Showing comments and forms 1 to 19 of 19

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24896

Received: 20/06/2024

Respondent: Mrs Anna Wilson-Patterson

Representation Summary:

HWB5 Green and Blue Infrastructure
There is no minimum length for new development to be built away from a water course. In the case of the Market Garden Site in Fairlight, three new builds are on the banks of the stream and the earth has subsided as a result.

Full text:

Q1.

Sadly the vision feels unachievable. Rother Officers avoid dialogue or face to face contact with some residents, who as a result have little trust in RDC’s integrity and competence. Disillusion with poor quality planning includes perceptions of cronyism and corruption. How will an infrastructure baseline be established? For example “Sensitive, sustainable and well-designed development that meets local housing and employment needs will be complemented by the timely delivery of supporting infrastructure.” RDC should revisit past developments that fall short of this criteria, where community complaints have been high. In Fairlight Cove we’ve lost amenity for 2 years caused by a poor quality, cramped, steep development of 16 houses. Residents dispute it’s built to the planning consent approved on appeal by the Planning Inspectorate. Storm overflows cover the lane with sewage, before the 16 new houses are even connected. A resident survey describes the gridlock of parked vehicles on our bus route, obstructing junctions and folk struggling to get on/off their driveways. Over decades there appears to have been no imaginative attempts to meet village overflow parking needs. For example removing wide grass verges to create parking spaces. We can’t see strategic joint working by RDC with our Parish Council. Our precept has increased by 40% in the past few years without extensive consultation and Parish Councillors spend our tax on their high running costs, meetings and social projects for retired people that duplicate existing locally funded voluntary sector provision by professional staff. Accountability and evaluation systems are lacking for Parish Councils to maintain infrastructure. Parts of Fairlight are lanes with high numbers of walkers, no pavements or footpaths, very few seats and signage clutter. A baseline study would show village assets in poor repair, with an increase in vehicle movements. Parking and speeding are increasing problems. Results from the 2023 Parish Council Residents Survey are not in the public domain. In relation to ‘Quality of Life’ residents regularly state a priority is public toilets. The decision by RDC to not cover the cost of public toilets at our local beach and in Rye indicates how removed you are from meeting basic expectations and needs of your residents, visitors to our area and local businesses.

Q2.

‘Conserving and enhancing the significant landscape and environmental quality across the district’ It would help if RDC insisted on professional quality Construction Management Plans or contractors signed up to the ‘Considerate Contractor’ Scheme. Also if RDC Enforcement Officers were resourced and supported to penalise construction sites in the same way they penalise residents or local builders, especially for radios, drug use and aggressive behaviours on site. Planting Management Plans and TPO’s are ignored, trees and hedgerows are cut, with no apparent penalties. Residents are encouraged to provide free labour to report alleged breaches of planning consent, but then Developers break the rules with impunity. The perception is that Rother Officers are too close to Developers, whilst being unwilling to meet with residents. There appears to be no monitoring of what the CIL funds are spent on in parishes in relation to the exisiting Local Plan and no minimum standard of “community consultation”.

Q3.

‘By supporting strong, safe and sustainable communities’ In Fairlight Cove there is a minimal bus service, which unfortunately can be disrupted at very short notice by road closures. Leaving school children or people without mobile phones disorientated and abandoned. Plus there is poor access to travel around our village for people with disabilities. There appears to be no baseline of how many village roads are difficult to use for disabled people, due to issues such as rough surfaces/moonscapes, pavement parking, cracked pavements or speeding traffic. New charges for car parks across RDC and HBC means people now drive into Fairlight Cove to park for free and some camp overnight outside residents homes. HBC is commonly perceived online as having corrupt working practices in relation to planning and development sites.

Q5.

SO 9 feels very important, but unless there are new initiatives in villages, there appears to be no resources to make this happen. It is difficult to get a face to face appointment at Hill Surgery, Hastings, few people can get through to reception. For people on low incomes, without a computer or mobile phone it is especially hard.

Q.27

There seems to be an opt out clause on Density. There seems little point in having policies, if you then create ways for property developers not to meet them.

Q.33

LWL3 Facilities at bus stops and iii Coastal Access This would be very important if it could be implemented.

LWL5

We welcome these policies in terms of height and steep sites, for example if a village is predominantly small low dwellings, very tall buildings stand out. For example at the entrance to Fairlight Cove and in the “transition” of the new Market Garden Site to the south.

LWL6

We welcome these policies in terms of height and steep sites, for example if a village is predominantly small low dwellings, very tall buildings stand out. For example at the entrance to Fairlight Cove and in the “transition” of the new Market Garden Site to the south.

Q45.

Streets For All. We welcome the shared streets policy especially “street furniture, good signage and way finding that is accessible to all to encourage walking and prioritise vulnerable users.” It would be beneficial to identify who currently lives in a ‘street’ or a ‘road’ and whether 4.62 SUDS and 4.64 could be implemented across the District. If RDC had clear design standards and guidelines, this would help Parish Councils who may not have access to professional expertise in planning. Community pride and cohesion is undermined by dirty and deteriorating infrastructure, Pett Level Road, Pett Level Toilets, Highways Pavement repairs, Southern Water sewage etc

Q.48

RDC needs to work with Parish Councils to create Parking Strategies for villages where parked vehicles now dominate the public realm, block footways, crossing points and sight lines.

Paragraph 5.16

Quiet Lanes and Slow Ways should be introduced on the 1066 walk and popular coastal footpaths as a priority.
This is a key issue for Fairlight enabling all generations to stay in rural communities for their lifetime and a source of frustration that new homes have not addressed the housing needs of local residents.

Q.54

The notion of “Hastings Fringes” feels unclear and ‘sensitive growth’ lacks a number, clarification would help.

Q.59

We object to the notion that a minimum of 35 dwellings in Fairlight is “sensitive” growth, we assume the site is East Field. This has been contested so many times over the years and the Field continues to flood, the sewage continues to overflow on Lower Waites Lane and Stream Lane. The increased traffic puts enormous pressure on village lanes which are in a poor state of repair. Pett Level Road is unpassable during the evening time due to the size of the pot holes. Access to a Post Office, Doctors Surgery and Dentists is limited.

Q.72

“Including the undeveloped coast, also has high intrinsic amenity value and is an important resource for nature conservation, leisure and tourism.” This would be more convincing if Pett Level Road were usable as a road, the moonscapes by the road side could be used for parking and the public toilets were open throughout the year.

Q.82

DEV3 The development boundary concept sounds confusing. If Fairlight Cove has a development boundary in the Local Plan surely the boundary of Waites lane is facing the ‘countryside’. Therefore an allocation of East Field for 35 houses would not meet the policy?

Q.90

DEV6 The Strategic Green Gap between Fairlight and Hastings is warmly welcomed, as are all the Gaps in the Plan. There are regular incidents where large vehicles e.g two buses/lorries etc get wedged along the narrow lanes travelling east along Fairlight Road which is claustrophobic and parked vehicles dominate. The areas open character feels essential to demarcate the start of the countryside.

Q.101

HWB5 Green and Blue Infrastructure
There is no minimum length for new development to be built away from a water course. In the case of the Market Garden Site in Fairlight, three new builds are on the banks of the stream and the earth has subsided as a result.

Q.102

A minimum precise measurement length should be insisted upon for all new developments near a water course. There is also no clear mention in Construction Management Plans for Site workers not to litter or pollute a water course. Also to store construction materials such as water proof insulation, glass etc a few metres from the edge so as they don’t fall into the water course.

Q.123

HOU5 Rural Exception Sites
This feels like another ‘get out’ clause. There is no clarity as to what RDC mean by “meaningful community engagement” If RDC has any examples of how this had worked in practice that would be helpful. Otherwise it could be removed.

Q.129

HOU8 Access to Standards Paragraph 8.72 This feels like another ‘get out’ clause

Paragraph 8.137

ESCC parking guidance is an under estimate, for the number of people who actually use a garage. The number of cars owned per household in rural areas and the fact that most dwellings have visitors and delivery vehicles. The car parking spaces are mean on new build developments, causing parked vehicles to over flow onto rural lanes and bus routes.

Q.144

”… private rear garden spaces of at least 10 metres in length will normally be required, other than in exceptional circumstances where this cannot be achieved in an otherwise acceptable development” We strongly object to the wording and opt outs within this Policy. At the Market Garden Site in Fairlight residents allege the 10 metre gardens have not been created. Allowing flexibility on the 10 metre rule makes a mockery of it being a Policy. This allows for Developers to erect cramped buildings on irregular and sloped sites. This is very disappointing. Similarly the policy can be avoided if “future occupiers of the dwellings will have a lesser requirement for amenity space” How can this be proven if properties are sold on the open market, another loophole for allowing dwellings with low amenity. It leaves little room for outdoor washing lines which have an environmental impact if clothes is dried indoors. Also the capacity for play equipment, to plant veg/fruit trees, store bicycles/canoes etc. We object to 8.136.

Q.146

The Policy is inappropriately flexible. Getting away with squashing the tiniest housing units onto a plot seems to be the game for a few Developers and RDC are encouraging it with this type of policy.

Q.166

Like most of our responses our comments relate to balancing new developments with maintaining infrastructure or improving strategic working with ESCC or Parish Councils. If the majority of visits are day trips then the issue of parking, overflow parking and public toilets remain very high on the list of problems to be addressed, which currently fail to meet customer expectations. The poor state of ESCC roads is a major factor in putting off visitors.

Q.180

LAN1 This is very important, especially to the undeveloped coast.

Page 356 (ix) The failure of RDC to stop Developers clearing trees and hedges is depressing.

Q.191

ENV 4 Fairlight Cove Coastal Change Management Area is important to support the work of the Fairlight Preservation Trust.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24965

Received: 02/07/2024

Respondent: Amanda Baker

Representation Summary:

It's good to have a limit on how many houses can be built before providing the local community a playing field, however green space and trees are just as important as a playing field. It's also a concern that Rosewood park development created a green space and then now want to go back on that commitment and build an access road through it to build yet more houses!

Full text:

It's good to have a limit on how many houses can be built before providing the local community a playing field, however green space and trees are just as important as a playing field. It's also a concern that Rosewood park development created a green space and then now want to go back on that commitment and build an access road through it to build yet more houses!

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 25580

Received: 18/07/2024

Respondent: Mrs Rosalyn Day

Representation Summary:

Policy should be a lot stronger about safeguarding blue infrastructure during and after development. Waterways are vulnerable to pollution caused by site run-off when vegetation is removed prior to building.

Full text:

Policy should be a lot stronger about safeguarding blue infrastructure during and after development. Waterways are vulnerable to pollution caused by site run-off when vegetation is removed prior to building.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 25711

Received: 21/07/2024

Respondent: Sussex Wildlife Trust

Representation Summary:

SWT supports the inclusion of this policy.

Full text:

SWT supports the inclusion of this policy.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 26325

Received: 17/07/2024

Respondent: Burwash Parish Council

Representation Summary:

Good policy

Full text:

Please see attached comments from Burwash Parish Council.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 26454

Received: 22/07/2024

Respondent: Bexhill Heritage

Representation Summary:

5.4 HWB5: Green and blue infrastructure
iv) Who in RDC is trained to establish if the GI Masterplan is sufficient to be submitted for planning approval?

iv) Can RDC confirm that the GI Masterplan will be reviewed by a number of people (minimum of two), independently with any disparity reconciled by them collectively?

Full text:

Please refer to attachment

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 26656

Received: 22/07/2024

Respondent: Ticehurst Parish Council

Representation Summary:

Excellent policy

Full text:

Individual comments made on specific policies as logged

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 26863

Received: 22/07/2024

Respondent: Northern Parishes Group

Representation Summary:

1 The Northern Parishes group (known in this document as the group) and the Friends of Bewl Water consider that the environmental and particularly the ornithological position at Bewl Water is so precarious that both Rother District Council and Wealden District Council should address this issue and insert a policy about Bewl Water in their draft plans. The Northern Parishes group working with Wadhurst and Ticehurst Parish Council and the Friends of Bewl Water drafted a section for the Wealden draft Local Plan to deal with the special position of Bewl Water, entitled ‘Policy ENV4 Bewl Water’. The proposal accompanies this submission.
2 The public perception about the threats to Bewl Water are such that a petition to Save Bewl Water attracted over 79,500 signatures. It is believed that Rother District Council is determined to make this plan Green to the Core. The Northern Parishes group wants to work with Rother District Council and to ensure that this is not just a byline but is an active policy. The centre of any green policy is the protection of its key environmental sites. The group also wants to work with Rother District Council and to ensure that Live Well Locally is also not just a byline but is another active policy. One of the most important factors of mental and physical good health is the protection of open spaces, their environmental properties and their outdoor pursuits. Sites that are in the countryside with water are particularly important. Bewl Water used to have a large active community using walking, bird watching, cycling, rowing, sailing, canoeing, horse riding, fishing facilities available at Bewl Water.
3 It is noted that the only references to Bewl Water in the Rother Draft Local Plan state:
‘para 6.34 ‘Some of Rother’s key recreational facilities come in the form of its waters, including the coast, and Bewl Water which crosses into both Tunbridge Wells Borough Council and Wealden District Council.’
‘ para 11.5 The surface water sources within Rother comprise three reservoirs at Bewl Water, Darwell Reservoir and Powdermill Reservoir. Bewl Water is situated at the northern edge of the district and straddles the adjacent authorities of Tunbridge Wells and Wealden. The reservoir is an important regional resource but is also a significant recreational amenity. Policies relating to the recreational use of Bewl Water, and other water-based recreation, is contained in the Health and Wellbeing chapter within Policy HWB5 (Green and Blue Infrastructure).’
4 The group has looked at draft plan policies GTC1-2, 4, 6-9; LWL 2-5; HWB 1, 3-5; LAN 1-3 and ENV 5 and consider that although these plans are well drafted they will provide no effective protection for Bewl Water.
5 It is suggested that it is necessary to have adequate protection policies in place and also state the importance of Bewl Water, both locally and internationally.
6 While Bewl Water is in three different district councils, it seems logical that the details of the plan should be the same for each District Council. The consultation period for the Tunbridge Wells District Council Local Plan has concluded. With this in mind, the group believes where possible that the wording should be the same in each plan. However, the authors of the Rother Local Plan will know that each local plan has its own style. Where possible the Rother District Local Plan style is used.
7 The authors at Rother District Council are reminded that when the next Boundary Commission invites submissions, it would be an appropriate moment to recommend that the whole of Bewl Water should be in one District Council. Our provisional recommendation is it should be entirely in the Rother District.

Proposed policy to inserted in the draft Rother Local Plan
Proposed Policy ENV4: Bewl Water
Policy Status Non-strategic
New Policy Yes
Overall Priorities Green to the core and Live Well Locally

Policy Wording

1) In order to prevent adverse effects on the integrity of Bewl Water, development will only be permitted when it can be shown that there would be no significant impact on wildlife, (and particularly birdlife), the dark skies and the tranquil nature of the area.
2) The ancient woodland and special Dame Sylvia Crowe landscape planting needs enhanced protection.
3) Residential development should be restricted to where exceptional circumstances exist. These will be exceptionally limited and are unlikely to occur during the lifetime of this plan.
4) Quiet daytime recreational activity should be encouraged. Sailing, rowing and angling should be particularly encouraged.
Nighttime activities should be curtailed in line with the restrictions currently in place.’

Explanatory text
‘Bewl Water: The most significant gull roost in southern England
11.36 Bewl Walter is located within the High Weald National Landscape and is at the northern point of Rother District Council, between Wadhurst and Ticehurst in Sussex.

Figure 41 The purple line is Rother District boundary. The area south of the line is Rother District. The area to the north-west is Wealden District Council. The area to the north-east is Tunbridge Wells District Council.
11.37 Three-quarters of Bewl Water and 7/8th of the reservoir is in Rother District.

Insert map showing the boundary
Figure 41 Plan of Bewl Water showing the site boundary

11.38 The landscape design was by Dame Sylvia Crowe DBE, a renowned internationally respected landscape architect. In 1971, Dame Sylvia Crowe said her aim at Bewl Water was 'to mend the organic structure of the countryside where it has been disrupted by the coming of the reservoir, and to accept the water as a natural feature rather than a recent and unnatural intrusion' This was achieved by tree planting, by hiding car parks behind curving banks, by designing buildings in local styles, by planting flood tolerant species on the water margin, and by using agricultural fencing instead of the urban fencing which typified pre­1960 reservoirs.
11.39 The Bewl Water site is 486 hectares. There are 366 hectares (880 acres) of reservoir with a 15 mile shoreline. Over 120,000 trees were planted near the shoreline to provide the right ecological balance for the site. It is the largest expanse of open water in southern England and it is the fifth largest expense of water in England.
11.40 Over 221 bird species have been recorded at Bewl Water. There is no other expanse of water in England that has attracted such a high bird count. Within the bird count there is a very large number of migrating birds. In February 2016, the number of roosting gulls present there was estimated to be over 120,000. Since then, bird flu has decimated all species of gulls, so they need even greater protection.
11.41 Sussex Biodiversity records for Bewl Water, for 1 September 2022, classify the site as a Local Wildlife Site with 479 protected and designated species, including 20 types of dragonflies, damselflies, declining pollinators such as bees and butterflies, small mammals, nine types of bat, amphibians and reptiles.
11.42 The reservoir is an important regional resource but is also a significant recreational amenity. Additional policies relating to the recreational use of Bewl Water are contained in the Health and Wellbeing chapter within Policy HWB5 (Green and Blue Infrastructure).’

Figure 42 Bewl Water Defra Magic Maps
Vertical bars denote ancient and semi-natural woodland and horizontal bars denote ancient replanted woodland

11.41 The site has ancient woodland and adjoins Chingley Wood, part of which is designated as a SSSI site and contains a high proportion of ancient woodland.
11.42 Bewl Water has daytime leisure activities which are important to the local communities and the tourist industry. The daytime activities include sailing, rowing, fishing, walking, cycling and horse riding. When the site was under previous management, annual visitor numbers of over 200,000 were achieved. Currently, there are about 150,000 visitors a year. Apart from fishing boats and emergency vehicles, no motorised transport is allowed except in the car parks and access road. This part of the High Weald National Landscape has particularly dark skies when compared with other parts of the National Landscape. Meter reading in Wadhurst Parish nearby indicate that the Bewl Water area has some of the darkest skies in the Southeast. SSky Quality Meter readings indicate skies as dark as 21.09 mags/arcsec2, a figure that corresponds to a Silver Tier International Dark Sky Reserve.
For the wildlife and the visitors, the tranquillity of the area is important.
11.43 Avoidance and mitigation measures are necessary to ensure that there is the necessary protection of the site, particularly for its tranquillity, its internationally important ecology, and its exceptional ornithological features. The avoidance and mitigation measures should take into account how light sensitive and noise sensitive the area is between dusk and dawn.


8 The authors of the draft Local Plan are invited to reflect very carefully on the need for adequate protection for Bewl Water

Full text:

See attached representation

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 27106

Received: 22/07/2024

Respondent: Westfield Parish Council

Representation Summary:

See points 140-142 in the attached submission.

Full text:

Please see attached document for the full submission from Westfield Parish Council.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 27329

Received: 22/07/2024

Respondent: Wadhurst Parish Council

Representation Summary:

Excellent policy

Full text:

Support for representations made by Ticehurst Parish Council.

Individual comments made on specific policies as logged.

Please also see attached a draft policy for Bewl Water drawn up by the Northern Parishes Group.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 27472

Received: 22/07/2024

Respondent: Catsfield Parish Council

Representation Summary:

Comments included within the response from Catsfield Parish Council from Dr John Feltwell Tree Warden to Catsfield Parish Council:
12. Other have been asked to provide Local Green Space (LGS) status to the Normanhurst TPO. This needs to be pursued with Rother for a definitive answer.
13. The Brooks should also be registered as a LGS as it represents the centre of the village that was originally settled.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 27806

Received: 23/07/2024

Respondent: Rye Neighbourhood Plan Steering Group

Representation Summary:

Proposed Policy HWB5: Green and Blue Infrastructure P196
Q96 – 100: Rye strongly supports the policy. In the Rye NP review we are looking to categorise key green spaces in the Parish as “Local Green Spaces” for additional protection.

Full text:

Please see attachment

Attachments:

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 27970

Received: 22/07/2024

Respondent: Kent County Council

Representation Summary:

PROW are generally considered an important part of Green Infrastructure, which should be given more clarity within this policy.

Full text:

The Kent County Council (KCC) Public Rights of Way and Access Service ('the Service') has been made aware of the Rother Draft Local Plan 2020 - 2040 ('the Plan') at its Regulation 18 consultation stage. As a neighbouring authority, the Service has reviewed the Plan and offers comments as below.
As a general statement, the Service is keen to ensure its interests are represented with respect to its statutory duty to protect and improve Public Rights of Way (PROW) in the county. The Service is committed to working in partnership with local and neighbouring authorities, councils, and others to achieve the aims contained within the KCC Rights of Way Improvement Plan (ROWIP) and the KCC 'Framing Kent's Future' strategy for 2022-2026. KCC intends for people to enjoy, amongst others, a high quality of life with opportunities for an active and healthy lifestyle, improved environments for people and wildlife, and the availability of sustainable transport choices.
Rother District lies in East Sussex and borders the Kent districts of Ashford, Folkestone and Hythe, and Tunbridge Wells. Although outside of Kent, it is felt appropriate to offer comments of a general and informative nature on this Plan given the high likelihood of cross-boundary interactions in the event sites in close proximity to Kent are in future proposed and developed, which could impact on and hopefully enhance access for both Rother District and Kent residents.
1.
The Service notes the Plan does not presently propose site allocations, preferring to first consult on the development strategy and draft Housing and Employment Land Availability Assessment. When sites come forward in due course, the Service will expect to be consulted where access need for future site residents or other occupants could impact existing access facilities in Kent.
2.
The Service notes the Plan's Vision (p19) gives a high profile to 'walking, cycling and public transport' to access facilities and services, and to the need for 'enhanced health and wellbeing'. These statements are welcomed as they provide considerable scope for the PROW networks of both East Sussex and Kent for positive partnership working to Rother District's future.
3.
Proposed Policy LWL3: Walking, Wheeling, Cycling and Public Transport (Outside the Site) (p73). It is proposed future major residential proposals will need to ensure Active Travel Infrastructure either by infrastructure delivery or a financial contribution, the timing of which is significant and requires mention, as infrastructure should be provided prior to occupation.
4.
Proposed Policy LWL3: Walking, Wheeling, Cycling and Public Transport (Outside the Site) (p73). Recognition of the King Charles III England Coast Path National Trail is welcomed, not least for the wellbeing benefits it delivers to residents and visitors.
5.
Proposed Policy LWL3: Walking, Wheeling, Cycling and Public Transport (Outside the Site) (p73). In designing and delivering future new routes, or perhaps upgrading existing facilities, various design guidance is given. It is quite likely the ESCC PROW Service has its own guidance which, as it is the local highway authority, should be recognised; for example, the ESCC ROWIP.
6.
Proposed Policy LWL3: Walking, Wheeling, Cycling and Public Transport (Outside the Site) (p73). The proposal to upgrade existing or provide new PROW could be a welcome benefit for both Rother District and Kent residents and visitors. For example, creating new bridleways around Ticehurst and Flimwell that link to the existing (Kent) bridleway network in Bedgebury Forest would not only offer local access benefits but also link to the Wealden Cycle Trail connecting Ashford and Tunbridge Wells. It is recommended any changes to the existing PROW network are undertaken in conjunction with the ESCC PROW Service and ourselves, given the legal processes involved and the need to ensure continuity of standards 'on the ground'.
7.
Vision for the Countryside (p164). The ambition for the countryside and coast to have improved access is supported. It is not specified how this is to be achieved; cross-reference to Proposed Policy LWL3: Walking, Wheeling, Cycling and Public Transport (Outside the Site) is suggested.
8.
Proposed Policy HWB1: Supporting Health and Wellbeing (p198). Recognition that access infrastructure can be a key factor in improving and maintaining communities' and individuals' health and wellbeing supports the Service's own view.
9.
Proposed Policy HWB5: Green and Blue Infrastructure (p211). PROW are generally considered an important part of Green Infrastructure, which should be given more clarity within this policy.
10.
Proposed Policy HWB6: Public Rights of Way (p215). The protection of individual PROW and the enhancement of local access networks impacted by proposed development is welcomed. Reference to 'Active Travel' could enhance understanding of this aim. One means to achieve the policy aim is to up-grade the status of Public Footpaths to Public Bridleways, so extending lawful use to cyclists, which can be achieved at comparatively small cost to road network enhancements. Rother District Council is recommended to consult with the ESCC PROW Service on this Policy.
11.
Proposed Policy INF1: Strategic Infrastructure Requirements (p223). As an adjunct to comment in point 3 above regarding the timely delivery of infrastructure so as to establish cultural change in access modes, this Policy and the requirement to deliver new infrastructure 'upfront or early in the development phasing' is welcomed. It is expected this will extend to infrastructure improvement in Kent where this is identified and agreed.
12.
Proposed Policy HOU18: Boundary Treatments and Means of Enclosure (p309). Bullet point 3 on p310 acknowledges 'public footpath or bridleway'; it would be clearer to replace with 'PROW' given a Restricted Byway or Byway Open to All Traffic could conceivably run adjacent to any site.
13.
Proposed Policy ECO10: Equestrian Developments (p351). The proposal to, ideally, site new development close to 'the bridleway system' would likely assist users' and local safety. The ESCC PROW Service should be consulted, and its comments carefully considered before finalising this Proposed Policy.
14.
Glossary (pp440-453). The Service supports the use of a comprehensive glossary, enabling readers who are not familiar with terms used within the Plan to more clearly understand the Plan's ambitions and means. For this reason the Service considers the Glossary should be revised as follows:
A.
'Active Travel': the definition offered within the Plan differs to that adopted by KCC - this can be found at https://www.kent.gov.uk/about-the-council/strategies-and-policies/service-specific-policies/roads-paths-and-transport-policies/active-travel-strategy; the definition should therefore be confirmed with ESCC.
B.
'Infrastructure': this acknowledges 'footpaths'; however, use of the broader term 'PROW' would enhance recognition of the need for improvement across wider access infrastructure;
C.
'PROW': a definition should be included for clarity and understanding. The Service recommends 'PROW is the generic term for Public Footpaths, Public Bridleways, Restricted Byways, and Byways Open to All Traffic. Each are public highways, similar to public roads, and are for public use at any and all times unless formally closed by the relevant local highway authority.'
In closing the Service adds that any future development proposals should reference NPPF Policy (as it then exists). Presently the Service would draw attention to:

NPPF (December 2023) para. 96: 'to achieve healthy, inclusive and safe places', which specifically encourage social interaction, minimise crime and disorder and the fear of such, and enable and support healthy lifestyles.

NPPF (December 2023) para. 97: to 'plan positively for the provision and use of shared spaces... support the delivery of local strategies to improve health, social and cultural well-being...guard against the unnecessary loss of valued facilities and services...and ensure an integrated approach to considering the location of housing, economic uses and community facilities and services'.

NPPF (December 2023) para. 102: to be 'based on robust and up-to-date assessments of the need for open space, sport and recreation facilities ... and opportunities for new provision.'

NPPF (December 2023) para. 104: 'Planning policies and decisions should protect and enhance public rights of way and access, including taking opportunities to provide better facilities for users, for example by adding links to existing rights of way networks including National Trails.'

NPPF (December 2023) para. 108: 'Transport issues should be considered from the earliest stages of plan-making and development proposals, so that:
...
c) opportunities to promote walking, cycling and public transport use are identified and pursued
...'

NPPF (December 2023) para. 110: 'Planning policies should:
...
b) be prepared with the active involvement of local highways authorities, other transport infrastructure providers and operators and neighbouring councils, so that strategies and investments for supporting sustainable transport and development patterns are aligned;
c) identify and protect, where there is robust evidence, sites and routes which could be critical in developing infrastructure to widen transport choice and realise opportunities for large scale development;
d) provide for attractive and well-designed walking and cycling networks with supporting facilities such as secure cycle parking (drawing on Local Cycling and Walking Infrastructure Plans);
...'

NPPF (December 2023) para. 116: '... applications for development should:
a) give priority first to pedestrian and cycle movements, both within the scheme and with neighbouring areas; and second – so far as possible – to facilitating access to high quality public transport, with layouts that maximise the catchment area for bus or other public transport services, and appropriate facilities that encourage public transport use;
b) address the needs of people with disabilities and reduced mobility in relation to all modes of transport;
c) create places that are safe, secure and attractive – which minimise the scope for conflicts between pedestrians, cyclists and vehicles, avoid unnecessary street clutter, and respond to local character and design standards;
This response is made on behalf of Kent County Council Public Rights of Way and Access Service. The views expressed should be considered only as the response of the County Council in respect of public rights of way and countryside access matters relating to the Plan.
Yours sincerely
Kate Beswick
Countryside Access Improvement Plan Officer
Public Rights of Way & Access Service

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 28020

Received: 22/07/2024

Respondent: Persimmon Homes Ltd

Agent: Judith Ashton Associates

Representation Summary:

Criterion 5 of HWB5 requires developments of 300 (+) dwellings to provide playing pitches on site in line with the recommendations of Rother’s Playing Pitch and Built Facilities Strategy and Sport England’s standards. Whilst not opposing this criterion, Persimmon Homes would suggest that the following is added to criterion 5 ‘unless evidence suggests that this is unachievable” as a sites topography may not make this possible/ economies of scale may mean providing / contribution to offsite provision is in certain circumstances preferable; or that this would fetter a developer’s ability to deliver BNG on site as such facilities do not assist in trying to deliver BNG. Indeed, they can actively prejudice it.

Full text:

I write with reference to the above. I act for Persimmon Homes who have an interest in a sound plan being delivered for Rother.
Having regard thereto, having reviewed the Regulation 18 Draft Local Plan (April 2024), and associated evidence base, especially the Sustainability Appraisal - Interim Report (SA) and associated appendices, Housing and Economic Land Availability Assessment (HELAA), Local Housing and Economic Needs Assessment (HEDNA), Development Strategy Background Paper (DSBP), Housing Background Paper (BP), Settlement Study (SS), and Infrastructure Delivery Plan (IDP), and Viability Assessment and CiL Review (VA); we have the following comments on the Draft Regulation 18 Rother Local Plan (April 2024), and associated evidence base.
1 The Plan Period
1.1 We note that the 2024 LDS suggests adoption of the Local Plan (Regulation 26) in Quarter 3 2026/27. As a result, the plan period advocated in policy SS2 will be less than 15 years from adoption. In order to comply with paragraph 22 of the NPPF, the plan period should we believe start at 1st April 2023 and be extended to 31st March 2042 as this will ensure it looks ahead for a minimum of 15 years from adoption. As a result, additional housing allocations need to be made to help address this additional requirement.
2 The Housing Requirement, Supply and Trajectory
2.1
Local Housing Need, and the Minimum Housing Requirement
2.1.1 We note that the proposed overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa.
2.1.2
Having reviewed the housing requirement against the standard method and the advice in the PPG about the need to consider the application of a cap, we note that adopting the standard methodology, and adjusting the figures to the base date of the local plan and using the latest local affordability ratio, the position is as set out below.
Step 1: Setting the Baseline
Household Projection = 523.41 dwellings per annum
Step 2: Adjustment for
Affordability
Local Affordability Ratio = 13.822
Adjustment Factor = 1.61 𝐴𝑑𝑗𝑢𝑠𝑡𝑚𝑒𝑛𝑡 𝑓𝑎𝑐𝑡𝑜𝑟=(13.82−44) 𝑥 0.25+1
Minimum Local Housing need
523.4
x 1.61 = 842.6
2.1.3
As set out in section 5 of the HEDNA a cap is applied to limit the level of increase, depending upon the stage that the local authority is at with regards to its strategic policies for housing. Where the policies have been adopted within the last 5 years, the LHN figure is capped at 40% above the average annual housing requirement figure as set out in the existing policies. Where the relevant policies were adopted more than 5 years ago (as is the case in Rother), the LHN is capped at 40% above whichever is higher of:
• The average annual projected household growth identified in Step 1; or
• The average annual housing requirement figure as set out in the most recently adopted strategic policies.
Having done this, we note the following:
40% cap
The average annual projected household growth identified in Step 1
523.4
732.7
The average annual housing requirement figure as set out in the most recently adopted strategic policies
3353
469
2.1.4 Given the above the LHN in Rother is reduced from 842 dpa to 733 dpa. That said, while the cap reduces the minimum number generated by the standard method, it does not reduce housing need itself. Therefore, strategic policies adopted with a cap applied may require an early review and updating to ensure that any housing need above the capped level is planned for as soon as is reasonably possible. The PPG is clear that the standard method is a minimum number and that in areas such as Wealden where the cap reduces the local housing need “consideration can still be given to whether a higher level of need could realistically be delivered. This may help prevent authorities from having to undertake an early review of the relevant policies”4. For Rother this would mean considering whether to deliver 842dpa. It is also important to note that the LHN figure is a minimum starting point, and it does not produce the Housing Requirement5.
2.1.5
In the context of the above, we note that the overall spatial development strategy in looking to deliver a minimum of 5,158 to 7,286 dwellings over the plan period is in effect only looking to deliver between 35% and 50% of the capped LHN.
2.1.6
We further note that the HEDNA is clear in the executive summary on both the scale of the LHN (737dpa at the time), and the findings of the housing growth scenario, indicating that there are ‘no exceptional local circumstances’ that would justify deviating from the Standard Method in Rother.
2.1.7
Whilst the inference in the plan is that the level of housing growth that is proposed is supply led (i.e. reflects the level of suitable sites assessed through the HELAA process) and constrained by the High Weald AONB, the Pevensey levels, the Strategic Gaps around Hastings and the SSSI around Rye, this is adopting a policy on approach to a situation that should be policy off.
2.1.8
Thus, not only is it unclear why the plan is not looking to deliver the LHN as identified in the HEDNA, but why it has not also looked at the uncapped need given the issues surrounding the unmet needs of its neighbours (see below). PPG6 identified a number of circumstances where it might be appropriate to plan for a higher housing need figure than the Standard Method indicates. Such circumstances can include:
• Instances where housing need is likely to exceed past trends; and
• Where the authority agrees to address unmet need arising from neighbouring authorities.
2.1.9 The PPG is not exhaustive in its examples as to what may be a sound reason for considering an uplift. Matters such as a high affordability ratio that is following a rising trend, along with significant affordable housing need, and of course the importance of ensuring an adequate buffer to cater for under supply, or instances where the Plan strategy fails to deliver as expected, are all sound reasons for considering an uplift.
2.1.10
In the context of the above we note that the SA in section 5, in reviewing the Spatial Development Strategy Options, does not appear to look at different scales of growth relative to the LHN (both capped and uncapped) or the implications of only delivering the scale of housing proposed, just a variety of different spatial options where the scale of development is unquantified, despite the fact one of the SA objectives is that ‘More opportunities are provided for everyone to be in a suitable home to meet their needs.’ The above belies the evidence base and the various reasons why the council need to meet their LHN / an uplift to the LHN should be considered further, as summarised in the commentary below.
2.1.11 The reasons for uplifting the LHN should be set into two categories, firstly those that indicate an uplift is required for the District itself and secondly any uplift that might arise from meeting unmet need from neighbouring authorities.
Affordability
2.1.12 Rother is an inherently unaffordable place to live as acknowledged at paras 1.15, 8.20 and 8.21 of the Reg 18 Plan which refer to the issues of the significant deterioration in affordability within the district The HEDNA (2024) identifies a significant need for affordable housing in Rother in the Plan period. This is due to a high, and increasing, house-price to earnings (affordability) ratio, meaning that growth in house prices is significantly outstripping growth in wages, and housing is becoming less affordable for people who live, work, and retire within the district.
2.1.13 To this end, we note, when looking at the ONS ‘House Price to Workplace-Based Earnings Ratio - March 2024’ that the ratio of median house price to median gross annual workplace-based earnings by local authority district, England, and Wales, 1997 to 2023 indicates that the ratio of median house price to median gross annual workplace-based earnings in RDC has increased significantly over the past 10 years from 10.53 to 12.847.
2.1.14 The rapid increase in the affordability ratio is clear evidence of the lack of housing delivery that has taken place over the last 10-year period within the District. Failing to deliver the LHN will only increase the rate of decline in affordability. For an improvement in the affordability situation to occur, decisive action is required through the provision of more housing over and above the capped LHN.
2.1.15 The matter of affordability alone clearly indicates that the Council should be planning for more than the capped LHN.
Affordable Housing Need
2.1.16 Linked to the issue of affordability is the significant need for affordable housing identified in the District. A symptom of a rising affordability ratio is the fact that more members of society are priced out of the open market and consequently require affordable housing in one form or another. Again, the Council acknowledges this in the Draft Plan and in the Feb 2024 HEDNA that accompanies the consultation pack.
2.1.17 The HEDNA indicates that the total net annual affordable housing need for the period 2021 to 2044 is 325 dpa, which is equivalent to 44% of the capped LHN figure (based on 733 dpa). Whilst policy HOU2 does not indicate what level of affordable provision the council will be looking to deliver, policy LHN2 of the adopted core strategy looks to deliver 30% affordable housing on sites in Bexhill and Hastings Fringe, and Rye, 35% in Battle and 40% in the rural areas. Even if the Council were to adopt a 40% requirement across the board, this will only be triggered for those sites that meet the qualifying criteria. It is therefore highly unlikely that the affordable housing need will be met. Indeed, given the decreasing trend in terms of affordability set out above, the gross affordable housing need of 325 dpa is highly likely to increase over the plan period, leading to an increase in the net shortfall and in turn a higher number of people in need and on the Council’s housing waiting list.
2.1.18 Whilst the councils latest AMR does not provide any information on affordable housing delivery, we note that the Governments Affordable housing supply statistics (AHS) 2022-23 table 1011C indicates that over the past 10 years RDC only delivered 887 affordable completions. An average of 89 (rounded up) affordable completions per annum, which just 27% of the average annual affordable need of 325 affordable dwellings per annum identified in the HNA. JAA table 1a – Affordable Housing Provision 2013 - 2023
13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 Total
Total affordable dwellings 80 123 103 20 56 60 130 126 15 174
887
2.1.19 Furthermore, whilst if you compare the level of affordable provision against total housing completions over the past 5 years this averages 38.7% of total housing completions, it fluctuates significantly and prior to this was averaging significantly less. JAA table 1b – Affordable Housing Provision as a percentage of overall housing delivery 2016 - 2023
18-19 19-20 20-21 21-22 22-23 Total
Net additional dwellings
255 247 175 237
390
1,304
Total affordable dwellings
60
130
126
15
174
505
% of total
23.5%
52.6%
72%
6.3%
44.6%
38.7%
2.1.20 Given the above, even if one assumes an average of 38%, this suggests that the plan would need to deliver over 8558 dpa to meet the identified affordable housing needs of the District.
2.1.21
Whilst we are not advocating this level of growth, the above demonstrates the need for the plan to deliver the LHN in full/ an uplift to the LHN figure to boost the supply of open market and affordable homes and thus help address the affordable housing needs of the District. Said approach would also reflect on spatial objective 4 – to respond to the housing crisis and help facilitate the delivery of housing to meet the needs of different groups in the community, by maximising the potential opportunities for residential development in sustainable and deliverable locations, helping to deliver affordable housing, and ensuring development is viable and supports growth in the district by providing certainty for developers through site allocations and clear planning policies.
2.1.22
The SA in reviewing the merits of the alternative spatial options appears to have paid little regard to these fundamental points.
Past Under Delivery
2.1.23
We note the Councils Five Year Housing Land Supply Statement – 1 April 2023 (published in December 2023) suggests that the Council is able to demonstrate a 3.09 year housing land supply for the period 01/04/23 to 31/03/28, and that the HDT results for 2022, as published in December 2023 was, as set out below, just 41%.
JAA table 2 - Result of 2022 Housing Delivery Test
Area Number of homes required Total number of homes required Number of homes delivered Total number of homes delivered Housing Delivery Test: 2022 measurement Housing Delivery Test: 2022 consequence 2019-20 2020-21 2021- 22 2019-20 2020-21 2021- 22
Rother 363 490 740
1593 247 175 239 661 41% Presumption
2.1.24
We further note that RDC housing delivery has over the past few years been somewhat mixed, with the Council failing to meet their annual housing requirement on a number of occasions, which has led to a deficit that suggests that there has been a record of under delivery that should be addressed by an uplift to the LHN figure.
A Buffer
2.1.25
Given the issues of the affordability and the affordable housing needs of the district identified above, as well as the issue of past underdeliver rates, we feel that at the very least a buffer should be built into the housing requirement for the Plan. Introducing a buffer into the housing requirement would ensure that the Council plans positively for the future in a manner that at least meets the minimum LHN rather than the capped figure, or indeed the ‘capacity’ based figure it currently looks
to deliver. This would in reality also provide an uplift to reflect the acute affordability problem and in turn the rising affordable housing need. Given the time horizon of the plan, the Council should also consider the need for flexibility to be built into the strategy so that it can be resilient to unforeseen changes that may occur during the latter years of the plan period.
2.1.26
To this end, we would stress the need for the SA to not only look at various Spatial Development Strategies, but to express these in the context of overall housing provision and assess not only a strategy that reflects the capped LHN, but both the uncapped LHN and indeed something that falls short of the capped LHN so that the effects of all reasonable alternatives are properly taken into consideration. As currently drafted the SA does not in our opinion adequately addresses the issues raised above or look to address the issue of unmet needs from adjacent authorities – see below.
2.1.27
Having regard to the above we consider a buffer of circa 10% i.e. circa 1,4669 additional dwellings should be added to the capped LHN over the plan period to ensure the Plan proceeds on a robust footing.10
2.2
Unmet Need
2.2.1 We note that the Reg 18 Plan makes no specific reference to the Duty to Cooperate (DtC) with neighbouring authorities over the issue of unmet need, there being no reference to the unmet needs of neighbours either. We also note that whilst the HEDNA recognises the fact that Hastings and Rother, together with their intrinsic sub-areas, comprise a self-contained Housing Market Area and Functional Economic Market Area, it does not comment upon the relationship of the HMA to adjacent HMA’s and their unmet need, there being only passing recognition of the fact that Wealden is within the influence of and overlapped by the Hastings and Rother HMA. Nor is there any commentary on how Rothers reg 18 Plan will look to address the unmet needs of Hastings, despite the joint statement agreed with Hastings BC on p16 of the Reg 18 Plan.
2.2.2
Similarly, whilst the Housing Background Paper advises at para 5.14 that the Council is committed to its duties in relation to the Duty to Co-operate, and in summer 2020 prepared a Duty to Co-operate Action Plan which outlines how and at what stage it intends to engage and consult with organisations on the development of the Local Plan, the Engagement and Duty to Cooperate Statement in commenting upon the engagement to date with Hastings BC, and in particular the matter of housing need, merely says at para 6.11 that ‘ The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 481 for Hastings. Hastings Borough Council made a formal request to Rother District Council on 3rd December 2021, along with requests other authorities, as to whether Rother could accommodate any of Hastings’ residual unmet need.’
2.2.3
This does not confirm the scale of Hastings unmet need, which we understand to be in the region of 5,525 dwellings11 or Rothers response to Hasting’s request, and as such does not suggest active, ongoing, and constructive engagement.
2.2.4
Similarly, in commenting upon engagement with Wealden, para 6.23 of the Engagement and Duty to Cooperate Statement advises that: ‘The Standard Methodology sets a housing need figure of 737 dwellings per annum for Rother and 1,212 for Wealden, however, in
their respective Plans, Rother has set an annual target of between additional 243-343 dwellings per annum, while Wealden sets a per annum target of and additional. Both sets of targets fall short of the need figures derived from the Standard Methodology. At this stage in Plan development, neither district has yet made a request in respect of unmet need.’
2.2.5
As is clear from the above Wealden’s target of 22,800 dwellings has actually been omitted from the document, as has reference to the implications in terms of Wealden’s unmet need of 7,071 dwellings12. .
2.2.6
Not only does the Engagement and Duty to Cooperate Statement fail to address the issue of how this unmet need will be tackled, but also makes it clear that Rother has not yet made a request to surrounding districts in respect of its unmet need, this despite the fact Wealden have for example just completed their reg 18 consultation. Again, this does not suggest active, ongoing, and constructive engagement, or due regard to the implications of the increasing scale of unmet need that is emerging in this part of East Sussex, a matter one would have expected the SA to have regard to in terms of the wider social, economic, and environmental consequences.
2.2.7
The lack of any MoU or SoCG with Hastings BC given their request of 3.1.21 is also of concern, as is the current lack of Mou or SoCG with Wealden DC, albeit we note one is in preparation and will we assume be available for scrutiny at Reg 19.
2.2.8
As the council will be aware, in order to demonstrate that the consultation on strategic cross boundary issues such as housing and unmet needs has been effective, continuous and ongoing, and the requirements of the Duty to Cooperate (DtC) have been addressed in terms of the overall housing requirement, MoU or SoCG will need to be produced and reviewed and updated regularly if they are to be relied upon.
2.2.9
Only through a rigorous approach to the issue of the DtC will the Council be able to demonstrate that its housing requirement is right, and that the spatial strategy is correct in its approach to growth. As things stand, we do not believe there to be sufficient evidence in place to demonstrate the DtC has been complied with, and as such can only conclude that the plan is legally flawed.
Conclusions on the Housing Requirement
2.2.10
Not only are the Council failing to meet their LHN as calculated by reference to the Standard Method i.e. 14,660 dwellings (733 dpa), but the shortfall of 7,374 – 9,502 dwellings is between 50% and 65% of the capped LHN. This is a significant shortfall exacerbated by the fact the LHN is a capped figure, and as the PPG is clear the LHN is only the starting point.
2.2.11
There are a range of factors relevant to the calculation of the housing requirement for the Draft Plan that the Council needs to consider when arriving at its overall housing requirement. These include:
• The inherent lack of affordability and the increasing affordability ratios;
• The poor levels of affordable housing delivery, and attendant increasing need for affordable homes; and • The importance of including a buffer above the LHN to ensure adequate housing delivery particularly given the Council’s historically poor track record of delivery as set out above.
2.2.12
When these factors are properly scrutinised, they demonstrate clear and rational reasons as to why there should be an uplift to the LHN. Having regard to the above Persimmon Homes t believe that at the very least the plan should provide for the uncapped need i.e. 733 dpa to ensure the Plan proceeds on a robust footing. Over a plan period of 1st April 2020 to 31st March 2042 this would equate to some 16,126 dwellings, circa 8,840 - 10,968 dwellings more than the plan is currently looking to provide for.
2.2.13
Setting the housing requirement at this level would significantly improve the affordability situation within the District and would deliver more affordable homes for those members of the community in the most need.
2.2.14
It is clear that the SA has as yet to assess the merits of delivering the LHN in full, a higher figure or indeed a lower one. It is also clear from the Engagement and Duty to Cooperate Statement that the council have yet to fully assess the effects of their neighbours’ unmet needs or to explore through the DtC, whether any of their neighbours could assist.
2.3 Housing Supply
2.3.1. Nowhere in the Reg 18 Plan is there a trajectory setting out how the housing requirement will be met or a rolling five year housing land supply maintained. Thus, in terms of supply all that is available is the information set out within table 34 of the Reg 18 Plan which indicates that the housing supply comprises the following:
Source of housing supply
a
Constructed 1 April 2020 – 31 March 2023
802
b
Known completions and commencements on large sites since 1 April 2023
340
c
With Planning Permission
1,693
d
DaSA & Neighbourhood Plan allocations without permission brought forward
1,660
e
Additional HELAA potential sites
2,129
f
Windfall projection (across the district)
663
Total Range
5,15813- 7,28714
2.3.2 In reviewing the above there is nowhere in the evidence base where one can review and assess the deliverability of those sites with outstanding planning permission that have yet to start on site, allocated sites without permissions or the additional HELLA sites. The councils Housing Land Supply and Housing Trajectory (April 2023 position statement), within its appendices provides details of the following:

Delivery by financial year of large site permissions (2,140 of which 1261 are only have outline consent))

Delivery by financial year of large sites delegated to approve subject to S106 (555, of which only 2 sites delivering 17 dwellings are for full planning permission, the majority being outline schemes))

Delivery by financial year of DaSA allocations (520, of which an appeal for one site for 40 dwellings has been dismissed)) •
Delivery by financial year of Neighbourhood Plan allocations (253 of which sites delivering only 34 are subject to applications)) and

Small site permissions (316)
2.3.4 As the above does not tally with the figures in table 34 it is impossible to scrutinise the housing land supply properly and ensure it is truly deliverable. All we can note is that the number of large sites with outline permission only that are due to start delivering in the next 5 years seems rather high, as do the number of large sites with a resolution to grant outline permission subject to S106. We would also ask that the next iteration of the plan the council produce a more detailed evidence base to demonstrate that the proposed commitments will deliver as suggested and that the council can maintain a robust and rolling 5 year housing land supply.
2.3.5 In the context of the above, we would suggest that the Council consider further whether a buffer of say 10% should be applied to those sites with planning permission that have yet to commence to take into account any potential non-delivery/ delay in delivery of the dwellings contained within this category which at 1,693 equates to nearly a third of the supply15. Similarly, the sites contained within the DaSA & Neighbourhood Plan allocations without permission, which equate to a comparable proportion of the total supply. Alternatively, the Council need to undertake a more detailed critique of the proposed commitments to ensure what is being put forward is truly deliverable within the plan period. Either way we believe this would generate the need to find land to accommodate a further 335 dwellings16.
2.3.6. Turning to windfalls, para 5.131 of the reg 18 plan indicates that windfall development forms an important part of the councils housing land supply and that the Council will continue to rely on windfall development as part of its development strategy. To this end table 34 of the Reg 18 Plan reports a figure of 663 windfalls over the plan period, and proposed policy DEV5 suggests a windfall development projection of 39 dwellings per annum for the plan period17. This is however slightly at odds with the findings of Table 3 of the councils Housing Land Supply and Housing Trajectory (April 2023 position statement), which suggests an annual average of 45 windfalls a year. Clearly clarity is required on this, as whilst para 6.9 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) suggests that work is currently underway on producing an updated windfall methodology background paper in support of the new Local Plan, which will reassess the likely contribution from windfall sites in the future, as well as the period over which any allowance should be applied, no such document appears within the evidence base. As the council will be aware, they will, in accordance with para 72 of the NPPF, need to provide compelling evidence that the windfall trajectory is a reliable source of supply, and cannot just rely upon a headline review of past windfall delivery rates without any analysis of expected future trends.
2.3.7 Finally in terms of the additional HELAA potential sites, we note that the HELLA in listing Identified Sites (existing allocations and sites with planning permission), and Potential Sites (Sites are potentially suitable, potentially available and potentially deliverable, subject to further assessment or investigation), discounts an unquantified number of ‘Other Potentially Suitable Sites Where Availability is Unknown’ and Rejected Sites (sites assessed as currently unsuitable/ unavailable/ unachievable), and that it is unclear how releasing some of these sites would come to enabling the council to meet their LHN if the assessment criteria were reviewed/ the sites themselves reassessed in terms of the overall area to be developed/ development capacity were reviewed. Given the scale of the unmet need we would respectfully suggest that no stone should be left unturned in looking to achieve the LHN and that whilst not all of the rejected sites will be acceptable, some may, with further consideration, have been suitable, such that the overall quantum of deliverable sites and thus the plans ‘capacity’ based housing figure could be higher. We would thus recommend that in order to demonstrate the housing supply figure is fully justified the council provide further evidence to this effect at Reg 19.
Conclusions on the Housing Supply
2.3.8 Having reviewed the component parts of the Housing Land Supply as best we can given the lack of available evidence to justify the position set out in table 34 of the Reg 18 Plan, we note that the figures relied upon to meet the Councils proposed ‘capacity’ based housing requirement require:

100% reliance on all current commitments (existing detailed, and outline permissions, as well as sites with a resolution to grant and sites allocated in the DaSA and Neighbourhood Plans). This is not justified and a 10% buffer should be introduced to allow for non-delivery/ slower than expected delivery i.e. circa 335 dwellings.

100% of the proposed housing sites delivering the quantum proposed within the plan period. This is however subject to all of said sites being found acceptable by the Local Plan Inspector/ site promoters confirming the sites can deliver this quantum of development in light of all the other policy requirements set out in the plan, such that a contingency may be sensible.

