Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 24726

Received: 31/05/2024

Respondent: Jane Beard

Representation Summary:

Brightling is a very social village which communicates well, as proved during Covid. The internet is very important here and, thanks to Andrew, we now have super fast connection. This then leads back to the question of power supply....

Full text:

Generally, green issues are under national guidelines. All Rother can do is try to enforce/encourage them. To reach lower emissions, which means using electricity more, we need to address a problem particular to Brightling, .i.e. reliability of electricity supply. This is proving to be very poor indeed and many of us now run emission busting generators.

Retrofitting of insulation is only as good as the people doing the work. So far, the record has not been good. However, an important step (together with the right rules on new properties) so this needs to be addressed in a professional manner. Where is the funding coming from?

Re-use of existing properties by changing to suit modern needs is good. At the moment it is easy to say a property is no longer fit for the purpose. There should be set criteria by which it is judged. Re-using not only saves on materials costs and energy, but also on demolition, clearing site and then re-delivering of new material all with its energy consumption. Local residents should be able to compile a description of what they see as "local style". A Bank for local building materials acquired through re-claim is an excellent idea. Would it be Council controlled or private as this could be open to unscrupulous acquisitions. (some will remember all our manhole covers being stolen not that many years ago!)

Water storage is something we need to look at, but how? Underground tanks? Then it is important to educate people in health and safety on re-use of this water.

Education should also play an important part in the conservation of nature. Many people do not see the huge variety we have around us, particularly in Brightling. (see Messenger articles on What to Look out for my contribution.)

Potential employment growth of 1861people (how do they know?) has been identified at Coldharbour Farm Estate. Will this be to the detriment of locals and other road users, with traffic movement, noise and unsightly commercial builders? What would the position be with other farms in the Parish where farming is clearly not a profitable enterprise and most having a back-up plan.

Residential development potential has been spotted in surrounding villages. This needs to be watched as there is a risk of increased traffic through Brightling as it is used as a rat run to get to other main roads, stations, etc.

Good luck with the 30 years vision for the A21!

To answer question 92/93 - Brightling is a very social village which communicates well, as proved during Covid. The internet is very important here and, thanks to Andrew, we now have super fast connection. This then leads back to the question of power supply....

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 26317

Received: 17/07/2024

Respondent: Burwash Parish Council

Representation Summary:

Little or no consultation with GPs in rural areas regarding capacity and needs of people in rural areas. Realistic implementation of the policy needs looking at. Size of gardens?

Full text:

Please see attached comments from Burwash Parish Council.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 27099

Received: 22/07/2024

Respondent: Westfield Parish Council

Representation Summary:

See points 131-136 in the attached submission.

Full text: