Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 23269

Received: 19/02/2017

Respondent: Mr Steve Armstrong

Representation Summary:

I wish to express my support for this policy. I believe that the restoration of the Rother Valley Railway, from Robertsbridge to Bodiam would offer considerable benefits in terms of increasing the tourism offer of the district, so contributing to widen gains in economic development. It may also have potential to divert visitors from the A21 Robertsbridge bypass to the benefit of the village. The later reducing traffic on country lanes, unsuited to such volumes.

I do not think the restored railway would have many, if any, adverse environmental consequences which could not be dealt with by appropriate mitigation measures.

Full text:

I wish to express my support for this policy. I believe that the restoration of the Rother Valley Railway, from Robertsbridge to Bodiam would offer considerable benefits in terms of increasing the tourism offer of the district, so contributing to widen gains in economic development. It may also have potential to divert visitors from the A21 Robertsbridge bypass to the benefit of the village, in addition to contributing to "park and ride" for Bodiam Castle. The later reducing traffic on country lanes, unsuited to such volumes.

Before retirement I worked as a chartered town planner for a range of organisations, including contributing to the design of the Channel Tunnel Rail Link. I do not think the restored railway would have many, if any, adverse environmental consequences which could not be dealt with by appropriate mitigation measures. Similarly I understand that the Department for Transport has adopted a more flexible stance, regarding the provision of level crossings required on the extension.

Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 23270

Received: 19/02/2017

Respondent: Mr P J Halden

Representation Summary:

I most sincerely believe that any overarching planning permissions should be granted to enable that vision to be realised.

I believe that there will be positive benefits to the village of Robertsbridge by increasing income for trades people and in raising the profile of the village.

It is my view that the existing management experience within the KESR and the obvious drive and determination of the RVR directors would make for a seamless and successful railway link.

Full text:

In making this submission I am guilty of not using the 'proper form' as I was confused by your website. Nevertheless I hope that it can be considered along with other submissions.

I have been a member of the KESR for many years. As a working volunteer with that railway for several years as footplate staff (a fireman), I am fully aware of the social and economic benefits that a well run and well organised preserved railway can bring to the region. I was fully aware of the various constraints that had been placed upon the operation of that line and I was trained in and I constantly implemented the disciplines which were essential in operating a successful and safe railway.

During the last few years I have been a frequent visitor to Robertsbridge to observe and appreciate the progress that has been made in securing and developing the station site towards what will clearly be a fitting terminus to the total length of the preserved railway from Tenterden. The concept of the opportunity to alight from a Hastings line train and to board a train to Tenterden is absolutely fantastic and will be a credit to all those with the vision and determination to achieve a re joining of this historic link. For that reason I most sincerely believe that any overarching planning permissions should be granted to enable that vision to be realised.

I believe that there will be positive benefits to the village of Robertsbridge by increasing income for trades people and in raising the profile of the village which has rather digressed following the opening or the by pass. I do not believe that aided by modern technology that there would not be any significant adverse affect upon traffic flow on either the A21 by pass or the former A21 access road.

In summary it is my view that the existing management experience within the KESR and the obvious drive and determination of the RVR directors would make for a seamless and successful railway link which would be the pride of this area of East Sussex.

Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 23271

Received: 17/02/2017

Respondent: Mr Peter Bennion

Representation Summary:

As a member of the Kent & East Sussex Railway (K&ESR), I confirm support for Policy EM8 to go forward in the name of Rother Valley Railway (RVR) who have the same ethos and expertise as K&ESR.

A dream to be realised!

Full text:

As a member of the Kent & East Sussex Railway (K&ESR), I confirm support for Policy EM8 to go forward in the name of Rother Valley Railway (RVR) who have the same ethos and expertise as K&ESR.

A dream to be realised!

Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 23272

Received: 20/02/2017

Respondent: Mr Raymond Bridges

Representation Summary:

I support the plan to extend the Rother Valley Railway and complete the connection with the KESR. The project will bring financial advantages, not only to the railway itself, but to both Tenterden and Robertsbridge. With the advantage that people can connect to the mainline network at Robertsbridge as well. The proposed level crossing on the A21 would only cause very minimal disruption to traffic flow. The increase in passenger numbers would be advantageous for the economies of Tenterden and Robertsbridge and would also bring more visitors to Bodiam Castle, which in turn would help the local economy.

Full text:

I fully support the plan to extend the Rother Valley Railway and complete the connection with the KESR. The project will bring financial advantages, not only to the railway itself, but to both Tenterden and Robertsbridge. With the advantage that people can connect to the mainline network at Robertsbridge as well. Mainline steam excursions could also connect to the extended KESR which again would bring additional benefits to the town. The proposed level crossing on the A21 would only cause very minimal disruption to traffic flow and when the steam trains cross the road would create an interesting distraction for road users. The increase in passenger numbers would be advantageous for the economies of Tenterden and Robertsbridge and would also bring more visitors to Bodiam Castle, which in turn would help the local economy and could create jobs in local shops, pubs and restaurants.

Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 23273

Received: 20/02/2017

Respondent: Mr Trevor Streeter

Representation Summary:

I am in favour of the reinstatement of the Railway (option A).

It is an undeniable fact that the population is increasing and wishing to access the countryside.

Driving through the roads I see the roadkill carnage on a daily basis. Railways do not have that same impact.

Isnt the main point that people would be encouraged to come by rail. For those holidaying on the south coast, the railway aspires to encourage another way of getting to inland attractions.

I believe that the flood aspects have been addressed.

Full text:

Dear Sir,

I am in favour of the reinstatement of the Railway by the Rother Valley Railway and elect for option A on your website regarding EM8 of the Rother District Councils policy.

It is an undeniable fact that the population of the country is increasing and wishing to access the countryside and the local attractions. Rather than upgrading the roads the Railway's project lends itself to moving people in a heritage environment through our beautiful valley, for the Railway in its own right, but also to those attractions along the route particularly Bodiam and Tenterden.

I read about the environmental impact. Driving through the roads I see the road kill carnage on a daily basis. Railways do not have that same impact and the banks of those are a far safer environment than roadsides. And throughout the country I see some wonderful wildlife habitats. If road "improvements" will eventually be necessitated it is difficult for me to see how that would help the wildlife. So much for the environmental effects.

And so to the car parking fantasy and incredible figures I see put about supposedly at the Robertsbridge end. Has anyone actually noticed that the railway forms a junction with the mainline there. Isnt the main point that people would be encouraged to come by rail. And so for those holidaying on the south coast, rather than taking a car through the countryside, especially on a marginal weather day the railway aspires to encourage another way of getting to those inland attractions.

I believe that the flood and flood plain aspects have been addressed as have the road crossing issues.

But lets look at the positive effects of tourists in the area creating the jobs and opportunities for the community as well as directly by the Railway.

And so on balance it seems that the Railway can only be a good thing for the community.

Regards
Trevor Streeter

Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 23287

Received: 20/02/2017

Respondent: Mr John Grant

Representation Summary:

Restoring the line as it was originally will help the railway and the economy of the local area by bring in more people to use all facilities on offer.

I also understand the considerable work done by RVR with Highways England in agreeing an acceptable solution to the crossing on the main A21 road and with the Local Authority concerned for the crossing 0f the B2244 at Junction road and the road at Northbridge Street. In addition, ensuring that the River Rother can flow unimpeded under the railway at Northbridge Street.

Full text:

I much appreciate and support the Work of the Rother Valley Railway in implementing the Rother District Council's Policy EM8 in extending the railway line from Bodiam to Robertsbridge by constructing the line to Junction Road and by building Robertsbridge Junction Station and the line as far as Northbridge Street. I also appreciate the support of Network Rail in connecting their line to the Rother Valley Railway line at Robertsbridge. The completion of the line between these points will enable the K&ESR to run the railway right through to Tenterden much improving their operation and opening up many more opportunities for the tourist and ordinary traveller. By completing this and restoring the line as it was originally will help the railway and the economy of the local area by bring in more people to use all facilities on offer.

The limited Parking at Robertsbridge should not cause any difficulty as it is adjacent to the mainline station encouraging visitors to come by train. For those wishing to travel by car there are adequate parking facilities at Northiam and Tenterden Stations which should in no way affect the enjoyment of their visit. Experience by the Bluebell Railway at East Grinstead where there is no parking at their station is that this has not caused any difficulties as by far the majority of visitors joining at East Grinstead come by train. Approval of this planning application will therefore demonstrate continued progress in implementing Rother District Council's Local Plan in encouraging more visitors to the area and limiting unnecessary congestion.
I also understand the considerable work done by RVR with Highways England in agreeing an acceptable solution to the crossing on the main A21 road and with the Local Authority concerned for the crossing 0f the B2244 at Junction road and the road at Northbridge Street. In addition to this the work they have done with the Environment Agency in ensuring that the River Rother can flow unimpeded under the railway at Northbridge Street and that the flood area in the meadows is not unnecessarily restricted improving flood control.

I trust that the planning application will now be able to be submitted to the planning committee and approved as soon as possible.

Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 23297

Received: 20/02/2017

Respondent: Mr John Bignell

Representation Summary:

I would like to propose that option A above be adopted by the planning committee.
The area is of outstanding natural beauty and would be further spoilt by any increase in road traffic.

The railway would offer the most attractive views and would attract road users to Robertsbridge and Tenterden thus increasing business potential in those areas.

Full text:

I would like to propose that option A above be adopted by the planning committee.
The area is of outstanding natural beauty and would be further spoilt by any increase in road traffic.

The railway would offer the most attractive views and would attract road users to Robertsbridge and Tenterden thus increasing business potential in those areas.

Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 23431

Received: 20/02/2017

Respondent: Sussex Wildlife Trust

Representation Summary:

The Sussex Wildlife Trust support sustainable modes of transport. However, we do not have enough information about this particular scheme to offer an opinion on this policy. It is unclear whether the application has been progressed with the consideration of the existing landowners and the level to which biodiversity interests have been considered.

Full text:

The following comments, related to biodiversity matters, are made on behalf of the Sussex Wildlife Trust.

If a question from the consultation is not included below, please assume that the Trust has no comments to make at this time.

PART B: DEVELOPMENT POLICIES

QUESTION 2: Do you agree that the optional water efficiency standard should be adopted and the proposed policy wording?

We are concerned that this policy appears to limit itself to water efficiency and believe that it should be broader in its approach to water resource management. The policy appears to consider only domestic water efficiency and we question if the policy should also consider commercial use.

QUESTION 3: Where, if anywhere, do you think could be an appropriate location for wind turbine(s) to be sited in the District?

Any proposal for wind turbines and associated infrastructure, such as connections to the grid, needs to ensure that impacts on biodiversity and their placement within the landscape in terms of their potential impacts on ecological networks are assessed before suggestions are made regarding suitable locations.
Therefore changes in policy wording to reflect this should be made.

QUESTION 4: What opportunities do you think there are to encourage biomass/wood fuel from local sources and how should these be reflected in planning policy?

This could be demonstrated through a policy which encourages biomass potential in commercial and possibly residential developments through appropriate design. However, the policy would need to recognise the importance of protecting woodlands so that their biodiversity value is considered and enhanced through the process. Further, the Rother Local Plan currently does not include an ancient woodland policy; if a wood fuel policy is adopted a separate ancient woodland policy is needed.

QUESTION 7: Do you agree with the policy approach to equestrian developments and the proposed policy wording?

We are encouraged to see the supporting text for this policy recognise the sensitivities of equestrian developments in the countryside and the need to ensure that these features are safeguarded. In relation to this we highlight that in paragraph 7.16 the last sentence states 'However, there is scope for equestrian development in the countryside that is limited in scale'. The term 'scale' perhaps needs defining to add clarity.

