2.9
Only through a rigorous approach to the issue of the DtC will the Council be able to demonstrate that its housing requirement is right, and that the spatial strategy is correct in its approach to growth. As things stand, we do not believe there to be sufficient evidence in place to demonstrate the DtC has been complied with, and as such can only conclude that the plan is legally flawed.
Conclusions on the Housing Requirement
2.2.10
Not only are the Council failing to meet their LHN as calculated by reference to the Standard Method i.e. 14,660 dwellings (733 dpa), but the shortfall of 7,374 – 9,502 dwellings is between 50% and 65% of the capped LHN. This is a significant shortfall exacerbated by the fact the LHN is a capped figure, and as the PPG is clear the LHN is only the starting point.
2.2.11
There are a range of factors relevant to the calculation of the housing requirement for the Draft Plan that the Council needs to consider when arriving at its overall housing requirement. These include:
• The inherent lack of affordability and the increasing affordability ratios;
• The poor levels of affordable housing delivery, and attendant increasing need for affordable homes; and • The importance of including a buffer above the LHN to ensure adequate housing delivery particularly given the Council’s historically poor track record of delivery as set out above.
2.2.12
When these factors are properly scrutinised, they demonstrate clear and rational reasons as to why there should be an uplift to the LHN. Having regard to the above Persimmon Homes t believe that at the very least the plan should provide for the uncapped need i.e. 733 dpa to ensure the Plan proceeds on a robust footing. Over a plan period of 1st April 2020 to 31st March 2042 this would equate to some 16,126 dwellings, circa 8,840 - 10,968 dwellings more than the plan is currently looking to provide for.
2.2.13
Setting the housing requirement at this level would significantly improve the affordability situation within the District and would deliver more affordable homes for those members of the community in the most need.
2.2.14
It is clear that the SA has as yet to assess the merits of delivering the LHN in full, a higher figure or indeed a lower one. It is also clear from the Engagement and Duty to Cooperate Statement that the council have yet to fully assess the effects of their neighbours’ unmet needs or to explore through the DtC, whether any of their neighbours could assist.
2.3 Housing Supply
2.3.1. Nowhere in the Reg 18 Plan is there a trajectory setting out how the housing requirement will be met or a rolling five year housing land supply maintained. Thus, in terms of supply all that is available is the information set out within table 34 of the Reg 18 Plan which indicates that the housing supply comprises the following:
Source of housing supply
a
Constructed 1 April 2020 – 31 March 2023
802
b
Known completions and commencements on large sites since 1 April 2023
340
c
With Planning Permission
1,693
d
DaSA & Neighbourhood Plan allocations without permission brought forward
1,660
e
Additional HELAA potential sites
2,129
f
Windfall projection (across the district)
663
Total Range
5,15813- 7,28714
2.3.2 In reviewing the above there is nowhere in the evidence base where one can review and assess the deliverability of those sites with outstanding planning permission that have yet to start on site, allocated sites without permissions or the additional HELLA sites. The councils Housing Land Supply and Housing Trajectory (April 2023 position statement), within its appendices provides details of the following:
•
Delivery by financial year of large site permissions (2,140 of which 1261 are only have outline consent))
•
Delivery by financial year of large sites delegated to approve subject to S106 (555, of which only 2 sites delivering 17 dwellings are for full planning permission, the majority being outline schemes))
•
Delivery by financial year of DaSA allocations (520, of which an appeal for one site for 40 dwellings has been dismissed)) •
Delivery by financial year of Neighbourhood Plan allocations (253 of which sites delivering only 34 are subject to applications)) and
•
Small site permissions (316)
2.3.4 As the above does not tally with the figures in table 34 it is impossible to scrutinise the housing land supply properly and ensure it is truly deliverable. All we can note is that the number of large sites with outline permission only that are due to start delivering in the next 5 years seems rather high, as do the number of large sites with a resolution to grant outline permission subject to S106. We would also ask that the next iteration of the plan the council produce a more detailed evidence base to demonstrate that the proposed commitments will deliver as suggested and that the council can maintain a robust and rolling 5 year housing land supply.
2.3.5 In the context of the above, we would suggest that the Council consider further whether a buffer of say 10% should be applied to those sites with planning permission that have yet to commence to take into account any potential non-delivery/ delay in delivery of the dwellings contained within this category which at 1,693 equates to nearly a third of the supply15. Similarly, the sites contained within the DaSA & Neighbourhood Plan allocations without permission, which equate to a comparable proportion of the total supply. Alternatively, the Council need to undertake a more detailed critique of the proposed commitments to ensure what is being put forward is truly deliverable within the plan period. Either way we believe this would generate the need to find land to accommodate a further 335 dwellings16.
2.3.6. Turning to windfalls, para 5.131 of the reg 18 plan indicates that windfall development forms an important part of the councils housing land supply and that the Council will continue to rely on windfall development as part of its development strategy. To this end table 34 of the Reg 18 Plan reports a figure of 663 windfalls over the plan period, and proposed policy DEV5 suggests a windfall development projection of 39 dwellings per annum for the plan period17. This is however slightly at odds with the findings of Table 3 of the councils Housing Land Supply and Housing Trajectory (April 2023 position statement), which suggests an annual average of 45 windfalls a year. Clearly clarity is required on this, as whilst para 6.9 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) suggests that work is currently underway on producing an updated windfall methodology background paper in support of the new Local Plan, which will reassess the likely contribution from windfall sites in the future, as well as the period over which any allowance should be applied, no such document appears within the evidence base. As the council will be aware, they will, in accordance with para 72 of the NPPF, need to provide compelling evidence that the windfall trajectory is a reliable source of supply, and cannot just rely upon a headline review of past windfall delivery rates without any analysis of expected future trends.
2.3.7 Finally in terms of the additional HELAA potential sites, we note that the HELLA in listing Identified Sites (existing allocations and sites with planning permission), and Potential Sites (Sites are potentially suitable, potentially available and potentially deliverable, subject to further assessment or investigation), discounts an unquantified number of ‘Other Potentially Suitable Sites Where Availability is Unknown’ and Rejected Sites (sites assessed as currently unsuitable/ unavailable/ unachievable), and that it is unclear how releasing some of these sites would come to enabling the council to meet their LHN if the assessment criteria were reviewed/ the sites themselves reassessed in terms of the overall area to be developed/ development capacity were reviewed. Given the scale of the unmet need we would respectfully suggest that no stone should be left unturned in looking to achieve the LHN and that whilst not all of the rejected sites will be acceptable, some may, with further consideration, have been suitable, such that the overall quantum of deliverable sites and thus the plans ‘capacity’ based housing figure could be higher. We would thus recommend that in order to demonstrate the housing supply figure is fully justified the council provide further evidence to this effect at Reg 19.
Conclusions on the Housing Supply
2.3.8 Having reviewed the component parts of the Housing Land Supply as best we can given the lack of available evidence to justify the position set out in table 34 of the Reg 18 Plan, we note that the figures relied upon to meet the Councils proposed ‘capacity’ based housing requirement require:
➢
100% reliance on all current commitments (existing detailed, and outline permissions, as well as sites with a resolution to grant and sites allocated in the DaSA and Neighbourhood Plans). This is not justified and a 10% buffer should be introduced to allow for non-delivery/ slower than expected delivery i.e. circa 335 dwellings.
➢
100% of the proposed housing sites delivering the quantum proposed within the plan period. This is however subject to all of said sites being found acceptable by the Local Plan Inspector/ site promoters confirming the sites can deliver this quantum of development in light of all the other policy requirements set out in the plan, such that a contingency may be sensible.
➢
663 dwellings to come forward as windfalls. The proposed windfall allowance is not based on a credible evidence base and is not justified. At 9 - 13% of the residual requirement, it is a significant part of the overall supply and needs to be reviewed to ensure a realistic approach is adopted at Reg 19.
2.3.9 As a result of the above, we would submit that as the predicted supply is effectively dictating the overall requirements – i.e. we are looking at a ‘capacity’ based housing requirement, the fact there is no flexibility in the proposed supply is of grave concern as in effect the overall supply could be a lot less than predicted unless additional sites are added in to address our concerns about the commitments, and windfalls and help provide a buffer / address the issues of affordability and DtC we have raised above. As it stands the plan would be incapable of accommodating any fluctuations in the market and could leave the council open to speculative applications very early in the plan period. The council’s assessment of potential housing sites in the HELLA and SA needs to be reviewed and no stone left unturned when it comes to identifying sites and addressing perceived constraints. Likewise, the councils rational for the yields they have attributed to the proposed allocations needs to be fully justified as, as we explain below, we do not think they are when the policy requirements set out in the draft plan are properly taken into consideration.
3
The need for a Stepped Trajectory
3.1 We note that para 5.102 of the Reg 18 Plan suggests that the Council would require a considerable step change in housing delivery in order to deliver a significant uplift compared to current and historic delivery rates over the last ten years. Figure 37 then illustrates that over the past 12 years the council have on average delivered 219dpa, albeit in the last two years they have delivered 237 and 390 dpa, respectively. Whilst the LHA at 733dpa would require a sea change in delivery, the current proposition, of a supply led target of 258 – 364dpa is clearly within the realms of that which has been achieved of late – reflecting the indeed, if the trajectory in appendix 7 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) is correct the council are anticipating an average of 544 dpa following over the next 5 years18: whilst this tails off after 28/29, this is because the trajectory is based on existing commitments (permissions and allocations) if, with a new plan in place additional sites were allocated, there is no reason why higher levels of growth could not be sustained longer term. There is thus no justification within the evidence base to support a stepped trajectory. Indeed para 5.102 of the Reg 18 Plan appears to suggest that delivery rates have been significantly impacted by the economic downturn and the effect of the coronavirus pandemic in recent years, such that while a number of current allocated sites have been permitted there have been significant delays in the build out of sites. This does not support a stepped trajectory it merely justifies past performance which with an economic upturn should begin to ensure a more robust and steady supply. Furthermore, as two thirds of the proposed supply is already committed there can be no justification for a stepped trajectory.
4
The Growth Options for Sub Areas
4.1 Whilst having no direct interest in the growth options, we do note that when looking at figure 33 that a considerable amount of the proposed growth, both committed and proposed through the additional sites identified through the HELAA that 46% of the proposed growth is in and around Bexhill, with only 9% being directed towards Battle, only 3.6% to the hastings fringe. Whilst we acknowledge that Bexhill is the least constrained of the main centres, one has to wonder if this is a sustainable approach, especially given the public transport links and level of services available in the likes of Battle and Robertsbridge. Comparing figure 35 of the Reg 18 Plan (the opportunities for housing growth) with Figure 12 of the settlement study (part 1) (Settlement Sustainability Score Table), the level of growth proposed in the Sustainable and Moderately Sustainable settlements seems to be significantly less than that proposed in Bexhill, which whilst it is the only ‘Highly Sustainable’ settlement seems somewhat out of proportion and one has to wonder whether this could lead to market saturation and actually prejudice housing land supply.
5
Development Principles Policies
5.1 We note that DEV2 requires: ‘Planning applications (whether in outline or full format) must relate to an entire development site to ensure a comprehensive approach, including where sites are in multiple ownerships.
When an outline application is submitted, a masterplan defining key parameters for the entire site must be submitted by the applicant to indicate how the overall development of the site can be achieved.’
5.2 Where sites are in multiple ownership, we would suggest that as long as a framework masterplan covering the whole site, and an infrastructure delivery strategy has been agreed, either through the site promoters and the council or via an SPD, there should be nothing to stop one party looking to promote their site in advance. As long as the application reflects the framework masterplan and s106 proceeds in accordance with the infrastructure delivery plan we fail to see how this would prejudice the plan. Indeed, it may well allow sites to proceed more quickly and thus actively assist the council in their housing land supply. 5.3 We note that DEV3 indicates that: ‘Development boundaries define the area within sustainable settlements where development will be permitted, provided it is consistent with this Local Plan.
Priority shall be given to reuse of brownfield sites, in order to make efficient use of previously developed land in sustainable settlements. Some greenfield development will be necessary in order to deliver housing and employment need, but this will be limited to inside development boundaries.’
5.4 Whilst in the first instance we assume the development boundaries will be redrawn to reflect the proposed allocations, we would also suggest that given the shortfall in the housing land supply, that the council should look to have a criterion based policy that enables development immediately adjacent to the limits of built development subject to certain criteria. For example, within Mid Sussex, policy DP6 provides for:
The growth of settlements will be supported where this meets identified local housing, employment, and community needs. Outside defined built-up area boundaries, the expansion of settlements will be supported where:
1. The site is allocated in the District Plan, a Neighbourhood Plan, or subsequent Development Plan Document or where the proposed development is for fewer than 10 dwellings; and
2. The site is contiguous with an existing built up area of the settlement; and
3. The development is demonstrated to be sustainable, including by reference to the settlement hierarchy.
The developer will need to satisfy the Council that:
• The proposal does not represent an underdevelopment of the site with regard to Policy DP26: Character and Design; or
• A large site is not brought forward in phases that individually meet the threshold but cumulatively does not.
5.5 A similar policy approach would we believe be appropriate here and would assist the council in meeting their LHN.
5.6 We note that DEV5 refers to the windfall rate of 39dpa. Given our comments above, this will need to be properly justified within the evidence base for the Reg 19 Plan.
5.7 Turning to DEV6, and the Strategic Green Gaps, the current strategic gap between Bexhill and Hastings should not be seen as a constraint on development on a par with the AONB or any other NPPF footnote 7 constraint, and should not in our opinion be carried over from the current core strategy without first being reviewed to establish if they can accommodate some growth to assist the council in meeting their LHN/ meeting the unmet needs of their neighbours, especially Hastings.
6
Health and Wellbeing Policies
6.1 We note that policy HWB2 requires a HIA to be undertaken on all applications for development of 100 (+) dwellings/ sites of more than 5ha. Whilst Persimmon Homes would agree that HIA are an essential part of plan making to ensure the Council understand the health outcomes of its strategy and is thus able to ensure these are effectively addressed, this should be achieved through the preparation of a whole plan HIA which will help inform the Council that the policies the plan contains address the key health outcomes for the area. As the plan and the policies it contains has been prepared to address the key health issues it is unnecessary for future development proposals that accord with this plan to undertake a separate HIA. If a development meets the policies in the plan, then it is by default addressing the health outcomes already identified by the Council. A HIA as part of the application would merely be repetition of the work the council has already undertaken. The only circumstance where an HIA may be appropriate would be for a larger unallocated site where the impacts may not have been fully considered by the council as part of the plan wide HIA. Policy HWB2 needs to be revised accordingly.
6.2 We also note that criterion 5 of HWB5 requires developments of 300 (+) dwellings to provide playing pitches on site in line with the recommendations of Rother’s Playing Pitch and Built Facilities Strategy and Sport England’s standards. Whilst not opposing this criterion, Persimmon Homes would suggest that the following is added to criterion 5 ‘unless evidence suggests that this is unachievable” as a sites topography may not make this possible/ economies of scale may mean providing / contribution to offsite provision is in certain circumstances preferable; or that this would fetter a developer’s ability to deliver BNG on site as such facilities do not assist in trying to deliver BNG. Indeed, they can actively prejudice it.
7
Infrastructure Policies
7.1 We note that policy INF1 (A) indicates that ‘Where new infrastructure capacity is required, it must be demonstrated that it can be delivered upfront or early in the development phasing.’ As the councils will be aware, the question of the supply of utilities to support development (including residential development) is a matter that is dealt with through separate statutory regimes. Providers such as the water and energy companies are required, among other things, to ensure a supply of services adequate to meet the needs of the plan-led system. As such policy INF41 (A) should not require applicants for planning permission to demonstrate that there is sufficient capacity with regard to provision of utilities such as water and power. Furthermore, when considering other infrastructure requirements, the policy should have regard to the cash flow implications of this criteria and be caveated accordingly.
8 Housing Policies
HOU1 Mixed and Balanced Communities
8.1 In noting the unit mix proposed in policy HOU1, we would in the first instance question the extent to which policy HOU1 should look to be prescriptive on the market housing to be delivered across the district for the whole of the plan period; rather the Council should recognise the need for flexibility, as per the NPPF and PPG, as the fact is the needs of the area may well change over the lifetime of the plan, particularly given the current uncertainty in the housing market, and that different areas will inevitably deliver different forms of housing i.e. apartments within more urban town centre locations and family housing in suburban areas; and that it is the combination of the two that will ultimately address the overall need.
HOU2 Affordable Housing
8.2 We note that no percentage has been provided in this policy to clarify the level of affordable provision to be provided on qualifying sites. We look forward to seeing and being able to comment upon the final requirement at Reg 19. In addition, we note that policy HOU28 also looks to see the affordable units well-integrated and designed to the same high quality to create tenure-neutral and socially inclusive homes and spaces; and that the affordable housing should be apportioned individually or in small clusters and where this is not proposed it should be robustly justified. Whilst we appreciate and support the need to ensure integration and to create more balanced communities, that has to be weighed against the management objectives of the affordable provider, who often find small clusters to be inefficient, such that this requirement needs to provide for those instances where the affordable provider feels a different approach is justified in that particular instance. HOU8 Access Standards
8.3 We note that policy HOU8 requires all new homes to be NDSS, and that as has already been established in the adopted development plan, there is a requirement for all new dwellings in the district to be M4(2) compliant, and 5% of affordable dwellings to meet M4(3)(2)(b) standards where a need exists. In addition, however, policy HOU8 includes a requirement for 5% of new market housing to meet the “wheelchair adaptable dwellings” standard in Part M4(3)(2)(a). Whilst para 8.71 of the plan suggests that these policy expectations are justified by the district’s ageing population and levels of disability, and the need for homes to appropriately meet the demands of occupiers throughout their lifetimes, this is not in our opinion clear and convincing evidence to justify this requirement and as such we would submit that this part of policy HOU8 should be deleted.
HOU9 – Specialist Housing for the Elderly
8.4 We note that policy HOU9 requires all developments of 100 (+) dwellings to set aside at least 10% of the total number of dwellings as specialist housing for older people. It is not clear whether this is in addition to, or as part of, the requirement also being set out in policy HOU8, or whether this could just be bungalows, or buildings that have to have communal areas. As drafted the policy is unclear and thus ineffective. In addition, subject to clarity it could be overly onerous when coupled with other requirements and thus likely to affect a sites viability.
HOU12 Self-Build and Custom Housebuilding
8.5 We note that policy H0U12 requires 5% Self/ Custom-Build Housing on all sites of 20 dwellings (+). Whilst the councils Self-build and Custom Housebuilding (SCHB) Headline Data Report 202319 indicates that as of 30.10.23 there were 197 individuals and 3 associations on the self-build and custom housebuilding register, it is not clear from the evidence base how many plots would be required if the existing commitments were taking into consideration. This needs to be established to ensure the proposed policy is justified and will be effective in meeting the outstanding demand.
8.6 In the context of the above, whilst noting the scale of the demand, we understand that before seeking to require the proposed developments to provide a proportion of the homes delivered as self-build plots the Council will need to examine other opportunities for meeting the needs of those who want to self-build. Under the Self Build & Custom Housebuilding Act 2015 and para 63 of the NPPF (2023), it is the Councils responsibility to ensure that sufficient permissions are given to meet demand. Further detail is provided in paragraph 57-014 of PPG with regard to the Council’s duties and whilst this recognises that it should take account of self-build registers when preparing planning policies, it also outlines that consideration needs to be given by Councils to the disposal of their own assets in order to meet the need for self-build plots or whether self-build could support the regeneration of brownfield sites. A need for self-build plots should not automatically lead to a policy requiring their provision on sites of 20 (+) dwellings. PPG also notes at paragraph 57-025 that local authorities should be encouraging developers and landowners to consider providing plots for self-build and custom house building but makes no reference to requiring their provision. The Government clearly sees the role of the local authority as working to identify opportunities with developers rather than placing responsibility on to the development industry. 8.7 The Council will also need to consider whether it is feasible that all sites of 20 (+) dwellings can deliver self-build plots. Often, especially on the larger sites, there are multiple contractors and large machinery operating on-site, and the development of single plots by individuals operating alongside this construction activity raises both practical and health & safety concerns. Any differential between the lead-in times / build out rates of self & custom build plots and the wider site may lead to construction work outside of specified working hours, building materials stored outside of designated compound areas and unfinished plots next to completed and occupied dwellings, resulting in consumer dissatisfaction. Whilst some sites may be able to locate self-build plots in a manner that reduces these potential risks, on others this will be impossible with developers unable to co-ordinate the provision of self & custom build plots with the development of the wider site. Such concerns must be given full consideration by the Council when preparing any policies on self-build to be included in the Local Plan.
8.8 Having regard to the above we would submit that the requirement to deliver 5% Self/ Custom-Build Housing on all sites of 20 (+) dwellings is likely to deliver very little in the way of tangible benefits, whilst creating significant difficulties for the builders involved. It would be a lot more effective for the Council to identify self-build sites or allocate certain sites to deliver a higher proportion of Self/ Custom-Build Housing.
8.9 Given the above we would suggest that the council review their requirements and are more explicit as to what they want, where and why, as at present policy HOU12 does not look to be properly justified or effective.
9 Green to the Core
GTC1: Net Zero Development Standards
9.1 We note that policy GTC1 requires all residential development to achieve: ‘a) LETI Total Energy Use Intensity (TEUI) Target for Operational Energy of 35 kWh/m2/year (GIA).
b) For new buildings, a 4-star Home Quality Mark (HQM) score; or for conversions to residential development, a Building Research Establishment Environmental Assessment Method (BREEAM)
‘Excellent’ standard as minimum.
c) A maximum space heating demand for new buildings (small scale housing) of 15 kWh/m2 per year.
d) If LETI, Home Quality Mark or BREEAM is updated or replaced during the plan period the equivalent replacement requirements will be applied.
9.2 It goes on to advise that ‘to demonstrate compliance, a Building Research Establishment (BRE) Home Quality Mark post-construction assessment or similar must be undertaken at practical completion.’
9.3 And that in terms of embodied carbon: ‘All new development proposals must demonstrate, through an energy statement, how the following embodied carbon standards will be met:
(i) All residential development must achieve a LETI C rating for embodied carbon emissions, equating to 600 kgCO2/m2 upfront embodied carbon and 970 kgCO2/m2 total embodied carbon.
From 1 January 2030, a LETI A rating must be achieved, equating to 300 kgCO2/m2 upfront embodied carbon and 450 kgCO2/m2 total embodied carbon.’
9.4 Whilst Persimmon Homes support the Government’s approach set out in the Future Homes Standard, we note that the Government have set out a clear roadmap as to how low carbon homes will, alongside the decarbonisation of the national grid, ensure that the Government can meet its commitments to net zero by 2050; and that the way forward being taken by the Government recognises that the improvements in energy efficiency of new homes should be a transition which ensures that new homes continue to come forward to meet housing needs whilst still being sufficiently challenging to significantly reduce the carbon emissions of new homes from 2025. This is set out explicitly in the Written Ministerial Statement of the Minister of State for Housing on the 13th December 2023, when he indicated that:
‘The improvement in standards already in force, alongside the ones which are due in 2025, demonstrates the Government’s commitment to ensuring new properties have a much lower impact on the environment in the future. In this context, the Government does not expect plan-makers to set local energy efficiency standards for buildings that go beyond current or planned buildings regulations. The proliferation of multiple, local standards by local authority area can add further costs to building new homes by adding complexity and undermining economies of scale. Any planning policies that propose local energy efficiency standards for buildings that go beyond current or planned buildings regulation should be rejected at examination if they do not have a well-reasoned and robustly costed rationale that ensures:
That development remains viable, and the impact on housing supply and affordability is considered in accordance with the National Planning Policy Framework.
The additional requirement is expressed as a percentage uplift of a dwelling’s Target Emissions Rate (TER) calculated using a specified version of the Standard Assessment Procedure (SAP).’20
9.5 As the council will be aware, the challenge to the WMS have been dismissed. Given the above, whilst the aspirations in Policy GTC1 are worthy and Persimmon Homes are committed to the delivery of Zero Carbon Homes/ Carbon Neutrality on all their sites, wherever it is practical and viable to do so, there is in our opinion no need for additional standards to be placed on developments through additional Local Plan policies that vary from that required in national government guidance. The plan has to acknowledge the implications of the transitional period and the need for flexibility during this period, in accordance with the aims and objectives of national policy. As such, not only is policy GTC1 overly complex and likely to impact on delivery/ viability, it is also clearly inconsistent with the approach advocated in the WMS. As a result, and having regard to our comments below on the lack of any Viability Assessment to support the reg 18 plan and the associated assessment of the implications of the emerging local plan policy on Net Zero Carbon, we would suggest that Policy GTC1 revert to the requirements set out in Building Regs.
GTC7: Local Nature Recovery Areas
9.6 We note this policy requires all new development to meet the objectives of the East Sussex (including Brighton and Hove) Local Nature Recovery Strategy (LNRS). We do not believe it is inappropriate to require all new development to meet the objectives set out in a document that is not a development plan document. Whilst the council can suggest that development has regard to the LNRS it is not consistent with national policy to require them to meet these objectives. It would also be perverse to require all new developments to adhere to a set of objectives that the council itself only has a duty to have regard to in its decision-making processes. We would therefore recommend that this policy is amended to advise that all new development has regard to the objectives set out in the LNRS
GTC8: Biodiversity Net Gain
9.7 We note that policy GTC8 requires al qualifying development proposals to deliver at least a 20% measurable biodiversity net gain attributable to the development. Whilst there does not appear to be any justification as to why a 20% BNG requirement is needed, such that we would submit the policy is unsound; Persimmon Homes are committed to doing as much as possible to meet the councils’ aspirations and as such would suggest that rather than require development to deliver at least 20% BNG, the Council recognises in policy that the 10% mandatory requirement is a minimum and that they will look favourably on development that seeks to go beyond this figure. If, however, the 20% BNG requirement is retained the council need to set out that where 20% is not deliverable it will seek to negotiate the viable level that can be provided over the 10% minimum required by the Environment Act 2021.
9.8 Such an approach would facilitate an element of flexibility that would take account of the potential implications delivering 20% BNG may have on viability/ overall dwelling numbers and would thus ensure a more effective policy approach, that is consistent with the aims and objectives of national policy as set out in the biodiversity net gain planning practice guidance of 14 February 2024 which at 006 Reference ID: 74-006-2024 states:
‘Plan-makers may seek a higher percentage than the statutory objective of 10% biodiversity net gain, either on an area-wide basis or for specific allocations for development. However, such policies will need to be evidenced including as to local need for a higher percentage, local opportunities for a higher percentage and any impacts on viability for development. Consideration will also need to be given to how the policy will be implemented.’ My emphasis.
9.9 In the context of the above the council need to have regard to the ecological baseline and the difficulties delivering 10% BNG, let alone 20% can have where the baseline is already high, such that offsite credits will be required, the level of which for smaller sites would be financially prohibitive such that the actual capacity of said sites may needs to be revisited. To this end we are aware of anecdotal evidence that suggests that to deliver 20% BNG a sites net to gross will fall from circa 75 to circa 65%, which can as a result impact on its overall development capacity and the councils associated housing land supply.
9.10 Notwithstanding our thoughts on the justification behind the 20% BNG requirements and its associated implications on a site’s development capacity, as well as its viability, there needs to be more in the plan to ensure the provision of a strategic network of sites that can deliver BNG offsite in Rother or within the same national character area (NCA); as whilst important in delivering 10% this is even more important if the Council introduces 20% BNG. At present there is little evidence that there will be sufficient local offsite credits in the short and medium term to support schemes that cannot deliver a 10/ 20% BNG on site. Nor is there any recognition of the fact that by requiring a 20% net gain the council are effectively adding to the pressure on the market for credits as more sites will be required to purchase offsite credits to meet this higher level of BNG. This increases costs and will more than likely delay sites that cannot secure these. Whilst we recognise the fact that there is the option of buying national credits, the cost of these is set well above the market to promote local solutions and will impact significantly on the viability of development meaning many developers will have to wait until local credits are available, which will prejudice the councils rolling 5 year housing land supply position.
10 Landscape Character
10.1 We note that policy LAN2 requires a CAVAT assessment to be submitted with all applications impacting on an individual or groups of trees in order to quantify their public amenity value. This is in our opinion totally unjustified and would question why a standard tree surveys would not suffice in the first instance, with a CAVAT assessment only being required where a tree of particular individual or group value is to be lost. 11 The SA of the Development Strategy
11.1 As set out above we note that the SA in scoring the Development Strategy, at Figures 11 and 12 does not actually comment upon the quantum of development the different options would deliver and how this would relate to the LHN, or indeed address the issue of the unmet needs of neighbours. Given SA objective 8 on housing this is somewhat surprising, as is the fact that no one option appears to have been chosen as the preferred option; albeit SDO3B (Bexhill Greenfield Growth Option 2: with New Multi-modal Transport Corridor) appears to score most favourable, followed by SDO6 (Brownfield Intensification and Redevelopment), which as it would totally fail to meet the LHN seems somewhat perverse, especially when figure 11 scores it as ‘Option supports the objective, or elements of the objective on balance, although effects may be minor’. Surely it would be ‘Option appears to conflict with the objective on balance and may result in minor adverse effects’ or indeed even ‘Potentially significant adverse effects’. Similarly, the scoring of SDO11 (Growth in settlements with train stations or sustainable transport alternatives) in figure 12 seems somewhat odd21 given its based on sustainable transport. To this end we also note that in a number of occasions, SOD4 and SOD5 for instance, growth is said to be resisted by virtue of land availability based on environmental and topographical constraints. Given the scale of unmet need currently proposed we would respectively suggest the council need to do more to establish whether additional land in these areas is available/ could be developed as no stone should be left unturned in trying to meet the LHN. As it stands, the SA lacks the necessary robustness required as it is impossible to assess the impact and weigh benefits and harm of each development strategy without know scale of delivery associated with each option.
11.2 Having regard to the above we feel it’s imperative that if the SA is to be effective the next iteration needs to assess the Development Strategy in the context of the LHN and how the council are to accommodate this/ the implications of not accommodating it/ over delivering to address adjacent authorities’ unmet needs.
12 The Infrastructure Delivery Plan Viability Assessment
12.1 We are surprised to note that whilst an Infrastructure Delivery Plan (IDP) has been produced to support the Reg 18 Plan, as well as an Infrastructure Background Paper, there is no Viability Appraisal (VA) of the plan. Not only does the lack of a VA makes it difficult to comment on the proposed policies, but it also raises questions about the aspirations of the IDP i.e. how these have been tested, and whether they are realistic and deliverable. If the plan is predicated on the aspirations of the IDP then the whole plans approach is also open to debate as how can it be said to be justified and effective if it has not been subject to a robust VA.
13 Conclusions on Reg 18 Plan
13.1 We are concerned that the scale of growth proposed in the overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa, which is significantly less than the capped LHN of 733dpa/ the uncapped LHN of 850 dpa. In our opinion there is no justification for promoting a lower housing target than the capped LHN given the aims and objectives of national government guidance and the affordability issues that exist within the district, that the plan says it wants to address. The scale of the potential shortfall (between 7,286 and 9,502 dwellings over the plan period22) is significant, and will we fear be exacerbated if the predicted supply does not deliver as forecast. Nowhere does the plan, or the evidence base demonstrate how this will be addressed. In addition, it does not appear to have been raised with adjacent authorities through discussions on the DtC. Nor does the plan/ its evidence base demonstrate how the acute levels of unmet housing need that exist within the area are to be addressed through constructive and active engagement so as to meet legal duties imposed by the DtC.
13.2 Similarly we are concerned that no evidence has been provided to demonstrate how the housing requirement will be met or how a rolling five year housing land supply will be achieved. The deliverability of the existing commitments needs to be demonstrated more evidentially than it has to date. Likewise, the evidence needs to be provided to demonstrate that the proposed allocations will deliver the quantum of development suggested when expected; and the plan needs to encompass compelling evidence to support the windfall rates expected rather than rely on historic trends.
13.3 We would also suggest that the plan period needs to be reviewed so that it provides for 15 years from adoption (i.e. till 31st March 2042).
13.4 Turning to the Development Strategy, the justification behind the Development Strategy and the clear preference for concentrating growth in and around Bexhill is not clear, the SA being silent on the quantum of development each Development Strategy could deliver and how the overall strategy related to the LHN.
13.5 In addition to the above we also have specific concerns about policies DEV2 (Comprehensive Development and Masterplanning), DEV3 (Development Boundaries), DEV5 (Development on Small Sites and Windfall), DEV6 (Strategic Green Gaps), HWB 2 (Health Impact Assessments), INF1 (Strategic Infrastructure Requirements), HOU1 (Mixed and Balanced Communities), HOU2 (Affordable Housing), HOU12 (Self-Build and Custom Housebuilding) , GTC1 (Net Zero Building Standards) and GTC8 (Biodiversity Net Gain), all of which we do not believe to be properly justified or consistent with national planning policy guidance as drafted.
In the context of the above we would like to highlight Persimmon Homes desire to work with Rother District Council on progressing a sound plan and that to this end we are happy to meet with officers to discuss our reps on the housing requirement, supply and trajectory and the other policies contained in the Reg 18 Plan/ its supporting evidence base.
Yours sincerely
JUDITH ASHTON
Judith Ashton Associates
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28012
Received: 22/07/2024
Respondent: Persimmon Homes Ltd
Agent: Judith Ashton Associates
In terms of the additional HELAA potential sites, we note that the HELAA discounts an unquantified number of ‘Other Potentially Suitable Sites Where Availability is Unknown’ and Rejected Sites (sites assessed as currently unsuitable/ unavailable/ unachievable), and that it is unclear how releasing some of these sites would come to enabling the council to meet their LHN if the assessment criteria were reviewed/ the sites themselves reassessed in terms of the overall area to be developed/ development capacity were reviewed. Given the scale of the unmet need we would respectfully suggest that no stone should be left unturned in looking to achieve the LHN and that whilst not all of the rejected sites will be acceptable, some may, with further consideration, have been suitable, such that the overall quantum of deliverable sites and thus the plans ‘capacity’ based housing figure could be higher.
I write with reference to the above. I act for Persimmon Homes who have an interest in a sound plan being delivered for Rother.
Having regard thereto, having reviewed the Regulation 18 Draft Local Plan (April 2024), and associated evidence base, especially the Sustainability Appraisal - Interim Report (SA) and associated appendices, Housing and Economic Land Availability Assessment (HELAA), Local Housing and Economic Needs Assessment (HEDNA), Development Strategy Background Paper (DSBP), Housing Background Paper (BP), Settlement Study (SS), and Infrastructure Delivery Plan (IDP), and Viability Assessment and CiL Review (VA); we have the following comments on the Draft Regulation 18 Rother Local Plan (April 2024), and associated evidence base.
1 The Plan Period
1.1 We note that the 2024 LDS suggests adoption of the Local Plan (Regulation 26) in Quarter 3 2026/27. As a result, the plan period advocated in policy SS2 will be less than 15 years from adoption. In order to comply with paragraph 22 of the NPPF, the plan period should we believe start at 1st April 2023 and be extended to 31st March 2042 as this will ensure it looks ahead for a minimum of 15 years from adoption. As a result, additional housing allocations need to be made to help address this additional requirement.
2 The Housing Requirement, Supply and Trajectory
2.1
Local Housing Need, and the Minimum Housing Requirement
2.1.1 We note that the proposed overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa.
2.1.2
Having reviewed the housing requirement against the standard method and the advice in the PPG about the need to consider the application of a cap, we note that adopting the standard methodology, and adjusting the figures to the base date of the local plan and using the latest local affordability ratio, the position is as set out below.
Step 1: Setting the Baseline
Household Projection = 523.41 dwellings per annum
Step 2: Adjustment for
Affordability
Local Affordability Ratio = 13.822
Adjustment Factor = 1.61 𝐴𝑑𝑗𝑢𝑠𝑡𝑚𝑒𝑛𝑡 𝑓𝑎𝑐𝑡𝑜𝑟=(13.82−44) 𝑥 0.25+1
Minimum Local Housing need
523.4
x 1.61 = 842.6
2.1.3
As set out in section 5 of the HEDNA a cap is applied to limit the level of increase, depending upon the stage that the local authority is at with regards to its strategic policies for housing. Where the policies have been adopted within the last 5 years, the LHN figure is capped at 40% above the average annual housing requirement figure as set out in the existing policies. Where the relevant policies were adopted more than 5 years ago (as is the case in Rother), the LHN is capped at 40% above whichever is higher of:
• The average annual projected household growth identified in Step 1; or
• The average annual housing requirement figure as set out in the most recently adopted strategic policies.
Having done this, we note the following:
40% cap
The average annual projected household growth identified in Step 1
523.4
732.7
The average annual housing requirement figure as set out in the most recently adopted strategic policies
3353
469
2.1.4 Given the above the LHN in Rother is reduced from 842 dpa to 733 dpa. That said, while the cap reduces the minimum number generated by the standard method, it does not reduce housing need itself. Therefore, strategic policies adopted with a cap applied may require an early review and updating to ensure that any housing need above the capped level is planned for as soon as is reasonably possible. The PPG is clear that the standard method is a minimum number and that in areas such as Wealden where the cap reduces the local housing need “consideration can still be given to whether a higher level of need could realistically be delivered. This may help prevent authorities from having to undertake an early review of the relevant policies”4. For Rother this would mean considering whether to deliver 842dpa. It is also important to note that the LHN figure is a minimum starting point, and it does not produce the Housing Requirement5.
2.1.5
In the context of the above, we note that the overall spatial development strategy in looking to deliver a minimum of 5,158 to 7,286 dwellings over the plan period is in effect only looking to deliver between 35% and 50% of the capped LHN.
2.1.6
We further note that the HEDNA is clear in the executive summary on both the scale of the LHN (737dpa at the time), and the findings of the housing growth scenario, indicating that there are ‘no exceptional local circumstances’ that would justify deviating from the Standard Method in Rother.
2.1.7
Whilst the inference in the plan is that the level of housing growth that is proposed is supply led (i.e. reflects the level of suitable sites assessed through the HELAA process) and constrained by the High Weald AONB, the Pevensey levels, the Strategic Gaps around Hastings and the SSSI around Rye, this is adopting a policy on approach to a situation that should be policy off.