663 dwellings to come forward as windfalls. The proposed windfall allowance is not based on a credible evidence base and is not justified. At 9 - 13% of the residual requirement, it is a significant part of the overall supply and needs to be reviewed to ensure a realistic approach is adopted at Reg 19.
2.3.9 As a result of the above, we would submit that as the predicted supply is effectively dictating the overall requirements – i.e. we are looking at a ‘capacity’ based housing requirement, the fact there is no flexibility in the proposed supply is of grave concern as in effect the overall supply could be a lot less than predicted unless additional sites are added in to address our concerns about the commitments, and windfalls and help provide a buffer / address the issues of affordability and DtC we have raised above. As it stands the plan would be incapable of accommodating any fluctuations in the market and could leave the council open to speculative applications very early in the plan period. The council’s assessment of potential housing sites in the HELLA and SA needs to be reviewed and no stone left unturned when it comes to identifying sites and addressing perceived constraints. Likewise, the councils rational for the yields they have attributed to the proposed allocations needs to be fully justified as, as we explain below, we do not think they are when the policy requirements set out in the draft plan are properly taken into consideration.
3
The need for a Stepped Trajectory
3.1 We note that para 5.102 of the Reg 18 Plan suggests that the Council would require a considerable step change in housing delivery in order to deliver a significant uplift compared to current and historic delivery rates over the last ten years. Figure 37 then illustrates that over the past 12 years the council have on average delivered 219dpa, albeit in the last two years they have delivered 237 and 390 dpa, respectively. Whilst the LHA at 733dpa would require a sea change in delivery, the current proposition, of a supply led target of 258 – 364dpa is clearly within the realms of that which has been achieved of late – reflecting the indeed, if the trajectory in appendix 7 of the Housing Land Supply and Housing Trajectory (April 2023 position statement) is correct the council are anticipating an average of 544 dpa following over the next 5 years18: whilst this tails off after 28/29, this is because the trajectory is based on existing commitments (permissions and allocations) if, with a new plan in place additional sites were allocated, there is no reason why higher levels of growth could not be sustained longer term. There is thus no justification within the evidence base to support a stepped trajectory. Indeed para 5.102 of the Reg 18 Plan appears to suggest that delivery rates have been significantly impacted by the economic downturn and the effect of the coronavirus pandemic in recent years, such that while a number of current allocated sites have been permitted there have been significant delays in the build out of sites. This does not support a stepped trajectory it merely justifies past performance which with an economic upturn should begin to ensure a more robust and steady supply. Furthermore, as two thirds of the proposed supply is already committed there can be no justification for a stepped trajectory.
4
The Growth Options for Sub Areas
4.1 Whilst having no direct interest in the growth options, we do note that when looking at figure 33 that a considerable amount of the proposed growth, both committed and proposed through the additional sites identified through the HELAA that 46% of the proposed growth is in and around Bexhill, with only 9% being directed towards Battle, only 3.6% to the hastings fringe. Whilst we acknowledge that Bexhill is the least constrained of the main centres, one has to wonder if this is a sustainable approach, especially given the public transport links and level of services available in the likes of Battle and Robertsbridge. Comparing figure 35 of the Reg 18 Plan (the opportunities for housing growth) with Figure 12 of the settlement study (part 1) (Settlement Sustainability Score Table), the level of growth proposed in the Sustainable and Moderately Sustainable settlements seems to be significantly less than that proposed in Bexhill, which whilst it is the only ‘Highly Sustainable’ settlement seems somewhat out of proportion and one has to wonder whether this could lead to market saturation and actually prejudice housing land supply.
5
Development Principles Policies
5.1 We note that DEV2 requires: ‘Planning applications (whether in outline or full format) must relate to an entire development site to ensure a comprehensive approach, including where sites are in multiple ownerships.
When an outline application is submitted, a masterplan defining key parameters for the entire site must be submitted by the applicant to indicate how the overall development of the site can be achieved.’
5.2 Where sites are in multiple ownership, we would suggest that as long as a framework masterplan covering the whole site, and an infrastructure delivery strategy has been agreed, either through the site promoters and the council or via an SPD, there should be nothing to stop one party looking to promote their site in advance. As long as the application reflects the framework masterplan and s106 proceeds in accordance with the infrastructure delivery plan we fail to see how this would prejudice the plan. Indeed, it may well allow sites to proceed more quickly and thus actively assist the council in their housing land supply. 5.3 We note that DEV3 indicates that: ‘Development boundaries define the area within sustainable settlements where development will be permitted, provided it is consistent with this Local Plan.
Priority shall be given to reuse of brownfield sites, in order to make efficient use of previously developed land in sustainable settlements. Some greenfield development will be necessary in order to deliver housing and employment need, but this will be limited to inside development boundaries.’
5.4 Whilst in the first instance we assume the development boundaries will be redrawn to reflect the proposed allocations, we would also suggest that given the shortfall in the housing land supply, that the council should look to have a criterion based policy that enables development immediately adjacent to the limits of built development subject to certain criteria. For example, within Mid Sussex, policy DP6 provides for:
The growth of settlements will be supported where this meets identified local housing, employment, and community needs. Outside defined built-up area boundaries, the expansion of settlements will be supported where:
1. The site is allocated in the District Plan, a Neighbourhood Plan, or subsequent Development Plan Document or where the proposed development is for fewer than 10 dwellings; and
2. The site is contiguous with an existing built up area of the settlement; and
3. The development is demonstrated to be sustainable, including by reference to the settlement hierarchy.
The developer will need to satisfy the Council that:
• The proposal does not represent an underdevelopment of the site with regard to Policy DP26: Character and Design; or
• A large site is not brought forward in phases that individually meet the threshold but cumulatively does not.
5.5 A similar policy approach would we believe be appropriate here and would assist the council in meeting their LHN.
5.6 We note that DEV5 refers to the windfall rate of 39dpa. Given our comments above, this will need to be properly justified within the evidence base for the Reg 19 Plan.
5.7 Turning to DEV6, and the Strategic Green Gaps, the current strategic gap between Bexhill and Hastings should not be seen as a constraint on development on a par with the AONB or any other NPPF footnote 7 constraint, and should not in our opinion be carried over from the current core strategy without first being reviewed to establish if they can accommodate some growth to assist the council in meeting their LHN/ meeting the unmet needs of their neighbours, especially Hastings.
6
Health and Wellbeing Policies
6.1 We note that policy HWB2 requires a HIA to be undertaken on all applications for development of 100 (+) dwellings/ sites of more than 5ha. Whilst Persimmon Homes would agree that HIA are an essential part of plan making to ensure the Council understand the health outcomes of its strategy and is thus able to ensure these are effectively addressed, this should be achieved through the preparation of a whole plan HIA which will help inform the Council that the policies the plan contains address the key health outcomes for the area. As the plan and the policies it contains has been prepared to address the key health issues it is unnecessary for future development proposals that accord with this plan to undertake a separate HIA. If a development meets the policies in the plan, then it is by default addressing the health outcomes already identified by the Council. A HIA as part of the application would merely be repetition of the work the council has already undertaken. The only circumstance where an HIA may be appropriate would be for a larger unallocated site where the impacts may not have been fully considered by the council as part of the plan wide HIA. Policy HWB2 needs to be revised accordingly.
6.2 We also note that criterion 5 of HWB5 requires developments of 300 (+) dwellings to provide playing pitches on site in line with the recommendations of Rother’s Playing Pitch and Built Facilities Strategy and Sport England’s standards. Whilst not opposing this criterion, Persimmon Homes would suggest that the following is added to criterion 5 ‘unless evidence suggests that this is unachievable” as a sites topography may not make this possible/ economies of scale may mean providing / contribution to offsite provision is in certain circumstances preferable; or that this would fetter a developer’s ability to deliver BNG on site as such facilities do not assist in trying to deliver BNG. Indeed, they can actively prejudice it.
7
Infrastructure Policies
7.1 We note that policy INF1 (A) indicates that ‘Where new infrastructure capacity is required, it must be demonstrated that it can be delivered upfront or early in the development phasing.’ As the councils will be aware, the question of the supply of utilities to support development (including residential development) is a matter that is dealt with through separate statutory regimes. Providers such as the water and energy companies are required, among other things, to ensure a supply of services adequate to meet the needs of the plan-led system. As such policy INF41 (A) should not require applicants for planning permission to demonstrate that there is sufficient capacity with regard to provision of utilities such as water and power. Furthermore, when considering other infrastructure requirements, the policy should have regard to the cash flow implications of this criteria and be caveated accordingly.
8 Housing Policies
HOU1 Mixed and Balanced Communities
8.1 In noting the unit mix proposed in policy HOU1, we would in the first instance question the extent to which policy HOU1 should look to be prescriptive on the market housing to be delivered across the district for the whole of the plan period; rather the Council should recognise the need for flexibility, as per the NPPF and PPG, as the fact is the needs of the area may well change over the lifetime of the plan, particularly given the current uncertainty in the housing market, and that different areas will inevitably deliver different forms of housing i.e. apartments within more urban town centre locations and family housing in suburban areas; and that it is the combination of the two that will ultimately address the overall need.
HOU2 Affordable Housing
8.2 We note that no percentage has been provided in this policy to clarify the level of affordable provision to be provided on qualifying sites. We look forward to seeing and being able to comment upon the final requirement at Reg 19. In addition, we note that policy HOU28 also looks to see the affordable units well-integrated and designed to the same high quality to create tenure-neutral and socially inclusive homes and spaces; and that the affordable housing should be apportioned individually or in small clusters and where this is not proposed it should be robustly justified. Whilst we appreciate and support the need to ensure integration and to create more balanced communities, that has to be weighed against the management objectives of the affordable provider, who often find small clusters to be inefficient, such that this requirement needs to provide for those instances where the affordable provider feels a different approach is justified in that particular instance. HOU8 Access Standards
8.3 We note that policy HOU8 requires all new homes to be NDSS, and that as has already been established in the adopted development plan, there is a requirement for all new dwellings in the district to be M4(2) compliant, and 5% of affordable dwellings to meet M4(3)(2)(b) standards where a need exists. In addition, however, policy HOU8 includes a requirement for 5% of new market housing to meet the “wheelchair adaptable dwellings” standard in Part M4(3)(2)(a). Whilst para 8.71 of the plan suggests that these policy expectations are justified by the district’s ageing population and levels of disability, and the need for homes to appropriately meet the demands of occupiers throughout their lifetimes, this is not in our opinion clear and convincing evidence to justify this requirement and as such we would submit that this part of policy HOU8 should be deleted.
HOU9 – Specialist Housing for the Elderly
8.4 We note that policy HOU9 requires all developments of 100 (+) dwellings to set aside at least 10% of the total number of dwellings as specialist housing for older people. It is not clear whether this is in addition to, or as part of, the requirement also being set out in policy HOU8, or whether this could just be bungalows, or buildings that have to have communal areas. As drafted the policy is unclear and thus ineffective. In addition, subject to clarity it could be overly onerous when coupled with other requirements and thus likely to affect a sites viability.
HOU12 Self-Build and Custom Housebuilding
8.5 We note that policy H0U12 requires 5% Self/ Custom-Build Housing on all sites of 20 dwellings (+). Whilst the councils Self-build and Custom Housebuilding (SCHB) Headline Data Report 202319 indicates that as of 30.10.23 there were 197 individuals and 3 associations on the self-build and custom housebuilding register, it is not clear from the evidence base how many plots would be required if the existing commitments were taking into consideration. This needs to be established to ensure the proposed policy is justified and will be effective in meeting the outstanding demand.
8.6 In the context of the above, whilst noting the scale of the demand, we understand that before seeking to require the proposed developments to provide a proportion of the homes delivered as self-build plots the Council will need to examine other opportunities for meeting the needs of those who want to self-build. Under the Self Build & Custom Housebuilding Act 2015 and para 63 of the NPPF (2023), it is the Councils responsibility to ensure that sufficient permissions are given to meet demand. Further detail is provided in paragraph 57-014 of PPG with regard to the Council’s duties and whilst this recognises that it should take account of self-build registers when preparing planning policies, it also outlines that consideration needs to be given by Councils to the disposal of their own assets in order to meet the need for self-build plots or whether self-build could support the regeneration of brownfield sites. A need for self-build plots should not automatically lead to a policy requiring their provision on sites of 20 (+) dwellings. PPG also notes at paragraph 57-025 that local authorities should be encouraging developers and landowners to consider providing plots for self-build and custom house building but makes no reference to requiring their provision. The Government clearly sees the role of the local authority as working to identify opportunities with developers rather than placing responsibility on to the development industry. 8.7 The Council will also need to consider whether it is feasible that all sites of 20 (+) dwellings can deliver self-build plots. Often, especially on the larger sites, there are multiple contractors and large machinery operating on-site, and the development of single plots by individuals operating alongside this construction activity raises both practical and health & safety concerns. Any differential between the lead-in times / build out rates of self & custom build plots and the wider site may lead to construction work outside of specified working hours, building materials stored outside of designated compound areas and unfinished plots next to completed and occupied dwellings, resulting in consumer dissatisfaction. Whilst some sites may be able to locate self-build plots in a manner that reduces these potential risks, on others this will be impossible with developers unable to co-ordinate the provision of self & custom build plots with the development of the wider site. Such concerns must be given full consideration by the Council when preparing any policies on self-build to be included in the Local Plan.
8.8 Having regard to the above we would submit that the requirement to deliver 5% Self/ Custom-Build Housing on all sites of 20 (+) dwellings is likely to deliver very little in the way of tangible benefits, whilst creating significant difficulties for the builders involved. It would be a lot more effective for the Council to identify self-build sites or allocate certain sites to deliver a higher proportion of Self/ Custom-Build Housing.
8.9 Given the above we would suggest that the council review their requirements and are more explicit as to what they want, where and why, as at present policy HOU12 does not look to be properly justified or effective.
9 Green to the Core
GTC1: Net Zero Development Standards
9.1 We note that policy GTC1 requires all residential development to achieve: ‘a) LETI Total Energy Use Intensity (TEUI) Target for Operational Energy of 35 kWh/m2/year (GIA).
b) For new buildings, a 4-star Home Quality Mark (HQM) score; or for conversions to residential development, a Building Research Establishment Environmental Assessment Method (BREEAM)
‘Excellent’ standard as minimum.
c) A maximum space heating demand for new buildings (small scale housing) of 15 kWh/m2 per year.
d) If LETI, Home Quality Mark or BREEAM is updated or replaced during the plan period the equivalent replacement requirements will be applied.
9.2 It goes on to advise that ‘to demonstrate compliance, a Building Research Establishment (BRE) Home Quality Mark post-construction assessment or similar must be undertaken at practical completion.’
9.3 And that in terms of embodied carbon: ‘All new development proposals must demonstrate, through an energy statement, how the following embodied carbon standards will be met:
(i) All residential development must achieve a LETI C rating for embodied carbon emissions, equating to 600 kgCO2/m2 upfront embodied carbon and 970 kgCO2/m2 total embodied carbon.
From 1 January 2030, a LETI A rating must be achieved, equating to 300 kgCO2/m2 upfront embodied carbon and 450 kgCO2/m2 total embodied carbon.’
9.4 Whilst Persimmon Homes support the Government’s approach set out in the Future Homes Standard, we note that the Government have set out a clear roadmap as to how low carbon homes will, alongside the decarbonisation of the national grid, ensure that the Government can meet its commitments to net zero by 2050; and that the way forward being taken by the Government recognises that the improvements in energy efficiency of new homes should be a transition which ensures that new homes continue to come forward to meet housing needs whilst still being sufficiently challenging to significantly reduce the carbon emissions of new homes from 2025. This is set out explicitly in the Written Ministerial Statement of the Minister of State for Housing on the 13th December 2023, when he indicated that:
‘The improvement in standards already in force, alongside the ones which are due in 2025, demonstrates the Government’s commitment to ensuring new properties have a much lower impact on the environment in the future. In this context, the Government does not expect plan-makers to set local energy efficiency standards for buildings that go beyond current or planned buildings regulations. The proliferation of multiple, local standards by local authority area can add further costs to building new homes by adding complexity and undermining economies of scale. Any planning policies that propose local energy efficiency standards for buildings that go beyond current or planned buildings regulation should be rejected at examination if they do not have a well-reasoned and robustly costed rationale that ensures:
That development remains viable, and the impact on housing supply and affordability is considered in accordance with the National Planning Policy Framework.
The additional requirement is expressed as a percentage uplift of a dwelling’s Target Emissions Rate (TER) calculated using a specified version of the Standard Assessment Procedure (SAP).’20
9.5 As the council will be aware, the challenge to the WMS have been dismissed. Given the above, whilst the aspirations in Policy GTC1 are worthy and Persimmon Homes are committed to the delivery of Zero Carbon Homes/ Carbon Neutrality on all their sites, wherever it is practical and viable to do so, there is in our opinion no need for additional standards to be placed on developments through additional Local Plan policies that vary from that required in national government guidance. The plan has to acknowledge the implications of the transitional period and the need for flexibility during this period, in accordance with the aims and objectives of national policy. As such, not only is policy GTC1 overly complex and likely to impact on delivery/ viability, it is also clearly inconsistent with the approach advocated in the WMS. As a result, and having regard to our comments below on the lack of any Viability Assessment to support the reg 18 plan and the associated assessment of the implications of the emerging local plan policy on Net Zero Carbon, we would suggest that Policy GTC1 revert to the requirements set out in Building Regs.
GTC7: Local Nature Recovery Areas
9.6 We note this policy requires all new development to meet the objectives of the East Sussex (including Brighton and Hove) Local Nature Recovery Strategy (LNRS). We do not believe it is inappropriate to require all new development to meet the objectives set out in a document that is not a development plan document. Whilst the council can suggest that development has regard to the LNRS it is not consistent with national policy to require them to meet these objectives. It would also be perverse to require all new developments to adhere to a set of objectives that the council itself only has a duty to have regard to in its decision-making processes. We would therefore recommend that this policy is amended to advise that all new development has regard to the objectives set out in the LNRS
GTC8: Biodiversity Net Gain
9.7 We note that policy GTC8 requires al qualifying development proposals to deliver at least a 20% measurable biodiversity net gain attributable to the development. Whilst there does not appear to be any justification as to why a 20% BNG requirement is needed, such that we would submit the policy is unsound; Persimmon Homes are committed to doing as much as possible to meet the councils’ aspirations and as such would suggest that rather than require development to deliver at least 20% BNG, the Council recognises in policy that the 10% mandatory requirement is a minimum and that they will look favourably on development that seeks to go beyond this figure. If, however, the 20% BNG requirement is retained the council need to set out that where 20% is not deliverable it will seek to negotiate the viable level that can be provided over the 10% minimum required by the Environment Act 2021.
9.8 Such an approach would facilitate an element of flexibility that would take account of the potential implications delivering 20% BNG may have on viability/ overall dwelling numbers and would thus ensure a more effective policy approach, that is consistent with the aims and objectives of national policy as set out in the biodiversity net gain planning practice guidance of 14 February 2024 which at 006 Reference ID: 74-006-2024 states:
‘Plan-makers may seek a higher percentage than the statutory objective of 10% biodiversity net gain, either on an area-wide basis or for specific allocations for development. However, such policies will need to be evidenced including as to local need for a higher percentage, local opportunities for a higher percentage and any impacts on viability for development. Consideration will also need to be given to how the policy will be implemented.’ My emphasis.
9.9 In the context of the above the council need to have regard to the ecological baseline and the difficulties delivering 10% BNG, let alone 20% can have where the baseline is already high, such that offsite credits will be required, the level of which for smaller sites would be financially prohibitive such that the actual capacity of said sites may needs to be revisited. To this end we are aware of anecdotal evidence that suggests that to deliver 20% BNG a sites net to gross will fall from circa 75 to circa 65%, which can as a result impact on its overall development capacity and the councils associated housing land supply.
9.10 Notwithstanding our thoughts on the justification behind the 20% BNG requirements and its associated implications on a site’s development capacity, as well as its viability, there needs to be more in the plan to ensure the provision of a strategic network of sites that can deliver BNG offsite in Rother or within the same national character area (NCA); as whilst important in delivering 10% this is even more important if the Council introduces 20% BNG. At present there is little evidence that there will be sufficient local offsite credits in the short and medium term to support schemes that cannot deliver a 10/ 20% BNG on site. Nor is there any recognition of the fact that by requiring a 20% net gain the council are effectively adding to the pressure on the market for credits as more sites will be required to purchase offsite credits to meet this higher level of BNG. This increases costs and will more than likely delay sites that cannot secure these. Whilst we recognise the fact that there is the option of buying national credits, the cost of these is set well above the market to promote local solutions and will impact significantly on the viability of development meaning many developers will have to wait until local credits are available, which will prejudice the councils rolling 5 year housing land supply position.
10 Landscape Character
10.1 We note that policy LAN2 requires a CAVAT assessment to be submitted with all applications impacting on an individual or groups of trees in order to quantify their public amenity value. This is in our opinion totally unjustified and would question why a standard tree surveys would not suffice in the first instance, with a CAVAT assessment only being required where a tree of particular individual or group value is to be lost. 11 The SA of the Development Strategy
11.1 As set out above we note that the SA in scoring the Development Strategy, at Figures 11 and 12 does not actually comment upon the quantum of development the different options would deliver and how this would relate to the LHN, or indeed address the issue of the unmet needs of neighbours. Given SA objective 8 on housing this is somewhat surprising, as is the fact that no one option appears to have been chosen as the preferred option; albeit SDO3B (Bexhill Greenfield Growth Option 2: with New Multi-modal Transport Corridor) appears to score most favourable, followed by SDO6 (Brownfield Intensification and Redevelopment), which as it would totally fail to meet the LHN seems somewhat perverse, especially when figure 11 scores it as ‘Option supports the objective, or elements of the objective on balance, although effects may be minor’. Surely it would be ‘Option appears to conflict with the objective on balance and may result in minor adverse effects’ or indeed even ‘Potentially significant adverse effects’. Similarly, the scoring of SDO11 (Growth in settlements with train stations or sustainable transport alternatives) in figure 12 seems somewhat odd21 given its based on sustainable transport. To this end we also note that in a number of occasions, SOD4 and SOD5 for instance, growth is said to be resisted by virtue of land availability based on environmental and topographical constraints. Given the scale of unmet need currently proposed we would respectively suggest the council need to do more to establish whether additional land in these areas is available/ could be developed as no stone should be left unturned in trying to meet the LHN. As it stands, the SA lacks the necessary robustness required as it is impossible to assess the impact and weigh benefits and harm of each development strategy without know scale of delivery associated with each option.
11.2 Having regard to the above we feel it’s imperative that if the SA is to be effective the next iteration needs to assess the Development Strategy in the context of the LHN and how the council are to accommodate this/ the implications of not accommodating it/ over delivering to address adjacent authorities’ unmet needs.
12 The Infrastructure Delivery Plan Viability Assessment
12.1 We are surprised to note that whilst an Infrastructure Delivery Plan (IDP) has been produced to support the Reg 18 Plan, as well as an Infrastructure Background Paper, there is no Viability Appraisal (VA) of the plan. Not only does the lack of a VA makes it difficult to comment on the proposed policies, but it also raises questions about the aspirations of the IDP i.e. how these have been tested, and whether they are realistic and deliverable. If the plan is predicated on the aspirations of the IDP then the whole plans approach is also open to debate as how can it be said to be justified and effective if it has not been subject to a robust VA.
13 Conclusions on Reg 18 Plan
13.1 We are concerned that the scale of growth proposed in the overall spatial development strategy as set out on p112 of the Reg 18 Draft Plan is to deliver a minimum of 5,158 to 7,286 dwellings over the plan period (2020 - 2040) i.e. 258-364 dpa, which is significantly less than the capped LHN of 733dpa/ the uncapped LHN of 850 dpa. In our opinion there is no justification for promoting a lower housing target than the capped LHN given the aims and objectives of national government guidance and the affordability issues that exist within the district, that the plan says it wants to address. The scale of the potential shortfall (between 7,286 and 9,502 dwellings over the plan period22) is significant, and will we fear be exacerbated if the predicted supply does not deliver as forecast. Nowhere does the plan, or the evidence base demonstrate how this will be addressed. In addition, it does not appear to have been raised with adjacent authorities through discussions on the DtC. Nor does the plan/ its evidence base demonstrate how the acute levels of unmet housing need that exist within the area are to be addressed through constructive and active engagement so as to meet legal duties imposed by the DtC.
13.2 Similarly we are concerned that no evidence has been provided to demonstrate how the housing requirement will be met or how a rolling five year housing land supply will be achieved. The deliverability of the existing commitments needs to be demonstrated more evidentially than it has to date. Likewise, the evidence needs to be provided to demonstrate that the proposed allocations will deliver the quantum of development suggested when expected; and the plan needs to encompass compelling evidence to support the windfall rates expected rather than rely on historic trends.
13.3 We would also suggest that the plan period needs to be reviewed so that it provides for 15 years from adoption (i.e. till 31st March 2042).
13.4 Turning to the Development Strategy, the justification behind the Development Strategy and the clear preference for concentrating growth in and around Bexhill is not clear, the SA being silent on the quantum of development each Development Strategy could deliver and how the overall strategy related to the LHN.
13.5 In addition to the above we also have specific concerns about policies DEV2 (Comprehensive Development and Masterplanning), DEV3 (Development Boundaries), DEV5 (Development on Small Sites and Windfall), DEV6 (Strategic Green Gaps), HWB 2 (Health Impact Assessments), INF1 (Strategic Infrastructure Requirements), HOU1 (Mixed and Balanced Communities), HOU2 (Affordable Housing), HOU12 (Self-Build and Custom Housebuilding) , GTC1 (Net Zero Building Standards) and GTC8 (Biodiversity Net Gain), all of which we do not believe to be properly justified or consistent with national planning policy guidance as drafted.
In the context of the above we would like to highlight Persimmon Homes desire to work with Rother District Council on progressing a sound plan and that to this end we are happy to meet with officers to discuss our reps on the housing requirement, supply and trajectory and the other policies contained in the Reg 18 Plan/ its supporting evidence base.
Yours sincerely
JUDITH ASHTON
Judith Ashton Associates

Attachments:

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 28091

Received: 22/07/2024

Respondent: East Sussex County Council

Representation Summary:

HWB5: Green and Blue Infrastructure, p211 – 214; We welcome the inclusion of blue and green infrastructure within the Plan and support the protection of existing, and the development of new, blue and green infrastructure.

Full text:

Please see attached submitted document for full comments.

Attachments:

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 28167

Received: 22/07/2024

Respondent: East Sussex County Council

Representation Summary:

Proposed Policy HWB5: Green and Blue Infrastructure, p211-212; The policy criteria should include recognition and opportunities for multi-functional benefits, therefore, it is suggested that the following text is included.

*‘Maximising opportunities to provide multi-functional benefits for the environment, climate change and communities.’*

Full text:

Please see attached submitted document for full comments.

Attachments:

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 28250

Received: 23/07/2024

Respondent: Environment Agency

Representation Summary:

We would prefer to see separate policy wording for green and blue infrastructure. Looking at the definition of green infrastructure these are predominately artificial or highly managed features associated with human activities, whereas the definition of blue infrastructure includes more natural habitats. Therefore, it would be more appropriate to have separate policy wording so that wording for each can maximise the benefits of each, whilst also protecting biodiversity and opportunities for habitat restoration.

Full text:

Please see full the Environment Agency's representations, please see attached submission document.

Attachments:

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 28295

Received: 23/07/2024

Respondent: Natural England

Representation Summary:

HWB i): We welcome the commitment to safeguarding existing green and blue infrastructure from
development.
HWB5 iii) b.: We also welcome the embedding of the Natural England GIF and its Principles and
Standards in this policy.
HWB5 iv): The inclusion of the requirement for developments of two hectares or more, or 50
dwellings or more, to produce a Green Infrastructure masterplan as part of their proposals, is also
welcome. We recommend reference to the GI Design Guide and to the GI Strategy Standard in
particular in relation to the content of these GI masterplans. (See also the GIF extract below*)

Note 41: We recommend extending the definition of GI given in this note, to include features for
species, such as bird and bat boxes, swift bricks and hedgehog holes. This would also strengthen
the wording in relation to the NPPF definition of GI.

Strategic Green Infrastructure:
We welcome the use by the authority of Natural England's GIF Principles and Standards as a tool to
review and update their 2006/7 Green Spaces, Sport and Recreation Study, 2011 Green
Infrastructure Study and 2016 Addendum (as stated in section 6.36). We would again recommend
reference to the GI Design Guide and to the GI Strategy Standard in particular (and in support of
NPPF paragraphs 20 and 175), to inform and guide any future work.

We also recommend the inclusion of the requirements for green infrastructure information (for
example as required by any GI Strategy document and the GI masterplans for 2 ha or more or major
development) within the local requirements of your planning validation checklist.

*Additional advice on GI Strategies and GI Design Guide:
The following advice is taken from the Process Journeys for Local Planning Authorities and is
particularly relevant to the development of GI Strategies:
"Each major new development has a Green Infrastructure Plan (which may be part of a Design and
Access Statement) setting out how the development will deliver the Green Infrastructure
Framework’s 15 Green Infrastructure Principles and the Green Infrastructure Standards as set out in
local green infrastructure policies, proposals and development requirements in development plans
and local design codes. The green infrastructure delivered within (or associated with) major new
developments should be managed, maintained and monitored for a minimum of 30 years."
The GI Design Guide aims to provide evidence based practical guidance on how to plan and design
good GI and it complements the National Model Design Code and National Design Guide. The GI
Design Guide can also be used by planners (and designers) to develop local design codes with
multifunctional GI at its heart.

Full text:

Full submission as attached.

Attachments:

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 28341

Received: 23/07/2024

Respondent: Transport Futures East Sussex

Representation Summary:

The ‘cooling effect’ of trees/shade and planted areas within urban settings is known and should be a factor in development plans, along with rainfall retention against flood risk.

Full text:

Thank you for forwarding this document: below are our comments on policies - together with a supporting rationale.

2.13
Q2, Q3
Agree the principles embodied in 2.13.

 A ’green to the core’ approach should deliver better ‘living spaces’ for children and future generations.
 Compact and less ‘car dependent’ developments should flow from this with a strong emphasis on exploring and expanding ‘active travel’ opportunities and integrated public transport measures - bus/rail.
 The greatest efficiencies will fow from integration of ‘transport’ and ‘land use’ policies that will secure benefits for public health (both mental and physical), environment, social equity, economy - while addressing the twin crises facing biodiversity and climate change. Perhaps the greatest benefits would accrue from ‘traffic reduction’.
 We welcome the very sensible approach of having a joint statement from Hastings BC and Rother DC (the ‘wrap round’ authority). The future ‘district-wide’ and ‘neighbourhood’ infrastructure should include and prioritise sustainable/healthy modes of transport with incentives to use them and with an objective to reduce numbers of vehicles. Successful delivery also requires close working with the Transport and Health authority - ESCC.
 Good publicity to apprise residents, visitors and tourists of non-car modes available to access attractions should be standard - it currently is hugely variable from the useless through mediocre to excellent: it should be standard practice that sustainable transport opportunities are featured in well designd and attractive publicity material.


Q4 Q5
Agree principles. Opportunities that arise from reducing traffic (numbers of vehilcles) would include alternative use of land for a multitude of purposes including housing/nature /acquifer replenishment/childrens’ play/economic activity.

Q6/7/8
Given higher standards are ‘coming down the track’ and that we have a new national administration we might hope for re-energising/accelerating more ambitious energy saving solutions so RDC and all of us might well be prepared (and wish for ) a more nimble approach to delivery of ‘best available’ practice.

We note that although a building or larger housing development may be high performing, if it remains ‘car dependent’ it can hardly be described as sustainable.

Q9/10

Support ambitions for ‘retro-fit’ standards. Reduced car use/increased sustainable mode take-up would free land in existing settlements if provision is made for pedestrian/cycle/bus/train facilities.




Q17/18/19

Support expansion of solar/wind generation subject to landscape/heritage considerations. Rooftop solar is perhaps less obtrusive.

Q20/21

Welcome the focus on ‘nature recovery’. 3.39 recognises that securing ‘designated sites’ is insufficient as a means to securing recovery: the wider countryside (and well managed urban areas too) are crucial if populations/species are to thrive. We note that some areas with notional protection (for example semi-natural ancient woodland of which the HWAONB/HWNL has much) is nibbled away at so needs greater protection and monitoring. The entire east Rother catchment with its many streams also needs protection and monitoring.

Q22/23/24

Yes, go above minimum; developers’ intent to create compensatory gains against damage to existing habitat has to be independently assessed by a third party and monitored over time. Noise and light impact should be taken into account.

Q25/26

I have an interest in the HWNL as I am the owner of 6.02 acres of semi-natural ancient woodland (Fleetwood) and grew up in Etchingham between the Limden and east Rother. It was a wonderfulplace in which to spend my childhood. I accumulated quite a bit of knowledge - flora, fauna, geology, secret places and much of this was on my daily walk to school and back. Much of this environmental capital is intact but the lanes are no longer tranquil or safe places to be and the growth of traffic now limits childrens’ opportunties to learn and therefore love what’s there. Lanes have chewed up verges and ruts - restricting refuge - and taking away childrens freedoms. Add to this the sheer power and size of vehicles and the knowledge that mobile phone use while driving is endemic, the HWNL has suffered and quality of life diminished. Noise is often present with driving styles on two or four wheels tailored to maximise it: the noise footprint is up to two miles in radius. The HWNL is still beautiful but tarnished. It’s not OK. The Plan might usefully attempt to address these issues via its officers and elected members.

In the past, the High Weald Heroes inititiative to apprise its children of the elements that make it special seemed to be a good scheme and might now be expanded to include partnership schools in urban areas to spread the understanding and appreciation of such elements more widely so as to recruit more guardians of the future. Education initiatives could be included in the Plan. Health benefits would accrue, particularly for mental health.

In terms of offering safe walking/cycling family holidays, the HWNL doesn’t perform nearly well enough. Bus and rail connections have improved a little through BSIP but not enough. Adding Eurostar again to access via Ashford would help. Bus rail integration south of Tunbridge Wells is under exploited.

Q27/28/29

Agree with principles and threads.

Q33/34/35/36/37/38

Agree with principles. Flared junctions should be avoided. Cycle/pedestrian priority across junctions should be adopted aas policy. Cyclops style roundabouts should become much more commonly adopted as standard.

Q39/40/41

Agree with principles. 20mph default speed in residential streets and streets with strong character/heritage value would all be safer. Burwash example.


Q42/43/44

Agree with principles.

Q45/46/47

Agree with principles. Stimulating and supportive of social cohesion/mental and physical health objectives. Traffic must not dominate. Conversation is ioften impossible if traffic/vehicle noise pervasive.

Q48/49/50

Too much parking is simply more unnecessary road space: there will be induced traffic. Hard standing can contribute to flooding and denies the acquifers natural replenishment.

Q51/52/53

The ‘A21 development corridor’ presumes the road as the key to likely development sites and suggests road based accessiblity will therefore be key to any development’s success. That sounds a little like ‘business as usual’ However, it can’t be allowed to mask under and unexploited opportunities for movement of people by bus and rail and more locally by electric/conventional cycle and via good, safe pedestrian and cycle links.
The first Multi-Modal Study (2000) found that 68% of traffic on the A21 in the morning peak originated from south of Tunbridge Wells. It would be prudent to examine the potential for bus links to and across the Charing Cross - Hastings railway line to broaden the footprint of public transport accessibility. For example, the A265/268 could give access by bus to the train at Etchingham for Hawkhurst - Hurst Green and Burwash residents/visitors/students. This could also reduce car dependency in any village expansion developments, moreso if accompanied by supportive parking policies in urban centres. Your plan envisages the possibility of a future with less land given to car parks (and hopefully an end to free parking). This could follow future road user charging in whatever form it eventually takes.

Cars are getting bigger. Edge of town developments often feature generous parking spaces and these are often occupied by large SUV type vehicles. We strongly feel that these vehicles are not compatible with high quality living spaces and that there should be strong disincentives aimed at reducing their often intimidating presence in our streets and country lanes and anywhere near our schools.

Q54/55/121

General points:

There should be a strong component of public housing for rent; a strong component of truly affordable housing; a comprehensive cycle network that includes chldrens’ routes to school; 20mph default limits in all residential streets and dsitributor roads where appropriate (it will sometimes be appropriate). An absence of flared junctions and ‘cyclops’ roundabouts if a roundabout is deemed necessary.

Bus services under the new administration can be franchised by the transport authority. There could be some creative dialogues around services that RDC/ESCC feels might be improved by new/enhanced or extended routes.

It remains to be seen whether or not developers will still be able to renege on agreements around any form of planning gain. New policies will emerge that might benefit the community.

Q71

The ‘A21 transport corridor’ can only be examined as a multi-modal study. I already commented at Q53 but would add: there’s no bus connection between Etchingham station and Hurst Green which is a problem for locals (Management of The George - Ruth Hardy: theroyalgeorge@gmail.com).

Q72

Rother’s outstanding countryside is impaired by too much traffic with its associated negative impacts not the least of these being noise. The ridges and valleys are features that give much joy: it is hoped that the streams and rivers are unpolluted but reassurances are needed. In the case of the locally important Conquest Hospital, buses are severely delayed by queuing cars blocking access to the hospital entrance from The Ridge.


Q80

Sustainable transport provision should be designed with cumulative impacts and needs of neighbouring developments in mind. Not sure this has happened in north and West Bexhill (bus delays between Little Common and Northeye suggest that priority measures could have been installed ahead of development).

Q93

The ‘cooling effect’ of trees/shade and planted areas within urban settings is known and should be a factor in development plans, along with rainfall retention against flood risk.

Q98

Agree importance for young and old to have access to community facilities. Youth clubs’ demise has left a gap. These should be accessible by public transport/foot/cycle.

Q 104

Agree public rights of way/cycle routes hugely important for utility and leisure/education functions. These can afford great days out and should be part of the tourism leisure strategies and publicised in conjunction with public transport access in mind.

Q107

CVCP straddles the Bexhill - Hastings Link Road. Tranquillity has been lost to a large extent, but a 40mph speed restriction and acoustic cameras to deter noisy two/four wheeled vehicles would go some way to conferring on the valley some of its lost charm. The nationally important Bronze Age site seems to absent from any publicity.