We are concerned about equestrian developments being proposed on designated sites such as Local Wildlife Sites. Therefore we welcome an approach to more clearly defined acceptable limits of equestrian development in relation to designated sites. The policy could benefit from underlining the need for up to date ecological management plans accompanying proposals, as per National Planning Policy Framework ( NPPF) section 165.

QUESTION 12: Do you agree with the proposed policy approach to external residential areas and the proposed policy wording? If not, what changes would you wish to see?

Creative approaches and orientation should be considered when designing external spaces. Their setting within the green infrastructure aspirations of the District should be looked at during the planning application stage. This would ensure a holistic and considered approach to green infrastructure.

While bullet point (i) gives clarity to the external spaces of dwellings of 3 or more bedrooms, there is a lack of commitment to the amount of space need for flat and complex developments. The last sentence of this bullet point states that, 'an appropriate level of usable community and amenity space should be provided'. We are concerned that this statement does not give the decision maker a clear enough direction for its interpretation.

Bullet point (ii) should reference the need to be permeable and where gardens are being lost efforts should be made to ensure there is no loss to biodiversity reference NPPF section 109. The council may find the RHS advice leaflet useful www.rhs.org.uk/advice/profile?PID=738

We suggest bullet point (iii) uses wording to incorporate green roofs on waste and recycling stores to help add to a developments' contribution to biodiversity as per NPPF section 118 'Opportunities to incorporate biodiversity in and around developments should be encouraged'.

QUESTION 13: Do you agree with the proposed policy approach to extensions to residential gardens and the proposed policy wording? If not, what changes would you wish to see?

This is an interesting policy and we welcome its inclusion. The Sussex Wildlife Trust have concern that an extension to a garden, if allowed, could in time lead to other development within that garden boundary. Therefore, the type of habitat a garden extension would involve needs to be considered.

We remind Rother District Council that the NPPF section 53 highlights the need to resist inappropriate development of gardens. Therefore perhaps wording to this effect is needed within the policy.

QUESTION 15: Do you agree with the policy approaches to boundary treatments and drives and accesses and to the wording of the proposed policies? If not, what changes would you wish to see?

The Sussex Wildlife Trust suggests that policy DHG7 (Boundary Treatments) includes wording to reflect the sentiments of section 118 of the NPPF.

This could be achieved by including a bullet point requiring impermeable boundary features to include gaps or passages beneath them to enable movement of wildlife such as hedgehogs and amphibians.

In addition policy DHG8 (Accesses and Drives) should reflect the need to ensure the proposals for new driveways do not lead to a loss in natural capital delivering ecosystem services. Therefore these should be permeable and look to include biodiversity features. See RHS guidance www.rhs.org.uk/advice/profile?PID=738

QUESTION 18: Do you agree with the policy approaches to maintaining landscape character and the High Weald AONB and to the respective proposed policy wordings?

The Sussex Wildlife Trust supports the policy approach to maintaining landscape character and the High Weald AONB. We recommend that policy DEN2 be strengthened by the addition of wording requiring development to deliver biodiversity gains which meet the AONB objectives.

We are concerned that the wording in the last sentence of the policy 'major development will be resisted' would not allow a decision maker to be clear when determining an application. What is the level of resistance intended?

QUESTION 19: Do you agree with the proposed definition of the Strategic Gaps, and the policy applying to them? If not, what changes would you wish to see?

Figure 7 demonstrates that an area of the existing Bexhill and Hastings/St Leonards green gaps is proposed to be removed from the strategic gap. However the supporting text (10.19 - 10.21) does not indicate the reasons for the exclusion. We feel the supporting text for this section would benefit from a brief explanation for the reason in inclusion or exclusion of areas.

We ask the council to consider the value of the strategic gaps in harnessing the district's natural capital. This natural capital will be delivering vital ecosystem services to the district and potentially to the authorities adjoining Rother District. Therefore we would suggest that this is reflected in the policy wording by:
'Within these gaps development will be carefully controlled and development will only be permitted in exceptional circumstances. Any development must be unobtrusive, not detract from the openness of the area and ensure that ecosystem services are not compromised.'

We believe this additional wording will reflect the importance of strategic gaps for ecosystems service delivery and will also enable the policy to sit in line with NPPF para 109.

QUESTION 20: Do you agree with the policy approach to supporting biodiversity and green space and to the proposed policy wording?

We are encouraged by the manner in which the supporting text for this policy has been approached. The Sussex Wildlife Trust supports the inclusion of an 'Enhancement Policy' approach, however the wording should be strengthened to better conform to the wording and ethos of Chapter 9 of the NPPF.

Part i - the qualification of 'in principle' should be removed. The proposal is either supported in full or it is not, 'in principle' adds nothing to the policy.

Part ii - the word 'significant' should be removed. All developments should aim to avoid harm to biodiversity.

Part iii - should look to reflect the sentiments of the NPPF section 109. The first sentence should be amended to read:
'In addition to ( ii) above , all developments will be expected to deliver net gain to biodiversity by retaining and enhancing biodiversity in a manner appropriate to the local context ....'

Part iv has a requirement for 'larger developments of more than 2 hectare or 50 dwellings...' to produce a green infrastructure (GI) masterplan'. Looking at the allocations, very few meet this requirement. We recognise that there are some larger allocations around Bexhill where we would certainly support the need to produce GI masterplans but we are concerned about the substantial number of allocations which do not meet these criteria. We suggest that the threshold is lowered to 25 dwellings. We also recommend that the policy requires all development to contribute to the aspirations of Rother's Green Infrastructure Strategy.

We suggest that Rother District Council include an Ancient Woodland policy within the Local Plan. This would reflect the ethos of the NPPF which clearly states in section 117:
'Planning permission should be refused for developments resulting in the loss or deterioration of irreplaceable habitats, including ancient woodland and the loss of aged or veteran trees found outside ancient woodland unless the need for, and benefits of, the development in that location clearly outweighs the loss.'

QUESTION 21: Do you agree with the policy approach to sustainable drainage and the proposed policy wording?

Reviewing the supporting text and policy wording there is no recognition of Pevensey and Pett being low lying areas (below sea level) and the associated risk of sea and ground water flooding. We suggest that this is included.

QUESTION 23: Do you agree with the policy approach to managing environmental pollution through the planning process and with the proposed policy wording?

The policy would be strengthened by ensuring that there is mention of biodiversity within the policy bullet point relating to lighting.

Lastly, although the supporting text highlights that the district is not subject to any Air Quality Management Areas, with increasing development we suggest that the council recognise the natural capital that helps filter and deal with pollutants.

Increased levels of development in the district means resources may come under increasing pressure. It may benefit the council to consider talking to the Sussex Biodiversity Record Centre about their Ecoserve programme. This programme shows where the district's natural capital is delivering ecosystem services such as air purification in relation to population demand.

QUESTION 24: Do you agree with the policy approach to comprehensive development and the proposed policy wording?

We support recognising the importance of a holistic approach to development which considers the three roles of sustainable development. In order to achieve this within the policy wording we suggest that the policy looks to include wording regarding net gain to biodiversity as per section 109 of the NPPF. We feel that this is important as phased development may overlook the cumulative impact on the district's natural capital and the ecosystem services being delivered.

PART C: SITE ALLOCATIONS

General Comments
The Trust recognises that the presence of designated sites and priority habitats and species has been a contributing factor in the assessment of the suitability of site allocations. We very much support the council's approach to exclude designated sites and sites of high biodiversity value for development. However we note that the site assessments were primarily based on desk-top studies. With the exception of North Bexhill and Spindlewood Drive it does not appear that any on the ground assessments have been carried out.

Given the council's commitment in the Core Strategy objectives 'To protect important ecological resources in the district' and in policy EN5 to 'support opportunities for management, restoration and creation of habitats...' we recommend that preliminary ecological appraisals are carried out for the preferred sites before they are officially allocated. This will ensure that any issues relating to ecology are identified before the plan reaches the examination stage.

We are pleased to see that the 'Key constraints/opportunities' sections for many of the preferred site allocations consider ecological impacts. However, these considerations are again inconsistently reflected in policy wording. For example, policy IDE1 requires that an ecological assessment is undertaken and that any impact on protected species mitigated. Further to this, policy MAR1 states that development proposals should be subject to an ecological survey.

By singling out only two of the site allocations, this may give the impression that proposals for other allocations may not require ecological surveys. The NPPF has a clear requirement for planning decisions to be based on up to date information and for development to achieve net gains for biodiversity. It would not be acceptable for proposals to proceed without the inclusion of up to date ecological information, especially given that thus far the sites have only been assessed at a desk-top level. This position needs to be reflected in the Biodiversity Policy (please see comments for QUESTION 20) and in all the site allocation policies. Therefore the following wording should be added to all site allocations:
'Prior to determination:
A site wide landscape and ecological management plan that is informed by up to date ecological information, including information on the site's utilisation and delivery of ecosystems services, will be produced. Mechanisms needed for implementation will be identified and secured. This will be to the
satisfaction of the local planning authority to ensure long term maintenance of retained and newly created habitats.'

We recognise that information regarding a site's utilisation of ecosystem services maybe too onerous for small allocations. However, we take this opportunity to highlight to the council that the Sussex Biodiversity Record Centre are now able to run a programme called Ecoserve. This programme uses biodiversity and habitat data to look at the ecosystems services currently provided by an area's natural capital. It also assesses where the demand for those services are in relation to population. We suggest that this might be a useful evidence base for the council to consider as an aid to helping smaller developments see how they could make a contribution or enhancements to the continued delivery of those services through their site.

Additionally, many of the site allocations are adjacent to ancient woodland. Again whilst this is usually noted in the 'Key constraints/opportunities' section, it is not consistently reflected in the policy wording for the allocation. For example Policy BRO1 part (v) specifies that 'a buffer zone of at least 15 metres is provided to the Ancient Woodland', while the presence of an ancient woodland is not mentioned in, for example, policy BEX1 or BEX2. Conversely policy BEX 9 does specify the need for a buffer to protect the adjacent ancient woodland, but the width of the buffer is not specified.

Core Strategy policy EN1 and NPPF paragraph 118 require the protection of ancient woodland in the district. Additionally, Natural England's Ancient Woodland standing advice is clear that a minimum buffer must be at least 15 metres. We therefore recommend that an Ancient Woodland policy is included in the DaSA and that any site allocation policy with the potential to impact on ancient woodland includes a requirement of a buffer zone of at least 15 metres.

We also note that most of the allocations require the 'retention and enhancement of boundary planting'. We understand that this requirement is primarily to mitigate visual impacts on the AONB, however this is also an opportunity to ensure that each allocation contributes to the creation of an ecological network for the district. We therefore recommend that when boundary planting is specified, additional wording is used, such as:
'Provision is made for the retention and enhancement of boundary planting, for the benefit of biodiversity and for screening purposes'.

The majority of the site allocation policies use the term 'some' when describing the number of dwellings or size of employment space required within a development. This is not a standard planning term and hence we are concerned that its use leaves the policies open to broad interpretation. Given the landscape and ecological sensitivities of many of the site allocations, we recommend that a maximum figure is proposed in each policy. This will provide clarity and ensure that the policy can be robustly applied.

Alternatively, if an approximate value is preferred, we recommend the use of the word 'approximately' rather than 'some' as this is more frequently used in a planning policy context. However, if the council is minded to use this approach, we would ask that an additional requirement is added to the policies to ensure that overdevelopment does not occur. We recommend the following:
'The final number of dwellings/employment size selected must be based on up to date environmental information that demonstrates the current ecosystem delivery of the site and its capacity to absorb the proposed level of development. '

QUESTION 26: Do you agree with the requirements of Policy BEX1? If not, how would you wish to see it amended?