2.1.8
Thus, not only is it unclear why the plan is not looking to deliver the LHN as identified in the HEDNA, but why it has not also looked at the uncapped need given the issues surrounding the unmet needs of its neighbours (see below). PPG6 identified a number of circumstances where it might be appropriate to plan for a higher housing need figure than the Standard Method indicates. Such circumstances can include:
• Instances where housing need is likely to exceed past trends; and
• Where the authority agrees to address unmet need arising from neighbouring authorities.
2.1.9 The PPG is not exhaustive in its examples as to what may be a sound reason for considering an uplift. Matters such as a high affordability ratio that is following a rising trend, along with significant affordable housing need, and of course the importance of ensuring an adequate buffer to cater for under supply, or instances where the Plan strategy fails to deliver as expected, are all sound reasons for considering an uplift.
2.1.10
In the context of the above we note that the SA in section 5, in reviewing the Spatial Development Strategy Options, does not appear to look at different scales of growth relative to the LHN (both capped and uncapped) or the implications of only delivering the scale of housing proposed, just a variety of different spatial options where the scale of development is unquantified, despite the fact one of the SA objectives is that ‘More opportunities are provided for everyone to be in a suitable home to meet their needs.’ The above belies the evidence base and the various reasons why the council need to meet their LHN / an uplift to the LHN should be considered further, as summarised in the commentary below.
2.1.11 The reasons for uplifting the LHN should be set into two categories, firstly those that indicate an uplift is required for the District itself and secondly any uplift that might arise from meeting unmet need from neighbouring authorities.
Affordability
2.1.12 Rother is an inherently unaffordable place to live as acknowledged at paras 1.15, 8.20 and 8.21 of the Reg 18 Plan which refer to the issues of the significant deterioration in affordability within the district The HEDNA (2024) identifies a significant need for affordable housing in Rother in the Plan period. This is due to a high, and increasing, house-price to earnings (affordability) ratio, meaning that growth in house prices is significantly outstripping growth in wages, and housing is becoming less affordable for people who live, work, and retire within the district.
2.1.13 To this end, we note, when looking at the ONS ‘House Price to Workplace-Based Earnings Ratio - March 2024’ that the ratio of median house price to median gross annual workplace-based earnings by local authority district, England, and Wales, 1997 to 2023 indicates that the ratio of median house price to median gross annual workplace-based earnings in RDC has increased significantly over the past 10 years from 10.53 to 12.847.
2.1.14 The rapid increase in the affordability ratio is clear evidence of the lack of housing delivery that has taken place over the last 10-year period within the District. Failing to deliver the LHN will only increase the rate of decline in affordability. For an improvement in the affordability situation to occur, decisive action is required through the provision of more housing over and above the capped LHN.
2.1.15 The matter of affordability alone clearly indicates that the Council should be planning for more than the capped LHN.
Affordable Housing Need
2.1.16 Linked to the issue of affordability is the significant need for affordable housing identified in the District. A symptom of a rising affordability ratio is the fact that more members of society are priced out of the open market and consequently require affordable housing in one form or another. Again, the Council acknowledges this in the Draft Plan and in the Feb 2024 HEDNA that accompanies the consultation pack.
2.1.17 The HEDNA indicates that the total net annual affordable housing need for the period 2021 to 2044 is 325 dpa, which is equivalent to 44% of the capped LHN figure (based on 733 dpa). Whilst policy HOU2 does not indicate what level of affordable provision the council will be looking to deliver, policy LHN2 of the adopted core strategy looks to deliver 30% affordable housing on sites in Bexhill and Hastings Fringe, and Rye, 35% in Battle and 40% in the rural areas. Even if the Council were to adopt a 40% requirement across the board, this will only be triggered for those sites that meet the qualifying criteria. It is therefore highly unlikely that the affordable housing need will be met. Indeed, given the decreasing trend in terms of affordability set out above, the gross affordable housing need of 325 dpa is highly likely to increase over the plan period, leading to an increase in the net shortfall and in turn a higher number of people in need and on the Council’s housing waiting list.
2.1.18 Whilst the councils latest AMR does not provide any information on affordable housing delivery, we note that the Governments Affordable housing supply statistics (AHS) 2022-23 table 1011C indicates that over the past 10 years RDC only delivered 887 affordable completions. An average of 89 (rounded up) affordable completions per annum, which just 27% of the average annual affordable need of 325 affordable dwellings per annum identified in the HNA. JAA table 1a – Affordable Housing Provision 2013 - 2023
13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 Total
Total affordable dwellings 80 123 103 20 56 60 130 126 15 174
887
2.1.19 Furthermore, whilst if you compare the level of affordable provision against total housing completions over the past 5 years this averages 38.7% of total housing completions, it fluctuates significantly and prior to this was averaging significantly less. JAA table 1b – Affordable Housing Provision as a percentage of overall housing delivery 2016 - 2023
18-19 19-20 20-21 21-22 22-23 Total
Net additional dwellings
255 247 175 237
390
1,304
Total affordable dwellings
60
130
126
15
174
505
% of total
23.5%
52.6%
72%
6.3%
44.6%
38.7%
2.1.20 Given the above, even if one assumes an average of 38%, this suggests that the plan would need to deliver over 8558 dpa to meet the identified affordable housing needs of the District.
2.1.21
Whilst we are not advocating this level of growth, the above demonstrates the need for the plan to deliver the LHN in full/ an uplift to the LHN figure to boost the supply of open market and affordable homes and thus help address the affordable housing needs of the District. Said approach would also reflect on spatial objective 4 – to respond to the housing crisis and help facilitate the delivery of housing to meet the needs of different groups in the community, by maximising the potential opportunities for residential development in sustainable and deliverable locations, helping to deliver affordable housing, and ensuring development is viable and supports growth in the district by providing certainty for developers through site allocations and clear planning policies.
2.1.22
The SA in reviewing the merits of the alternative spatial options appears to have paid little regard to these fundamental points.
Past Under Delivery
2.1.23
We note the Councils Five Year Housing Land Supply Statement – 1 April 2023 (published in December 2023) suggests that the Council is able to demonstrate a 3.09 year housing land supply for the period 01/04/23 to 31/03/28, and that the HDT results for 2022, as published in December 2023 was, as set out below, just 41%.
JAA table 2 - Result of 2022 Housing Delivery Test
Area Number of homes required Total number of homes required Number of homes delivered Total number of homes delivered Housing Delivery Test: 2022 measurement Housing Delivery Test: 2022 consequence 2019-20 2020-21 2021- 22 2019-20 2020-21 2021- 22
Rother 363 490 740
1593 247 175 239 661 41% Presumption
2.1.24
We further note that RDC housing delivery has over the past few years been somewhat mixed, with the Council failing to meet their annual housing requirement on a number of occasions, which has led to a deficit that suggests that there has been a record of under delivery that should be addressed by an uplift to the LHN figure.
A Buffer
2.1.25
Given the issues of the affordability and the affordable housing needs of the district identified above, as well as the issue of past underdeliver rates, we feel that at the very least a buffer should be built into the housing requirement for the Plan. Introducing a buffer into the housing requirement would ensure that the Council plans positively for the future in a manner that at least meets the minimum LHN rather than the capped figure, or indeed the ‘capacity’ based figure it currently looks
to deliver. This would in reality also provide an uplift to reflect the acute affordability problem and in turn the rising affordable housing need. Given the time horizon of the plan, the Council should also consider the need for flexibility to be built into the strategy so that it can be resilient to unforeseen changes that may occur during the latter years of the plan period.
2.1.26
To this end, we would stress the need for the SA to not only look at various Spatial Development Strategies, but to express these in the context of overall housing provision and assess not only a strategy that reflects the capped LHN, but both the uncapped LHN and indeed something that falls short of the capped LHN so that the effects of all reasonable alternatives are properly taken into consideration. As currently drafted the SA does not in our opinion adequately addresses the issues raised above or look to address the issue of unmet needs from adjacent authorities – see below.
2.1.27
Having regard to the above we consider a buffer of circa 10% i.e. circa 1,4669 additional dwellings should be added to the capped LHN over the plan period to ensure the Plan proceeds on a robust footing.10
2.2
Unmet Need
2.2.1 We note that the Reg 18 Plan makes no specific reference to the Duty to Cooperate (DtC) with neighbouring authorities over the issue of unmet need, there being no reference to the unmet needs of neighbours either. We also note that whilst the HEDNA recognises the fact that Hastings and Rother, together with their intrinsic sub-areas, comprise a self-contained Housing Market Area and Functional Economic Market Area, it does not comment upon the relationship of the HMA to adjacent HMA’s and their unmet need, there being only passing recognition of the fact that Wealden is within the influence of and overlapped by the Hastings and Rother HMA. Nor is there any commentary on how Rothers reg 18 Plan will look to address the unmet needs of Hastings, despite the joint statement agreed with Hastings BC on p16 of the Reg 18 Plan.
2.2.2
Similarly, whilst the Housing Background Paper advises at para 5.14 that the Council is committed to its duties in relation to the Duty to Co-operate, and in summer 2020 prepared a Duty to Co-operate Action Plan which outlines how and at what stage it intends to engage and consult with organisations on the development of the Local Plan, the Engagement and Duty to Cooperate Statement in commenting upon the engagement to date with Hastings BC, and in particular the matter of housing need, merely says at para 6.11 that ‘ The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 481 for Hastings. Hastings Borough Council made a formal request to Rother District Council on 3rd December 2021, along with requests other authorities, as to whether Rother could accommodate any of Hastings’ residual unmet need.’
2.2.3
This does not confirm the scale of Hastings unmet need, which we understand to be in the region of 5,525 dwellings11 or Rothers response to Hasting’s request, and as such does not suggest active, ongoing, and constructive engagement.
2.2.4
Similarly, in commenting upon engagement with Wealden, para 6.23 of the Engagement and Duty to Cooperate Statement advises that: ‘The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 1,212 for Wealden, however, in
their respective Plans, Rother has set an annual target of between additional 243-343 dwellings per annum, while Wealden sets a per annum target of and additional. Both sets of targets fall short of the need figures derived from the Standard Methodology. At this stage in Plan development, neither district has yet made a request in respect of unmet need.’
2.2.5
As is clear from the above Wealden’s target of 22,800 dwellings has actually been omitted from the document, as has reference to the implications in terms of Wealden’s unmet need of 7,071 dwellings12. .
2.2.6
Not only does the Engagement and Duty to Cooperate Statement fail to address the issue of how this unmet need will be tackled, but also makes it clear that Rother has not yet made a request to surrounding districts in respect of its unmet need, this despite the fact Wealden have for example just completed their reg 18 consultation. Again, this does not suggest active, ongoing, and constructive engagement, or due regard to the implications of the increasing scale of unmet need that is emerging in this part of East Sussex, a matter one would have expected the SA to have regard to in terms of the wider social, economic, and environmental consequences.
2.2.7
The lack of any MoU or SoCG with Hastings BC given their request of 3.1.21 is also of concern, as is the current lack of Mou or SoCG with Wealden DC, albeit we note one is in preparation and will we assume be available for scrutiny at Reg 19.
2.2.8
As the council will be aware, in order to demonstrate that the consultation on strategic cross boundary issues such as housing and unmet needs has been effective, continuous and ongoing, and the requirements of the Duty to Cooperate (DtC) have been addressed in terms of the overall housing requirement, MoU or SoCG will need to be produced and reviewed and updated regularly if they are to be relied upon.
2.2.9
Only through a rigorous approach to the issue of the DtC will the Council be able to demonstrate that its housing requirement is right, and that the spatial strategy is correct in its approach to growth. As things stand, we do not believe there to be sufficient evidence in place to demonstrate the DtC has been complied with, and as such can only conclude that the plan is legally flawed.
Conclusions on the Housing Requirement
2.2.10
Not only are the Council failing to meet their LHN as calculated by reference to the Standard Method i.e. 14,660 dwellings (733 dpa), but the shortfall of 7,374 – 9,502 dwellings is between 50% and 65% of the capped LHN. This is a significant shortfall exacerbated by the fact the LHN is a capped figure, and as the PPG is clear the LHN is only the starting point.
2.2.11
There are a range of factors relevant to the calculation of the housing requirement for the Draft Plan that the Council needs to consider when arriving at its overall housing requirement. These include:
• The inherent lack of affordability and the increasing affordability ratios;
• The poor levels of affordable housing delivery, and attendant increasing need for affordable homes; and • The importance of including a buffer above the LHN to ensure adequate housing delivery particularly given the Council’s historically poor track record of delivery as set out above.
2.2.12
When these factors are properly scrutinised, they demonstrate clear and rational reasons as to why there should be an uplift to the LHN. Having regard to the above Persimmon Homes t believe that at the very least the plan should provide for the uncapped need i.e. 733 dpa to ensure the Plan proceeds on a robust footing. Over a plan period of 1st April 2020 to 31st March 2042 this would equate to some 16,126 dwellings, circa 8,840 - 10,968 dwellings more than the plan is currently looking to provide for.
2.2.13
Setting the housing requirement at this level would significantly improve the affordability situation within the District and would deliver more affordable homes for those members of the community in the most need.
2.2.14
It is clear that the SA has as yet to assess the merits of delivering the LHN in full, a higher figure or indeed a lower one. It is also clear from the Engagement and Duty to Cooperate Statement that the council have yet to fully assess the effects of their neighbours’ unmet needs or to explore through the DtC, whether any of their neighbours could assist.
2.3 Housing Supply
2.3.1. Nowhere in the Reg 18 Plan is there a trajectory setting out how the housing requirement will be met or a rolling five year housing land supply maintained. Thus, in terms of supply all that is available is the information set out within table 34 of the Reg 18 Plan which indicates that the housing supply comprises the following:
Source of housing supply
a
Constructed 1 April 2020 – 31 March 2023
802
b
Known completions and commencements on large sites since 1 April 2023
340
c
With Planning Permission
1,693
d
DaSA & Neighbourhood Plan allocations without permission brought forward
1,660
e
Additional HELAA potential sites
2,129
f
Windfall projection (across the district)
663
Total Range
5,15813- 7,28714
2.3.2 In reviewing the above there is nowhere in the evidence base where one can review and assess the deliverability of those sites with outstanding planning permission that have yet to start on site, allocated sites without permissions or the additional HELLA sites. The councils Housing Land Supply and Housing Trajectory (April 2023 position statement), within its appendices provides details of the following:
•
Delivery by financial year of large site permissions (2,140 of which 1261 are only have outline consent))
•
Delivery by financial year of large sites delegated to approve subject to S106 (555, of which only 2 sites delivering 17 dwellings are for full planning permission, the majority being outline schemes))
•
Delivery by financial year of DaSA allocations (520, of which an appeal for one site for 40 dwellings has been dismissed)) •
Delivery by financial year of Neighbourhood Plan allocations (253 of which sites delivering only 34 are subject to applications)) and
•
Small site permissions (316)
2.3.4 As the above does not tally with the figures in table 34 it is impossible to scrutinise the housing land supply properly and ensure it is truly deliverable. All we can note is that the number of large sites with outline permission only that are due to start delivering in the next 5 years seems rather high, as do the number of large sites with a resolution to grant outline permission subject to S106. We would also ask that the next iteration of the plan the council produce a more detailed evidence base to demonstrate that the proposed commitments will deliver as suggested and that the council can maintain a robust and rolling 5 year housing land supply.
2.3.5 In the context of the above, we would suggest that the Council consider further whether a buffer of say 10% should be applied to those sites with planning permission that have yet to commence to take into account any potential non-delivery/ delay in delivery of the dwellings contained within this category which at 1,693 equates to nearly a third of the supply15. Similarly, the sites contained within the DaSA & Neighbourhood Plan allocations without permission, which equate to a comparable proportion of the total supply. Alternatively, the Council need to undertake a more detailed critique of the proposed commitments to ensure what is being put forward is truly deliverable within the plan period. Either way we believe this would generate the need to find land to accommodate a further 335 dwellings16.
2.3.6. Turning to windfalls, para 5.131 of the reg 18 plan indicates that windfall development forms an important part of the councils housing land supply and that the Council will continue to rely on windfall development as part of its development strategy. To this end table 34 of the Reg 18 Plan reports a figure of 663 windfalls over the plan period, and proposed policy DEV5 suggests a windfall development projection of 39 dwellings per annum for the plan period17. This is however slightly at odds with the findings of Table 3 of the councils Housing Land Supply and Housing Trajectory (April 2023 position statement), which suggests an annual average of 45 windfalls a year. Clearly clarity is required on this, as whilst para 6.9 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) suggests that work is currently underway on producing an updated windfall methodology background paper in support of the new Local Plan, which will reassess the likely contribution from windfall sites in the future, as well as the period over which any allowance should be applied, no such document appears within the evidence base. As the council will be aware, they will, in accordance with para 72 of the NPPF, need to provide compelling evidence that the windfall trajectory is a reliable source of supply, and cannot just rely upon a headline review of past windfall delivery rates without any analysis of expected future trends.
2.3.7 Finally in terms of the additional HELAA potential sites, we note that the HELLA in listing Identified Sites (existing allocations and sites with planning permission), and Potential Sites (Sites are potentially suitable, potentially available and potentially deliverable, subject to further assessment or investigation), discounts an unquantified number of ‘Other Potentially Suitable Sites Where Availability is Unknown’ and Rejected Sites (sites assessed as currently unsuitable/ unavailable/ unachievable), and that it is unclear how releasing some of these sites would come to enabling the council to meet their LHN if the assessment criteria were reviewed/ the sites themselves reassessed in terms of the overall area to be developed/ development capacity were reviewed. Given the scale of the unmet need we would respectfully suggest that no stone should be left unturned in looking to achieve the LHN and that whilst not all of the rejected sites will be acceptable, some may, with further consideration, have been suitable, such that the overall quantum of deliverable sites and thus the plans ‘capacity’ based housing figure could be higher. We would thus recommend that in order to demonstrate the housing supply figure is fully justified the council provide further evidence to this effect at Reg 19.
Conclusions on the Housing Supply
2.3.8 Having reviewed the component parts of the Housing Land Supply as best we can given the lack of available evidence to justify the position set out in table 34 of the Reg 18 Plan, we note that the figures relied upon to meet the Councils proposed ‘capacity’ based housing requirement require:
➢
100% reliance on all current commitments (existing detailed, and outline permissions, as well as sites with a resolution to grant and sites allocated in the DaSA and Neighbourhood Plans). This is not justified and a 10% buffer should be introduced to allow for non-delivery/ slower than expected delivery i.e. circa 335 dwellings.
➢
100% of the proposed housing sites delivering the quantum proposed within the plan period. This is however subject to all of said sites being found acceptable by the Local Plan Inspector/ site promoters confirming the sites can deliver this quantum of development in light of all the other policy requirements set out in the plan, such that a contingency may be sensible.
➢
663 dwellings to come forward as windfalls. The proposed windfall allowance is not based on a credible evidence base and is not justified. At 9 - 13% of the residual requirement, it is a significant part of the overall supply and needs to be reviewed to ensure a realistic approach is adopted at Reg 19.
2.3.9 As a result of the above, we would submit that as the predicted supply is effectively dictating the overall requirements – i.e. we are looking at a ‘capacity’ based housing requirement, the fact there is no flexibility in the proposed supply is of grave concern as in effect the overall supply could be a lot less than predicted unless additional sites are added in to address our concerns about the commitments, and windfalls and help provide a buffer / address the issues of affordability and DtC we have raised above. As it stands the plan would be incapable of accommodating any fluctuations in the market and could leave the council open to speculative applications very early in the plan period. The council’s assessment of potential housing sites in the HELLA and SA needs to be reviewed and no stone left unturned when it comes to identifying sites and addressing perceived constraints. Likewise, the councils rational for the yields they have attributed to the proposed allocations needs to be fully justified as, as we explain below, we do not think they are when the policy requirements set out in the draft plan are properly taken into consideration.
3
The need for a Stepped Trajectory
3.1 We note that para 5.102 of the Reg 18 Plan suggests that the Council would require a considerable step change in housing delivery in order to deliver a significant uplift compared to current and historic delivery rates over the last ten years. Figure 37 then illustrates that over the past 12 years the council have on average delivered 219dpa, albeit in the last two years they have delivered 237 and 390 dpa, respectively. Whilst the LHA at 733dpa would require a sea change in delivery, the current proposition, of a supply led target of 258 – 364dpa is clearly within the realms of that which has been achieved of late – reflecting the indeed, if the trajectory in appendix 7 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) is correct the council are anticipating an average of 544 dpa following over the next 5 years18: whilst this tails off after 28/29, this is because the trajectory is based on existing commitments (permissions and allocations) if, with a new plan in place additional sites were allocated, there is no reason why higher levels of growth could not be sustained longer term. There is thus no justification within the evidence base to support a stepped trajectory. Indeed para 5.102 of the Reg 18 Plan appears to suggest that delivery rates have been significantly impacted by the economic downturn and the effect of the coronavirus pandemic in recent years, such that while a number of current allocated sites have been permitted there have been significant delays in the build out of sites. This does not support a stepped trajectory it merely justifies past performance which with an economic upturn should begin to ensure a more robust and steady supply. Furthermore, as two thirds of the proposed supply is already committed there can be no justification for a stepped trajectory.
4
The Growth Options for Sub Areas
4.1 Whilst having no direct interest in the growth options, we do note that when looking at figure 33 that a considerable amount of the proposed growth, both committed and proposed through the additional sites identified through the HELAA that 46% of the proposed growth is in and around Bexhill, with only 9% being directed towards Battle, only 3.6% to the hastings fringe. Whilst we acknowledge that Bexhill is the least constrained of the main centres, one has to wonder if this is a sustainable approach, especially given the public transport links and level of services available in the likes of Battle and Robertsbridge. Comparing figure 35 of the Reg 18 Plan (the opportunities for housing growth) with Figure 12 of the settlement study (part 1) (Settlement Sustainability Score Table), the level of growth proposed in the Sustainable and Moderately Sustainable settlements seems to be significantly less than that proposed in Bexhill, which whilst it is the only ‘Highly Sustainable’ settlement seems somewhat out of proportion and one has to wonder whether this could lead to market saturation and actually prejudice housing land supply.
5
Development Principles Policies
5.1 We note that DEV2 requires: ‘Planning applications (whether in outline or full format) must relate to an entire development site to ensure a comprehensive approach, including where sites are in multiple ownerships.
When an outline application is submitted, a masterplan defining key parameters for the entire site must be submitted by the applicant to indicate how the overall development of the site can be achieved.’
5.2 Where sites are in multiple ownership, we would suggest that as long as a framework masterplan covering the whole site, and an infrastructure delivery strategy has been agreed, either through the site promoters and the council or via an SPD, there should be nothing to stop one party looking to promote their site in advance. As long as the application reflects the framework masterplan and s106 proceeds in accordance with the infrastructure delivery plan we fail to see how this would prejudice the plan. Indeed, it may well allow sites to proceed more quickly and thus actively assist the council in their housing land supply. 5.3 We note that DEV3 indicates that: ‘Development boundaries define the area within sustainable settlements where development will be permitted, provided it is consistent with this Local Plan.
Priority shall be given to reuse of brownfield sites, in order to make efficient use of previously developed land in sustainable settlements. Some greenfield development will be necessary in order to deliver housing and employment need, but this will be limited to inside development boundaries.’
5.4 Whilst in the first instance we assume the development boundaries will be redrawn to reflect the proposed allocations, we would also suggest that given the shortfall in the housing land supply, that the council should look to have a criterion based policy that enables development immediately adjacent to the limits of built development subject to certain criteria. For example, within Mid Sussex, policy DP6 provides for:
The growth of settlements will be supported where this meets identified local housing, employment, and community needs. Outside defined built-up area boundaries, the expansion of settlements will be supported where:
1. The site is allocated in the District Plan, a Neighbourhood Plan, or subsequent Development Plan Document or where the proposed development is for fewer than 10 dwellings; and
2. The site is contiguous with an existing built up area of the settlement; and
3. The development is demonstrated to be sustainable, including by reference to the settlement hierarchy.
The developer will need to satisfy the Council that:
• The proposal does not represent an underdevelopment of the site with regard to Policy DP26: Character and Design; or
• A large site is not brought forward in phases that individually meet the threshold but cumulatively does not.
5.5 A similar policy approach would we believe be appropriate here and would assist the council in meeting their LHN.
5.6 We note that DEV5 refers to the windfall rate of 39dpa. Given our comments above, this will need to be properly justified within the evidence base for the Reg 19 Plan.
5.7 Turning to DEV6, and the Strategic Green Gaps, the current strategic gap between Bexhill and Hastings should not be seen as a constraint on development on a par with the AONB or any other NPPF footnote 7 constraint, and should not in our opinion be carried over from the current core strategy without first being reviewed to establish if they can accommodate some growth to assist the council in meeting their LHN/ meeting the unmet needs of their neighbours, especially Hastings.
6
Health and Wellbeing Policies
6.1 We note that policy HWB2 requires a HIA to be undertaken on all applications for development of 100 (+) dwellings/ sites of more than 5ha. Whilst Persimmon Homes would agree that HIA are an essential part of plan making to ensure the Council understand the health outcomes of its strategy and is thus able to ensure these are effectively addressed, this should be achieved through the preparation of a whole plan HIA which will help inform the Council that the policies the plan contains address the key health outcomes for the area. As the plan and the policies it contains has been prepared to address the key health issues it is unnecessary for future development proposals that accord with this plan to undertake a separate HIA. If a development meets the policies in the plan, then it is by default addressing the health outcomes already identified by the Council. A HIA as part of the application would merely be repetition of the work the council has already undertaken. The only circumstance where an HIA may be appropriate would be for a larger unallocated site where the impacts may not have been fully considered by the council as part of the plan wide HIA. Policy HWB2 needs to be revised accordingly.
