Showing comments and forms 31 to 35 of 35

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 28185

Received: 23/07/2026

Respondent: Mr Raphael Brandon

Agent: Corbil Planning Ltd

Representation Summary:

We support the following identified spatial development options on page 110:

• Hastings Fringes urban growth (SDO5)
• Radial settlement network connected to Bexhill and Hastings (SDO2)
• Village clusters centred around Rye and Battle (SDO1)

Sites such as ICK0017 demonstrate that there is a significant degree of development capacity within these rural areas and villages where localised landscape assessments can demonstrate a lower sensitivity and potential for new housing of a modest size.

Full text:

Please see attached full representation on the draft Local Plan in relation to HELAA site ICK0017.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 28283

Received: 23/07/2024

Respondent: The Rector and Scholars of Exeter College

Agent: Bidwells

Representation Summary:

2.19 The Council has considered a series of potential spatial development options (SDO’s 1-12), and these have individually undergone a Sustainability Appraisal. These are detailed in the Development Strategy Background Paper which forms part of the Draft Local Plan Evidence Base.

2.20 With respect to the land to which these representations relate, the following options appear to be compatible with the further sustainable growth of Robertsbridge:
● SDO10: A21 Corridor – Development along the A21 within an identified corridor of settlements, with opportunities for growth. Opportunities for sustainable travel through enhanced bus services and cycle track along this corridor.
● SDO4: Sustainable Development Growth – prioritise new development on the edge of sustainable settlements, providing major development and extending settlement boundaries where appropriate.
● SD011: Growth in the settlements with train stations – development around train stations in settlements served by them.

2.21 The Development Strategy concludes that the most appropriate spatial development options to take forward as Rother’s proposed development strategy is a combination of the following options:
● Brownfield intensification and redevelopment within sustainable settlements (SDO6)
● Bexhill greenfield growth on the northern and western edges of the built-up area of Bexhill to create new compact, connected communities (SDO3A)
● Hastings Fringes urban growth (SDO5)
● Radial settlement network connected to Bexhill and Hastings (SDO2)
● Village clusters centre around Rye and Battle (SDO1)
● Sustainable settlement growth (SDO4) with longer term, a focus on the A21 Corridor
(SDO10).

2.22 Spatial Development Options 3B, 7, 8, 9 and 12 are explicitly discounted at paragraph 10.5 of the Background Paper. SDO11 is not outlined as either being taken forward or discounted, however, the vision for Northern Rother (see paragraph 2.37) would appear to suggest that it has been taken forward, which we would support.

2.23 We support Spatial Development Option 04 and the approach to focus growth in settlements that score highest with regards to sustainability, which as outlined in paragraph 2.42 includes Robertsbridge. This would be fundamentally in line with NPPF paragraph 11 which states that all plans should promote a sustainable pattern of development. The development of land to which these representations relate would be compatible with this preferred Spatial Development Option.

2.24 We support the principle of SDO10, however, we do not consider that this should be limited to longer-term growth only. We are supportive of this option’s aspiration to anticipate and respond to long-term requirements but this should be in recognition of existing suitable opportunities along the A21 to deliver sustainable growth on deliverable sites in the shorter-term, for example at Robertsbridge. The development of such sites should not be delayed unnecessarily, especially when such sites are available now.

Full text:

See attached representation which responds to:
- Certain questions within the Local Plan; and
- HELAA site Land at Grove Farm (Phase 2), Robertsbridge. This includes three appendices within the attached document.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 28335

Received: 23/07/2024

Respondent: Transport Futures East Sussex

Representation Summary:

The ‘A21 development corridor’ presumes the road as the key to likely development sites and suggests road based accessiblity will therefore be key to any development’s success. That sounds a little like ‘business as usual’ However, it can’t be allowed to mask under and unexploited opportunities for movement of people by bus and rail and more locally by electric/conventional cycle and via good, safe pedestrian and cycle links.
The first Multi-Modal Study (2000) found that 68% of traffic on the A21 in the morning peak originated from south of Tunbridge Wells. It would be prudent to examine the potential for bus links to and across the Charing Cross - Hastings railway line to broaden the footprint of public transport accessibility. For example, the A265/268 could give access by bus to the train at Etchingham for Hawkhurst - Hurst Green and Burwash residents/visitors/students. This could also reduce car dependency in any village expansion developments, moreso if accompanied by supportive parking policies in urban centres. Your plan envisages the possibility of a future with less land given to car parks (and hopefully an end to free parking). This could follow future road user charging in whatever form it eventually takes.

Cars are getting bigger. Edge of town developments often feature generous parking spaces and these are often occupied by large SUV type vehicles. We strongly feel that these vehicles are not compatible with high quality living spaces and that there should be strong disincentives aimed at reducing their often intimidating presence in our streets and country lanes and anywhere near our schools.

Full text:

Thank you for forwarding this document: below are our comments on policies - together with a supporting rationale.

2.13
Q2, Q3
Agree the principles embodied in 2.13.

 A ’green to the core’ approach should deliver better ‘living spaces’ for children and future generations.
 Compact and less ‘car dependent’ developments should flow from this with a strong emphasis on exploring and expanding ‘active travel’ opportunities and integrated public transport measures - bus/rail.
 The greatest efficiencies will fow from integration of ‘transport’ and ‘land use’ policies that will secure benefits for public health (both mental and physical), environment, social equity, economy - while addressing the twin crises facing biodiversity and climate change. Perhaps the greatest benefits would accrue from ‘traffic reduction’.
 We welcome the very sensible approach of having a joint statement from Hastings BC and Rother DC (the ‘wrap round’ authority). The future ‘district-wide’ and ‘neighbourhood’ infrastructure should include and prioritise sustainable/healthy modes of transport with incentives to use them and with an objective to reduce numbers of vehicles. Successful delivery also requires close working with the Transport and Health authority - ESCC.
 Good publicity to apprise residents, visitors and tourists of non-car modes available to access attractions should be standard - it currently is hugely variable from the useless through mediocre to excellent: it should be standard practice that sustainable transport opportunities are featured in well designd and attractive publicity material.


Q4 Q5
Agree principles. Opportunities that arise from reducing traffic (numbers of vehilcles) would include alternative use of land for a multitude of purposes including housing/nature /acquifer replenishment/childrens’ play/economic activity.

Q6/7/8
Given higher standards are ‘coming down the track’ and that we have a new national administration we might hope for re-energising/accelerating more ambitious energy saving solutions so RDC and all of us might well be prepared (and wish for ) a more nimble approach to delivery of ‘best available’ practice.

We note that although a building or larger housing development may be high performing, if it remains ‘car dependent’ it can hardly be described as sustainable.

Q9/10

Support ambitions for ‘retro-fit’ standards. Reduced car use/increased sustainable mode take-up would free land in existing settlements if provision is made for pedestrian/cycle/bus/train facilities.




Q17/18/19

Support expansion of solar/wind generation subject to landscape/heritage considerations. Rooftop solar is perhaps less obtrusive.

Q20/21

Welcome the focus on ‘nature recovery’. 3.39 recognises that securing ‘designated sites’ is insufficient as a means to securing recovery: the wider countryside (and well managed urban areas too) are crucial if populations/species are to thrive. We note that some areas with notional protection (for example semi-natural ancient woodland of which the HWAONB/HWNL has much) is nibbled away at so needs greater protection and monitoring. The entire east Rother catchment with its many streams also needs protection and monitoring.

Q22/23/24

Yes, go above minimum; developers’ intent to create compensatory gains against damage to existing habitat has to be independently assessed by a third party and monitored over time. Noise and light impact should be taken into account.

Q25/26

I have an interest in the HWNL as I am the owner of 6.02 acres of semi-natural ancient woodland (Fleetwood) and grew up in Etchingham between the Limden and east Rother. It was a wonderfulplace in which to spend my childhood. I accumulated quite a bit of knowledge - flora, fauna, geology, secret places and much of this was on my daily walk to school and back. Much of this environmental capital is intact but the lanes are no longer tranquil or safe places to be and the growth of traffic now limits childrens’ opportunties to learn and therefore love what’s there. Lanes have chewed up verges and ruts - restricting refuge - and taking away childrens freedoms. Add to this the sheer power and size of vehicles and the knowledge that mobile phone use while driving is endemic, the HWNL has suffered and quality of life diminished. Noise is often present with driving styles on two or four wheels tailored to maximise it: the noise footprint is up to two miles in radius. The HWNL is still beautiful but tarnished. It’s not OK. The Plan might usefully attempt to address these issues via its officers and elected members.

In the past, the High Weald Heroes inititiative to apprise its children of the elements that make it special seemed to be a good scheme and might now be expanded to include partnership schools in urban areas to spread the understanding and appreciation of such elements more widely so as to recruit more guardians of the future. Education initiatives could be included in the Plan. Health benefits would accrue, particularly for mental health.

In terms of offering safe walking/cycling family holidays, the HWNL doesn’t perform nearly well enough. Bus and rail connections have improved a little through BSIP but not enough. Adding Eurostar again to access via Ashford would help. Bus rail integration south of Tunbridge Wells is under exploited.

Q27/28/29

Agree with principles and threads.

Q33/34/35/36/37/38

Agree with principles. Flared junctions should be avoided. Cycle/pedestrian priority across junctions should be adopted aas policy. Cyclops style roundabouts should become much more commonly adopted as standard.

Q39/40/41

Agree with principles. 20mph default speed in residential streets and streets with strong character/heritage value would all be safer. Burwash example.


Q42/43/44

Agree with principles.

Q45/46/47

Agree with principles. Stimulating and supportive of social cohesion/mental and physical health objectives. Traffic must not dominate. Conversation is ioften impossible if traffic/vehicle noise pervasive.

Q48/49/50

Too much parking is simply more unnecessary road space: there will be induced traffic. Hard standing can contribute to flooding and denies the acquifers natural replenishment.

Q51/52/53

The ‘A21 development corridor’ presumes the road as the key to likely development sites and suggests road based accessiblity will therefore be key to any development’s success. That sounds a little like ‘business as usual’ However, it can’t be allowed to mask under and unexploited opportunities for movement of people by bus and rail and more locally by electric/conventional cycle and via good, safe pedestrian and cycle links.
The first Multi-Modal Study (2000) found that 68% of traffic on the A21 in the morning peak originated from south of Tunbridge Wells. It would be prudent to examine the potential for bus links to and across the Charing Cross - Hastings railway line to broaden the footprint of public transport accessibility. For example, the A265/268 could give access by bus to the train at Etchingham for Hawkhurst - Hurst Green and Burwash residents/visitors/students. This could also reduce car dependency in any village expansion developments, moreso if accompanied by supportive parking policies in urban centres. Your plan envisages the possibility of a future with less land given to car parks (and hopefully an end to free parking). This could follow future road user charging in whatever form it eventually takes.

Cars are getting bigger. Edge of town developments often feature generous parking spaces and these are often occupied by large SUV type vehicles. We strongly feel that these vehicles are not compatible with high quality living spaces and that there should be strong disincentives aimed at reducing their often intimidating presence in our streets and country lanes and anywhere near our schools.

Q54/55/121

General points:

There should be a strong component of public housing for rent; a strong component of truly affordable housing; a comprehensive cycle network that includes chldrens’ routes to school; 20mph default limits in all residential streets and dsitributor roads where appropriate (it will sometimes be appropriate). An absence of flared junctions and ‘cyclops’ roundabouts if a roundabout is deemed necessary.

Bus services under the new administration can be franchised by the transport authority. There could be some creative dialogues around services that RDC/ESCC feels might be improved by new/enhanced or extended routes.

It remains to be seen whether or not developers will still be able to renege on agreements around any form of planning gain. New policies will emerge that might benefit the community.

Q71

The ‘A21 transport corridor’ can only be examined as a multi-modal study. I already commented at Q53 but would add: there’s no bus connection between Etchingham station and Hurst Green which is a problem for locals (Management of The George - Ruth Hardy: theroyalgeorge@gmail.com).

Q72

Rother’s outstanding countryside is impaired by too much traffic with its associated negative impacts not the least of these being noise. The ridges and valleys are features that give much joy: it is hoped that the streams and rivers are unpolluted but reassurances are needed. In the case of the locally important Conquest Hospital, buses are severely delayed by queuing cars blocking access to the hospital entrance from The Ridge.


Q80

Sustainable transport provision should be designed with cumulative impacts and needs of neighbouring developments in mind. Not sure this has happened in north and West Bexhill (bus delays between Little Common and Northeye suggest that priority measures could have been installed ahead of development).

Q93

The ‘cooling effect’ of trees/shade and planted areas within urban settings is known and should be a factor in development plans, along with rainfall retention against flood risk.

Q98

Agree importance for young and old to have access to community facilities. Youth clubs’ demise has left a gap. These should be accessible by public transport/foot/cycle.

Q 104

Agree public rights of way/cycle routes hugely important for utility and leisure/education functions. These can afford great days out and should be part of the tourism leisure strategies and publicised in conjunction with public transport access in mind.

Q107

CVCP straddles the Bexhill - Hastings Link Road. Tranquillity has been lost to a large extent, but a 40mph speed restriction and acoustic cameras to deter noisy two/four wheeled vehicles would go some way to conferring on the valley some of its lost charm. The nationally important Bronze Age site seems to absent from any publicity.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 28350

Received: 01/08/2024

Respondent: Kieran Mullan MP

Representation Summary:

Several allocated sites involve greenfield land, raising concerns about environmental impact and sustainability. As the proposal notes, it may be necessary to develop on some greenfield land to meet targets, however redevelopment of existing brownfield sites should be prioritised.

Impact on Green Spaces and Agricultural Land: Some site allocations may involve the development of greenfield sites. This might conflict with some sustainability goals and local opposition from communities valuing these green spaces. Likewise, it is necessary to make sure that adequate infrastructure, connectivity and services exist for further development in these areas.

Full text:

It is important that any development that takes place is sustainable, supported by suitable infrastructure and protects and wherever possible enhances the local environment. Working with parish councils to ensure planning priorities are supported by local communities is key, and Neighbourhood Plans are central to this.
Whilst it is important that we provide new homes that local people can afford to buy locally, affordability and supply concerns should not override everything else. Similarly, eco-friendly design should not be the sole consideration- beauty and a design code in keeping with existing design elements are also important.

I note that ‘delivering district-wide and neighbourhood infrastructure to support growth, and strengthening the sustainability of settlements and communities’ are identified as key planning issues. It is essential that the local transport infrastructure and services fully support these ambitions, if they are to be achieved.

I support the Council’s vision that future development should support biodiversity wherever possible.

To alleviate flooding risk and support bio-diversity net gain, application assessment, monitoring and planning enforcement are as, if not more, important and require greater resources going forward.

Please find below some specific concerns and issues I want to raise regarding housing, the environment and sustainability, infrastructure and services, stakeholder and community engagement, as well as some final economic considerations.

1. Distribution of Housing:

There appears to be a heavy concentration of new housing developments in certain areas, such as Bexhill North, while the Urban environment appears to have a lower housing growth potential. This may lead to overburdened infrastructure and services in certain areas, while others remain underdeveloped.

2. Affordable Housing Provision:

The plan sets a target of a percentage affordable housing. I welcome the Plan’s commitment to ensure “that a sufficient number and range of homes can be provided to meet the needs of present and future generations”. However, consider:

Affordable Housing targets: The plan mentions the provision of affordable housing, but specific numbers and how they align with actual need (e.g. population growth) need to be clearer.

Viability and Delivery: The plan allows for financial contributions in lieu of on-site affordable housing under certain circumstances. This could lead to fewer affordable homes being built in practice, as developers might prefer to pay contributions rather than integrate affordable units into their projects.

3. Environmental and Sustainability Concerns:

Several allocated sites involve greenfield land, raising concerns about environmental impact and sustainability. As the proposal notes, it may be necessary to develop on some greenfield land to meet targets, however redevelopment of existing brownfield sites should be prioritised.

The importance of local beauty: As stated above, while eco-friendly design is undoubtedly crucial, it should not be the only consideration in our planning process. It is equally important to ensure that new developments adhere to a design code that emphasizes local beauty, aesthetic appeal and harmony with existing architectural elements. This will preserve and enhance the unique character and beauty of our communities.

Impact on Green Spaces and Agricultural Land: Some site allocations may involve the development of greenfield sites. This might conflict with some sustainability goals and local opposition from communities valuing these green spaces. Likewise, it is necessary to make sure that adequate infrastructure, connectivity and services exist for further development in these areas.

4. Infrastructure and Services

The Infrastructure Delivery Plan identifies the need for significant investment in transport, education, health, and utilities to support the new housing developments.

There may be insufficient planning for the necessary infrastructure (e.g., roads, public transport, schools, healthcare) to support the new housing developments, particularly in areas seeing significant growth. The Plan acknowledges the needs of older people and individuals with disabilities, so the link between housing and infrastructure provision in local development need close attention.

5. Community and Stakeholder Engagement

The document acknowledges the need for ongoing consultation with local communities and stakeholders to refine site allocations and development plans. However:

Expanding community Involvement: The process of site allocation may not always have met community expectations of involving local communities and stakeholders, leading to decisions that do not fully reflect local needs and priorities. It would be ideal for the proposal to outline the specifics of how consultations regarding new housing will be carried out to maximise the input of local communities.

Transparency and Justification of Choices: The criteria and rationale for selecting specific sites over others may not be clear to local communities, leading to potential criticisms of bias or insufficient justification. This may cause undue concern in local areas, where residents may feel they are excluded from decision making but have the most impact.

6. Economic Considerations:

Economic Viability and Job Creation: While the plan includes employment floorspace, it is crucial to ensure that these developments will genuinely lead to job creation and economic benefits for the local population. There should be a clear link between housing growth and employment opportunities. The housing strategy could detail the steps taken to improve employment opportunities in local areas; which would mean residents have shorter commutes and thus less strain on the transport network.

I also welcome the Plan’s support for diversification of traditional rural businesses as basis for development in our countryside and planning aims.

Finally, consideration should be given to further ensuring a diversity of employment types are supported e.g., higher skilled/technical opportunities as part of this.


These points highlight potential areas for further scrutiny and discussion to ensure the local plan is comprehensive, balanced, and meets the needs of all community members effectively.

Comment

Rother Local Plan 2020-2040 (Regulation 18)

Representation ID: 28406

Received: 23/04/2025

Respondent: Gladman Developments

Representation Summary:

Recognising the significant constraints that affect the district, 83% of the district is within
the High Weald National Landscape (NL), historic constraints and environmental
designations whilst planning for housing development is complex, the spatial strategy
essentially determines itself.

The draft Local Plan states that this is a landscape-led spatial strategy that will deliver
between 258 to 364 dwelling per annum (dpa) over the plan period. This is between 369 and
475 homes each year below what the minimum required by the standard method. The
failure to meet needs in full also means that affordable housing delivery will be substantially
below what is needed.

As a main transport and community hub in the district, significant housing delivery in Bexhill
will be essential in providing for a successful spatial strategy. North and West of Bexhill are
the most sustainable locations in the district and significant housing should be allocated to
the town on sites capable of delivering housing, whilst balancing the recognised constraints
of the district. It is essential that sites allocated are maximised to ensure that the most
effective use of land is utilised.

Gladman consider it essential to recognise the significant impact that not meeting housing
needs will have on its population and starts to take a more positive approach to meeting
housing needs. Whilst we recognise that there are a range of constraints in the district the
NPPF is clear in Paragraph 11 that these must provide strong reasons for restricting growth
and as part of these considerations the Council must also take full account of the social and
economic impacts of not meeting needs, not just the potential harms.

It will also be vital that the council seeks to maximise development on each site it does
allocate give the significant shortfall between housing needs and supply. The Council should
look to ensure that all land within submitted sites that are considered suitable for
development are allocated for development. In allocating sites, the Council should be
mindful that to maximize housing supply the widest possible range of sites, by size and
market location are required so that house builders of all types and sizes have access to
suitable land in order to offer the widest possible range of products. The key to increased
housing supply is the number of sales outlets.

The maximum delivery is achieved not just because there are more sales outlets but
because the widest possible range of products and locations are available to meet the
widest possible range of demand. In summary a wider variety of sites in the widest possible
range of locations ensures all types of house builder have access to suitable land which in
turn increases housing delivery.

Gladman support the important role that Bexhill plays in the spatial strategy for the district
and are promoting a series of development interests in this area that could contribute to
the timely delivery of housing within the plan period.

Full text:

Please see attached representations document.

Please also see StoryMap detailing Gladman's portfolio of using the following address: https://storymaps.arcgis.com/collections/315747d6c3ef40069b1b886958aaedaf