General comment
The Sussex Wildlife Trust supports a plan-led planning process and acknowledges that site BEX1 is included in the adopted North East Bexhill SPD. However, we question whether the district's natural capital can absorb this level of development around Bexhill. All the allocated sites around the north east of Bexhill should be treated holistically and assessed for their impact on ecosystem services (NPPF paragraphs 109, 114 and 117). There must be a strategic approach to the development of these sites to ensure that ecological networks are retained across the sites.

Policy BEX1
We support the protection of the adjacent ancient woodland and the retention of the tree line through the centre of the site, as shown in the detailed map. However, this protection does not appear to be repeated in the policy wording. Additionally, the 'Key constraints/opportunities' section recognises that the land along the Combe stream to the north-west of the site should be retained as an amenity/wildlife corridor. Again, this is not reflected in policy wording. If requirements are not included in the policy, we are concerned that they may be disregarded at the application stage. This could also lead to confusion for developers and inconsistency in the decision making process. Therefore, policy BEX1 should be strengthened to include:
 A buffer of at least 15 metres to the ancient woodland
 The retention of the central belt of trees and enhancements to create a robust corridor between the ancient woodland and the wider countryside.
 The retention of the land along the Combe stream as an amenity/wildlife corridor
The Trust supports the retention of the central tree belt; however, the proposed access appears to sever this corridor. We recommend that the access is reconfigured to ensure the corridor is preserved in its entirety. If this is not deemed feasible wording should be added to ensure that the tree belt still functions as and ecological corridor.

It is vital that any green infrastructure within the site connects well to the surrounding area. We recommend additional wording in section (iv) to insure this:
'landscape and woodland belts are developed, implemented and connected to the wider landscape as an integral part of proposals'.

QUESTION 27: Do you agree with the preferred sites for housing development at Bexhill? If not, which site(s) should be preferred?

The Trust questions whether the district's natural capital is able to absorb this level of development around Bexhill. Before finalising site allocations, especially larger greenfield sites around the development boundary, we recommend that the council assesses the capacity of these sites to provide ecosystem services. We take this opportunity to highlight to the council that the Sussex Biodiversity Record Centre are now able to run a programme called Eco serve which uses biodiversity and habitat data to look at the ecosystems services the natural capital is currently providing and where the demand for those services are in relation to population. We suggest that this might be a useful evidence base for the council to consider.
QUESTION 28: Do you agree with the requirements of Policy BEX2? If not, how would you wish to see it amended?

General comment
As per our comments for QUESTION 26, site BEX2 should be assessed strategically with allocation BEX1 and BEX3. Overall, these allocations cover a significant area of greenfield, which will be providing vital ecosystem services to the district. The cumulative impact of these allocations on the district's natural capital needs to be assessed and accounted for to ensure that the expansion of Bexhill is truly sustainable as per the NPPF. Additionally, any green infrastructure strategy should cover all these sites to ensure permeability throughout the developments and multifunctional benefits across the north east of Bexhill are achieved.

Policy BEX2
As per our comments for QUESTION 26, we are concerned that some of the intentions in the 'Key constraints/opportunities' section and the detailed map are not reflected in the policy wording. We recommend that policy BEX2 is strengthened to include:
 A buffer of at least 15 metres to the ancient woodland
 Part (ii) should include a requirement for the pond to be retained as an ecological feature with landscaping to connect it to the wider countryside

QUESTION 29: Do you agree with the requirements of Policy BEX3? If not, how would you wish to see it amended?

Notwithstanding our general comments in QUESTIONS 26 and 28, if development is to occur here then option 1 would be preferable. This would retain a larger proportion of greenfield and allow more creative approaches to green infrastructure and ecological enhancements. We recommend that information on the site's utilisation and delivery of ecosystem services should be produced and used to inform the site's layout.

The Trust is concerned that the now approved North Bexhill Access Road severs the ghyll woodland at Kiteye Wood.

Any development in this area should seek to mitigate this impact through appropriate habitat creation and/or management. Additionally, the policy should make reference to the retention of the land along the Combe stream as an amenity/wildlife corridor, as per policy BEX1. These requirements could be included in part (vii) of the policy, which we support.

As with previous comments the wording to protect ancient woodland should be strengthened to include a requirement for a 15 metre buffer.

We also recommend that the policy protects the 'Woodland Complex at Buckholt Farm' Local Wildlife Site, to the north east of the site allocation. Whilst it sits outside the development boundary, this ancient woodland could still be harmed by the indirect impacts of the development. These need to be assessed and avoided at the master planning stage.

QUESTION 33: Do you agree with the requirements of Policy BEX7? If not, how would you wish to see it amended?

The Trust supports the retention of the southern section of the site as an ecology area. However, the wording of section (iv) should be strengthened to include a requirement to enhance the area as per core strategy policy EN5. We recommend:
'The southern section of the site remains undeveloped as an ecology area. Ecological enhancements should be implemented to improve the area for biodiversity. Provision should be made for the long term management of this area.'
QUESTION 35: Do you agree with the requirements of Policy BEX9? If not, how would you wish to see it amended?

The Trust supports the retention of the tree belts in the centre of the site, the designation as a natural green space and the wording of part (vi). However, it is not clear to us how this corridor will be retained intact given that vehicle access is only proposed from the east of the site. This indicates that internal roads will sever the corridor in order to access the residential area in the North West. This should be a consideration in designing the layout of the site. At the very least we recommend wording to ensure that the integrity of the green corridor is maintained.

We support the inclusion of section (vii), however this should be strengthened with a requirement for the ancient woodland buffer at least 15 metres wide.

Additionally, it should be specified that the pond is retained as an ecological feature, rather than as part of any SuDS scheme for the site.

QUESTION 36: Do you agree with the requirements of Policy BEX10? If not, how would you wish to see it amended?

The Trust supports requirement (ii), however this should be expanded to specify that integration includes an integrated scheme of green infrastructure to ensure that the entire site remains permeable and receives multifunctional benefits.
The words 'where possible' should be removed from part (v). The pond should be retained and enhanced; this cannot be seen as unduly onerous given the site of the scheme.

QUESTION 37: Which of the development options for Northeye do you prefer? Should other options be considered?

Any policy for this site must include protections against the potential negative impacts of the creation of sports pitches such as flood lighting and impermeable surfaces. We recommend wording is included to ensure that there are no harmful impacts of this type of development.

QUESTION 38: Do you agree with the requirements of Policy BEX11? If not, how would you wish to see it amended?

This policy should include wording to manage the type of playing pitches which might be suitable on this site. Consideration should be made to the use of artificial pitches and associated lighting. In particular, potential impacts on bats which are likely to be present in the area should be considered.

QUESTION 43: Do you agree with the requirements of Policy BEX15? If not, how would you wish to see it amended?

The 'Key constraints/opportunities' section states that 'a large proportion of the site suffers from surface water flooding'. Therefore, we recommend that an additional criterion is added to the policy to ensure that a SuDS scheme is implemented to rectify this issue. We also recommend that green infrastructure is included to both help with the flooding issue and to connect the site to the wider GI network in the town.

QUESTION 47: Do you agree with the preferred site for housing development along the Hastings Fringes? If not, which site(s) should be preferred?

The Trust supports the allocation of brownfield sites of low ecological value over the allocation of greenfield sites. A large amount of development is already proposed for the fringes of Hastings through the Hastings Development Management Plan. We would not support any further urban sprawl into the surrounding countryside without full accounting of the area's natural capital and assessment of the area's utilisation and delivery of ecosystem services.

QUESTION 49: Do you agree with the preferred sites for employment development along the Hastings Fringes? If not, which site(s) should be preferred?

The Trust does not support further urban sprawl at the Hastings fringe; however of the four sites recommended, the preferred sites seem to be the least damaging. As stated previously we recommend that preliminary ecological appraisals are carried out before sites are formally allocated to ensure that there is no significant harm to biodiversity.

Additionally, a wider green infrastructure plan should be required, covering both of these sites in conjunction with the adjacent Hasting allocations to ensure a holistic approach.

QUESTION 50: Do you agree with the requirements of Policy HAS2? If not, how would you wish to see it amended?

We recommend that point (iv) is strengthened as follows to ensure net gains to biodiversity as per the NPPF:
'provision is made, in conjunction with the adjoining employment allocations, for the retention, enhancement and long-term future management of woodland to the north of the site for the benefit of biodiversity'.

QUESTION 51: Do you agree with the requirements of Policy HAS3? If not, how would you wish to see it amended?

We support criterion (iv), however any green infrastructure should be integrated into the surrounding employment allocations, to ensure multifunctional benefits are seen across the whole area.

QUESTION 53: Do you agree with the requirements of Policy HAS5, including the boundary as defined in the Policies Map? If not, how would you wish to see it amended?

We recommend an addition to criterion (ii) to ensure net gains to biodiversity as per the NPPF.
'...the Site of Nature Conservation Importance within it, and creates net gains to biodiversity within the Park...'

QUESTION 54: Do you agree with the recommendation regarding the Hastings Fringes development boundaries? If not, please explain how you wish the development boundaries to be applied to this area?

The Trust strongly supports the designation of a strong development boundary which prevents further urban sprawl into the wider countryside. (Please see QUESTION 47).

QUESTION 56: Do you agree with the requirements of Policy BEC1? If not, how would you wish to see it amended?

We support requirement (iii), but would recommend the addition of 'for the benefit of biodiversity' to ensure that any tree and hedgerow planting contributes to the wider ecological network of the district.

QUESTION 57: Do you agree with the requirements of Policy BEC2? If not, how would you wish to see it amended?

We recommend that the policy is strengthened to better reflect the contents of the 'Key constraints/opportunities' section. In particular, reference should be made to the requirement to keep the remaining area as amenity land and to the retention of the pond as an ecological feature rather than as part of any SuDS scheme deemed necessary.

QUESTION 59: Do you agree with the preferred sites for development at Broad Oak? If not, which site(s) should be preferred?

The Sussex Wildlife Trust strongly supports the exclusion of sites containing ancient woodland and/or designated for their biodiversity value such as BO14. To allocate such sites would be contrary the policies within the Rother Core Strategy.

QUESTION 60: Do you agree with the requirements of Policy BRO1? If not, how would you wish to see it amended?

The Trust strongly supports the wording of requirement (v) and the specification of a buffer of at least 15 metres. We recommend that this wording is replicated in other policies for sites adjacent to ancient woodland.

We support requirement (iv), but would recommend the addition of 'for the benefit of biodiversity' to ensure that any tree and hedgerow planting contributes to the wider ecological network of the district.

QUESTION 61: Do you agree with the requirements of Policy BRO2? If not, how would you wish to see it amended?

We support requirement (iii), but would recommend the addition of 'for the benefit of biodiversity' to ensure that any tree and hedgerow planting contributes to the wider ecological network of the district.

QUESTION 65: Do you agree with the requirements of Policy CAM2? If not, how would you wish to see it amended?

This policy needs to be strengthened to ensure that the adjacent Local Wildlife Site, Local Geological Site, SSSI and Special Protection Area are protected from harm. Whilst the protection and management of the dunes is a key landscape and ecological objective of the SPD, there does not appear to be a specific requirement to protect and enhance these designated sites. This should be addressed in the policy.

QUESTION 66: Do you agree with the proposed development boundary? If not, how would you wish to see it amended?

The Trust strongly supports the deletion of the SSSI from the development boundary. Dungeness, Romney Marsh & Rye Bay SSSI is of national importance to biodiversity and should not be degraded through encroaching development.

QUESTION 68: Do you agree with the requirements of Policy CAT1? If not, how would you wish to see it amended?

The 'Key constraints/opportunities' section states that buffer planting should be informed by ecological surveys, however this requirement is not reflected in the policy wording. Given that the site appears to contain well developed scrub, any application for this site must include a thorough ecological survey to assess if the site can absorb the level of development suggested whilst producing net gains for biodiversity.