6.2 We also note that criterion 5 of HWB5 requires developments of 300 (+) dwellings to provide playing pitches on site in line with the recommendations of Rother’s Playing Pitch and Built Facilities Strategy and Sport England’s standards. Whilst not opposing this criterion, Persimmon Homes would suggest that the following is added to criterion 5 ‘unless evidence suggests that this is unachievable” as a sites topography may not make this possible/ economies of scale may mean providing / contribution to offsite provision is in certain circumstances preferable; or that this would fetter a developer’s ability to deliver BNG on site as such facilities do not assist in trying to deliver BNG. Indeed, they can actively prejudice it.
7
Infrastructure Policies
7.1 We note that policy INF1 (A) indicates that ‘Where new infrastructure capacity is required, it must be demonstrated that it can be delivered upfront or early in the development phasing.’ As the councils will be aware, the question of the supply of utilities to support development (including residential development) is a matter that is dealt with through separate statutory regimes. Providers such as the water and energy companies are required, among other things, to ensure a supply of services adequate to meet the needs of the plan-led system. As such policy INF41 (A) should not require applicants for planning permission to demonstrate that there is sufficient capacity with regard to provision of utilities such as water and power. Furthermore, when considering other infrastructure requirements, the policy should have regard to the cash flow implications of this criteria and be caveated accordingly.
8 Housing Policies
HOU1 Mixed and Balanced Communities
8.1 In noting the unit mix proposed in policy HOU1, we would in the first instance question the extent to which policy HOU1 should look to be prescriptive on the market housing to be delivered across the district for the whole of the plan period; rather the Council should recognise the need for flexibility, as per the NPPF and PPG, as the fact is the needs of the area may well change over the lifetime of the plan, particularly given the current uncertainty in the housing market, and that different areas will inevitably deliver different forms of housing i.e. apartments within more urban town centre locations and family housing in suburban areas; and that it is the combination of the two that will ultimately address the overall need.
HOU2 Affordable Housing
8.2 We note that no percentage has been provided in this policy to clarify the level of affordable provision to be provided on qualifying sites. We look forward to seeing and being able to comment upon the final requirement at Reg 19. In addition, we note that policy HOU28 also looks to see the affordable units well-integrated and designed to the same high quality to create tenure-neutral and socially inclusive homes and spaces; and that the affordable housing should be apportioned individually or in small clusters and where this is not proposed it should be robustly justified. Whilst we appreciate and support the need to ensure integration and to create more balanced communities, that has to be weighed against the management objectives of the affordable provider, who often find small clusters to be inefficient, such that this requirement needs to provide for those instances where the affordable provider feels a different approach is justified in that particular instance. HOU8 Access Standards
8.3 We note that policy HOU8 requires all new homes to be NDSS, and that as has already been established in the adopted development plan, there is a requirement for all new dwellings in the district to be M4(2) compliant, and 5% of affordable dwellings to meet M4(3)(2)(b) standards where a need exists. In addition, however, policy HOU8 includes a requirement for 5% of new market housing to meet the “wheelchair adaptable dwellings” standard in Part M4(3)(2)(a). Whilst para 8.71 of the plan suggests that these policy expectations are justified by the district’s ageing population and levels of disability, and the need for homes to appropriately meet the demands of occupiers throughout their lifetimes, this is not in our opinion clear and convincing evidence to justify this requirement and as such we would submit that this part of policy HOU8 should be deleted.
HOU9 – Specialist Housing for the Elderly
8.4 We note that policy HOU9 requires all developments of 100 (+) dwellings to set aside at least 10% of the total number of dwellings as specialist housing for older people. It is not clear whether this is in addition to, or as part of, the requirement also being set out in policy HOU8, or whether this could just be bungalows, or buildings that have to have communal areas. As drafted the policy is unclear and thus ineffective. In addition, subject to clarity it could be overly onerous when coupled with other requirements and thus likely to affect a sites viability.
HOU12 Self-Build and Custom Housebuilding
8.5 We note that policy H0U12 requires 5% Self/ Custom-Build Housing on all sites of 20 dwellings (+). Whilst the councils Self-build and Custom Housebuilding (SCHB) Headline Data Report 202319 indicates that as of 30.10.23 there were 197 individuals and 3 associations on the self-build and custom housebuilding register, it is not clear from the evidence base how many plots would be required if the existing commitments were taking into consideration. This needs to be established to ensure the proposed policy is justified and will be effective in meeting the outstanding demand.
8.6 In the context of the above, whilst noting the scale of the demand, we understand that before seeking to require the proposed developments to provide a proportion of the homes delivered as self-build plots the Council will need to examine other opportunities for meeting the needs of those who want to self-build. Under the Self Build & Custom Housebuilding Act 2015 and para 63 of the NPPF (2023), it is the Councils responsibility to ensure that sufficient permissions are given to meet demand. Further detail is provided in paragraph 57-014 of PPG with regard to the Council’s duties and whilst this recognises that it should take account of self-build registers when preparing planning policies, it also outlines that consideration needs to be given by Councils to the disposal of their own assets in order to meet the need for self-build plots or whether self-build could support the regeneration of brownfield sites. A need for self-build plots should not automatically lead to a policy requiring their provision on sites of 20 (+) dwellings. PPG also notes at paragraph 57-025 that local authorities should be encouraging developers and landowners to consider providing plots for self-build and custom house building but makes no reference to requiring their provision. The Government clearly sees the role of the local authority as working to identify opportunities with developers rather than placing responsibility on to the development industry. 8.7 The Council will also need to consider whether it is feasible that all sites of 20 (+) dwellings can deliver self-build plots. Often, especially on the larger sites, there are multiple contractors and large machinery operating on-site, and the development of single plots by individuals operating alongside this construction activity raises both practical and health & safety concerns. Any differential between the lead-in times / build out rates of self & custom build plots and the wider site may lead to construction work outside of specified working hours, building materials stored outside of designated compound areas and unfinished plots next to completed and occupied dwellings, resulting in consumer dissatisfaction. Whilst some sites may be able to locate self-build plots in a manner that reduces these potential risks, on others this will be impossible with developers unable to co-ordinate the provision of self & custom build plots with the development of the wider site. Such concerns must be given full consideration by the Council when preparing any policies on self-build to be included in the Local Plan.
8.8 Having regard to the above we would submit that the requirement to deliver 5% Self/ Custom-Build Housing on all sites of 20 (+) dwellings is likely to deliver very little in the way of tangible benefits, whilst creating significant difficulties for the builders involved. It would be a lot more effective for the Council to identify self-build sites or allocate certain sites to deliver a higher proportion of Self/ Custom-Build Housing.
8.9 Given the above we would suggest that the council review their requirements and are more explicit as to what they want, where and why, as at present policy HOU12 does not look to be properly justified or effective.
9 Green to the Core
GTC1: Net Zero Development Standards
9.1 We note that policy GTC1 requires all residential development to achieve: ‘a) LETI Total Energy Use Intensity (TEUI) Target for Operational Energy of 35 kWh/m2/year (GIA).
b) For new buildings, a 4-star Home Quality Mark (HQM) score; or for conversions to residential development, a Building Research Establishment Environmental Assessment Method (BREEAM)
‘Excellent’ standard as minimum.
c) A maximum space heating demand for new buildings (small scale housing) of 15 kWh/m2 per year.
d) If LETI, Home Quality Mark or BREEAM is updated or replaced during the plan period the equivalent replacement requirements will be applied.
9.2 It goes on to advise that ‘to demonstrate compliance, a Building Research Establishment (BRE) Home Quality Mark post-construction assessment or similar must be undertaken at practical completion.’
9.3 And that in terms of embodied carbon: ‘All new development proposals must demonstrate, through an energy statement, how the following embodied carbon standards will be met:
(i) All residential development must achieve a LETI C rating for embodied carbon emissions, equating to 600 kgCO2/m2 upfront embodied carbon and 970 kgCO2/m2 total embodied carbon.
From 1 January 2030, a LETI A rating must be achieved, equating to 300 kgCO2/m2 upfront embodied carbon and 450 kgCO2/m2 total embodied carbon.’
9.4 Whilst Persimmon Homes support the Government’s approach set out in the Future Homes Standard, we note that the Government have set out a clear roadmap as to how low carbon homes will, alongside the decarbonisation of the national grid, ensure that the Government can meet its commitments to net zero by 2050; and that the way forward being taken by the Government recognises that the improvements in energy efficiency of new homes should be a transition which ensures that new homes continue to come forward to meet housing needs whilst still being sufficiently challenging to significantly reduce the carbon emissions of new homes from 2025. This is set out explicitly in the Written Ministerial Statement of the Minister of State for Housing on the 13th December 2023, when he indicated that:
‘The improvement in standards already in force, alongside the ones which are due in 2025, demonstrates the Government’s commitment to ensuring new properties have a much lower impact on the environment in the future. In this context, the Government does not expect plan-makers to set local energy efficiency standards for buildings that go beyond current or planned buildings regulations. The proliferation of multiple, local standards by local authority area can add further costs to building new homes by adding complexity and undermining economies of scale. Any planning policies that propose local energy efficiency standards for buildings that go beyond current or planned buildings regulation should be rejected at examination if they do not have a well-reasoned and robustly costed rationale that ensures:
That development remains viable, and the impact on housing supply and affordability is considered in accordance with the National Planning Policy Framework.
The additional requirement is expressed as a percentage uplift of a dwelling’s Target Emissions Rate (TER) calculated using a specified version of the Standard Assessment Procedure (SAP).’20
9.5 As the council will be aware, the challenge to the WMS have been dismissed. Given the above, whilst the aspirations in Policy GTC1 are worthy and Persimmon Homes are committed to the delivery of Zero Carbon Homes/ Carbon Neutrality on all their sites, wherever it is practical and viable to do so, there is in our opinion no need for additional standards to be placed on developments through additional Local Plan policies that vary from that required in national government guidance. The plan has to acknowledge the implications of the transitional period and the need for flexibility during this period, in accordance with the aims and objectives of national policy. As such, not only is policy GTC1 overly complex and likely to impact on delivery/ viability, it is also clearly inconsistent with the approach advocated in the WMS. As a result, and having regard to our comments below on the lack of any Viability Assessment to support the reg 18 plan and the associated assessment of the implications of the emerging local plan policy on Net Zero Carbon, we would suggest that Policy GTC1 revert to the requirements set out in Building Regs.
GTC7: Local Nature Recovery Areas
9.6 We note this policy requires all new development to meet the objectives of the East Sussex (including Brighton and Hove) Local Nature Recovery Strategy (LNRS). We do not believe it is inappropriate to require all new development to meet the objectives set out in a document that is not a development plan document. Whilst the council can suggest that development has regard to the LNRS it is not consistent with national policy to require them to meet these objectives. It would also be perverse to require all new developments to adhere to a set of objectives that the council itself only has a duty to have regard to in its decision-making processes. We would therefore recommend that this policy is amended to advise that all new development has regard to the objectives set out in the LNRS
GTC8: Biodiversity Net Gain
9.7 We note that policy GTC8 requires al qualifying development proposals to deliver at least a 20% measurable biodiversity net gain attributable to the development. Whilst there does not appear to be any justification as to why a 20% BNG requirement is needed, such that we would submit the policy is unsound; Persimmon Homes are committed to doing as much as possible to meet the councils’ aspirations and as such would suggest that rather than require development to deliver at least 20% BNG, the Council recognises in policy that the 10% mandatory requirement is a minimum and that they will look favourably on development that seeks to go beyond this figure. If, however, the 20% BNG requirement is retained the council need to set out that where 20% is not deliverable it will seek to negotiate the viable level that can be provided over the 10% minimum required by the Environment Act 2021.
9.8 Such an approach would facilitate an element of flexibility that would take account of the potential implications delivering 20% BNG may have on viability/ overall dwelling numbers and would thus ensure a more effective policy approach, that is consistent with the aims and objectives of national policy as set out in the biodiversity net gain planning practice guidance of 14 February 2024 which at 006 Reference ID: 74-006-2024 states:
‘Plan-makers may seek a higher percentage than the statutory objective of 10% biodiversity net gain, either on an area-wide basis or for specific allocations for development. However, such policies will need to be evidenced including as to local need for a higher percentage, local opportunities for a higher percentage and any impacts on viability for development. Consideration will also need to be given to how the policy will be implemented.’ My emphasis.
9.9 In the context of the above the council need to have regard to the ecological baseline and the difficulties delivering 10% BNG, let alone 20% can have where the baseline is already high, such that offsite credits will be required, the level of which for smaller sites would be financially prohibitive such that the actual capacity of said sites may needs to be revisited. To this end we are aware of anecdotal evidence that suggests that to deliver 20% BNG a sites net to gross will fall from circa 75 to circa 65%, which can as a result impact on its overall development capacity and the councils associated housing land supply.
9.10 Notwithstanding our thoughts on the justification behind the 20% BNG requirements and its associated implications on a site’s development capacity, as well as its viability, there needs to be more in the plan to ensure the provision of a strategic network of sites that can deliver BNG offsite in Rother or within the same national character area (NCA); as whilst important in delivering 10% this is even more important if the Council introduces 20% BNG. At present there is little evidence that there will be sufficient local offsite credits in the short and medium term to support schemes that cannot deliver a 10/ 20% BNG on site. Nor is there any recognition of the fact that by requiring a 20% net gain the council are effectively adding to the pressure on the market for credits as more sites will be required to purchase offsite credits to meet this higher level of BNG. This increases costs and will more than likely delay sites that cannot secure these. Whilst we recognise the fact that there is the option of buying national credits, the cost of these is set well above the market to promote local solutions and will impact significantly on the viability of development meaning many developers will have to wait until local credits are available, which will prejudice the councils rolling 5 year housing land supply position.
10 Landscape Character
10.1 We note that policy LAN2 requires a CAVAT assessment to be submitted with all applications impacting on an individual or groups of trees in order to quantify their public amenity value. This is in our opinion totally unjustified and would question why a standard tree surveys would not suffice in the first instance, with a CAVAT assessment only being required where a tree of particular individual or group value is to be lost. 11 The SA of the Development Strategy
11.1 As set out above we note that the SA in scoring the Development Strategy, at Figures 11 and 12 does not actually comment upon the quantum of development the different options would deliver and how this would relate to the LHN, or indeed address the issue of the unmet needs of neighbours. Given SA objective 8 on housing this is somewhat surprising, as is the fact that no one option appears to have been chosen as the preferred option; albeit SDO3B (Bexhill Greenfield Growth Option 2: with New Multi-modal Transport Corridor) appears to score most favourable, followed by SDO6 (Brownfield Intensification and Redevelopment), which as it would totally fail to meet the LHN seems somewhat perverse, especially when figure 11 scores it as ‘Option supports the objective, or elements of the objective on balance, although effects may be minor’. Surely it would be ‘Option appears to conflict with the objective on balance and may result in minor adverse effects’ or indeed even ‘Potentially significant adverse effects’. Similarly, the scoring of SDO11 (Growth in settlements with train stations or sustainable transport alternatives) in figure 12 seems somewhat odd21 given its based on sustainable transport. To this end we also note that in a number of occasions, SOD4 and SOD5 for instance, growth is said to be resisted by virtue of land availability based on environmental and topographical constraints. Given the scale of unmet need currently proposed we would respectively suggest the council need to do more to establish whether additional land in these areas is available/ could be developed as no stone should be left unturned in trying to meet the LHN. As it stands, the SA lacks the necessary robustness required as it is impossible to assess the impact and weigh benefits and harm of each development strategy without know scale of delivery associated with each option.
11.2 Having regard to the above we feel it’s imperative that if the SA is to be effective the next iteration needs to assess the Development Strategy in the context of the LHN and how the council are to accommodate this/ the implications of not accommodating it/ over delivering to address adjacent authorities’ unmet needs.
12 The Infrastructure Delivery Plan Viability Assessment
12.1 We are surprised to note that whilst an Infrastructure Delivery Plan (IDP) has been produced to support the Reg 18 Plan, as well as an Infrastructure Background Paper, there is no Viability Appraisal (VA) of the plan. Not only does the lack of a VA makes it difficult to comment on the proposed policies, but it also raises questions about the aspirations of the IDP i.e. how these have been tested, and whether they are realistic and deliverable. If the plan is predicated on the aspirations of the IDP then the whole plans approach is also open to debate as how can it be said to be justified and effective if it has not been subject to a robust VA.
13 Conclusions on Reg 18 Plan
13.1 We are concerned that the scale of growth proposed in the overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa, which is significantly less than the capped LHN of 733dpa/ the uncapped LHN of 850 dpa. In our opinion there is no justification for promoting a lower housing target than the capped LHN given the aims and objectives of national government guidance and the affordability issues that exist within the district, that the plan says it wants to address. The scale of the potential shortfall (between 7,286 and 9,502 dwellings over the plan period22) is significant, and will we fear be exacerbated if the predicted supply does not deliver as forecast. Nowhere does the plan, or the evidence base demonstrate how this will be addressed. In addition, it does not appear to have been raised with adjacent authorities through discussions on the DtC. Nor does the plan/ its evidence base demonstrate how the acute levels of unmet housing need that exist within the area are to be addressed through constructive and active engagement so as to meet legal duties imposed by the DtC.
13.2 Similarly we are concerned that no evidence has been provided to demonstrate how the housing requirement will be met or how a rolling five year housing land supply will be achieved. The deliverability of the existing commitments needs to be demonstrated more evidentially than it has to date. Likewise, the evidence needs to be provided to demonstrate that the proposed allocations will deliver the quantum of development suggested when expected; and the plan needs to encompass compelling evidence to support the windfall rates expected rather than rely on historic trends.
13.3 We would also suggest that the plan period needs to be reviewed so that it provides for 15 years from adoption (i.e. till 31st March 2042).
13.4 Turning to the Development Strategy, the justification behind the Development Strategy and the clear preference for concentrating growth in and around Bexhill is not clear, the SA being silent on the quantum of development each Development Strategy could deliver and how the overall strategy related to the LHN.
13.5 In addition to the above we also have specific concerns about policies DEV2 (Comprehensive Development and Masterplanning), DEV3 (Development Boundaries), DEV5 (Development on Small Sites and Windfall), DEV6 (Strategic Green Gaps), HWB 2 (Health Impact Assessments), INF1 (Strategic Infrastructure Requirements), HOU1 (Mixed and Balanced Communities), HOU2 (Affordable Housing), HOU12 (Self-Build and Custom Housebuilding) , GTC1 (Net Zero Building Standards) and GTC8 (Biodiversity Net Gain), all of which we do not believe to be properly justified or consistent with national planning policy guidance as drafted.
In the context of the above we would like to highlight Persimmon Homes desire to work with Rother District Council on progressing a sound plan and that to this end we are happy to meet with officers to discuss our reps on the housing requirement, supply and trajectory and the other policies contained in the Reg 18 Plan/ its supporting evidence base.
Yours sincerely
JUDITH ASHTON
Judith Ashton Associates
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28068
Received: 23/07/2024
Respondent: Bellway Homes
Agent: Savills
It is evident that the housing and development needs of the District are greater than when the Core Strategy and Site allocations DPD were previously adopted. The Housing and Economic Development Needs Assessment (HEDNA) confirms this, identifying that the local housing need (LHN) is 737dpa based on the standard method calculation (capped), compared to the current Core Strategy target of 335dpa, and average rate of delivery of only 204dpa.
Paragraph 5.9 of the ELP confirms RDC’s commitment to maximising development opportunities, with growth being informed by the identified and potential additional sites in the HELAA.
The current strategy wording provides a housing target range. This is a minimum target of only 258-364 dpa, based only on RDC’s identified sites and potential sites. It does not reflect the LHN.
Although RDC notes that the range is subject to change, it is evident that RDC must identify further sites and safeguard existing sites with planning permission if it is going to address district housing needs.
This is particularly relevant when considering the HEDNA Housing Growth Comparison chart, which shows a housing trajectory that only meets or exceeds the LHN for a 3 year period between 2022/23 and 2030/31.
Thus it is essential that sites with planning permission, such as Land at Clavering Walk, Cooden, are allocated. This would then provide a source of new housing that is certain for the early part of the plan period. The site has been assessed to be suitable for delivery of up to 85 dwellings, as per the outline planning permission. The approved RMA seeks to deliver 70 homes. Again this is certain. However, despite Bellway’s commitment to delivering the new homes here, there are delays, with pre commencement conditions not yet discharged despite planning permission first being granted in 2020. Whilst the development is implemented, there are still aspects to finalise. Bellway has not artificially delayed delivery, and the delay is simply a result of the planning process. It is anticipated that there are other committed sites that are also in a similar situation. The allocation of the site would ensure it is safeguarded at least until such time as the first homes are delivered.
Please see attached letter with representations on the Regulation 18 consultation. The representation includes general comments in addition to responses to a number of questions raised within the Emerging Local Plan.
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28079
Received: 23/07/2024
Respondent: Peter & Melanie Collier
Agent: Rubix Estates
The Standard Method Local Housing Need (LHN) figure for Rother is 773 dpa (2023 base date) or
727 dpa (2024 base date). The Hastings & Rother Housing and Economic Development Needs
Assessment (HEDNA) Update (2024) identifies an affordable housing need (net) of 325 dpa, and
some 2,054 households are on the Rother Housing Register.
ONS datasets indicate that the latest median housing affordability ratio (2023) for Rother is 11.44,
having risen from 8.83 in 2013, and 7.77 in 2003. The lower-quartile affordability ratio is now 12.84,
rising from 10.53 in 2013 and 7.03 in 2003. Paragraph 8.21 of the Draft Local Plan cites the HEDNA’s
analysis regarding housing affordability. This notes that 44% of newly forming households earn less
than the amount needed to rent a lower-quartile property on the open market. Likewise, 94% earn
less than the amount needed to buy a lower-quartile open market dwelling.
The level of housing need is then significant, and affordability pressures are, therefore, serious and
widespread. Whilst Rother’s position is not unique, the current LHN for the district is also far higher
than the adopted (out-of-date) Core Strategy requirement (averaged at 335 dpa). Moreover, the
adopted Core Strategy requirement did not, in any case, fully address the scale of housing needs
identified in the (now defunct) South East Plan. Notwithstanding the HEDNA’s commentary on the
efficacy of the Standard Method, there can be no dispute that Rother (and the Rother-Hastings HMA)
represents an area of high housing need.
Despite the above, the proposed Spatial Strategy (as presented on pages 112 and 113 of the
consultation document) proposes only;
“a minimum of [5,158 to 7,287] dwellings, at an average rate of [258 to 364] per year.”
In other words, the Plan seeks to deliver between a third and just below half of the level of housing
need identified through the Standard Method calculation. Moreover, the net annual need for affordable
housing of 325 dpa (as identified in the HEDNA Update) is also likely to exceed the total (i.e., market
and affordable) annual housing target envisaged in the Draft Local Plan.
Draft Policy HOU2 ‘Affordable Housing’ does not yet specify the percentage of affordable housing
sought from market-led residential developments. However, depending on the conclusions of a future
Plan-wide viability assessment, the tariff is likely to be between 30% and 50%. As such, it is selfevident that only a fraction of overall affordable housing needs will be addressed through the Plan’s
current proposals.
As a separate point, and despite the analysis in the HEDNA Update (in particular, in paragraphs 6.32
to 6.49), RDC does not appear to argue that exceptional circumstances exist to justify a deviation
from the Standard Method (as per NPPF paragraph 61) and the minimum Local Housing Need figure
arrived through it. It is the Standard Method LHN figure that should, therefore, be taken to represent
the Objective Assessment of Need Rather than seeking to make the case that there are exceptional circumstances justifying a departure
from the Standard Method, the Council instead contends that it is constraints found within the Planarea that prevent identified needs from being met. Indeed, in paragraphs 5.1 to 5.8, the Plan suggests
that the prevalence of areas at high risk of flooding, designated habitat sites and areas of highlandscape value, means that housing needs cannot be met in full, without resulting in unacceptable
impacts.
Rubix Estates recognises that parts of the Plan-area are subject to environmental constraints.
However, it is not accepted that there are no further opportunities to meet housing needs either in full
or at least to a much greater extent.
For example, within the HELAA (2024), the availability of a significant number of sites is listed as
‘unknown’, with these, therefore, being discounted when they might otherwise be suitable for meeting
needs. Many sites are also judged to be ‘unsuitable’ when it is clear from the Site Assessment
commentary (in the HELAA) that their suitability or unsuitability is finely balanced. Likewise, many
sites that are judged to be potentially suitable have had their estimated capacity and/or developable
area reduced when compared to the promoter’s / landowner’s estimate.
A more specific concern is that the HELAA (and, by extension, the Draft Local Plan) has taken a
‘policy-on’ approach to the evaluation of site constraints. Whilst that may be appropriate for statutory
designations (e.g., National Landscape), local, non-statutory designations should be treated
differently.
The above suggests that there is scope to refresh the HELAA evaluation to bring forward additional
sites. In this context, it must be recognised that the socioeconomic consequences of not fully meeting
housing needs (and to the degree currently envisaged) will have real-world consequences. Housing
affordability will worsen, and issues such as overcrowding and the suppression of household
formation will fail to be addressed. Broader consequences will arise in relation to intergenerational
inequality, declining social mobility and hindered economic productivity
Please refer to full submission in attachment
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28102
Received: 23/07/2024
Respondent: Mr & Mrs Hedges
Number of people: 2
Agent: Batcheller Monkhouse
The Regulation 18 draft local plan identifies a number of spatial strategies across the district to respond to different circumstances, including some additional development within Staplecross.