QUESTION 69: Do you agree with the requirements of Policy CAT2? If not, how would you wish to see it amended?

Requirement (iii) should be subject to ecological surveys to assess the impact of severing the hedgerow. We also recommend that 'for the benefit of biodiversity' is added to the end of requirement (iv)(b) to ensure that any tree and hedgerow planting contributes to the wider ecological network in Catsfield.

QUESTION 72: Do you agree with the requirements of Policy HUR1? If not, how would you wish to see it amended?

As the stream/ditch that sub-divides the two lower fields is recommended to be retained for both heritage and ecological reasons, this should be reflected in the policy. We recommend that requirement (vii) is amended to:
'...is retained and incorporated within the layout as an ecological feature. Development should ensure that the biodiversity value of the feature is enhanced and that it is integrated into the wider blue/green infrastructure plan for the site...'

QUESTION 73: Do you agree with the requirements of Policy HUR2? If not, how would you wish to see it amended?

This site is adjacent to Hurst Green Meadows and Woodland Local Wildlife Site. This should be acknowledged in the policy and a requirement to protect and enhance the LWS should be included.

QUESTION 76: Do you agree with the requirements of Policy IDE1? If not, how would you wish to see it amended?

We strongly support the requirement for an ecological assessment. This assessment should inform the design and layout of the development to ensure the site remains permeable to species. Opportunities to incorporate biodiversity gains throughout the development should be taken.

QUESTION 79: Do you agree with the requirements of Policy NOR1? If not, how would you wish to see it amended?

Enhancements to the existing tree belts should be sought for the benefit of biodiversity.

QUESTION 82: Do you agree with the requirements of Policy PEA1? If not, how would you wish to see it amended?

The Trust strongly supports the protection of the traditional orchard and the aims to bring it into long-term sustainable management. This is a priority habitat and as such its protection and enhancement is fundamental to the council's aims in the Core Strategy. We strongly support requirement (v) and recommend that there is a requirement for a long-term ecological monitoring and management plan for the site.

Requirement (vi) should include 'enhancement' as well as retention to ensure net gains to biodiversity. We also recommend that the requirement for a SuDS scheme is included in the policy.

QUESTION 83: Do you agree with the proposed development boundary? If not, how would you like to see it amended?

The Trust strongly supports the exclusion of the traditional orchard from the development boundary. This will help to protect the site in the long term.

QUESTION 84: Do you agree with the preferred site for development at Rye Harbour? If not, which site should be preferred?

The Trust strongly supports the exclusion of sites designated as SSSI. These would clearly not be suitable for development and their allocation would be contrary to the Core Strategy and NPPF.

QUESTION 85: Do you agree with the requirements of Policy RHA1? If not, how would you wish to see it amended?

The site is also adjacent to the SPA and this should be acknowledged in the policy. We recommend that requirement (iv) is extended as follows:
'...development of RH10 does not adversely impact upon the Rye Harbour SSSI and avoids impacts on the SPA'.

QUESTION 86: Do you agree with the proposed development boundary? If not, how would you like to see it amended?

It appears a typo is included in paragraph 15.98. The reference to Donsmead, Station Road should be removed.

We support the proposed development boundary as it should prevent further development encroaching onto sites designated for their biodiversity value.

QUESTION 87: Do you agree with Policy RHA2 regarding the Harbour Road Industrial Estate and the proposed boundary changes? If not, how would you wish to see it amended?

Given the ecological sensitivity of the land surrounding this allocation, we recommend that requirement (iii) is strengthened as follows:
'...a comprehensive landscaping strategy and an ecological monitoring and mitigation plan to improve the overall appearance and the biodiversity value of development.'

QUESTION 88: Do you agree with the preferred sites for development at Westfield? If not, which site(s) should be preferred?

The Sussex Wildlife Trust strongly supports the exclusion of sites containing ancient woodland and/or designated for their biodiversity value. To allocate such sites would be contrary the policies within the Rother Core Strategy.

QUESTION 89: Do you agree with the requirements of Policy WES1? If not, how would you wish to see it amended?

We strongly suggest the policy includes wording relating to up to date ecological surveys and boundary features working for the benefit of biodiversity are incorporated as per our general comments at the start of this section. Further to this, as identified in the 'Key constraints/opportunities' section, the previous ecological appraisals suggested biodiversity gains. The Trust strongly supports the inclusion of wording to support biodiversity gains but seeks that these are not limited to bird and bat boxes. Instead biodiversity gains should be implemented depending on the findings of the up to date ecological surveys submitted at the time of the application. We remind the council that if they are minded to suggest bird and bat boxes as part of the gains for this site in future, wording should be included to highlight the need to incorporate natural features supporting these artificial homes.

QUESTION 90: Do you agree with the requirements of Policy WES2? If not, how would you wish to see it amended?

We strongly suggest the policy includes wording relating to up to date ecological surveys and boundary features working for the benefit of biodiversity are incorporated as per our general comments at the start of this section. The aerial photograph shows the degraded formal gardens and it would be interesting to see if this allocation could consider how these former gardens might be integrated into the layout of the development site, as it may enable the retention of features of interest.

QUESTION 91: Do you agree with the requirements of Policy WES3? If not, how would you wish to see it amended?

The southern section of the allocations lies within the Hasting Fringes Biodiversity Opportunity Area (BOA). We strongly support the requirement for an ecological assessment. This assessment should inform the design and layout of the development to ensure the site remains permeable to species.

Opportunities to incorporate biodiversity gains throughout the development as per the ecological surveys and aspirations of the BOA should be taken.

QUESTION 92: Do you agree with the requirements of Policy WES4? If not, how would you wish to see it amended?

We note this allocation falls outside the 2006 development boundary. However, we are supportive of measures taken to encourage modes of sustain able transport and to interlink those benefits with biodiversity gains. The text accompanying the allocated site states that there are locally present protected species. Therefore we recommend that (iii) reads:
'ecological improvements are based on up to date ecological surveys and are implemented in accordance with these findings and those of the Hasting Fringes Biodiversity Opportunity Area and Rother Green infrastructure Strategy'.