We support the principle of employing a number of spatial strategies to provide the flexibility to respond to differing circumstances and as a village with some services and connectivity to higher tier settlements Staplecross makes a logical focus for additional growth. This is particularly the case as Staplecross is the largest village in the parish of Ewhurst (as identified in paragraph 12.16 of the adopted Development and Site Allocations Plan).
See attached documents which comprise the submission regarding HELAA sites EWH0009: Land east of Hop Gardens, Northiam Road, Staplecross and EWH0018: Land south of Watts Wood, Staplecross.
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28106
Received: 23/07/2024
Respondent: Mr & Mrs Hedges
Number of people: 2
Agent: Batcheller Monkhouse
See the Housing Need section (pages 1-4) in the attached Representation which details comments on the housing need for Rother district, the constraints within the District, the development figures contained in the draft Local Plan, and how HELAA sites EWH0009 and EWH0018 can help meet the housing need.
See attached documents which comprise the submission regarding HELAA sites EWH0009: Land east of Hop Gardens, Northiam Road, Staplecross and EWH0018: Land south of Watts Wood, Staplecross.
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28186
Received: 23/07/2026
Respondent: Mr Raphael Brandon
Agent: Corbil Planning Ltd
The Local Housing Need (LHN) is 733dpa based on the 2023 base date. The LPA is proposing a net completion rate of between 258 and 364 dpa (not even half that of the LHN and in the lower case, a figure which is less than the current Core Strategy). This is notwithstanding there being an acute housing crisis in Rother and a desperate under-supply. The ambition of the Council, which is to perpetuate this shortage at up to 364 dpa, is lack-lustre and far too low.
We are led to understand that the figures of 258 to 364 dpa are based on the total of committed developments (i.e. existing allocations and sites with planning permission), and the same with potential site allocations added. The proposal is therefore to base the housing requirement either on the existing level of development already committed or to only marginally increase it through the addition of those sites which it already feels palatable through the HELAA.
The proposed housing requirement should be based on or as close to the LHN as only then will Rother be able to say that it is planning for its housing needs of the future.
Please see attached full representation on the draft Local Plan in relation to HELAA site ICK0017.
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28208
Received: 23/07/2023
Respondent: Mr & Mrs Hedges
Agent: Christine Dadswell
The Regulation 18 draft local plan identifies a number of spatial strategies across the district to respond to different circumstances, including some additional development within Staplecross.
We support the principle of employing a number of spatial strategies to provide the flexibility to respond to differing circumstances and as a village with some services and connectivity to higher tier settlements Beckley makes a logical focus for additional growth.
Submission containing representations that include the following matters:
Promotion of HELAA site BEC0025 - Land West of Royal Oak Close, Beckley
Housing Need
Proposed Strategy: Overall Spatial Development Strategy
Vision for Rye & Eastern Settlements
Proposed Policy DEV3: Development Boundaries
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28220
Received: 23/07/2024
Respondent: Mr & Mrs Hedges
Agent: Christine Dadswell
Representation on housing need in Rother and the draft Local Plan proposed development strategy.
In accordance with the Government’s objective of significantly boosting housing supply we contend the Council should pursue a higher growth strategy to fully meet the full identified housing need for the plan period.
For full representation please see attached submission document.
Submission by Christine Dadswell of Batcheller Monkhouse on behalf of Mr & Mrs Hedges regarding:
Promotion of HELAA sites:
- EWH0009 land east of Hop Gardens, Northiam Road
- EWH0018 Land South of Watts Wood, Staplecross
Housing Need
Proposed Strategy: Overall Spatial Development Strategy
Vision for Northern Rother
Proposed Policy DEV3: Development Boundaries
Please see attached documents for full representations.
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28221
Received: 23/07/2024
Respondent: Mr & Mrs Hedges
Agent: Christine Dadswell
Proposed Strategy: Overall Spatial Development Strategy
The Regulation 18 draft local plan identifies a number of spatial strategies across the district to respond to different circumstances, including some additional development within Staplecross.
We support the principle of employing a number of spatial strategies to provide the flexibility to respond to differing circumstances and as a village with some services and connectivity to higher tier settlements Staplecross makes a logical focus for additional growth. This is particularly the case as Staplecross is the largest village in the parish of Ewhurst (as identified in paragraph 12.16 of the adopted Development and Site Allocations Plan).
Submission by Christine Dadswell of Batcheller Monkhouse on behalf of Mr & Mrs Hedges regarding:
Promotion of HELAA sites:
- EWH0009 land east of Hop Gardens, Northiam Road
- EWH0018 Land South of Watts Wood, Staplecross
Housing Need
Proposed Strategy: Overall Spatial Development Strategy
Vision for Northern Rother
Proposed Policy DEV3: Development Boundaries
Please see attached documents for full representations.
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28230
Received: 23/07/2024
Respondent: Mr W Gowland
Agent: BATCHELLER MONKHOUSE
The key objective to significantly boost the supply of housing remains a focus of planning policy at all levels. Paragraph 60 of the NPPF states that to support this aim it is important to ensure a sufficient amount and variety of land can come forward where it is needed.
In addition, paragraph 11b of the NPPF states:
‘Strategic policies should, as a minimum, provide for objectively assessed needs for housing and other uses, as well as any needs that cannot be met within neighbouring areas, unless:
i. the application of policies in this Framework that protect areas or assets of particular importance provides a strong reason for restricting the overall scale, type or distribution of development in the plan area;
or
ii. any adverse impacts of doing so would significantly and demonstrably outweigh the benefits, when assessed against the policies in this Framework taken as a whole.’
The Regulation 18 consultation identifies the housing need in the district as 14,660 homes for over the twenty-year plan period 2020 to 2040. This figure was identified in the Housing and Economic Development Needs Assessment (HEDNA, 2024), and was derived using the Standard Method, as required by the NPPF and accompanying Planning Practice Guidance (PPG). This amounts to 733 dwellings per annum. It is not clear from the Regulation 18 consultation whether this figure includes a 20% buffer to be applied as a result of under delivery as set out at paragraph 77 of the NPPF. If the 20% buffer has yet to be applied, housing requirement would increase to 879 dwellings per annum -17,580 dwellings over the plan period.
In any event, the Council have confirmed they do not in fact intend to meet their full housing need (as calculated by the standard method) for a number of reasons most notably the significant landscape and flooding constraints which exist across the district. We accept that footnote 7 of paragraph 11 of the 2023 NPPF allows for a reduction in housing delivery in areas restricted by certain designations, including National Landscape, of which a significant part of the Rother District falls within. However, we do not consider the lower housing figures offered in the Regulation 18 Consultation have been justified or that sufficient reason has been given for not meeting the higher housing need figure identified within the ‘range’ put forward by the LPA, as discussed below. It is acknowledged that the Council have stated that the final figures to be put forward for adoption will be ‘minimum’ figures. However, the history of under delivery of housing since the adoption of the Core Strategy is well documented (as set out paragraph 5.3 of the Regulation 18 Plan) which makes all the more pressing case for the Council to be taking a more radical approach to positively plan for a higher level of housing.
The Council have made a passing reference in the Regulation 18 plan to a couple of reasons as to why they cannot meet their housing need figure calculated using the standard methodology including:
• Landscape constraints
• Constraints resulting from areas lying within flood zones
Beyond a passing reference to environmental constraint, the Council has not set out in detail why they cannot meet their full identified housing need yet seem to acknowledge the need to plan for higher levels of growth by running an additional call for sites alongside the Regulation 18 consultation. The land at Great Park Farm would not be constrained by any of the landscape or flooding constraints cited by the Council as reason to not meet the full identified housing need.
Whilst located within in the High Weald National Landscape (formerly AONB) area the two parcels of land within the wider holding of Great Park Farm are considered to be capable of accommodating some development without adverse effect on the natural beauty of the High Weald which underpins the designation of this area. The land is located entirely within Flood Zone 1 meaning it is not in an area of the district which is at risk of adverse flooding.
Great Park Farm is located some 800m from the village at Catsfield which has a range of day-to-day facilities which can be accessed from the site, including a primary school, pub, village hall, village shop and it is important to highlight the farm shop and café which are located at Great Park Farm itself. There are also bus stops within Catsfield which provide an hourly service to Bexhill, Battle and Hastings where a wider range of day-to-day facilities can be found.
Paragraph 70 of the NPPF recognises that small scale developments can deliver housing at a faster rate. The land is in a single, family ownership and so there are no third-party ownership issues which might prevent or delay development. It is anticipated that a small-medium scale development here could be delivered at a relatively quick rate.
In accordance with the Government’s objective of significantly boosting housing supply we contend the Council should pursue a higher growth strategy to fully meet the full identified housing need for the plan period. Adopting this approach will allow the Council to develop a long-term sustainable growth strategy which provides flexibility to adapt to changes in demand and allow for the inevitable cases where development does not come forward for some reason or under delivers. This is particularly the case given the history of under delivery in the district. It would also allow for a more consistent delivery rate, allowing for a wider range of smaller sites to be delivered while the infrastructure is put in place to serve larger developments.
See attached document for the representation which addresses:
- Housing Need
- Preferred Spatial Development Options
- The Vision for Battl eand Surround Settlements
- Proposed Policy DEV5: Development on Small Sites and Windfall Development
- Proposed Policy ECO1: Supporting New Employment Development
- Proposed Policy ECO2: Protecting Existing Employment Sites and Premises
- HELAA sites CAT0013 (Piggery, Great Park Farm, Horns Corner, Catsfield) and CAT0021 (Nursery (glasshouses), Great Park Farm, Horns Corner, Catsfield).
Comment
Rother Local Plan 2020-2040 (Regulation 18)
Representation ID: 28232
Received: 23/07/2024
Respondent: Mr W Gowland
Agent: BATCHELLER MONKHOUSE
The Regulation 18 draft local plan identifies a number of spatial strategies across the district to respond to different circumstances, including small-scale development in the radial settlement network connected to Bexhill and Hastings, at densities consistent with the surrounding area, where it is sustainable and does not negatively impact the setting of the High Weald National Landscape.
We support the principle of employing a number of spatial strategies to provide the flexibility to respond to differing circumstances. As a village on the outskirts of Bexhill and Hastings with equally good connections to Battle, Catsfield is well-placed to take some additional growth. Figure 21 of the Regulation 18 plan identifies housing growth of 35 dwellings based on existing allocations in the Development and Sites Local Plan (DaSA). The Regulation 18 plan seeks to add an additional 25 development units to Catsfield beyond the DaSA allocations. The existence of allocations for housing growth within the adopted DaSA and the further sites identified in the HELAA is an indication of the fact that Catsfield is considered to be a suitable location for housing growth and we would contend that moving forward additional allocations for small-scale development should be made in Catsfield.
This is particularly the case as whilst the DaSA allocation for Catsfield (land west of B2204, Catsfield) has existed since 2019 no development has been brought forward as of yet so there is no guarantee that the site will deliver the 35 residential units identified. The allocation site has been the subject of an application which was submitted in December 2023 but was withdrawn by the applicant in May of this year. The uncertainty over whether this site will deliver provides justification for considering additional allocations within the Catsfield area to ensure that at the minimum the quantum of growth identified within the DaSA is still delivered.
Mr Gowland and his family have already successfully diversified Great Park Farm, through the development of a successful nursery, farm shop and café and more recently panning permission has been granted for a small number of bespoke glamping cabins to offer holiday accommodation. The two further parcels of land identified as CAT0013 Piggery site & CAT0021 Nursery site (and in particular CAT0021) provide an opportunity to further diversify the land through commercial purposes and provide greater employment opportunities for residents within Catsfield. The Settlement Sustainability Assessment, more on which will be expanded on later in this letter, identified Catsfield as being of low sustainability principally through its lack of employment opportunities. Figure 22 of the Regulation 18 plan identifies that no employment floor space was allocated within the DaSA nor does the Regulation 18 plan seek to provide any further employment floor space of the course of the plan period for Catsfield. Considering the lack of employment opportunities was identified as one of the key elements affecting the sustainability of the settlement for further development, a reassessment of the employment floor area could unlock not only employment space but also further housing allocations within the settlement.
See attached document for the representation which addresses:
- Housing Need
- Preferred Spatial Development Options
- The Vision for Battl eand Surround Settlements
- Proposed Policy DEV5: Development on Small Sites and Windfall Development
- Proposed Policy ECO1: Supporting New Employment Development
- Proposed Policy ECO2: Protecting Existing Employment Sites and Premises
- HELAA sites CAT0013 (Piggery, Great Park Farm, Horns Corner, Catsfield) and CAT0021 (Nursery (glasshouses), Great Park Farm, Horns Corner, Catsfield).