Question 93 - 103

We support the retention of gaps between settlements. While these gaps are often retained for reasons of coalescence and visual sensitivities, we highlight that the Sussex Wildlife Trust also sees the need to recognise the importance of these green gaps in delivering ecosystem services to the local communities (NPPF section 109).

QUESTION 105: Do you agree with the requirements of Policy GYP1, including the boundary as defined on the Policies Map? If not, how would you wish to see it amended?

We strongly suggest the policy includes wording relating to up to date ecological surveys and boundary features working for the benefit of biodiversity are incorporated as per are general comments at the start of this section.

QUESTION 109: Do you agree with the requirements of Policy (MAR1)? If not, how would you wish to see it amended?

We support the requirement for an ecological survey. We recommend that criterion (i) includes 'for the benefit of biodiversity' and the criterion (iv) requires the use of SuDS.

QUESTION 110: Do you agree with a policy to support the continued allocation for the re-instatement of the railway link from Robertsbridge to Bodiam along its original route?

The Sussex Wildlife Trust support sustainable modes of transport. However, we do not have enough information about this particular scheme to offer an opinion on this policy. It is unclear whether the application has been progressed with the consideration of the existing landowners and the level to which biodiversity interests have been considered.

QUESTION 111: Do you have any comments on this scope or content of the new Local Plan that are not covered by other questions?

We highlight the need for a specific Ancient Woodland Policy as per section 117 of the NPPF.
'Planning permission should be refused for developments resulting in the loss or deterioration of irreplaceable habitats, including ancient woodland and the loss of aged or veteran trees found outside ancient woodland unless the need for, and benefits of, the development in that location clearly outweighs the loss.'

We welcome the inclusion of the green infrastructure study as an evidence base for the local plan. We would like to know if this will progress into a clear strategy identifying delivery mechanisms. We suggest that the local plan may benefit from a specific policy on green infrastructure/ecological networks to ensure consistent integration of this infrastructure within development.

Should you have any further questions regarding our consultation response please feel free to contact me.

Yours sincerely,
Laura Brook
Conservation Officer

Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 23466

Received: 20/02/2017

Respondent: Natural England

Representation Summary:

RVR1

Priority habitats
- Coastal and floodplain grazing marsh; within part of the proposed route (west end)
- deciduous woodland: within part of the proposed route (adjacent to original railway, where new route will re-join it, to east of Junction Road).

Impact on these habitats needs to be considered and if necessary, appropriate mitigation measures specified.

Full text:

RVR1

Priority habitats
- Coastal and floodplain grazing marsh; within part of the proposed route (west end)
- deciduous woodland: within part of the proposed route (adjacent to original railway, where new route will re-join it, to east of Junction Road).

Impact on these habitats needs to be considered and if necessary, appropriate mitigation measures specified.

Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 23691

Received: 20/02/2017

Respondent: East Sussex County Council

Representation Summary:

Archaeology

OTHER POLICIES Page 337
Rother Valley Railway

Yes, although consideration must be given to archaeological costs in recording the industrial / railway archaeology - GREEN

Full text:

Archaeology

Please note that for most answers in this section a Red, Amber or Green rating has been assigned. In providing these responses, regard has been had to paragraph 169 of the NPPF. We are of the view that in order to satisfy this part of the NPPF, some of the proposed site allocations should be subject to archaeological assessment prior to the Pre-Submission version of the DaSA being published - these particular sites are identified below. For all the proposed allocations there will be a requirement for the subsequent planning applications to satisfy paragraph 128 of the NPPF

OTHER POLICIES Page 337
Rother Valley Railway

Yes, although consideration must be given to archaeological costs in recording the industrial / railway archaeology - GREEN

Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 23776

Received: 20/02/2017

Respondent: East Sussex County Council

Representation Summary:

Ecology

OTHER POLICIES Page 337

Rother Valley Railway

The policy should be amended to state that appropriate mitigation, compensation and enhancement for ecological impacts will be provided.

Full text:

Ecology

OTHER POLICIES Page 337

Rother Valley Railway

The policy should be amended to state that appropriate mitigation, compensation and enhancement for ecological impacts will be provided.

Comment

Development and Site Allocations (DaSA) Local Plan - Options and Preferred Options

Representation ID: 23986

Received: 18/02/2017

Respondent: Mr William Tinkler

Representation Summary:

I support the application.

*I believe the economic benefit to the local area will be significantly enhanced.
*The link to National Rail will be able to travel to the new connected line by rail.
*The progress so far attained by extending the existing KESR past Bodiam and the sensitive development of the railway at Robertsbridge show the commitment in a professional and responsible manner.
*KESR is an experienced operator, there are no concerns that this expertise can be transferred to the extension.
*Concerns relating to flooding and road crossings have been addressed.

Full text:

The reasons why I support the application is as follows:

*I believe the economic benefit to the local area already demonstrated by the Kent and East Sussex Railway will be significantly enhanced by the joining up with the Rother Valley Railway. The connection will extend the line and make the railway more attractive to visitors and also increases the possibility of having guest locomotives at Robertsbridge.
*The link to National Rail that has already been put in place with wonderful support from that organisation will provide an environmental benefit in that visitors will be able to travel to the new connected line by rail, thus reducing traffic in and around Bodiam and Tenterden. Further environmental benefit will be gained by the possibility of moving material such as heavy track ballast by rail rather than road to the connected railway thus relieving traffic movements further.
*The progress so far attained by extending the existing Kent and East Sussex Railway past Bodiam and the sensitive development of the railway at Robertsbridge show the commitment of the Rother Valley Railway to both implement and finance the scheme in a professional and responsible manner.
*With the Kent and East Sussex Railway being an experienced operator, there are no concerns that this expertise can be transferred to the extension once the line is open.
*The concerns relating to flooding and road crossings have been professionally addressed and no longer provide an obstacle to the scheme.